View original document

The full text on this page is automatically extracted from the file linked above and may contain errors and inconsistencies.

Union Wages and Hours
Building Trades
July 1,1976
U.S. Department of Labor
Bureau of Labor Statistics
1977




Union Wages and Hours:
Building Trades
July 1,1976
U.S. Department of Labor
Ray Marshall, Secretary
Bureau of Labor Statistics
Julius Shiskin, Commissioner
1977
Bulletin 1972




For sale by the Superintendent of Documents, U.S. Government Printing Office
Washington, D .C . 20402
Stock N o. 029-001-02049-0




Preface
The Bureau of Labor Statistics conducts annual surveys of wage rates and weekly straighttime hours for specified crafts or jobs as provided in labor-management agreements in the
construction, printing, local transit, and local trucking industries. A biennial survey of grocery
stores also is included in this program. Wage rates and hours presented are those in effect July
1, as reported to the Bureau by the appropriate labor organization officials in each of the
surveyed cities.
Preliminary listings of union wage rates and hours for construction employees in each city
were issued earlier. Copies of these are available from the Bureau of Labor Statistics, Wash­
ington, D.C. 20212, or any of its regional offices listed on the inside back cover of this
bulletin.
This study of construction wage rates was conducted in the Bureau’s Office of Wages and
Industrial Relations. This bulletin was prepared by Mark Sieling in the Division of Occupa­
tional Wage Structures. It provides a comprehensive account of the current study and includes
indexes of union wage rates for building trades employees for 1907-76. Field work for the
survey was conducted by the Bureau’s Assistant Regional Commissioners for Operations.
Material in this publication is in the public domain and may be reproduced without
permission of the Federal Government. Please credit the Bureau of Labor Statistics and cite
the name and number of the publication.




iii




Contents
Page
Summary
.......................................................................................................................................................................................... 1
Industry characteristics
................................................................................................................................................................. 1
Wage trends
..........................................................................................................................................................................................2
Trade averages ......................................................................................................................................................................................2
Regional and city averages ............................................................................................................................................................. 2
Fringe b e n e f i t s ..................................................................................................................................................................................4
Wage rates by type of c o n stru c tio n ................................................................................................................................................. 4
Weekly h o u r s ......................................................................................................................................................................................4
Chart: Average hourly wage rates for journeymen as a percent of rates for helpers and laborers,
all building trades, 1907-76 .............................................................................................................................................................. 3
Text tables:
1. Annual percent increases in average union hourly wage rates, all building trades, 1966-76 ...................................... 2
2. Wage rates, benefits, and benefits as a proportion of total hourly wages and benefits, all
building trades, 1966-76 .............................................................................................................................................. 4
Reference
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.

20.

tables:
Wage rate indexes: United States
.................................................................................................................................. g
Wage rate indexes by trade: United S t a t e s ...................................................................................................................... 7
Weekly hours indexes: United S t a t e s .............................................................................................................................. 9
Weekly hours indexes by trade: United S t a t e s ......................................................................................................... j 0
Average wage rates and employer contributions to funds by trade: United States ............................................... 12
Cents-per-hour and percent changes in average wage rates by trade: United S t a t e s ............................................... 13
Cents-per-hour changes in wage rates by trade: United S ta t e s .................................................................................... 14
Percent changes in wage rates by trade: United S t a t e s ................................................................................................ 15
Wage rate distribution by trade: United S t a t e s ............................................................................................................ 16
Weekly hours: United States ........................................................................................................................................ 17
Average wage rates by trade: Regions
........................................................................................................................ lg
Average wage rates plus employer contributions to funds: Regions ........................................................................ 19
Cents-per-hour and percent changes in average wage rates by trade: Regions
........................................................20
Average wage rates and employer contributions to funds: Selected cities by
population g r o u p ..................................................................................................................................................... 22
Average wage rates and employer contributions to funds: Selected cities by region
........................................... 23
Average wage rates and employer contributions to funds, journeymen, and laborers:
Selected cities by population g r o u p ........................................................................................................................ 24
Average wage rates and employer contributions to funds, journeymen, and laborers:
Selected cities by r e g i o n ............................................................................................................................................ 26
Cents-per-hour and percent changes in average wage rates: Selected cities by
population g r o u p ........................................................................................................................................................ 28
Cents-per-hour and percent changes in average wage rates: Selected cities by region ............................................29
Wage rates, hours, and employer contributions to funds: Selected cities ................................................................ 30

Appendix: Scope and method of s t u d y ........................................................................................................................................... 134




v




Building Trades, July 1, 1976

Workers covered by this study were union members pri-

marily engaged in construction of commercial and residen­
tial buildings.3 These workers are generally employed by
two types of firms: (1) General contractors, who may per­
form a wide variety of tasks in the construction of build­
ings, including site management; and (2) special trades con­
tractors, who are primarily engaged in one type of activity,
such as carpentry, electrical work, or painting. Special
trades contractors usually do jobs on a subcontract basis for
general contractors. Both kinds of contractors are usually
small, and employ workers in only a few of the building
trades.
Of the 33 trades included in survey averages, the largest
by far was carpenters, accounting for about one-fourth of
the union membership within the scope of the survey.
Other numerically important trades include building la­
borers—the largest of the helper/laborer categories-brick­
layers, electricians, painters, pipefitters, plumbers, and
sheet-metal workers.4
Union workers in the construction industry are organ­
ized into craft groups that have local jurisdiction over spe­
cific types of work, such as carpentry or plumbing. Unions
whose pay scales are reported in this survey are affiliated
with the Building and Construction Trades Department of
the AFL-CIO. Die largest of these affiliates is the United
Brotherhood of Carpenters and Joiners of America.
Although, usually the craft organization is highly local­
ized, there are multitrade and national or regional elements
to bargaining. For example, the same union often organizes
two allied trades or more, such as bricklayers and stone­
masons, painters and paperhangers, and reinforcing and
structural iron workers. Certain unions, such as the Inter­
national Brotherhood of Electrical Workers, have nation­
wide clauses reflected in their local contracts. Others, like
elevator constructors, tie their rates to an average of those
for several key trades in a locality. Also, in some parts of
the country, such as California, several trades bargain to­
gether in areas covering all or part of a State or States.

1 Beginning in 1976, a new city sample was selected from cities
with 100,000 to 500,000 inhabitants; the probability selection pro­
cess resulted in the addition o f 20 cities not previously studied, the
deletion of 24 cities, and the retention of 20 cities from that size
group. The 26 cities with at least one-half million inhabitants were
also retained. Trends for 1975-76 were linked to the existing index
using the new city sample; 1976 averages also reflect the new sam­
ple.
2 The Construction Industry Stabilization Committee (CISC) was
established on March 29, 1971, to review proposed wage and fringe
benefit increases in the construction industry. The CISC’s authority
expired
Apr. 30, 1974.

3Wage rates for workers in heavy and highway construction are
shown in table 20. These rates, however, were not used in calculat­
ing any of the indexes or averages in other tables in this bulletin.
Also excluded from the survey indexes and averages are wage rates
for operating engineers shown in the building construction section
o f table 20.
4 For a more detailed account of the characteristics of the con­
struction industry, see Industry Wage Survey: Contract Construc­
tion, September 1972, Bulletin 1853 (Bureau of Labor Statistics,
1975), pp. 1-6, and Contract Clauses in Construction Agreements,
Bulletin 1864 (Bureau of Labor Statistics, 1975).

Summary

Average union wage rates for building trades workers
increased 6.5 percent between July l, 1975, and July 1,
1976, in cities of at least 100,000 inhabitants.1 Excluding
1971 through 1973, when wage controls were in effect, this
increase was the smallest annual gain since a 5.6-percent
increase was reported in 1966-67.2 By comparison, a 7.3percent increase was reported for the July 1975-76 period
in the Bureau’s Hourly Earnings Index which covers pro­
duction and nonsupervisory workers in private nonfarm in­
dustries.
The July 1975-76 average increase for journeymen was
6.5 percent, compared with 6.6 percent for helpers and
laborers, on the national level. Wage rates for journeymen
averaged S9.92 an hour on July 1, 1976; helpers and la­
borers averaged S7.54 an hour.
Regionally, average wage rates were highest in the Mid­
dle Atlantic and Pacific States, and lowest in the Southwest
and Southeast. When cities were grouped by population
size, the average was highest for the size group containing
the six largest cities (those with at least 1 million inhabi­
tants) and lowest for the groups of smaller cities studied
(100,000 to 250,000 inhabitants). Among regional and city
size groupings, however, considerable overlapping of city
averages was noted.
Employer contributions to insurance, pension, and vaca­
tion funds continued to increase in relative importance. On
the average, these contributions accounted for 17 percent
of the total 1976 wage and benefit package—nearly two and
one-half times the corresponding 7-percent figure for 1965,
the first year that benefits were included in the survey.

Industry characteristics




1

1976—11.7 percent -reflecting in part wage gains of 11 per­
cent or more reported in Corpus Christi, Dallas, Fort
Worth, and Houston. The smallest average increase among
the regions was 3.2 percent in New England with about
one-half of all workers studied in that region reporting in­
creases of less than 3 percent. Table 13 shows, however,
that the increases by trade varied considerably within indi­
vidual regions. (For changes in scales by city, see tables 18
and 19.)
Over the past 50 years the gap between the (standard­
ized) wage rates6 of skilled and unskilled union workers in
the building trades has lessened fairly constantly. In 1925,
the wage rates of building trades journeymen were 93 per­
cent above those of unskilled workers; in 1976, the differ­
ential was 32 percent, (chart).7 This differential was the
same as in 1975, reflecting a stable relationship between the
two groups during the 12 months ended July 1, 1976.

T ext table 1. Annual percent increases in average union
hourly wage rates, all building trades, 1966-76

Year

July to July:
1966-67 ......... .................
1967-68 ...........................
1968-69 ...........................
1969-70 ...........................
1970-71 ...........................
1971-72 ...........................
1972-73 ...................... .. .
1973-74 ...........................
1974-75 ...........................
1975-76 ...........................

Ail
building
trades
workers

Journeymen

Helpers
and
laborers

5.6
6.6
8.3
11.6
11.8
6.4
5.0
7.8
8.6
6.5

5.6
6.7
8.4
11.4
11.6
6.6
4.8
7.6
8.7
6.5

5.7
6.4
7.6
12.5
12.7
5.4
5.7
9.1
8.0
6.6

Wage trends

Wage rates advanced an average of 6.5 percent between
July 1, 1975 and July 1, 1976, for the 33 building trades
classifications studied. This increase, which amounted to
6.5 percent for journeymen and 6.6 percent for helpers and
laborers, raised the wage rate index (1967=100) for all such
trades to 200.5 (table 1).
Excluding the 1971-73 period, when the size of wage
increases was monitored and controlled by the Construc­
tion Industry Stabilization Committee, the 6.5-percent in­
crease during the July 1, 1975-76 period was the smallest
since a 5.6-percent increase was recorded in 1966-675 (text
table 1).
Between 1966 and 1976, wage rates advanced at an aver­
age annual rate (compounded) of 7.7 percent—an annual
rate of 8.7 percent in the first half of the period and 6.8
percent in 1971-76.
During the year ended July 1, 1976, wage rates increased
for slightly less than nine-tenths of the workers studied.
Slightly more than three-tenths of the workers had gains of
2 percent and under 6 percent; one-fourth, between 6 and 8
percent; and three-tenths, 8 percent or more (tables 7 and

Trade averages

Union wage rates in the building trades averaged $9.48
on July 1, 1976 (table 5). Journeymen averaged $9.92, and
helpers and laborers $7.54.
All but about 4 percent of the union members covered
by the study were under collective bargaining agreements
providing wage rates of between $6.50 and $12 an hour;
the middle 50 percent of the array fell between $8.69 and
$10.48.
Among the journeymen classifications studied, average
wage rates were highest for pipefitters ($10.63) and eleva­
tor constructors ($10.61) and lowest for slate and tile
roofers ($9.16), and glaziers ($9.23). Average hourly rates
for the nine helper-laborer classifications studied ranged
from $7.88 for marble setters’helpers to $5.90 for composi­
tion roofers5helpers. As shown in table 9, wage rates within
each trade were widely dispersed.
Regional and city averages

8 ).

Among the trades studied, the largest percentage in­
creases were reported for slate and tile roofers—9.9 percent,
and boilermakers—9.3 percent (table 6). Average increases
for the journeyman trades typically were between 6 and 8
percent; for helpers and laborers, they usually were be­
tween 5 and 7 percent. Wage indexes for selected trades are
shown in table 2.
The Southwest region reported the largest average an­
nual wage rate increase between July 1975 and July
5
Information on a somewhat more limited scale indicates
the pace o f construction increases slowed somewhat over the 6
months following the July 1, 1976, annual study. The Bureau’s
quarterly survey of seven major building trades showed an average
increase of 5.8 percent over the year ended Apr. 1,1977. The trades
included in the survey account for almost two-thirds of the member­
ship in the 33 trades within the scope of the annual study.




Among the nine regions studied, average wage rates were
highest in the Pacific ($9.98) and Middle Atlantic ($9.98)
regions, and lowest in the Southwest ($8.18) and Southeast
($8.26) (table 11). When fringe benefit payments were
6 To minimize the effects o f changes in membership composition
o f the 2 major groups, journeymen’s wages and helpers’ and la­
borers’ wages were “standardized” by weighting the 1967 average
wage rates for these 2 groups by levels of their wage indexes
(1967=100) in the years being studied. For example, the standard­
ized wage rate for journeymen in 1976 was computed as follows:
that $5.09 (wage in 1967) weighted by 200.3 (index for 1976) yields
$10.20, the comparable figure for helpers and laborers, $3.83,
weighted by 201.9 yields $7.73. The differential is thus 32 percent.
7For details on the relationship of journeymen’s wages to those
of helpers and laborers from 1907 to 1968, see “Wage Differentials
in the Building Trades,” Monthly Labor Review, October 1969, pp,
14-17.

2




Average hourly wage rates for journeymen as a percent of rates for
helpers and laborers, all building trades, 1907-76.
Percent

1907

1912

1917

1922

1927

1932

1937

1942

1947

1952

1957

1962

1967

1972

1976

added to wages (table 12), the percentage differentials be­
tween highest paying and lowest paying regions grew from
22 to 43 percent, reflecting, in part, relatively smaller em­
ployer contributions to benefit funds in the lower paying
regions.
When cities were grouped by population size, average
rates and wages plus employer benefit payments were high­
est for cities of at least 1 million inhabitants, and lowest for
cities having populations of 100,000 to 250,000 (table 14).
However, city size seemed less important than other fac­
tors, such as location or variation in bargaining power
among union locals, in determining wage rates. For ex­
ample, 12 of the 20 cities in size group IV (100,000 to
250,000) had average wage rates higher than the $9.11 for
Houston-one of the six largest cities.
When the cities were grouped by region, the importance
of location was apparent. For example, the average wage
levels for the four California cities studied in the smallest
size group were all higher than the regional averages re­
ported in all but the Pacific Coast, Great Lakes, and Middle
Atlantic States (table 15). Tables 16 and 17 show wage and
fringe benefit averages for journeymen and helpers and la­
borers in the selected cities, grouped by population size and
by region, respectively.

Text table 2. Wage rates, benefits, and benefits as a
proportion of total hourly wages and benefits, all building
trades, 1966-76

Year

Wage
rate

Benefit

Wage rate
plus
benefit

Benefit as
percent
of rate
plus benefit

All building trades
1 9 6 6 ___
1967....
1 9 6 8 ___
1969....
1 9 7 0 ___
1 9 7 1 ___
1 9 7 2 ___
1973....
1974. . . .
19 7 5 ___
1 9 7 6 ___

$4.59
4.83
5.14
5.54
6.18
6.88
7.27
7.62
8.14
8.88
9.48

$0.39
0.44
0.54
0.64
0.80
0.95
1.06
1.21
1.45
1.68
1.95

1 9 6 6 ___
1 9 6 7 ___
19 6 8 ___
1969....
1970....
19 7 1 ___
19 7 2 -----1 9 7 3 ___
1 9 7 4 ___
1975. . ..
1 9 7 6 ___

$4.83
5.09
5.43
5.87
6.54
7.28
7.69
8.02
8.55
9.32
9.92

$0.41
0.47
0.58
0.68
0.84
0.99
1.10
1.26
1.50
1.74
2.02

$ 4.98
5.27
5.68
6.17
6.97
7.82
8.34
8.83
9.59
10.56
11.43

7.8
8.3
9.5
10.4
11.5
12.1
12.7
13.7
15.1
15.9
17.1

Journeymen

Fringe benefits. Payments to insurance, pension, and vaca­
tion funds continued to increase in relative importance
(text table 2). On July 1,1976, employer contributions for
these fringe benefits accounted for 17 percent of the wageplus-benefit average of $11.43 for all building trades work­
ers, compared with 16 percent a year earlier. This ratio
increased by 1 to 2 full percentage points over the year in
11 of the 458 cities studied separately in both periods and
by 2 or more percentage points in 4 cities; it declined in 3
of the 45 comparable cities—Dallas, Omaha, and Salt Lake
City—and, just by less than one-half of 1 percentage point.
The importance of fringe benefits to the total wagefringe package varied by geographic location. The Pacific
Coast region reported the highest proportion of fringe bene­
fits to wages plus benefits—23 percent. Each of the nine
California cities studied reported that 23 to 25 percent of
wages plus benefits were payments for insurance, pensions,
and vacations; among cities studied outside the Pacific
Coast, only in New York did the proportion reach the 23percent mark. Benefit payments were typically least signifi­
cant for cities in the Southeast, the Southwest, and in the
Border States, usually making up between 7 and 12 percent
of the overall package.

$ 5.24
5.55
6.00
6.54
7.39
8.27
8.79
9.28
10.05
11.06
11.94

7.8
8.5
9.7
10.4
11.4
12.0
12.5
13.6
14.9
15.7
16.9

Helpers and laborers
1966....
1967 . . . .
1968....
19 6 9 ___
1 9 7 0 ___
19 7 1 ___
1 9 7 2 ___
1973 . . . .
1 9 7 4 ___
19 75___
1 9 7 6 ___

$3.67
3.83
4.05
4.33
4.86
5.43
5.68
6.06
6.53
7.06
7.54

$0.30
0.36
0.42
0.49
0.61
0.78
0.92
1.02
1.25
1.44
1.64

$ 3.97
4.19
4.47
4.82
5.47
6.22
6.61
7.08
7.79
8.51
9.18

7.6
8.6
9.4
10.2
11.2
12.5
13.9
14.4
16.0
16.9
17.9

NOTE: Because of rounding, sum of wage rate and benefit may
not equal wage rate plus benefit.

and other heavy construction in each of 66 cities. Rates for
street and highway and other heavy construction projects
were usually the same as, or lower than, rates for the same
trade and city in the building sector. Differentials by type
of construction were far more common for carpenters,
cement finishers, operating engineers, and laborers than for
structural iron workers. Most local unions contacted in the
Bureau’s first heavy/highway construction survey in 1972
reported their members to be completely mobile among the
three types of construction.

Wage rates by type of construction

Table 20 presents wage rates, hours, and selected benefit
payments for unionized building trades, street, highway,

weekly hours

8 For this tabulation, Minneapolis and St. Paul were considered
as 1 city.

Straight-time houis averaged 39.3 per week on July 1,
1976, about the same as in 1975 (table 10). Slightly over




4

four-fifths of the members within the scope of the study
had straight-time schedules of 40 hours; most of the other
workers were scheduled for 35 hours. The number of




weekly hours before overtime premiums are paid has
changed very little in the past decade, as shown in tables 3
and 4.

5

Table 1. Wage rate Indexes: United States
(Indexes of union hourly wage rates in the building trades, 1 9 07-j7 6)
(1967=100)
Date

A ll trades

Journeymen

Helpers
and laborers

1907
1908
1909
1910

May
May
May
May

15
15
15
15

..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................

7.7
8.2
8.6
9.0

8.2
8.8
9.2
9.6

5.6
5.8
G.O
6.2

1911
1912
1913
1914
1915

May
May
May
May
May

15
15
15
1
1

....................................... ...................................................................................................................
..................................................., ....................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................
........... , ...................................................................................... ....................................................

9.1
9.3
9.5
9.8
9.9

9.7
9.9
10.2
10.4
10.5

6.2
6.2
6.4
6.5
6.6

1916
1917
1918
1919
1920

May
May
May
May
May

15
15
15
15
15

..........................................................................................................................................................
..........................................................................................................................................................
................................ -........................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................

10.2
10.8
12.0
13.8
18.5

10.8
11.5
12.7
14.5
19.3

6.8
7.5
8.6
10.0
14.5

1921
1922
1923
1924
1925

May
May
May
May
May

15
15
15
15
15

..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................

18.9
17.7
19.6
21.1
21.9

19.7
18.6
20.5
22.1
22.9

14.6
13.3
14.1
15.3
15.8

1926
1927
1928
1929
1930

May
May
May
May
May

15
15
15
15
15

..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................

23.4
24.2
24.3
24.6
25.7

24.5
25.3
25.5
25.3
26.9

17.2
17.5
17.7
18.0
18.9

1931
1932
1933
1934
1935

May
May
May
May
May

15
15
15
15
15

..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................

25.7
22.0
21.4
21.G
21.8

27.0
23.1
22.5
22.6
22.9

18.8
16.1
15.3
15.8
15.9

1936
1937
1938
1939
1940

May
May
May
July
July

15
15
15
1
1

...............................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................

22.5
24.1
26.3
26.5
26.9

23.6
25.2
27.5
27.6
28.0

(6.8
18.3
20.1
20.3
20.7

1941
1942
1943
1944
1945

June 1
July 1
July 1
July 1
July i

..........................................................................................................................................................
..........................................................................................................................................................
............................................................................................................ .............................................
..........................................................................................................................................................
..........................................................................................................................................................

27.9
29.6
29.8
30.1
30.7

29.0
30.7
30 8
31.0
31.6

21.7
23.8
24.1
24.3
25.5

1946
1947
1948
1949
1950

July
July
July
July
July

1
1
1
1
1

..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................

34.2
39.1
43.3
45.1
47.0

35.0
39.9
44.0
45.9
47.8

29.6
34.6
39.1
40.5
42.7

1951
1952
1953
1954
1955

July
July
July
July
July

1
1
1
1
1

..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................

50.1
53.2
55.9
58.0
60.0

50.8
53.9
56.5
58.6
60.6

45.6
48.6
52.0
54.2
56.5

1956
1957
1958
1959
1960

July
July
July
July
July

1
1
1
1
1

..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................

62.8
66.0
69.0
72.4
75.4

63.3
66.5
69.5
72.7
75.5

59.9
53.4
66.5
70.7
74.0

1961
1962
1963
1964
1965

July
July
July
July
July

1
1
1
1
1

..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................
................ .........................................................................................................................................

78.4
81.3
84.2
87.3
90.0

78.4
81.4
84.4
87.4
90.9

77.5
80.3
83.2
86 8
90.8

1966
1967
1968
1969
1970
1971

July
July
July
July
July
July

1
1
1
1
1
1

..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................
.........................................................................................................................................................
..........................................................................................................................................................

94.7
100.0
106.6
115.4
128.8
144.0

94.7
100.0
10G.7
115.7
128.9
143.9

94.6
100.0
105.9
113.9
128.1
144.4

1972
1973
1974
1975

July 1
July 1

..........................................................................................................................................................
................................................ , ........................................................................................................

153.2
160.8

153.4
160.8

152.2
160.8

July 1
July 1

..........................................................................................................................................................
..........................................................................................................................................................

1976

1 J u ly 1j "...................................................................................................................... ....................................




6

173.4
188.3

173.0
188.1

175.4
189.4

200.5

200.3

201.9

Table 2. Wage rate indexes by trade: United States
(Indexes of union hourly wage rates in the building trades, 19 07—176)
(1967=100)

Date

5
5
5
5

Carpen­
ters

Cement
finishers

E lectri­
cians
(inside
wirers)

Elevator
con­
structor

Lathers

Machin­
ists

_
-

_
-

_

_
-

Asbestos
workers

Boiler
makers

B rick­
layers

_
-

_
-

11.0
11.3
11.6
11.8

7.9
8.4
8.8
9.2

9.7
9.6
9.9
10.0

7.8
8.5
8.9
9.1

_
-

11.8
11.9
12.2
12.4
12.5

9.4
9.6
9.7
9.9
10.0

10.4
10.4
10.7
10.7
10.9

9.2
9.3
9.5
9.8
10.0

11.3
11.4

_

12.6
13.0
14.1
15.6
21.3

10.3
11.2
12.4
14.3
19.2

10.9
11.6
12.8
11,5
19.4

10.2
10.9
12.0
13.8
18.3

11.7
12.5
13.3
15.5
19.9

_
11.2
12.CX
17.3

11.2
11.6
12.5
13.9
19.9

_
-

21.1
20.5
23.3
24.6
26.0

19.3
17.9
20.0
21.3
21.8

20.1
18.7
20.4
22.6
22.7

18.9
17.8
18.5
20.6
21.7

20.9
19.5
20.8
23.3
24.4

17.7
17.7
18.8
19.8
22.0

20.2
19.0
21.0
22.6
24.6

_
-

27.6
28.3
28.5
29.1
29.9

23.4
24.1
24.3
24.6
25.6

24.2
25.3
25.0
25.0
26.6

22.9
23.8
24.1
24.5
25.5

25.6
26.6
26.9
27.0
28.3

22.3
23.8
24.1
24.5
25.6

25.3
26.3
26.4
26.2
27.3

_
-

29.8
25.5
24.9
24.9
24.6

25.7
21.0
21.0
21.3
21.7

26.8
23.4
22.9
23.1
23.2

25.9
24.7
22.6
22.6
23.7

28.4
26.4
24.5
24.7
24.7

25.8
21.6
21.5
22.8
23.0

27.1
24.4
23.5
24.1
24.4

-

22.8
24.2
26.4
26.5
27.1

23.8
25.5
27.8
28.0
28.2

24.3
25.4
28.0
28.0
28.5

24.9
25.9
29.1
29.5
30.0

23.4
25.6
27.5
27.6
27.9

24.9
27.4
29.5
30.5
30.7

_

.........
.........
.........
.........

Glaziers

_
-

_
-

-

~

1907
1908
1909
1910:

May
May
May
May

1
1
1
1

1911
1912
1913
1914:
1915

May
May
May
May
May

1 5 .........
1 5 .........
1 5 .........
1 .........
1 .........

1916
1917
1918
1919
1920

May
May
May
May
May

1
1
1
1
1

5
5
5
5
5

.........
.........
.........
.........
.........

9.8
10.3
11.6
14.1
18.3

1921
1922
1923
1924
1925

May
May
May
May
May

15
15
15
15
15

.........
.........
.........
.........

18.6
17.2
17.9
20.0
20.8

1926
1927
1928
1929:
1930

May
May
May
May
May

1
1
1
1
1

5
5
5
5
5

.........
.........
.........
.........
.........

22.2
23.3
23.5
24.6
26.0

_
-

1931
1932
1933
1934
1935

May
May
May
May
May

1
1
1
1
1

5
5
5
5
5

.........
.........
.........
.........
.........

26.2
21.9
21.8
21.8
22.1

_
-

1936
1937
1938
1939
1940

May 1 5
May 1 5
June 1
June 1
June 1

.........
.........
.........
.........
.........

23.0
24.7
27.1
27.3
27.6

_
25.7
28.3
28.6
29.0

24.7
26.5
29.2
29.4
29.9

1941 :
1942 :
1943:
1944 :
1945:

June
July
July
July
July

1
1
1
1
1

.........
.........
.........
.........
.........

28.5
30 6
30.7
30.9
31.2

29.5
31.4
31.4
31.4
31.7

30.7
31.8
31.9
32.3
33.0

27.7
29.6
29.7
30.0
30.5

29.2
30.9
31.3
31.6
31.9

29.9
31.9
32.0
32.2
32.9

30.7
32.4
32.7
32.9
33.1

28.8
30.1
30.3
30.4
31.0

1946 :
1947::
1948::
1949::
1950::

July
July
July
July
July

1
1
1
1
1

.........
.........
.........
.........
.....

34.3
38.0
42.0
45.0
47.2

34.2
38.3
42.9
45.3
47.4

36.9
42.6
48.6
51.1
52.9

34.3
39.5
43.5
44.7
46.9

35.8
40.3
45.0
46.4
48.3

35.1
39.6
43.4
47.2
48.4

35.3
40.4
44.4
47.3
49.5

1951::
1952::
1953::
1954::
1955::

July
July
July
July
July

1
1
1
1
1

.........
.........
.........
.........
.........

49.9
52.2
56.0
58.7
60.4

49.9
53.0
56.4
58.8
60.5

55.1
59.8
61.7
63.6
65.3

50.0
53.1
55.8
57.6
59.8

51.4
53.7
57.0
58.7
60.9

52.0
55.0
57.3
59.0
60.3

1956::
1957::
1958::
1959 :
1960::

July
July
July
July
July

1
1
1
1
1

.........
.........
.........
.........
.........

62.8
65.6
69.6
72 5
75 0

63.1
66.9
70.4
73.8
76.9

68.3
70.9
73.3
76.5
78.8

62.3
65.6
68.6
72.1
75.0

63.9
67.1
69.9
73.4
76.2

1961::
1962::
1963:;
1964::
1965::

July
July
July
July
July

1
1
1
1
1

.........
.........
.........
.........
.........

77.3
80.6
83.6
86.7
90.5

80.0
82.8
85.4
88.9
92.3

81.8
84.3
86.7
89.3
91.8

77,9
80.7
83.6
86.6
90.7

1966
1967
1968
1969
1970
1971

July
July
July
July
July
July

1
1
1
1
1
1

.........
.........
.........
.........
.........
.........

94.3
100.0
107.0
116.6
129.5
145.9

95.8
100.0
106.2
114.1
125.7
139.9

95.0
100.0
106.8
115.0
127.7
144.9

1972 : July 1
1973 : July 1

.........
.........

155.8
161.9

148.4
156.4

1974: July 1
1975: July 1
1976:: Ju ly 1

____
____
...

173.5
187.2

166.7
184.4

203.1

201.5

~

-




-

-

-

-

-

11.0
11.1
11.2
11.3

Mosaic
and
terrazzo
workers
_
-

-

8.5
8.5
9.8
9.0

-

11.5
11.8
13.0
15.2
20.8

_

19.7
19.3
21.8
22.8
23.2

18.3
17.8
18.2
21.5
22.6

21.4
20.0
21.9
23.1
24.4

26.1
26.6
26.7
28.6
28.7

23.1
24.0
25.2
26.4
27.6

25.9
26.7
27.2
27.1
28.7

_
-

28.8
26.4
25.6
25.4
25.6

27.9
25.9
23.6
24.0
24.0

28.7
24.3
23.8
23.5
23.5

-

24.0
25.2
28.0
28.4
28.5

24.7
26.5
28.2
28.5
28.1

_

24.8
26.4
26.5
26.7

25.7
27.2
29.5
29.6
30.1

27.3
27.8
27.9
28.1

23.4
24.8
27.9
28.1
28.2

31.9
33.3
33.3
33.6
34.0

27.3
28.7
29.4
29.6
29.6

30.2
30.7
30.9
31.2
32.4

28.7
29.7
30.2
30.6
31.2

30.4
31.4
32.0
32.3
32.7

30.0
31.3
31.4
31.8
32.0

29.1
30.7
30.9
31.1
32.1

34.1
39.2
43.0
44.4
46.8

37.8
44.0
48.1
50.0
54.7

33.0
38.1
42.1
44.4
45.1

36.0
41.0
45.8
47.5
49.2

35.3
41.4
46.1
47.5
50.0

36.3
40.6
43.9
46.2
47.8

35.6
40.6
42.9
45.2
47.0

35.0
39.1
43.3
45.3
47.2

52.3
54.3
57.9
60.1
62.3

49.1
51.4
55.0
56.6
59.2

57.2
59.2
61.9
63.6
65.2

47.9
50.0
54.3
56.5
59.1

50.8
54.5
58.2
60.1
61.5

53.2
54.9
57.6
59.9
61.7

50.9
54.2
56.8
58.5
60.9

50.1
53.1
56.4
58.3
60.7

50.1
53.1
55.6
58.6
60.0

63.6
- 66.8
70.3
72.7
76.4

64.7
67.3
70.7
73.9
76.3

62.2
65.4
68.7
72.0
75.3

68.0
70.9
73.9
76.5
79.1

61.4
63.7
67.8
71.1
73.8

64.4
68.2
70.8
73.4
76.2

64.9
68.0
70.8
74.1
76.7

63.4
66.7
69.1
71.8
74.9

63.1
67.1
69.9
72.9
75.8

62.8
66.1
69.5
72.5
75.2

79.1
81.6
84.2
86.9
90.9

79.4
83.6
86.2
89.2
91.5

79.9
82.3
86.4
89.1
92.4

78.1
80.5
83.6
86.9
90.4

81.4
84.1
86.2
89.2
92.4

76.8
79.9
83.3
86.9
90.6

78.9
81.2
84.3
87.0
90.2

79.S
82.4
85.2
88.1
91.8

77.7
80.6
84.3
87.3
90.9

78.5
81.2
83.7
87.1
90.5

78.0
80.9
83.6
86.8
90.4

94.6
100.0
107.0
115.8
128.9
141.5

94.6
100.0
106.3
114.6
127.0
143.8

94.9
100.0
106.5
117.1
130.4
148.4

95.6
100.0
104.1
110.4
124.9
141.4

95.6
100.0
107.2
115.8
130.7
145.9

95.2
100.0
106.3
115.4
128.6
147.0

95.1
100.0
105.7
111.8
121.1
135.6

94.6
100.0
106.1
113.4
124.6
138.2

95.8
100.0
105.8
112.9
124.0
136.4

94.6
100.0
106.3
115.1
126.6
139.5

94.4
100.0
107.5
117.3
131.0
145.4

94.6
100.0
106.6
115.7
129.5
145.8

153.4
159.5

150.9
160.1

154.7
161.4

158.8
164.9

152.4
159.5

156.6
165.7

155.9
165.4

148.7
156.0

148.3
154.8

143.9
150.5

152.1
160.6

155.9
• 164.1

154.0
159.5

172.3
184.0
; 194.1

172.1
187.0
198.2

176.6
189.6
201.9

175.1
193.8
206.8

166.0
183.6
200.5

178.1
192.5
205.6.

179.7
193.3
202.0

165.6
182.0
194.2

167.4
178.9
187.0

161.1
173.3
185.3

172.8
187.9
202.0

176.6
190.4

172.9
188.9
202.5

-

-

-

-

-

12.5
12.5
13.2
14.7
19.4

_
-

Pipe­
fitters

9.9
10.5
11.4
12.2
18.0

-

_
-

7.5
8.3
8.9
9.4

Paperhangers

_
-

10.3
10.5
10.7
10.9

11.5
11.5
12.2
12.3
12.5

Paint­
ers

9.6
9.7
10.?
10.4
10.5

7

_
-

Marble
setters

-

_
-

-

-

202.8

9.3
9.5
9.8
10.1
10.3
10.4
10.9
11.9
13.3
17.6
17.8
17.3
18.2
20.9
22.0
23.9
24.5
24.9
25.0
26.3
26.4
22.7
22.1
22.3
22.7

Table 2. Wage rate indexes by trade: United States— Continued
(Indexes of union hourly wage rates in the building trades, 1907- 76)
(1967=100)

Plas­
terers

Date

Plumb­
ers

Rein­
forcing
iron
w o rk­
ers

Roofers,
compo­
sition

Roofers,
slate
and
tile

Sheetmetal
workers

Stone­
masons

Struc­
turaliron
workers

9.9
10.1
10.1
10.2

8.1
8.9
9.5
10.1

1907:
1908:
1909:
1910:

May
May
May
May

1
1
1
1

5
5
5
5

.........
.........
.........
.........

12.1
12.1
12.2
12.4

9.6
9.7
9.8
9.9

_

_

_

-

-

-

-

-

-

7.8
8.0
8.0
8.3

1911:
1912:
1913:
1914:
1915:

May
May
May
May
May

15
15
15
1
1

.........
.....
.........
.........
.........

12.4
12.7
12.8
12.8
12.9

10.5
10.6
10.9
11.1
11.1

_
-

_

-

7.8
8.1

_
9.9
10.3

8.6
8.8
9.1
9.5
9.6

10.3
10.4
10.7
11.1
11.2

10.3
10.5
10.8
11.1
11.1

1916:
1917:
1918:
1919:
1920:

May
May
May
May
May

1
1
1
1
1

5
5
5
5
5

.........
.........
.........
.........
.........

13.4
13.8
14.5
16.7
21.9

11.2
11.6
12.8
15.2
18.8

_
-

8.2
8.6
9.7
10.8
15.4

10.6
11.3
12.4
14.2
18.3

9.7
10.2
11.9
13.2
17.7

11.4
11.8
12.9
14.5
20.2

1921:
1922:
1923:
1924:
1925:

May
May
May
May
May

1
1
1
1
1

5
5
5
5
5

.........
.........
.........
.........
.........

23.0
22.1
24.7
27.6
28.1

19.6
18.2
20.2
21.9
22.4

_
-

16.2
15.5
15.6
18.1
18.7

19.9
19.0
21.2
23.5
24.6

18.3
17.0
18.3
20.1
20.7

1926:
1927:
1928:
1929:
1930:

May
May
May
May
May

1
1
1
1
1

5
5
5
5
5

.........
.........
.........
.........
.........

30.1
30.7
30.9
30.4
32.0

24.1
24.6
25.1
25.4
26.4

_
-

20.3
20.9
21.3
21.7
23.0

25.4
26.6
26.6
26.9
27.8

1931:
1932:
1933:
1934:
1935:

May
May
May
May
May

1
1
1
1
1

5
5
5
5
5

.........
.........
.........
.........
.........

31.9
26.5
25.5
25.8
26.1

26.6
23.2
22.9
23.2
23.5

_

23.2
20.3
19.8
20.2
20.8

1936:
1937:
1938:
1939:
1940:

May 1 5
May 1 5
June 1
June 1
June 1

.........
.........
.........
.........
.........

26.2
28.9
32.3
32.6
32.7

24.1
25.4
28.5
28.8
29.2

_

19411942:
1943:
1944:
1945:

June 1
July 1
July 1
July 1
July 1

.........
.........
.........
.........
.........

33.3
34.2
34.3
34.5
35.0

1946:
1947:
1948:
1949:
1950:

July
July
July
July
July

1
1
1
1
1

.........
.........
.........
.........
.........

1951:
1952:
1953:
1954:
1955:

July
July
July
July
July

1
1
1
1
1

1956:
1957:
1958:
1959:
I9 6 0 :

July
July
July
July
July

1961:
1962:
1963:
1964.
1965:

Tile
layers

_

Brick
layers'
tenders

Building
laborers

Compo­
sition
roofers'
helpers
_

-

6.4
6.4
6.4
6.6

5.9
5.9
5.9
6.1

11.1
11.7
11.8
11.8

6.6
6.6
6.8
6.8
6.9

6.2
6.2
6.5
6.5
6.6

11.2
11.9
13.6
15.3
19.4

12.0
12.5
12.9
14.1
18.9

7.1
7.9
9.2
10.7
15.6

6.9
7.7
8.9
10.1
14.6

20.7
19.3
22.8
24.2
24.6

19.8
17.9
19.2
21.7
22.0

18.8
18.5
20.3
22.9
23.5

15.7
13.1
14.3
14.9
16.6

14.8
13.8
.14.1
15.7
15.0

_
-

22.2
22.8
22.4
23.2
20.2

27.1
27.5
27.8
28.6
29.0

23.6
25.2
25.3
25.5
26.9

24.6
25.8
25.7
26.0
27.2

18.2
18.6
18.6
19.4
20.2

16.5
16.6
16.6
16.7
17.6

_
-

27.8
24.2
23.6
23.4
24.1

24.7
21.4
20.8
20.9
21.1

29.2
25.9
24.2
24.1
24.1

27.2
23.6
23.3
23.6
23.8

27.5
23.7
23.0
23.0
23.2

20.0
16.6
16.4
17.5
17.0

17.4
15.0
14.1
14.6
14.8

_

24.3
26.1
27.8
28.1
28.5

21.5
23.0
25.3
25.7
26.1

24.3
26.9
29.2
29.3
29.1

24.4
26.7
28.8
29.1
29.2

23.6
25.3
27.7
27.8
27.8

17.8
19.2
21.2
21.2
22.0

16.1
17.6
18.9
19.0
19.3

_

24.1
26.4
26.7
27.0

20.9
22.6
25.0
25.1
25.6

30.5
31.8
31.9
32.1
32.8

28.4
29.6
29.8
29.9
30.6

26.7
29.1
29.2
29.4
29.8

29.2
31.8
32.0
32.2
32.9

27.4
29.8
29.9
30.1
30.4

29.9
31.6
31.7
31.9
32.7

30.6
31.6
31.7
31.9
32.4

28.2
29.6
30.0
30.3
31.3

22.7
24.5
24.7
24.9
25.8

38.7
45.4
48.3
52.8
55.2

35.5
41.1
45.5
46.9
48.0

33.7
37.9
42.1
44.0
45.8

33.2
38.6
42.7
44.7
46.6

35.7
39.7
44.1
46.5
47.6

34.2
37.7
42.3
43.6
45.7

37.1
42.4
48.6
51.5
54.7

35.3
39.6
44.2
45.8
48.0

35.4
41.4
46.3
48.4
49.4

.........
.........
.........
.........
.........

57.9
61.2
63.6
64.7
66.7

50.8
53.8
55.8
58.8
60.3

48.8
51.4
54.3
56.3
58.7

49.4
52.0
55.1
57.1
59.2

51.3
54.2
57.1
59.1
61.3

48.3
51.9
54.3
56.9
59.1

56.6
60.7
61.7
63.1
65.0

51.1
53.5
56.5
58.6
60.7

1
1
1
1
1

.........
.........
.........
.........
.........

69.2
71.7
74.0
76.4
79.6

62.9
66.4
69.3
72.9
75.3

61.4
64.8
67.4
71.0
74.2

62.2
65.4
67.8
71.3
74.6

64.5
67.7
70.9
73.9
76,8

61.8
64.7
68.3
71.6
74.8

67.9
69.9
72.5
74.9
77.4

July
July
July
July
July

1
1
1
1
1

.........
.........
.........
_____
.........

81.4
84.0
86.0
89.7
92.1

78.1
81.1
84.4
87.8
91.4

77.0
80.5
83.2
86.6
89.4

77.6
80.7
83.8
87.0
90.6

79.5
81.7
85.3
89.0
92.1

77.4
80.4
83.9
86.7
90.3

1966:
1967:
1968:
1969:
1970:
1971:

July
July
July
July
July
July

1
1
1
1
1
1

.........
.........
.........
.........
.........
.........

95.6
100.0
105.1
113.3
126.0
140.9

94.6
100.0
106.8
115.9
130.5
145.8

93.8
100.0
107.3
118.0
130.4
145.7

94.6
100.0
107.7
116.4
130.0
147.4

95.4
100.0
106.4
114.3
125.4
142.1

1972:
1973.
1974:
1975:
1976:

July
July
July
July
J u ly

1 .........
1 .........
1
____
1
....
1 . . . .]

150.9
157.5
170.5
182.7

152.8
158.8
172.7
186.7
199.6

154.9
160.8
173.1.
189.3
202.4

156.1
164.3
177.6
191.8
203.3

151.7
160.4
172.9
189.6
208.4

,195.9




-

-

-

-

-

-

-

-

-

-

-

_
_
- '
-

-

-

-

Plaster­
ers'
laborers
7.9
8.2
8.3
8.4

Tile
layers'
helpers

Plumb­
ers'
laborers
_

_

-

-

-

-

-

8.4
8.5
8.7
8.9
8.9

_
-

9.2
9.7
11.2
12.8
18.5

_

19.2
16.8
18.5
19.9
21.2

_
-

22.5
22.7
23.0
23.2
24.5

_
-

24.4
20.3
19.1
19.6
20.0

_

7.3
7.4
7.5
7.7

-

-

"

-

8.0
8.2
8.5
10.3
16.9
17.0
16.0
16.4
17.8
18.3

-

-

19.8
20.1
20.5
20.2
21.9

-

21.9
19.4
18.4
18.4
19.1

-

20.0
21.3
21.4
22.0

20.3
22.2
25.0
25.3
25.3

_
20.2
20.8
21.7

19.4
20.4
22.5
22.6
22.6

20.4
22.7
23.0
21.4
24.7

23.0
25.4
25.5
26.2
26.2

25.8
27.8
28.0
28.1
29.2

22.9
24.5
24.7
25.2
25.9

23.2
24.7
25.0
25.1
25.4

30.0
35.1
39.3
40.4
43.2

28.9
33.8
38.1
39.6
41.8

29.7
32.8
37.7
39.8
41.8

32.8
38.8
43.7
45.4
46.9

29.5
33.8
37.8
40.3
42.1

29.5
36.3
41.1
42.9
44.4

52.8
54.9
58.0
59.6
61.7

45.4
48.3
50.9
53.1
55.3

44.8
47.8
51.4
53.7
56.1

44.7
48.6
51.0
52.6
55.1

51.4
54.6
57.7
59.7
62.1

45.0
47.1
50.3
52.9
55.2

47.4
49.7
52.2
55.0
56.9

63.3
66.6
68.8
72.6
75.1

64.1
67.6
69.5
73.2
76.2

59.6
62.8
65.8
70.4
73.2

59.3
63.0
66.1
70.5
73.8

58.3
62.3
65.1
68.7
71.6

65.4
68.6
71.5
74.5
77.8

58.1
61.4
64.7
68.4
72.4

59.7
62.2
64.9
69.2
73.8

80.7
82.7
85.2
87.5
90.0

78.0
81.4
84.1
87.2
90.2

80.0
81.7
85.4
88.2
92.7

76.7
80.4
82.8
86.7
91.5

77.4
80.0
82.9
86.4
90.5

74.8
77.2
80.8
84.6
89.3

80.7
83.3
85.7
89.8
91.6

75.9
79.4
81.9
86.1
90.2

76.8
80.4
84.2
87.7
91.9

94.5
100.0
106.8
115.7
131.8
149.9

94.6
100.0
105.7
114.0
128.6
142.0

94.8
100.0
106.8
117.1
129.5
144.7

95.8
100.0
106.2
113.5
123.8
138.3

94.5
100.0
105.1
111.7
125.0
145.6

94.5
100.0
106.5
114.8
129.3
144.4

94.0
100.0
107.2
116.7
128.6
148.5

94.6
100.0
106.1
116.4
131.6
148.2

94.1
100.0
107.0
115.1
130.1
148.8

95.4
100.0
107.3
114.4
128.5
149.1

160.1
166.7
179.6
193.9
205.3

151.0
157.5
171.8
184.2
194.1

152.2
158.6
169.9
184.7
195.8

149.3
156.6
167.0
183.7.
196.6

152.3
162.5
175.3
187.2
197.9

152.2
160.5
176.1
190.7
203.3 >

159.5
169.7

156.2
166.5
179.8
193.1
208.4

157.5
166.1
180.2
192.4
204.5

159.6
167.5

8

185.6
202.5
213.0

|

180.7
193.9
206.9

Table 3. Weekly hours indexes: United States
{Indexes of union weekly hours in the building trades, 1907— 76),

Date

A ll trades

Journeymen

Helpers
and laborers

1907:
1908:
1909:
1910:

May
May
May
May

15
15
15
15

...................................................................................................................
....................................................................................................................
....................................................................................................................
....................................................................................................................

125.1
123.2
121.5
120.0

123.8
122.0
120.5
119.1

129.8
127.1
124.4
122.2

1911:
1912:
1913:
1914:
1915:

May
May
May
May
May

15
15
15
1
1

................................................................................................ ..................
...................................................................................................................
....................................................................................................................
..........................................................................................................................................................
....................................................................................................................

119.6
119.2
119.0
118.4
118,3

118.7
118.3
118.0
117.7
117.6

122.0
121.6
121.6
120.9
120.8

1916:
1917:
1918:
1919:
1920:

May
May
May
May
May

15
15
15
15
15

....................................................................................................................
....................................................................................................................
....................................................................................................................
....................................................................................................................
....................................................................................................................

117.9
117.6
117.0
116.4
115.9

117.1
116.9
116.2
115.8
115.3

120.5
120.0
119.6
118.5
117.7

1921:
1922:
1923:
1924:
1925:

May
May
May
May
May

15
15
15
1 5
15

...................................................................................................................
. . . . . ...........................................................................................................
....................................................................................................................
..................................................................................................................
...................................................................................................................

115.8
115.8
115.9
115.9
115.9

115.2
115.3
115.4
115.4
115.4

117.7
117.4
117.6
117.6
117.4

1926:
1927:
1928:
1929:
1930:

May
May
May
May
May

15
15
15
15
15

...................................................................................................................
...................................................................................................................
...................................................................................................................
...................................................................................................................
............................. .............................. ......................................................

115.7
115.5
114.8
113.8
110.6

115.2
114.8
114.0
113.3
110.0

117.1
117.1
117.0
114.7
112.1

1931:
1932:
1933:
1934:
1935:

May
May
May
May
May

15
15
15
15
15

...................................................................................................................
...................................................................................................................
....................................................................................................................
...................................................................................................................
....................................................... ...........................................................

109.3
107.3
107.0
103.0
102.2

108.5
106.6
106.2
102.3
101.5

111.2
108.7
1082
104.8
104.1

1936:
1937:
1938:
1939:
1940:

May 15
May 15
June 1
June 1
June 1

...................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................

102.2
102.6
100.9
100.7
100.6

101.5
101.9
100.1
100.0
100.0

104.3
104.7
103.0
102.8
102.2

1941:
1942:
1943:
1944:
1945:

June 1
July 1
July 1
July 1
July 1

..........................................................................................................................................................
....................................................................................................................
...................................................................................................................
...................................................................................................................
..........................................................................................................................................................

101.0
101.8
101.7
101.9
101.9

100.5
101.8
102.0
102.2
102.2

102.5
101.6
100.9
100.9
100.9

1946:
1947:
1948:
1949:
1950:

July
July
July
July
July

1
1
1
1
1

..........................................................................................................................................................
..................................................... ...................................................................................................
.........................................................................................................................................................
...................................................................................................................
.......................................................................... ............................ ..............

100.9
100.8
100.8
100.9
101.0

101.1
100.9
101.0
101.1
101.2

100.2
100.2
100.1
100.1
1001

1951:
1952:
1953:
1954:
1955:

July
July
July
July
July

1
1
1
1
1

....................................................................................................................
....................................................................................................................
....................................................................................................................
..........................................* ................................................................................................
....................................................................................................................

100.9
100.9
100.9
100.9
100.9

101.1
101.1
101.1
101.1
101.1

100.0
100.2
100.2
100.2
100.2

1956:
1957:
1958:
1959:
1960:

July
July
July
July
July

1
1
1
1
1

....................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................
..........................................................................................................................................................
...................................................................................................................

100.9
100.9
100.8
100.8
100.7

101.1
101.1
101.0
101.0
100.9

100.2
100.2
100.2
100.2
100.2

1961:
1962:
1963:
1964:
1965:

July
July
July
July
July

1
1
1
1
1

..........................................................................................................................................................
...................................................................................................................
....................................................................................................................
....................................................................................................................
..........................................................................................................................................................

100.6
100.5
100.3
100.3
100.2

100.8
100.7
100.5
100.5
100.4

100.2
100.2
100.1
100.1
100.1

1966:
1967:
1968:
1969:
1970:
1971:

July
July
July
July
July
July

1
1
1
1
1
1

..........................................................................................................................................................
....................................................................................................................
....................................................................................................................
....................................................................................................................
....................................................................................................................
....................................................................................................................

100.1
100.0
100.0
100.1
99.9
99.8

100.2
100.0
100.0
100.1
99.9
99.8

100.1
100.0
100.0
100.0
99.9
99.9

1972:
1973:
1974:
1975:
1976:

July
July
July
July
J u ly

1
1
1
1
1

..........................................................................................................................................................
...................................................................................................................
...................................................................................................................
..........................................................................................................................................................
............................................................................................... ! ...................

99.8
99.6
99.6
99.8
99.8

99.8
99.8
99.8
100.0
100.0

99.9
99.0
99.0
99.0
99.0




9

Table 4„

Weekly hours indexes by trade: United States

(Indexes of union weekly hours in each building trade, 1 9 0 7 - 76)
(1967=100)

Asbestos
workers

Date

5
5
5
5

Boiler­
makers

_

.........
.........
.........
.........

1907
1908
1909
1910

May
May
May
May

1
1
1
1

1911
1912
1913
1914
1915

May
May
May
May
May

1 5 .........
1 5 .........
1 5 .........
1
....
1 .........

1916
1917
1918
1919
1920

May
May
May
May
May

1
1
1
1
1

5
5
5
5
5

.........
.........
.........
.........
.........

1921
1922
1923
1924
1925

May
May
May
May
May

1
1
1
1
1

5
5
5
5
5

.........
.........
.........
.........
.........

114.3'
111.3
111.0
111.1
111.1

_
-

_
-

-

-

_
-

-

-

~

113.4
112.9
112.3
111.1
111.0

_
-

-

Electri­
cians
(inside
wirers)

Elevator
con­
structors

Glaziers

Lathers

_

_

-

-

~

~

B rick­
layers

Carpen­
ters

Cement
finishers

124.3
121.7
119.1
116.9

121.8
120.0
118.5
117.1

122.7
121.6
122.5
122.3

128.8
127.9
127.0
126.3

116.5
116.5
116.3
115.8
115.7

116.5
116.4
116.3
115.8
115.8

121.1
121.1
119.8
119.0
119.0

126.1
125.7
125.2
124.7
124.0

118.1
117.6

115.8
115.1
115.1
114.9
114.8

115.8
115.8
114.6
113.9
114.0

117.2
115.9
115.3
114.4
113.8

123.0
122.4
121.6
120.6
120.3

117.5
116.8
116.8
116.0
115.9

114.8
114.8
114.8
114.7
114.6

113.9
114.0
114.4
114.2
114.2

113.8
113.7
113.7
113.7
113.4

120.3
120.3
120.3
120.2
120.2

114.7
114.1
114.1
111.1
108.4

114.2
114.2
113.6
113.6
110.1

113.4
113.0
112.4
112.5
108.1

106.8
104.4
105.5
103.6
103.5

108.4
105.6
104.0
103.1
102.6

Mosaic
and
terrazzo
workers

Machin­
ists

Marble
setters

_

_
-

-

-

-

120.4
120.4
119.2
118.9

_

-

_

_

_

-

-

-

122.7
122.7
122.7
122.1

118.4
118.4
118.4
118.2
118.2

_

114.0
114.0
113.5

122.1
121.5
121.5
121.2
120.4

118.0
117.9
117.9
117.3
117.3

115.8
115.5
115.6
115.6
115.5

114.0
114.1
113.5
113.5
113.1

120.1
120.2
120.7
120.4
120.0

_
—
-

120.2
120.2
119.5
116.7
113.9

115.5
115.5
115.5
115.0
111.4

113.5
113.9
113.4
112.2
108.6

119.7
119.1
118.5
117.9
111.3

_
-

106.9
105.6
107.6
103.7
103.5

112.9
110.1
110.1
103.6
99.4

109.3
109.3
106.9
106.0
105.7

106.7
104.3
104.3
98.8
98.2

110.7
110.2
109.6
103.3
103.1

_
-

102.7
103.5
100.6
100.6
100.6

103.0
103.1
100.0
100.0
100.2

99.8
104.6
104.0
103.7
103.7

106.5
106.2
101.9
103.0
102.5

98.6
98.6
96.8
96.6
96.6

102.1
103.5
101.5
100.7
100.5

_

_
-

-

-

Paint­
ers

Paperhangers

Pipe­
fitters

127.3
125.4
123.7
122.1

_

119.0
119.0
118.7
118.0

~
_
-

-

121.2
121.1
120.4
120.2
120.2

120.1
120.1
115.7
115.7
115.7

119.3
119.2
118.7
118.5
115.1

-

117.4
116.4
117.4
117.4
117.4

115.7
115.7
115.7
115.8
115.7

115.2
116.0
115.7
115.6
115.9

_
-

117.4
117.3
117.3
117.3
111.1

115,7
115.3
115.3
115.4
109.1

115.6
115.1
111.9
111.6
110.4

_
-

109.1
108.0
107.9
106.6
106.6

108.0
103.7
105.2
105.1
104.4

109.4
109.2
109.0
95.7
95.5

_
-

101.4
100.8
100.7
100.7

106.5
108.7
106.5
106.5
101.7

103.2
104.0
101.3
101.3
101.3

95.9
95.9
96.0
95.7
96.1

93.4
92.8
92.9
93.2

103.9
104.0
98.5
98.9
98.9

-

-

-

_

~

-

117.9
117.1
116.7
115.2
115.2
114.8
114.7
113.6
113.5
113.4
113.3
113.3
113.3
113.3
113.3
113.1
112.9
112.9
112.3
107.3

1926
1927
1928
1929
1930

May
May
May
May
May

1
1
1
1
1

5
5
5
5
5

.........
.........
.........
.........
.........

111.1
111.0
111.0
110.1
106.1

1931
1932
1933
1934
1935

May
May
May
May
May

15
15
15
15
15

.........
.........
.........
.........
.........

103.5
102.2
101.1
101.0
100.2

1936 :
1937 :
1938 :
1939 :
1940 :

May 1 5 .........
May 1 5 .........
June 1 .........
June 1 .........
June 1 .........

100.5
100.2
98.5
98.5
97.9

106.3
101.0
101.0
101.0

103.5
104.6
101.1
101.2
100.9

1941 :
1942 :
1943 :
1944 :
1945 :

June 1 .........
July 1 .........
July 1 .........
July 1 .........
July 1 .........

98.5
98.6
98.6
98.6
98.6

101.5
101.6
101.6
101.6
101.6

101.1
102.0
102.0
102.0
102.0

101.2
101.4
101.4
101.7
101.7

100.7
100.6
100.6
100.6
100.6

104.3
108.4
108.4
108.4
108.4

102.2
101.9
101.9
101.9
101.9

97.2
98.6
98.6
98.6
98.6

101.4
103.3
104.2
103.8
104.4

100.5
100.5
100.5
100.5
100.5

101.9
101.9
101.9
101.9
101.9

101.6
101.6
101.6
101.6
101.6

96.4
101.9
101.9
102.2
102.2

93.7
100.4
100.4
101.2
101.2

99.5
101.1
101.1
101.1
101.1

1946
1947
1948
1949
1950

July
July
July
July
July

1
1
1
1
1

.........
.....
.........
.........
.........

99.7
99.7
100.0
100.0
100.0

99.6
99.6
101.0
101.0
101.0

101.5
101.0
101.7
101.3
101.3

100.9
100.8
100.8
100.8
100.8

100.4
100.0
100.0
100.0
100.0

104.2
104.2
104.2
105.9
105.9

101.9
101.9
101.9
101.9
101.9

98.6
100.0
100.0
100.0
100.0

103.0
103.0
98.8
98.8
101.9

100.0
100.8
100.8
100.8
100.8

101.9
101.9
102.0
102.0
102.0

101.6
100.6
102.3
102.3
102.3

101.5
101.6
101.6
101.6
101.6

101.0
101.3
101.3
101.3
101.3

100.2
100.2
100.2
100.2
100.2

1951 :
1952 :
1953 :
1954:
1955 :

July
July
Ju'y
July
July

1
1
1
1
1

.........
.........
.........
.........
.........

100.0
100.0
100.0
100.0
100.0

101.0
101.0
101.0
101.0
101.0

101.4
101.4
101.4
101.4
101.4

100.8
100.8
100.8
100.8
100.8

100.0
100.0
100.0
100.0
100.0

105.9
104.9
104.9
104.9
104.9

101.9
101.9
101.9
101.9
101.9

100.0
100.0
100.0
100.0
100.0

101.9
100.9
101.0
100.5
100.5

100.8
100.8
100.8
100.0
100.0

102.0
102.0
102.0
102.0
102.0

102.3
102.3
102.3
102.3
102.3

100.4
100.4
100.4
100.4
100.4

100.1
100.1
100.1
100.1
100.1

100.2
100.2
100.2
100.2
100.2

1956 :
1957 :
1958 :
1959 :
1960:

July
July
July
July
July

1
1
1
1
1

.........
.........
.........
.........
.........

100.0
100.0
100.0
100.0
100.0

101.0
100.3
100.3
100.3
100.3

101.4
101.4
101.3
101.3
101.3

100.8
100.8
100.8
100,8
100.8

100.0
100.0
100.0
100.0
100.0

104.9
104.9
103.4
103.4
103.4

101.9
101.9
101.9
101.9
101.9-

100.0
100.0
100.0
100.0
100.0

100.5
100.5
100.5
100.5
100.5

100.0
100.0
100.0
99.9
99.9

102.0
102.0
102.0
102.0
102.0

100.3
100.3
100.3
100.3
100.3

100.4
100.4
100.4
100.4
100.3

100.1
100.1
100.1
100.1
100.1

100.2
100.2
100.2
100.2
100.2

1961 :
1962 :
1963 :
1964 :
1965:

July
July
July
July
July

1
1
1
1
1

.........
.........
.........
.........
.....

100.0
100.0
100.0
100.0
100.0

100.3
100.3
100.1
100.1
100.2

101.3
101.3
100.0
100.0
100.0

100.8
100.8
100.8
100.8
100.6

100.0
100.0
100.0
100.0
100.0

103.4
102.1
100.9
100.9
100.3

101.9
101.9
100.0
100.0
100.0

100.0
100.0
100.0
100.0
100.0

100.5
100.5
100.5
100.5
100.5

100.1
100.1
100.0
100.0
100.0

102.0
102.1
102.0
102.0
102.0

100.3
100.3
100.3
100.3
100.3

100.2
100.2
100.2
100.2
100.2

100.1
100.1
100.1
100.1
100.1

100.2
100.2
100.2
100.2
100.1

1966 : July
1967 : July
1968 : July
1969 : July
1970 : .July
1971 : July

1
1
1
1
1
1

.........
.........
.........
.........
.....
.........

100.0
100.0
100.0
99.7
99.7
99.7

100.0
100.0
100.0
100.0
100.0
100.0

100.0
100.0
100.0
100.0
99.9
99.8

100.3
100.0
100.0
100.0
99.9
99.9

100.0
100.0
100.0
100.0
100.0
100.0

100.1
100.0
99.8
100.8
100.7
100.7

100.0
100.0
100.0
100.0
100.0
100.0

100.0
100.0
100.0
100.0
100.0
100.0

100.3
100.0
100.6
100.4
100.0
100.0

100.0
100.0
100.0
100.0
100.0
100.0

101.0
100.0
100.0
100.0
100.0
100.0

100.1
100.0
100.0
100.0
100.0
99.9

100.1
100.0
100.0
100.0
100.0
100.0

100.0
100.0
100.0
100.0
100.0
100.0

100.0
100.0
100.0
99.7
98.9
98.8

1972 :
1973:
1974 :
1975 :
1976 :

1
1
1
1
1

.........
.........
____
____
....

99.5
99.5
99.5
99.5
99.5

100.0
100.0
100.0
100.0
100.0

99.8
99.8
99.8
99.8
99.8

99.9
99.9
99.9
99.9

100.0
100.0
100.0
100.0

100.0
100.0
100.0
100.0
100.0

100.0
100.0
100.0
100.0

100.0

100.0
99.4
99.4
99.4
99.4

100.0
100.0
100.0
100.0

100.0

100.7
100.7
100.7
102.6
102.6

100.0
100.0
100.0
100.0
100.0

99.9
99.7
99.7
99.7
99.7

100.0
100.4
100.3
100.3
100.3

100.0
102.0
101.8
101.8
101.8

98.8
98.8
98.8
98.7
98.7

July
July
July
July
J u ly




-

_
-

‘

10

100.0

-

-

100.0

-

_

106.2
105.2
104.6
104.0
103.7

Table 4.

W eekly hours indexes by trade: United States— Continued

(indexes of union weekly hours in each building trade, 1 90 7 -J76)

(1967=1001

Date

Plas­
terers

Plumb­
ers

Rein­
forcing
iron
w o rk­
ers

Roofers,
compo­
sition

Roofers,
slate
and
tile

Sheet
metal
workers

Stone­
masons

Struc­
turaliron
workers

118.0
11 7.9
117.9
117.9

118.3
118.3
118.3
116.5

120.0
117.6
116.0
114.7

115.7
115.7
115.6
115.6
115.5

114.5
113.4
1T2.9
112.7
112.7

B rick­
layers'
tenders

Building
laborers

Compo­
sition
roofers'
helpers

123.6
123.6
123.2
122.2

125.2
125.2
124.8
121.8

-

110.7
113.1
113.1
112.7

121.6
120.6
120.6
119.1
119.1

121.8
121.8
121.8
121.4
121.4

Tile
layers

1907
1908:
1909
1910:

May
May
May
May

15
15
15
15

.........
.........
.........
.........

119.3
118.7
118.7
118.6

123.4
123.5
123.5
123.3

_

_

_

-

-

-

-

-

-

-

-

-

1911
1912
1913
1914
1915

May
May
Mav
May
May

15
15
15
1
1

.........
.........
.....
....
.........

119.3
117.8
117.8
117.7
117.1

123.0
122.0
122.0
121.5
121.5

_

_

-

115.2
115.2

112.4
112.4

117.6
116.1
115.9
115.8
115.6

1916
1917
1918
1919:'
1920

May
May
May
May
May

15
15
15
15
15

.........
_____
.....
.........
.........

115.9
1 15.8
115.6
115.6
115.3

120.9
120.8
119.8
119.4
119.4

_
-

115.2
114.4
113.9
113.9
113.9

112.0
110.0
110.0
109.7
109.7

115.1
115.0
113.8
113.3
112.9

115.3
115.2
115.2
114.5
114.5

112.4
112.2
111.8
111.6
111.6

112.1
111.8
111.8
111.3
111.0

119.1
119.0
119.0
118.6
118.3

120.8
119.4
118.9
116.7
115.4

_
-

123.3
123.1
123.1
122.6
122.6

1921
1922
1923
1324
1925

May
Mav
May
May
May

15
15
15
15
15

.........
.........
_____
.........
_____

115.0
115.1
115.7
115.7
114.5

119.3
119.3
119.3
119.3
119.3

_
-

111.7
111.7
111.7
111.7
111.7

109.6
109.5
109.8
109.4
109.4

112.9
112.8
112.8
112.8
112.8

114.6
114.5
114.5
114.2
114.2

111.6
111.6
111.6
111.6
111.3

111.1
110.9
111.2
111.2
111.2

118.3
118.6
118.6
118.5
118.3

115.4
114.6
115.4
115.1
115 2

_
-

122.1
122.1
122.2
122.1
122.0

1926
1927
1928
1929
1930

May
May
May
May
May

1 5 .........
1 5 .........
1 5 .........
1 5 .........
1 5 .........

112.0
115.0
110.6
109.5
107.1

119.3
119.0
119.0
118.0
112.5

111.7
111.7
111.6
111.0
106.6

109.4
109.4
109.4
108.1
103.4

112.8
112.4
112.1
112.0
107.9

114.4
114.2
114.1
110.8
106.9

111.6
111.6
111.5
111.0
107.6

111.2
111.1
110.8
110.6
104.9

118.5
118.5
118.5
111.9
112.0

115.4
115.6
115.5
115.4
113.3

1931
1932
1933
1934
1935

May
May
May
May
May

15
15
15
15
15

.........
.........
.........
.....
_____

106.2
104.4
106.5
101.9
100.4

111.0
110.6
110.1
109.0
108.2

105.3
104.2
105.5
102.8
102.7

101.7
101.7
101.7
101.3
100.0

106.0
104.5
104.4
102.9
103.0

105.0
104.6
103.8
103.3
103.2

106.3
103.7
103.4
101.9
100.7

103.5
102.4
102.2
95.3
95.3

110.6
108.2
107.6
105.6
105.5

111.9
108.0
107.6
102.9
102.8

1936
1937
1938
1939.
1940

May 1 5
May 15
June 1
June 1
June 1

.........
____
.........
.........
.........

98.7
98.8
94.8
94.8
94,6

106.8
107.4
102.1
102.4
101.3

100.3
100.3
100.2
100.2

103.3
103.4
101 6
101.7
101.3

100.9
100.8
99.6
99.6
99.5

102.9
103.0
100.9
100.9
100.9

103.2
103.2
99.8
99.8
99.7

100.6
100.1
99.0
98.9
98.9

95.2
99.3
99.3
99.3
99.3

105.3
105.6
104.3
104.0
103.9

103.3
103.6
103.1
103.0
102.4

-

-

-

-

_
_

-

__
-

_

_

Plaster­
ers'
laborers

-

-

-

126.0
125.5
125.2
125.2
125.1
124.4
124.4
124.5
124.5

Plumb­
ers'
laborers

Tile
layers'
helpers
----------------1.

_
-

-

-

-

-

_
_
-

-

_
125.7
125.1
125.1
123.2
122.8
121.8
121.8
121.4
121.4
121.6
121.6
122.7
122.7
122.7

118.0
117.9
118.2
118.1
115.0

_
-

114.1
113.8
111.9
108.5
107.2

_
-

113.0
111.6
111.7
107.0
93.1

99.9
99.9
99,9
99.6

105.4
105.4
100.5
100.2
99.8

_
103.2
103.2
100.0

93.1
99.6
99.6
99.6
99.6

"
_
-

_

-

122.7
122.7
122.7
122.1
114.2

1941 : June
1942 : July
1943 : July
1944 : July
1945 : July

1
1
1
1
1

.........
.........
.........
.........
.........

94.9
96.7
100.5
100.6
100.6

101.7
102.3
104,2
104.2
104.2

101.1
101.1
101.2
101.2
101.2

102.0
102.1
102.0
101.9
101.9

99.5
100.9
100.7
100.7
100.7

101.7
101.8
101.8
101.8
101.8

99.8
100.0
100.0
100.0
100.0

99.3
100.0
100.0
100.0
100.0

99.7
101.0
100.0
100.0
100.0

103.8
102.6
102.4
102.4
102.4

102.7
101.7
100.3
100.3
100.3

100.2
100.5
100.0
100.0
100.0

100.2
100.3
100.9
100.9
100.9

100.0
99.7
103.0
102.9
102.9

100.0
100.0
100.0
100.0
100.0

1946 :
1947 :
1948:
1949 :
1950 :

July
July
July
July
July

1
1
1
1
1

.........
.........
.........
.........
.........

98.6
97.6
97.5
98.1
100.4

100.6
99.6
99.9
99.9
100.6

100.6
100.0
100.0
100.0
100.0

101.6
101.6
101.6
100.4
100.4

100.7
100.7
100.7
100.7
100.7

101.7
101.0
101.0
100.8
100.8

99.8
99.1
100.8
100.6
100.6

100.0
100.0
100.0
100.0
100.0

100.0
100.0
100.0
100.0
100.0

100.8
100.3
100.3.
100.3
100.3

100.1
101.1
100.1
100.1
100.1

100.0
100.0
100.0
100.0
100.0

100.2
99.4
98.1
98.1
98.1

100.0
100.0
100.0
100.0
100.0

100.0
100.0
100.0
100.0
100.0

1951
1952
1953
1954
1955

July
July
July
July
July

1
1
1
1
1

.........
.........
.........
.........
.....

100.4
100.4
100.4
100.4
100.4

100.6
100.6
100.6
100.6
100,6

100.0
100.0
100.0
100.0
100.0

100.4
100.4
100.4
100.4
100.4

100.7
100.7
100.7
100.7
100.7

100.8
100.8
100.8
100.8
100.8

100.7
100.7
100.7
100.7
100.7

100:0
100.0
100.0
100.0
100.0

100.0
100.0
100.0
100.0
100.0

100.1
101.2
101.2
101.2
101.2

99.9
100.0
100.0
100.0
100.0

100.0
100.0
100.0
100.0
100.0

99.3
99.8
99.8
99.9
100.2

100.0
100.0
100.0
100.0
100.0

100.0
100.0
100.0
100.0
100.0

1956
1957
1958
1959
1960

July
July
July
July
July

1
1
1
1
1

, ____
.....
.........
.........
.........

100.4
100.4
100.4
100.6
100.4

100.6
100.6
100.6
100.6
100.6

100.0
100.0
100.0
100.0
100.0

100.4
100.4
100.4
100.4
100.4

100.7
100.7
100.7
100.7
100.7

100.8
100.8
100.8
100.8
100.8

100.7
100.7
100.5
100.5
100.5

100.0
100.0
100.0
100.0
100.0

100.0
100.0
100.0
100.0
100.0

100.1
100.1
100,1
100.1
100.1

100.0
100.0
100.0
100.0
100.0

100.2
100.0
100.2
100.0
100.0
100.2
100.0 ; 100.2
100.0
100.2

100.0
100.0
100.0
100.0
100.0

100.0
100.0
100.0
100.0
100.0

1961
1962
1963
1964
1965

July
July
July
July
July

1
1
1
1
1

.....
.........
.........
.........
.....

100.4
100.4
100.4
100.4
100.4

100.6
100.6
100.6
100.6
100.2

100.0
100.0
100.0
100.0
100.0

100.4
100.4
100.4
100.4
100.4

100.7
100.7
100.5
100.4
100.3

100.8
100.8
100.8
100.8
100.7

100.5
100.5
100.4
100.4
100.2

100.0
100.0
100.0
100.0
100.0

100.0
100X)
100.0
100.0
100.0

100.1
100.1
100.0
100.0
100.0

100.0
100.0
100.0
100.0
100.0

100.0
100.0
100.0
100.0
100.0

100.2
100.2
100.0
100.0
100.0

100.0
100.0
100.0
100.0
100.0

100.0
100.0
100.0
100.0
100.0

1966
1967
1968
1969
1970
1971

July
July
July
July
July
July

1
1
1
1
1
1

.........
.........
.........
.........
.........
.........

100.2
100.0
100.1
100.1
99.9
99.9

100.1
100.0
100.0
99.9
98.7
98.3

100.0
100.0
100.0
100.0
100.0
100.0

100.4
100.0
99.6
99,5
99.4
99.4

100.3
100.0
99.7
99.7

100.0
100.0
100.0
100.0
100.0
99.6

100.0
100.0
100.0
100.0
100.0
100.0

100.0
100.0
100.0
100.0

99.6
99.6

100.3
100.0
100.0
100.0
100.0
99.9

100.0
99.9

100.0
100.0
100.1
100.1
100.1
100.1

100.0
100.0
100.0
100.0
100.0
100.0

100.0
100.0
100.0
100.0
100.0
100.0

100.0
100.0
100.2
100.2
100.3
100.3

100.0
100.0
100.0
100.0
100.0
100.0

100.0
100.0
100.1
100.1
99.8
99.8

1972::
1973::
1974:
1975:
1976 :

July
July
July
July
J u ly

1
1
1
1
1

.........
99.9
......... 100.5
____ 100.5
100.5
....
. . . . ; 100.5

98.3
97.7
98^3
98.3
98.3

100.0
100.0
100.0
100.0
100.0

99.4
99.4
99.7
99.5
99.5

99.6
99.6
99.6
99.6
99.6

99.9
99.9
99.9
99.9
99.8

99.6
99.6
99.6
99.6
99.6

100.0
100.0
100.0
100.0
100.0

99.9
99.9
99.9
99.9
99.9

100.1
99.0
99.0
99.0
99.0

100.0
99.2
99.2
99.2
99.2

100.0
100.0
100.0
100.0
100.0

100.3
98.5
98.9
98.9
98.9

100.0
100.0
100.0
100.0
100.0




11

99.8
99.8
99.8
99.8
99.8




Table 5. Average wage rates and employer contributions to funds
by trade: United States
(A v e r a g e union h o u r ly w a g e r a te s and e m p lo y e r c o n tr ib u tio n s 1 in the b u ild in g
tr a d e s , J u ly 1, 1976)

T ra d e

A ll

b u ild in g

A v e ra g e
ra t e
per hour

A v e ra g e
e m p lo y e r
c o n tr ib u tio n 1
p e r hour

A v e r age
r a t e p lu s
e m p lo y e r
c o n tr ib u tio n 1
per hour

t r a d e s ............................

$ 9 . 48

$ 1 .9 5

J o u r n e y m e n ................................................................
A s b e s t c s w o r k e r s ............................ .............
B o i l e r m a k e r s ...................... .. ...........................
B r i c k l a y e r s ........................................................
C a rp e n te rs .. . . . . . . . . . . . . . . . . . . . .
C e m e n t f i n i s h e r s ........................................
E le c tr ic ia n s
( in s id e w i r e r s ) . . . .
E l e v a t c r c o n s t r u c t o r s .................... ..
G l a z i e r s . ................................. .................. ..
L a t h e r s ....................................... ..........................
M a c h i n i s t s ..........................................................
M a r b le s e t t e r s . .............. .. ...........................
M o s a ic a n d t e r r a z z o w o r k e r s . . . . .
P a i n t e r s ....................................... .. ......................
P ap e r h a n g e r s ................................. .. ................
P i p e f i t t e r s . ........................................... ..
P l a s t e r e r s ..........................................................
P lu m b e r s ....................... ........................................
R e i n f o r c i n g i r o n w o r k e r s ....................
R o o f e r s , c o m p o s i t i o n ...............................
R o o f e r s , s l a t e a n d t i l e .............. ..
S h e e t - m e t a l w o r k e r s . . . ..........................
S to n e m a s o n s .......................................................
S t r u c t u r a l - i r o n w o r k e r s .......................
T i l e l a y e r s ........................................................

9 .9 2
9 .7 2
10. 19
9 .9 5
9 .7 1
9 .4 2
10. 4 4
1 0 .6 1
9 .2 3
9 .6 7
9 .8 5
9 . 47
9 .6 8
9 .2 9
9 . 28
10. 6 2
9 .5 6
1 0 .2 7
9 .7 5
9 . 40
9 .1 6
1 0 .1 2
9. 9 2
10. 00
9 .3 4

2 .0 2
2. 10
2 .C 2
2 .0 0
1 .9 7
2 .0 5
1 .6 6
1 .5 8
1 .5 5
1 .5 3
. 64
1 .7 1
2 .1 1
1 .2 5
1. 49
2 .5 5
1 .6 8
2 .4 9
2 . 31
1 .7 0
1 .7 0
2 . 10
1. 65
2 .5 2
1 .7 0

1 1 .9 4
1 1 . 61
1 2 .2 1
1 1 .9 5
1 1 .6 8
1 1 .4 8
1 2 .3 1
1 2 .1 8
1 0 .7 7
1 1 .1 9
1 0 .6 9
1 1 .1 8
1 1 .7 9
10. 6 4
1 C . 77
1 3 .1 8
1 1 .2 3
12. 76
1 2 .0 6
1 1 .1 0
1 0 .8 6
12. 2 2
1 1 .7 7
1 2 . 51
1 1 .0 4

H e lp e r s a n d l a b o r e r s ....................................
B r i c k l a y e r s ' t e n d e r s ...............................
B u i l d i r . g l a b o r e r s .......................................
C o m p o s itio n r e e f e r s ' h e l p e r s . . . .
E le v a to r c o n s t r u c t o r s ' h e lp e r s . .
M a r b le s e t t e r s ' h e l p e r s ....................
P l a s t e r e r s ' l a b o r e r s ...............................
P lu m b e r s ' l a b o r e r s ............................... ..
T e r r a z z o w o r k e r s * l a b o r e r s ..............
T i l e l a y e r s ' h e l p e r s ......................... .. .

7 . 54
7 .7 9
7 .4 8
5 .9 0
7. 49
7 .8 8
7 .6 8
7 .2 9
7 .8 2
7. 81

1 .6 4
1 .4 8
1 .7 4
1 .0 4
1 .4 2
1 .5 4
1 .4 7
1 .2 1
. S3
1 .3 7

9 .1 8
9 .2 7
S. 22
6 .9 4
8 .9 1
9 .4 2
9 . 16
8. 50
6 .7 5
9 .1 8

1 In c lu d e s e m p lo y e r c o n tr ib u tio n s to i n ­
s u r a n c e ( li f e in s u r a n c e , h o s p ita liz a t io n , m e d ­
ic a l,
s u r g ic a l,
and o th e r s im i la r ty p e s of
h e a lth and w e lfa r e p r o g r a m s ) and p e n s io n funds
and v a c a tio n p a y m e n ts to a fund or to th e w o r k ­
e r s a s p r o v id e d in la b o r -m a n a g e m e n t c o n ­
t r a c t s . A v e r a g e s p r e s e n te d a r e fo r a s tr a ig h t tim e hour; in a c tu a l p r a c t ic e , h o w e v e r , s o m e
e m p lo y e r p a y m e n ts a r e c a lc u la t e d fo r to ta l
h o u r s w o r k e d o r g r o s s p a y r o ll.
A v e r a g e r e f e r s to a ll w o r k e r s in the
c la s s if ic a t io n , in c lu d in g t h o s e fo r w h o m e m ­

$ 1 1 .4 3

p lo y e r c o n tr ib u tio n s w e r e not s p e c if ie d in t h e ir
p a r t ic u la r c o n t r a c t s . S u ch s it u a tio n s w e r e i n ­
c lu d e d in th e a v e r a g e c o m p u ta tio n a s z e r o c o n ­
t r ib u t io n s .
S o m e c o n t r a c t s a l s o p r o v id e a d d itio n a l
p a y m e n ts to o th e r funds s u c h a s h o lid a y s , a p ­
p r e n t ic e s h ip , and u n e m p lo y m e n t b e n e f it s . In ­
fo r m a tio n on p a y m e n ts to t h e s e funds w a s not
c o lle c t e d .
NO TE : B e c a u s e o f rounding, s u m s of i n ­
d iv id u a l ite m s m a y not eq u a l t o t a ls .

12




Table 6. Cents-per-hour and percent changes
average in wage rates by trade: United States
(C h a n g e s in union h o u r ly w a g e r a te s in th e b u ild in g t r a d e s ,
J uly 1, 19 7 5 -J u ly 1, 1976)
Am ount o f change
J u ly 1 , 1975 to
J u l y 1 , 1976
T ra d e
C e n ts
p er hour

A ll b u ild in g

t r a d e s ............................

56

J o u r n e y m e n .................................... . ..................... ..
A s b e s t o s w o r k e r s . . . . . . . ......................
E o i l e r m a k e r s ....................................................
G r i d e la y e r s .................................................
C a r p e n t e r s . . . . . . . ......................................
C e m e n t f i n i s h e r s ...................... ............... ..
E le c tr ic ia n s
( in s id e w i r e r s ) . . . .
E l e v a t o r c o n s t r u c t o r s ............................
G l a z i e r s ...............................................................
l a t h e r s ....................................................... ..
i
M a c h i n i s t s ......................................................... i
M a r b le s e t t e r s . . . . ...........................
I
M o s a ic a n d t e r r a z z o w o r k e r s ...........
Pa i n t e r s . ................... .. ................................... ..
P a p e rh a n g e r s .....................................................
P i p e f i t t e r s .......................................................
P l a s t e r e r s ....................................................... ..
P lu m b e r s .......................................................... ..
R e in fo r c in g ir o n w o r k e r s . . . . . . . .
Boo f e r s , c o m p o s i t i o n ..............................
R o o f e r s , s l a t e a n d t i l e .......................
S b e e t - m e t a l w o r k e r s .................... ..
S to n e m a s o n s .......................................................
S t r u c t u r a l - i r c n w o r k e r s ......................
T i l e l a y e r s .................................

61
76
87
52
55
£7
65
89
£9
42
62
41
62
eh
57
71
6£
66
63
53
82
£6
51
56
61

H e lp e r s a n d l a b o r e r s ....................................
B r i c k l a y e r s ' t e n d e r s ...............................
E u i l d i n g l a b o r e r s . . . . . . . . .................
C o m p o s itio n r c o f e r s ’ h e l p e r s . . . .
E le v a to r c o n s t r u c t o r s ' h e lp e r s . .
M a r b le s e t t e r s ' h e l p e r s ......................
P l a s t e r e r s ' l a b o r e r s . . . . ................. ..
P lu m b e r s ' l a b o r e r s ....................................
T e r r a z z o w o r k e r s ' l a b o r e r s ..............
T i l e l a y e r s ' h e l p e r s . . ..........................

46
42
46
29
62
36
56
43
65
49

NO TE:
V a r ia tio n s
in
th e s iz e of annual i n c r e a s e s
fr o m s u r v e y to s u r v e y m a y
r e fle c t ,
in p a rt, tim in g of
n e g o tia tio n s in r e la tio n to the
J uly 1 s u r v e y r e f e r e n c e d a te .
In creases
in d ic a te d
r e f le c t
r a te s a v a ila b le and p a y a b le

P e rc e n t

6 .5

'
|
!
;
I
!
|
|
!

6. £
8 .5
9 .3
5 .5
e. o
6 .5
6 .7
9. 2
6. 6
4 .5
6 .7
4. 5
6. 9
7.5
6.5
7. 2
7. 2
6. S
6 .9
6 .0
9 .9
5. S
5 .4
6 .0
7. C
6. 6
£. 7
6 .6
5 .2
9 .0
4. 7
7. 5
6 .3
S-1
6 .7

on the s u r v e y d a te, and do
n o t in c lu d e in c r e a s e s m a d e
la te r th at a r e r e t r o a c t iv e to
J uly 1 o r b e f o r e . Such r e t r o ­
a c tiv e in c r e a s e s a r e in c lu d e d
in the w a g e r a te s r e p o r te d in
the fo llo w in g y e a r 's s u r v e y .

13

Table 7. Cents-per-hour changes in wage rates by trade: United States
( C e n t s - p e r - h o u r c h a n g e s in union h o u r ly w a g e r a te s and p e r c e n t of b u ild in g tr a d e s w o r k e r s a ffe c te d , J uly 1, 1 9 7 5 -7 6 )
P e rc e n t

T ra d e

P e rc e n t
of
u n io n
w o rk e rs
NO
a f f e c t e d by
change
change

$ 0 .2 0 $ 0 .3 0 $ 0 .9 0
and
On d e r u n d e r
$ 0 . 20 $ 0 . 30 $ 0 . 90 $ 0 . 5 0

t r a d e s ............................

89. 8

9. 9

3. 4

J o u r n e y m e n ................. . ..........................................
A s b e s t o s w o r k e r s ........................................
B o i le r m a k e r s .............. « . .................................
Er i c k l a y e r s ...............................................
C a r p € n t e r s ..........................................................
C e m e n t f i n i s h e r s ...................................... ..
E le c tr ic ia n s
( in s id e v i r e r s ) . . . .
E le v a t o r c o n s t r u c t o r s . . . . . . . . . . .
G l a z i e r s ................................................................
l a t h e r s ..................................................................
M a c h i n i s t s .........................................................
M a r b le s e t t e r s . . . .............. ........................
M o s a ic a n d t e r r a z z c w o r k e r s ............
P a i n t e r s .............. .................................................
F a p e rh a n g e r s ....................................................
P i p e f i t t e r s .......................................................
P l a s t e r e r s ..........................................................
P lu m b e r s ...............................................................
B e i n f o r c i n g i r o n w o r k e r s . . . ............
B o o f e r s , c o m p o s i t i o n . .........................
E o o f e r s , s l a t e a r.d t i l e .......................
S h e e t - m e t a l w o r k e r s . . . ..............
S to n e m a s o n s .......................................................
S tr u c tu r a l- ir o n w o r k e r s . . . . . . . . .
T i l e l a y e r s ............................................

9 0 .0
95. 7
99. 1
9 3 .2
87 .8
8 1. 5
85. €
1 0 0 .0
9 C .8
7 7 .9
7 3 .0
6 6 .7
9 2 .2
9 6 .1
9 6. €
96. 6
6 7 .6
9 7 .0
9 2. 6
9 2. 3
9 7 .8
8 6 .7
9 2.6
60. 6
9 8 .C

9 .7
4. 3
.9
6 .7
12. 2
1 8. 4
1*4.2
9 .2
1 9 .7
2 3. *4
30.44
6 .3
3 .9
3. *4
1 .6
1 2 .0
1 .8
7 . *4
7. 7
2 .2
13. 3
7. *4
19. 4
1 .44

2 .6
8 .0
1. 6
2 .0
3 .9
3 .9
3 .7
9 .1
.5
.5
d)

H e lp e r s a n d l a b o r e r s . .................................
E r i c k l a y e r s ' t e n d e r s . . . .............. ..
B u i l d i n g l a b o r e r s . ................................ .. i
C o m p o s itio n r o o f e r s ' h e l p e r s . . . .
E le v a to r c o n s t r u c t o r s ' h e lp e r s . .
M a r b le s e t t e r s ' h e l p e r s .................
P l a s t e r e r s ' l a b o r e r s ...............................
P lu m b e r s ' l a b o r e r s . . . . . . . . . . . . . .
T e rra z z o w o rk e rs ' la b o r e r s . . . . . .
T i l e l a y e r s ' h e l p e r s . . . . . .............

€ 9. 1
S C .4
8 8 .0
82. 5
10 C. c
7 9 .6
9 2 .5
9 9 .5
9 4. 3
65. 1

1 0 .8
9 .3
12.0
12. 6
20.1
7 .5
. 5
5. 7
1 2 .3

A ll

b u ild in g

.5
1 3 .5
1. *4
2. 6
i 8 .2
| 6 .2
; 2 .5
12. 1
2 .3
6 .44
7 .1
26 .5
2. 8
e. 1
1 .9
2 .2
7 .9
9. 7
I *4. 9

i s’2

5 .3
5. 1
44.<4
5 .1
44. 7
9 .7
2 .6
3 .1
7 .7
6. 8
1 .3
7 .2
1 2 .5
i £ .7
jl3 . 7
! 3 .44
; 2 .5
! 8. 0
i (D
i
.5
I 1 .0
i 1 2. t
6 .6
(D
1 3 .2

7 .6
6. 9
1 .6
11.4*
44. 9
3. C
6 .1
5 .3
5 .7
8. 1
i
! 10.44
| 2 .9
i 18. 9
1 5 .9
■ 6. C
1 2. 1
8. C
: 1 C .7
I 7 .5
3 .9
! 5 .2
: 5 .9
! 5 .8
j 1 1 .2

1 0 .7
6 .3
5 .9
2 .3
£. 9
1 1 .8
j 44 8 .0
9 .7
I 7 .7 ! 9 .9
111 . 9 1 3 9 . 1
6 .5
6 .2
j 2.0
9 0. 1
I 5 .1
1 1 .6
i 1 2 -3
1 3 -9

a ffe c te d

by ch an ge

of->

$ 0 .6 0

$ 0 .7 0

$ 0 . 80

$ 0 . 90 $ 1 . 0 0

$ 1. 20 $ 1- 40

$ C. 6 C $ 0 . 7 0

$ 0 .8 0

$ 0 .9 0

$1 . 0 0

$1 . 2 0

$1 .4 0

$ 1 .6 0

2. 1

1 .5

1. 4
1 .8
. 2
4 .2
.3
.0
2 .6
9 .2
.7
. 1
1 .7
.8
4 .1
2. 4
3. 4
6 .2
2 .2
. 1
1 3 .4
5 .0
. 1
. 7
. 0
. 3
.3
. 3

1 2 .7

1 5 .7

5 .8

3 .5

6. 3

1 2. 9
11 .9
1 5 .2
11. 4
1 2 .5
6 .7
5 .6
2 3 .5
19. 3
2 .5
2 5 .8
12. 1
5 .4
9 .5
21 .3
1 5 .0
3. 3
1 8 .8
1 0 .6
1 8 .8
5. 2
16. 1
1 C .7
1 2 .9
7. 1

1 7 .9
1 6 .9
1 .2
2 1 .5
2 0 .9
6 .6
1 0 .8
9. 9
7. 6
6 .0
2 .9
9. 1
59. 1
1 6 .1
7 .4
2 8 .7
1 2 -5
3 3 .0
8 .6
5 .4
2 C .S
1 1 .1
1 0 .5
12. 9
7 .6

6 .1
8 .9
2 6 .3
1. 1
3 .0
5 .5
2 .5
5. 4
4 .3
1 .9
9 .7
1 .0
2 .2
1 4 .2
11. S
3. C
2 8 .3
7 .3
6 .2
5 .9
(1 )
1 6 .5
6 .7

2 .9
1 1 .2
2 .6
1 .7
3 .9
1 0 .2
3 .5
7. 9
6 .4
4 .1
1 .6
1 .9
4 .7
2 .2
1 .0
1. 1
2 .8
8 .1
2 .2
4 .2
1 .9
2 .9
4 .3

6 .8
17 . 2
35. 1
4 .6
3 .2
1 5 .7
8. 8
6 .5
4 .8
4 .0
3 .7
. 3
.3
1 4 .3
13. 1
8 .0
1 1 .7
1 -9
4. 2
9. 1
1 1 .4
4. C
5 .8
6 .0
8 .6

2 .5
3 .0
j . 8
2 .7
2. 7
6. 9
5. 6
Z .9
2 2 .7
. 6
1 .3
z .e
. 4
. 4
1 Is
3. 1
7 .C
1 .4
3. 9
.9
8 .3

1 .9
3. 8
1 .4
.2
1. 2
c. €
8 .7
1 .9
2 .3
.1
. 8
3 .C
1 .4
1 .5
1. s
.4
1. 2
3. 6
.1

1 9 .2
1 1. 1
1 5 .8
3 0 .3
1 .2
9 .9
2.C
6 .7

14. 1
9. 7
1 6 .9
1 1 .9
7 .7
13. 8
2 6 .9
1 1 .1
7 .7

8 .4
1 3 .6
7 .1
11 .6
3 .6
.7
2 0 .0
1 .9
1 3 .5
. 1

4. 3
.9
4 .9
.8
4 .5
2. 6
1 .8
5. 0
2 4 .3
4 .6

1 .8
.7
1 .7
2 .7
( D
.9
.8
1 7 .8

4 .4
5 .8
3 .5
2. 0
15. 0
. 2
1 3 .1
. 9

. z
. 8
8 .5
~

. 1
2 .6
1 .3
2 .9
2. 2

€ .9

NOTE:
t o t a ls .

14

$ 0 .5 0

w o rk e rs

15. 1
7. 7
1C. C
7 .6
1 9 .5
1 1 .6
15. C
6. S
2 2 .6
9 .6
13 .6
12 .4
1 5 .0
1 .5
8 .8
12. 5
10. 7
2 2. 0
6 .0
.9
1 5 .0
6 .7
6 .9
16. 2
2. 9
8 .6
1 2 .9
1 12.8
9 .1
i 5 .9
9 .6
9. 6
i 6 .6
8.9
! 1 .0
9 . c !I 16 .6
|1 5 .2 !1 1 8 .9
6. 8
1 5. 8
8. 8
1C. C
1 9 .C
1 5 .6
8 .1
8 .5
9. 6
1 9. 1

1 L e s s than 0. 05 p e r c e n t.




o f to ta l

1 5 .5

1 7 .5
1 8. 2
1 8 .1
5.1
1 2 .3
1 5 .9
16. 6
1 9 .5
8.1
9 .7

B e c a u s e of rounding,

* 5

$1 . 6 0
a nd
over

- 5

su m s of in d iv id u a l ite m s m a y not e q u al

Table 8. Percent changes in wage rates by trade: United States
( P e r c e n t ch a n g e s in union h o u r ly w a g e r a te s and p e r c e n t of b u ild in g tr a d e s w o r k e r s a ffe c te d , J u ly 1, 1 9 7 5 -7 b )
P e rc e n t o f t o t a l

T ra d e

P e rc e n t
of
u n io n
w o rk e rs
a ffe c te d
by
change

No
change

Less
2
th a n
and
2
under
p e rc e n t
3

w o rk e rs

a ffe c te d

3

4

5

6

7

8

10

12

14

16

18

4

5

6 *

7

8

10

12

14

16

18

20

7 .8

4 .0

3 .0

1. 1

0. 6

1. 7

7 .4
1 9 .3
1 2 .9
1 .2
4 .9
I 1 0 .5
!I 4 . 4
4 .5
! 1 0 .6
4 .0
2 6 .4
1 .9
.9
1 8 .1
1 2 .0
8 .2
1 3 .5
9 .1
1 .6
1 4 .5
5 .4
8 .7
3 .6
5 .9
1 3 .0

4 .4
1 2 .3
1 9 .1
4 .3
3 .3
1 4 .6
5 .8
1 5 .2
1 .9
.6

2 .3
1 .2
—

1 .0
3 .6
..

.2
1 .9

2 .1
4. 2
. 3

9 .9

3 .0

4 .7

6 .5

8 .1

1 1 .7

1 3 .0

1 0 .4

1 4 .2

9 0 .0
9 5 .7
99. 1
9 3. 2
Ca rp e n t e r s .......................................................... 8 7 . 8
C e ire n t f i n i s h e r s .......................................... 8 1 . 5
f le c tr ic ia n s
( in s id e w i r e r s ) . . . . 8 5 .8
E l e v a t o r c o n s t r u c t o r s ............................ 1 0 0 .0
Gl a z i e r s ............................................................... 9 0 . 8
la t h e r s . ............................................................... 7 7 . 9
M a c h i n i s t s . . . . . . . . . . . . . . . . . . . . . . 7 3 .0
Mar t i e s e t t e r s ............................................... 6 6 . 7
M o s a ic a n d t e r r a z z o w o r k e r s ............ 9 2 . 2
P a i n t e r s ................. ............................................. 9 6 . 1
P a p e r h a n g e r s .................................................... 9 6 . 6
P i p e f i t t e r s . . . ____. . . . . ____ _____ . . .
96. 6
E l a s t e r e r s ...................... .................................. 8 7 . 6
P lu m b e r s . ........................................... ................ 9 7 . 0
R e in fo r c in g ir o n w o r k e r s . . . . . . . . 9 2 .6
R o o f e r s , c o m p o s i t i o n ............................... 9 2 . 3
R o o f e r s , s l a t e a n d t i l e ....................... 9 7 . 8
S h e e t - i r e t a l w o r k e r s .................................. 8 6 . 7
S to n e m a s o n s ................................. ..
9 2 .6
S t r u c t u r a l - i r o n w o r k e r s ....................... 8 0 . 6
T i l e l a y e r s .............................. ..
9 8 .0

9 .7
4 .3
. 9
6. 7
1 2 .2
18. 4
1 4 .2
9 .2
19. 7
23. 4
30. 4
6 .3
3 .9
3. 4
1 .6
1 2 .0
1 .8
7. 4
7 .7
2 .2
1 3 .3
7 .4
19. 4
1 .4

2 .5
-

5. 1
4 .4

5. 7
1. 6
_

9 .0
2 .7
..

4 .5
4 .0
.6
1 1 .9
6 .5
4 .9
1 9 .8

1. 1
1 1 .5
1 .4
2. 8
8. 2
6. 2
4. 2
12. 1
2. 3
3 .6

6 .9
4 .7
8 .7
3. 1
1 .8
1 0 .5
8 .8
1. 3
5 .4
1. 0
2 .8
2. 5
2. 8
4. 5
8 .5
7. 3
.6
9 .9
6 .6
3 .8
9 .4

12. 9
1 0 .7
4. 7
1 7 .0
2 2 .0
9 .1
7 .1
6 .8
7. 5
8. 5
12. 5
6. 5
5. 1
9. 1
7 .4
15. 3
5 .0
5. 3
4 .0
11. 1
15. 8
7. 3
15. 4
6. 8
13. 3

1 2 .3
1 6 .1
1 5 .0
8. 8
6 .4
9. 8
1 4 .5
2 5 .3
16. 8
3 .1
2. 5
1 1 .8
1 1 .6
6 .3
23. 1
2 2 .6
9. 1
28. 8
8 .0
12. 4
5. 7
1 6 .0
1 1 .8
1 0 .4
5 .7

1 0 .0
8 .2
17. 8
2 3 .0
6 .5
4 .4
3 .3
5 .4
1 0 .4
3 .1
(1 )
9 .5
5 6 .4
8 .6
7 .0
1 2 .9
1 .9
1 7 .8
2 3 .1
1 6 .2
1 5 .5
6 .2
1 2 .3
1 3 .4
1 5 .2

1 5 .1
1 3 .5
2 5 .5
4 .5
2 2 .6
1 1 .4
7 .8
1 2 .9
1 2 .8
1 1 .5
2 9 .8
!i 11 .2
8 .3
1 5 .5
3 .8
1 1 .8
1 5 .2
6 .8
2 9 .1
7 .2
1 4 .1
1 1 .0
2 .8
1 9 .7
5 .7

H e lp e r s a n d l a b o r e r s .................................... 8 9 . 1
B r i c k l a y e r s ' t e n d e r s ............................... 9 0 . 4
Building l a b o r e r s .................... .................. 8 8 . 0
C o m p o s itio n r o o f e r s ' h e l p e r s . . . . 8 3 .5
E le v a t o r c o n s t r u c t o r s ' h e l p e r s . . 1 0 0 .0
r t a r b l e s e t t e r s ' h e l p e r s . . . .............. 7 9 . 6
E l a s t e r e r s ' l a b o r e r s . . . ....................... 9 2 . 5
P 1 u m c e t s • l a b o r e r s .................................... 9 9 . 5
T e r r a z z o w o r k e r s ' la b o r e r s - . . - . . 9 4 . 3
T i l e l a y e r s ’ h e l p e r s ............................... 8 5 . 1

1 0 .8
9 .3
1 2 .0
1 2 .6

5 .3
2 3 .2
1 .4
2 .7

2 .8
3 .4
2 .6
1 .4
1 .9
1 0 .3
5 .2
4 .7
1 .2

9 .8
5 .9
1 0 .5
6 .1
7 .6
9 .9

6 .6
7 .8
6. 1
2 6 .3
8. 1
2 .3
6 .4
5 .8
6 .2
j 7 .8

1 6 .1
9 .9
1 8 .3

1 2 .2
1 2 .3
1 3 .3
3 .3
3 .8
4 .7
3 .9
1 3 .9
9 .3
5 .9

1 0 .4
7 .0
1 0 .4
1 6 .8
15. 3
1 5 .7
1 7 .7
8 .4
2 5 .5

A ll b u ild in g

t r a d e s ............................

89. 8

J o u r n e y m e n ...............................................................
A s b e s t o s w o r k e r s .............. .. ........................

2 0 .1
7 .5

.5
5 .7
1 2 .3

8. 0
1 .6
3 .0
2. 6
3. 9
. 8
9. 1

..

1. 9
. 9
(1 )

2 .2
4 .7
9 .7

.8
4 .5

I
!
!
]
j

_

4. 5
4 .0
8. 5
16. 1
5 .0
7. 5
2. 2
7 .6
1. 8
6. 3
3. 1
2 .5
8. 2

5.9
2 5 .5
5 .4
1 3 .6

13. 5
7 .7
4 .2
1 2 .5
1 .5
6 .3
4 .2
. 4
1 0 .0
1 .1
1 9 .0
16. 4
9. 4
8 .9
4 .6
5 .8
13. 1
1 .5
8. 1
16. 1
9 .2
1 1 .5
4 .1
1 .2
4 .5
2 1 .9
!
.9
|2 5 .9
| 3 .5
5 .6

i! 1 1 . i

1 L e s s than 0 .0 5 p e r c e n t.




by change o f-

NOTE:
t o ta ls .

15

2. 2
3 2 .4
2 .3
9 .6
3 .7
5 .8
3 .1

9.5

B e c a u s e of rounding,

9 .8
5. 3
1 0 .7

4. 4
.7
15. 3
22. 9
1 0. 3
6. 2

3 .8
2 .8
2 .7
3 .6
4 .7
2 .9
_

_

1 .7
.8
1 .1
3 .6
3 .3
7 .9
3 .8
5 .9
.1
1 0 .5
.8
3 .7
4 .4
1 1 .1

.3
1 .0
2 .9
2 .4
.8

1 2 .0
j 5 .3

5 .7
5 .6
6 .4

1
1 0 .0
. 2. 4
5. 3
3 .7
13. 3
19. 1

1 .4
3 .2
3 .9
.1

!
3. 8

-

1 .4
.2
2 .4
1 .6
1 0 .6
1 .6
-

_

.1
.3
.5
.7
2 .1
2 .9
1 .9
.4
1 .0
1 .2
2 .2
.3
1 .7
1 .8
1 .3
2 .8
1 0 .4

.2

3. 1
-

3. 4

8. 8

.6

.2
.3

_
(1)
1 .2
-

_

.7
.5
1 .8
. 1
7 .0
. 1
2. 4
1 .9
2 .6
8 .5
-

20
and
over

8. 6
1 .9
.7
2 .3
. 1
1 .7
. 8
3 .0
1 .9
2 .7
6 .2
2 .2
13. 4
3. 6
. 7
. 2

1 .4
3 .0
3 .2
2 .6

s u m s of in d iv id u a l ite m s m a y not equal

Table 9. Wage rate distribution by trade: United States
( P e r c e n t d is tr ib u tio n of b u ild in g t r a d e s w o r k e r s by union h o u r ly w a g e r a te s , J uly 1, 1 976)

Percent o f

u n io n

jo u rn e y m e n

whcse

ra te s

per

hour

were-*

Average

Trade

rate
per
hour

Jour ney men.. ................ .
As test os workers..... .........
Boilermakers..................
Bricklayers...................
Carpenters....................
Cement finishers..............
Electricians..................
Elevator constructors...... .
Glaziers......................
Lathers .........
each ini sts.... ................
Barbie setters................
Mosaic and terrazzo workers....
Painters........ ..............
Pape rh angers..................
Pipefitters...................
Plasterers....................
Plumbers................... .
Fein forcing iron workers..... .
Roofers, composition..........
Foofers, slate and tile.......
Sheet-metal workers...........
Stonemason s................ .
Structural-iron workers.... .
Tile la yers ....................

$9.92
9.72
10.19
9.95
9.71
9. 42
10. 44
10. 61
9. 23
9. 67
9. 85
9. 47
9. 68
9. 29
9. 28
10.63
9.56
10.27
9.75
9. 40
9. 16
10. 12
9.92
10.00
9. 34

|$7. 40 $7.80 $ 8. 20 $8. 60 $9.CO :
$ 9. 4C $9.80 j$ 1 0 .2 0 $1 0.6 c! $11 00 $1 1.40 *11.80
i
jnder
$ 12- zU
: 7.40!
a rd
$7. 80 $8.20 $8.60 $9.00 $9-40 $9.8 0 $10. 20 $10.60 $11. 00 $11. 4 C * 1 1.80 $ 1I2.2C ever
1 .9
.2
2.9
2.5
.2
.9
.4
2.1
2.0
2.4
.1
.5
.2
13. 3
6. 4
6 .C
.0
.0
2.9
4.8

0.9
1.6
.5
2. 5
4.1
3. 1
1 .2
3.1
5.4
9. £
1.0
.7
3-3
2.5
.5
3 .5

2.6
3. 2
4.7
4.4
4- 1
.2
1.1
8.5
£.2
25. £
2.7
2.5
4. 4
2.3
oc
1 .7
7.C
2.5
.6
1.3
2.6

3. 3
6. 8 12. 6
. 3 10.5 30. 1
10.1 24.3
4.3
2.2
7.1
2.4
5.9
13.8
9. 1
6. 8 10.6
1.5
1.5 13.2
.7
5.1
12.3
2.7
16.4 17. 5
5. 8 21.0
£. 6
7. 9
6 .6 10.8
1.4
4.7
11.4
3. 9 2 9. 2 11-7
17.4 18. 1 12.9
2.2
8.4
3.6
19.0
18.4
e.3
2. 9 11-5
3.2
3. 7
9.9
15.4
7.7
3.7
14.5
6. 6 27.8
£. 1
e 10.6
4.3
7.2 ! 5.7
2.8
3.7 I 8 .5
9.6 ! 17.7
16.6
L

17. 3
14. 3
12. 1
11-3
7.6
8.2
17.8
20.9
24. S
17.8
33.7
16.5
8.7 ! 9.3
i 2.2
11.7
2 7. 7
11. 9
14.9
18.8
I 23 .C
1 C.O
9.3
| 43 .4
59. 4 i
5. 3
6.5'
I 14.7
| 9-8
6 .2
j 9.0
13.9
| 19. 2
12. 9
9.6
15.0
9.3
1 0 -2
19.5
6.3
10. 0
1 6.0
13.1
19.1
22.2
! 14.4
6.8
|28.5
S. C

13.3
15. 0
1 .7
16. 2
11.2
8.6
21 .3
12.8
8. 4
3. 4
3.6
5.2
7.7
.5
15. 1
17. £
17. 1
10.5
12.6
10. 2
13.7!
34.2
14.4
16.9

13. 2
3. 4
28. 1
23. 8
11. 2
2. 8
20. 9
19. 6
,8
16. 6
4 .0
10 . 3
4. 3
12. 8
23. 4
9. 4
1. 6
14. 4
13. 0
10. 3
2. C
10.,6
10. 6
13. 6
,1

£. 8
1 .2
6. 2
2. 8
1- 6
2 .C
3. 3
.9
1- c
2 2. 1
.1
.0
;8. £
.7
18.2
1. 5
12.7
.1
2. 3

5>. 2
5.7
.4
i. 4
8i.4
i: 1
2:.4
13I.6
.4
8
1.1
c
4L:.4
i.e
22■.9
>.8
i.e
i ;.5
14. 9
7.8

1 .7
1 .6
13.4
.4
4. 3
1£. C
.7
1.6
1. 4
.0
.2
£- 7
1.2
-6
1. 9
2.0
(1)
1- 2
1.0

1 -C
7. 2
£. £
.4
-

1.4
-

I

Per cent o f union helpers a rd

laborers whose rates per hour were-

Average
$4. 4 0 $4.80 $5.20 $ 5 . 6 0 |$6.00 $6. 40 $6. 60 $7.20 :
$7. 60 $6.00 $8..4 C *8 .8 0 $9 .20
rate
per
(Jnder a rd
*a.60
hour
$4.40 under
am
$4.8 C $5.2C $5.60 $6.00 | $6.40 $6.80 $7. 20 $7.60 ,
$8. 00 $6. 4 0 $8. eC $9. .
2C $ 9 .t0 ever
i

and l a b o r e r s ............. .
Bricklayers* tenders............

Helpers

E u i L d i i g L a b o r e r s ........................ ..
C o m p o sitio n r o o f e r s ' h e l p e r s . . . .
E le v a to r c o n s tru c to rs ' h e lp e rs ...
M a rb le s e t t e r s ' h e l p e r s . . . . . . . . .
F l as

t.e r

ers ' l a

F l nrn h e r s •

fo r ers

________....

1 aborers. . . . . . . . . . . . . .

T errazzo w o rke rs' la b o r e r s . . . . . .
T i l e l a y e r s ' h e l p e r s ............................ ..

$7. 54
7.79
7. 48

0.1
2C.5
-

5 .9 0

7. 49
7.88
7.68
7. 29
7. 82

_
.2
i

i L

-

3.7
1. 5
4. 4
19.0
(D
1. 3
5. 7
4.1
3.8

2 .(3
1 3
4.;
1
1.;3
8. !
6.'5
6.i
0

0 .7
1.0
.4
1.5
(1)
.8
2. 3
3-3

2. 9
2. 7
2.3
8.3
2.0
(1)

5. 3
6. 2
5. 1
5.4
6.0
2. 2

£_1

l. 9

93-6!

. 4

2.6 1 11.8

.6

1 -4 I

13. 0
7.6
15 2
14.0
10.0
5. 1
7.1
8 .9
7.4
4. 2

7. 6
5.8
6.8
.8
20.9
15. 2
8.9

! 21.6
| 16.7
j24 .9
7.7
15. 6
! .5
:
8. 4
I 12 . 4
2. 4 |
.8
7.9 j 11. 9

9 1.1
16.1
24. 1
1. 1
22. 7
94.1
9.7

5 .6

3. 0
4. 8

9. 1
7. 1
8 .1
8
9. 6

12. 1
14.2
1 9, 7
i
4 3 . fc

6..1
24 .0
1,

1..9
1 1..c
6 ..0
1 t) «, 1
2 fc,.4
6. _c

1.3
1 .7
1. C)
£. '
1.1
2 .5
4. 5
7. 3
.4

1 .7
1. 2
.3

1.1
1o . 1
1 1. z
1 .6

7: ! 1-

1 L e s s than 0 ,0 5 p e r c e n t.




1 .6

3. 7
1. 6
3.6
5.6
12.8
13. 3
1.8
6 .C
7.6
5.2

NO TE:
;o ta ls .

16

B e c a u s e of rou n d in g,

su m s of in d iv id u a l ite m s m a y not equal

Table 10. Weekly hours: United States
( P e r c e n t d is tr ib u tio n of u nion b u ild in g tr a d e s w o r k e r s by sta n d a r d w e e k ly h o u r s , J u ly 1, 1976)

Percent of union members having a wcrJcweek of->
weekly
hours

All building trades..........

Under
35 hours

35 hours

36 hours

Over 37.5
37.5 hours and under
40 hours

39.3

(1)

11.7

3. 1

0.7

0)

Journeymen...... .
Asbestos workers..... ..........
Boilermakers...................
Bricklayers.....................
Carpenters.....................
Cement finishers...............
Electricians (inside wirers)....
Elevator constructors...........
Glaziers...... ............ .
lathers........................
Machinists............. ........
Marble setters.......... .......
Mosaic and terrazzo workers....
Painters.......... .............
Paper hangers...................
Pipefitters........... .........
Plasterers......................
Plumbers........................
Reinforcing iron workers.......
Roofers, composition...........
Roofers, slate and tile........
Sheet-metal workers............
Stonemasons.................. .
Structural-iron workers........
Tile layers............ ........

39. 2
39.2
3 9.5
39.0
39. 2
39.6
39.2
39.5
39. 7
39.2
4 0.0
39.4
29. 5
38.7
39.0
38.9
29. 3
38.8
39.9
39.3
29. 1
39.4
3 8.8
39.9
40. 0

(1)
_
_

12.6
15.1
7.6
19. 4
13.9
8.3
14.4
10. 4
4.5
15.4

3.7
•
3 .5
_
1. 7

.9
_
3.6
1.0
_
_
2.5

.4
1.9

12. 6
1C. 6
25.8
16.4
7. 2
11.2
11.3
2.6
13. 1
1 7.4
8.9
22.9
2. 7

_
_
1 .0
5. 2
16. 9
2.0
14.5

_
_
_
_
_
_
_
.3
_
1.9

-

(1)
_
_
_
_
2.8
_
_
_
_
_
_
_
_
_
_
_
_
_
-

Helpers and laborers.............
Bricklayers* tenders...........
Building laborers............ .
Composition roofers’ helpers....
Elevator constructors' helpers..
Marble setters' helpers........
Plasterers' laborers...........
Plumbers' laborers.............
Terrazzo workers' laborers.....
Tile layers' helpers......... ..

39.6
38. 8
3 9.8
40.0
39.3
39.5
39. 7
4 C. C
39.5
40.0

7.7
22.7
4.6
.8
14. 2
9. 2
3.5

.2

_
_
_
_
_

_

_

_
_
_
_
_
_

-

-

-

_
_
_
_
_
.4
.9
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
"

10.7
.8

L e s s th an 0. 05 p e r c e n t.




1. 2
.2
_
_
Is

_
_
2.1

_
_
4.5
2. 3

_

N O TE: B e c a u s e o f ro u n d in g ,
e q u a l t o ta ls .

17

_

40 hcuis

84. 5
.

Other

(1)

82.7
84.9
8b.8
79.6
82.6
91. 7
‘ 81.5
89.6
92. 3
82. 8
1CC.0
87.4
89.4
7 2. 2
78.3
75.2
85.9
7 2. 3
97.4
85.6
82.4
86. 6
74.7
97.3
100.0

(1)
(1)
_

92.2
76. 9
95.4
SS.2
65.8
90.8
94.3
100.0
89.3
99.2

_
_
_
_
_
_
_
_
-

_
_
_
_
_
_
_
_
_

_
_
_
_
-

s u m s o f in d iv id u a l ite m s m ay not

Table 11. Average wage rates by trade: Regions
(A v e r a g e u nion h o u r ly w a g e r a te s in th e b u ild in g t r a d e s , by r e g io n , 1 J uly 1, 1976)

Region
Trade
United
States

New
E ngl an d

Middle
Atlantic

Border
States

South­
east

South­
west

Great
lakes

Middle
Vest

to untain Iacific

$9. 48

$9. 38

$9. 98

$8. 90

$ 8.26

$ 8.1 8

$9.79

$ 9.35

$8.87

$9.98

Journeymen..... ............ .
Asbestos workers................
Boil ermak ers........ ...........
Bricklayers................. .
Carpenters......... ............
Cement finishers........... .
Electricians (inside wirers)....
Elevator constructors..........
Gla ziers.......................
L at hers .......... .
Machini sts......................
Marble setters.............. .
Mosaic and terrazzo workers.....
Paint ers .................. .
Pape rh angers .. .............. .
P ipe fitters.....................
Plasterers.............. .......
Plum hers ............ .......
Reinforcing iron workers.......
Roofers, composition...........
Roofers, slate and tile........
Sheet-metal workers.......... .
S ton em asons. ...........
Structural-iron workers.... .
Tile layers........ .

9.92
9.72
10. 19
S. 95
9.71
9.42
10. 44
1C.61
9.23
9.67
9. 85
9. 47
9.68
9.29
9. 28
10.63
9.56
10.27
9. 75
9. 4 C
9.16
10.12
9. 9 2
10.00
9.34

9 .77
9. 33
10. 66
9.9 C
9 .54
9.87
10.09
10.24
9.38
9.56
9. 50
9.73
9.72
9.25
8. 92
10.35
9.39
10.27
1C. 08
9.2 5
9 .64
9.93
9. 9 5
9.67
9.73

10.48
10.32
10-6 C
1 0.63
10.39
10. 01
ii.ee
1 C.71
9.70
10.04
1C. 46
9.33
9.87
9. 24
9.21
1 C.68
9.96
10. 31
10-43
10.C7
9.81
10. 62
10 .C7
1C.72
9.16

9. 53
9.41
9.51
9.26
9.55
9. 02
1 C.OC
1 0.2 0
8-97
9. 13
1 C.4C
9.29
8.31
6. 6 4
9. C6
9.96
9.26
9.56
9.77
7 .73
7.07
9. 52
9.81
9.77
7.65

6. 72
8.62
8.8 C
9.02
8. 50
6.27
9.C6
9.25
8. 19
6. 92
9.46
8 .9 6
8. 85
6.04
8,16
9.32
8. 56
9.32
8.91
8 .26
8. 19
9.11
9.02
8.66
8.47

8. 67
9.31
9.00
8.99
8.39
8.49
9 .4 6
9.08
7. 9 9
8.5£
7.90
9.48
8.55
8.41
8.40
9.36
8. 99
8.82
7 .2 4
7.29
7.71
8.96
9.59
8.4 1
8.99

10.11
9.96
10.60
10. 18
1C.C5
9.73
10.58
11. 20
9.28
9.46
10.61
9.66
9.82
9.19
8.85
10.47
9.76
10.13
10 .66
10. 33
9. 92
10.15
10.01
10. 17
9. 61

9.77
9.56
9.59
9-49
9.64
9.46
10.20
10. 24
9.31
9.C9
9.84
8.76
8.43
9.31
9.44
10. 31
9.43
10.35
9.39
8.67
8. 65
1 0 .33
9.47
9. 20
6. 73

9. 48
9-14
10.8 1
9.72
9. C2
6.6 7
10.34
9. 93
9.23
8 .6 2
8.61
6.91
8.72
8.74
10.00
9.1C
9-79
9.87
8.77
8.4 7
9.6 7
9.85
9. 89
8.67

1 0.43
10.72
11.38,
9.88
9.90,
9.46
10. 85
11. 84
9.43
10.60
11. 14
9. 77
1C.1 7
10.36
10. 32
11. £2
9-89
11.45
10-79
9. 46
9.44
1 C.49
10.08
1C. 6C
9.98

Helpers and laborers.............
Bricklayers' tenders...........
Euilding laborers........ .
Composition reefers' helpers....
Elevator constructors' helpers..
Marble setters' helpers........
Plasterers' laborers...........
Plumbers' laborers.............
Terrazzo workers' laborers......
Tile layers' helpers...........

7. 54
7.7 9
7.48
5.90
7.49
7. 88
7.68
7.29
7.82
7.81

7. 6 3
7.73
7.5 0
7.93
7. 26
6. 70
7.75
9.77
8.66

6.19
8 .65
8.04
6. 65
7. 82
8.19
8.32
8.43
8. 65
8. 16

6.70
6.39
6.80
4.44
7.03
8.24
7.96
6. 10
6. 23
6. 17

5.82
5.74
5. 7 4
5.16
6. 5C
7.74
6.03
5. 89
£.55
£.38

5 .89
6.15
5. SC
2.70
6.37
6 .80
5.68
6.40
6.61

8 .04
8. 00
8.CO
7.20
7.76
8 .95
8. 26
8. 49
6.70
8.87

7.70
7.70
7.59
7.22
8.64
8.55
8.9 1
9.C3
7.85

6. 96
7. 6 2
6.85

7.90
6. 43
7.7 8
6.13
8.19
7. 10
9. 53
7.97
6 .56
8.10

All building trades..........

1 T he r e g io n s r e fe r r e d to in t h is stu d y in c lu d e : N ew E n g la n d —
C o n n e cticu t, M ain e, M a s s a c h u s e t t s , N ew H a m p sh ir e , F.hode Isla n d , and
V e r m o n t; M id d le A tla n tic —N ew J e r s e y , N ew Y o rk , and P e n n s y lv a n ia ;
B o r d e r S t a te s —D e la w a r e .
D i s t r i c t of C o lu m b ia , K en tucky, M a ry la n d ,
V ir g in ia ,
and W e st V ir g in ia ; S o u th e a s t—A la b a m a . F lo r id a , G e o r g ia ,
M is s i s s i p p i , N o rth C a r o lin a , South C a r o lin a , and T e n n e s s e e ; S o u th ­




18

-

6.78
7.93
7.6 5
6.71
7.01
8.04

w e s t —A r k a n sa s . L o u is ia n a , O klahom a, and T e x a s ; G r e a t L a k es—I ll in o is ,
Indiana,
M ic h ig a n , M in n e so ta , Ohio, and W isc o n s in ;
M id d le
W e s t—Iow a.
K a n sa s, M is s o u r i, N e b r a s k a , N o r th D ak ota, and South
D akota; M ountain—A r iz o n a , C o lo ra d o , Idaho, M ontana, N ew M e x ic o ,
Utah, and W y o m in g ; P a c i f i c —A la s k a , C a lifo r n ia , N ev a d a , O regon, and
W a sh in g to n . H aw aii w a s e x c lu d e d fr o m the s u r v e y .

Table 12. Average wage rates plus employer contributions to funds: Regions
(A v e r a g e union h o u r ly w a g e r a te s p lu s e m p lo y e r c o n tr ib u tio n s 1 in the b u ild in g tr a d e s by r e g io n s z, J u ly 1, 1976)

Begion
Trade
United
States

N ew
En gla nd

Midd le
Atlantic

$11.01

$12-33

Border
States

South­
east

South­
west

Great
Lakes

Middle
Best

Mount a in F a c i ± i c

All building trades........ ..

$11.'13

$9.97

$9.20

$9.0 6

$11. 69

$10. 5C

$ 10.5 1

$ 12.52

Journeymen......... ..............
Asbestos workers.... .
Eoilerna kers....................
Brickl ayers....... .............
Carpenters......... ...........
C eirert finishers-...............
Electricians (inside wirers)....
Elevator constructors..........
Glaziers........................
Lathers.................. .
Machinists........... ..........
Mar lie setters.................
Mosaic and terrazzo workers....
Painters................. ......
Pa per hangers....... ............
Pipefitt ers....................
PI a sterers....... .
Plumbers............ ...........
fieinforcing iron workers........
Boofers, composition............
Ecofers, slate and tile...... .
Sheet-petal workers............
Stonemasons.................. .
Structural-iron workers.........
Tile 1 ayers .................. .

11. 9 4
11.81
12.21
11.95
11. 6 8
11. as
12.31
12. 18
10. 77
11. 19
10.69
11. 18
11. 79
10.64
1 C.77
13. 18
11.22
12.76
12.06
11. 10
10. 86
12. 22
11 .77
12.51
11.04

11. 50
11 -€C
12.50
11. 45
10. 9 1
11.08
12.24
11.67
10. 67
1 0.56
10.16
1 1. 20
11. 16
10-69
10.06
12.31
10. 36
12.22
12.32
11. 14
11.46
12.05
11.65
12.02
11. 18

12. S3
12.29
13.18
13. 58
13.11
12.71
13.61
12. 6S
11.31
12.25
11.29
11. 16
11.77
10.52
10 .36
12. 55
11.77
12.64
13.25
12. 77
11.82
12 .S4
12.01
13. 55
11. 37

1C.70
10.69
11. 14
10.24
1 0.51
9.77
11. 22
11. 62
5.86
9.62
11. 26
10.46
5.26
9.48
10. 13
11. 51
5.61
10.95
11. 31
6.36
7.4 0
11.14
1 1.00
11.51
6. 47

9.73
10.13
10. 40
5. 6 1
9.33
8 .88
10. 51
10.63
9.11
9.41
9. 46
5.76
5.76
8.7 2
8. 7 2
1C.53
9.44
10.75
9. 8 7
5. C2
8.6 1
10.38
9. 9 2
9.53
9.31

9.62
10.75
10.50
9.74
9 .11
9.16
10.52
10.45
8.94
9.50
8. 2 5
9.80
8 .84
9.02
9. 12
11.04
9.55
9.80
6.45
7.72
8.18
9.92
10.31
9.56
S.35

12.09
12.70
12. 79
12.12
11 . 55
11. 48
12.52
12.69
10.66
11. 14
11. 54
11 .37
12 .34
10. 41
10. 20
12.71
11 .30
12.42
13. C£
12.07
11 .63
12. 15
11. €4
12.58
11.04

11.40
11. 58
11.25
11 . C6
11. C2
11. 34
11.95
11.64
11.08
9.78
11.CS
S.8C
9.08
10. 17
1C.41
13-27
10.47
12. 35
11.11
5.55
10.57
12. 08
11.26
11 .1 6
10.1 8

11.25
1 1. 1 1
13. C1
11.07
10 .79
10- 70
12.32
11 .3 4
10. 14
9. 99
9.53
9.77
10. 32
10 -C 9
1 1 .73
10.87
11. 5 3
12.11
9.7C
9.89
11. 6 2
1 1.4C
12 .12
9.65

13.3o
13. 33
13.61
12.17
12. 74
12.65
13.47
13.42
1 1.85
12. 54
12.12
12.22
12. 59
12.21
12.62
15.68
12. 7 4
15. 6 3
14.16
11.o9
11.64
13. 7 6
12.55
13.9 1
12.3a

Helpers and laborers..... ........
Bricklayers* tenders....... .
Building laborers..............
Coppcsition roofers' helpers....
Elevator constructors' helpers..
Marble setters' helpers.........
Plasterers* laborers...........
Plumbers' laborers........ .
Terrazzo workers' laborers.... .
Tile layers' helpers...........

9.18
9.27
S. 22
6. 54
8.91
9.42
9.16
8. 50
€.75
9.18

8.80
8.94
8. 68
S.5S
8.46
9.79
8.88

10.19
10. 58
10.10
6-77
9.72
10.22
10. 13
10.75
10.30
9.50

7. 36
6. 96
7.4 6
4.64
8.27
9.01
8. 81
6.65
6.63
6.51

6. 42
6.35
6.23
5.76
7.7 1
9. 15
6. 75
6.47
6.11
5.95

6.43
6.71
€ .32
2.70
7.60
7. 05
6.21
6 .90
6.96

9.55
9.41
5.5 9
8. 66
9.05
9.95
9.64
10.13
9. 43
10. 05

8.51
8.85
8.78
8. 52
8.55
S. 56
10.59
9. 35
9. C?

8.21
8.83
8.11
8. OC
9.22
8.97
7.77
8.0 2
S.C2

1C.78
11.34
10. 73
7. 4 7
5.47
9.49
12.67
10. z7
10. 54
1C.44

-

1C.12
9.75

1 S e e ta b le 5, fo o tn o te 1,




S e e ta b le 11, fo o tn o te 1.

19

Table 13. Cents-per-hour and percent changes in average wage rates by trade: Regions
(C h a n g e s in un ion h o u r ly w a g e r a te s in th e b u ild in g t r a d e s by r e g io n , 1 J uly 1,

1975-76)

Begion

Trade

New
England

United
St at es
Cents
per
hour

Percent

Cents
per
hour

Middle
Atlantic

Percent

Cents
per
hour

Percent

Border
States
Cents
per
hour

South­
east

Percent

Ce nts
per
h cur

South­
west

Percent

Cents
p er
he ui

Percent

58

6. 5

29

3.2

49

5.2

60

7.3

50

6.5

8o

11. 7

Machj.ni sts.............. .......
Marble setters.......... .
Mosaic and terrazzc workers.....
Paint ers............. .........
Pape changers....................
P ipe fitters.....................
Flast, er ers............. ........
Plum cers......... .......... .
Beinicrcing iron workers.......
Roofers, corrposition...... .
Hoofers, slate and £ile........
Sheet -metal workers........... .
S tonern ason s.... .............
Structura 1-iron workers........
Tile layers.....................

61
76
87
52
55
£7
65
89
59
42
62
41
62
64
57
71
65
66
63
53
82
56
51
£6
61

6.5
8. £
9.3
5.5
6.0
6. £
6. 7
9.2
6.8
4. 5
6. 7
4. 5
6.9
7.5
6. £
7.2
7.2
6.9
6. 9
6. 0
9.9
5.9
£. 4
6. 0
7.0

30
38
68
27
20
39
48
45
28
42
0
€5
63
28
24
47
41
48
12
40
24
21
36
5
63

3. 2
4.3
6.8
2.8
2. 1
4.1
5.C
4.6
3. 1
4. 6
.0
7.1
7.0
3. 1
2.8
4.8
4.5
4.9
1.2
4.5
2.5
2. 1
3.7
.6
7.0

56
75
72
56
49
37
60
60
38
15
6
39
59
73
6C
84
56
52
43
58
58
29
54
79
32

£. €
7.8
7.3
£. 6
4.9
3.8
5.4
6.0
4. 1
1.5
.6
4.3
6. 3
8.6
6.9
8.4
6. 0
5.3
4.3
6.1
6. 3
2.7
5.6
8.0
3.7

62
79
61
52
49
68
82
60
62
109
90
49
52
52
56
65
82
68
80
56
48
66
48
54
50

7.C
9.2
6.8
6. C
5.4
8.2
8. 9
6. 2
7. 5
13.6
9.5
5.6
6.6
6.4
6.6
7.0
9. 7
7.7
8 .9
7.8
7. 2
7.4
5.2
5.8
7.0

53
68
60
49
44
41
53
83
50
63
0
45
49
51
51
73
£6
67
56
43
6C
61
40
56
47

6.4
8.6
7.3
5.8
5.5
5.2
6. 2
5. 8
6.5
7.6
.0
5. 3
£.9
6.7
6.6
8.6
6.9
7.6
6.7
5.5
7.9
7.1
4.7
6. 9
5- 9

69
107
100
75
83
85
119
96
64
42
63
113
79
1 C6
107
74
75
83
61
49
£7
87
87
70
83

11.4
13.0
12. £
9.1
11.0
1 1. 2
14. 4
12. 1
8.6
5.1
8. 7
13. £
1C.1
14.8
14. 6
6. £
S.1
1o.3
9. 1
7. 2
6.1
1C.o
9. 9
9. 1
1C. 1

Helpers and laborers.............
Briciclayers' tenders............
Euilding laborers..............
Composition roofers' helpers....
Elevator constructors' helpers..
Marb?.e setters' helpers........
Plasterers' laborers...........
Plumpers' laborers.............
Terr azzo workers' laborers.....
Tile layers' helpers........ .

46
42
46
29
62
36
56
43
65
49

6. 6
5.7
6.6
5. 2
9.0
4. 7
7. 9
6.3
9. 1
6.7

23
17
20
17
34
35
24
115
34

3.1
2.2
2.7
2. 1
£.0
4.2
3.2

25
17
26
42
46
19
44
38
55
22

3.2
2.0
3.4
6.7
6.3
2 .4
5.6
4. 8
6.7
2. 7

54
35
59
22
59
53
68
29
39
38

8.7
5.8
9. 4
5.2
9.2
6.9
9.3
4. 9
6.7
6.6

39
34
40
21
50
39
32
46
45
41

7.3
6.3
7.6
4.5
8.3
5.2
5.7
£.4
6.7
8.3

72
72
73
20
67
92
69

14.0
13. 2
14.3
8.0
11.7
15. 6
13. 9

All. building trades..........
Journe’men ........... .
Asbestcs workers....... ........
Boilorirakers..... ............-.
Er icklayers................. .
C arp <5nters ........... .........
Cement finishers........... .
Electricians (inside wirers)....
Elevator constructors..........
Glaziers........................

-

13. 3
4.0

S e e f o o tn o te s at end of ta b le .




20

-

-

83
84

14.8
14.6

Table 13. Cents-per-hour and percent changes In average wage rates by trade: Regions — Continued
( C h a n g e s i n u n i o n h o u r l y w a g e r a t e s in t h e b u i l d i n g t r a d e s b y r e g i o n s , 1 j u h

1,

1975-76)

f

fie gi cn
G reat
La k e s

Trade
C ents
per
hour

A ll

b u ild in g

t r a d e s ..................... ................................................................... ..

J o u r n e y m e n ................... ........................................... .....................................................................................
A soe s t c s b a r k e r s - ................................. ....................................... ...................................................
B o i l e r m a k e r s . . . . . .................................................................... .......................... ..
E r i c k l a y e r s ....................................................................................
C a r p e n t e r s ................. ..............................................................................................................
Ce m e n t f i n i s h e r s ................................................................ ................................................................
............................ ............................. ..
E le c tric ia n s
( i n s i d e wix: e r s
F l e v a t o r c o n s t r u c t o r s . . . . . . . ............................................... ....................................... ..
b l a z i e r s ............................................... ..........................................................
L a t h e r s . . . ................................................................. .. ........................................ .. ................................
M a c h i n i s t s - . ......................................................................... ..
M a r b l e s e t t e r s ......................
......
M o s a i c a n d t e r r a z z c w o r k e r s . . ....................................... ........................................
P a i n t e r s . ...................................... ...................................................................................
Pape rh a n g e r s ................................... ............................. .. ................................................... ..
P i pe f i t t e r s .................................... .. .............................................. ............................................ ..
P l a s t e r e r s . . ............................................ .. ................................ ..................................................... . .
P l u m b e r s .................................... .. ........................................ .. ........................................ ..
i
P ei n f o r e i n g i ro n w o r k e r s . . . ....................................... .................. .. ................................ ..
R o o f e r s , c o m p o s i t i o n - . . . . ......................... .. ..........................................................................
P o o f e r s , s l a t e a n d t i l e ........................................................... ...............................................
S h e e t - m e t a l w o r k e r s . . . . ............................................... ........................ ..................................
S t o n em a s o n s . ................... ..................................................... .......................................... .................... !
S t r u c t u r a 1 - i r o n w o r k e r s . .............. .. ................................................................... .................... I
T i l e l a y e r s ................. ........................................ .. ................................................................................. I
!
h e i f e r s a n d l a b o r e r s .................... .................. ............................................. .............................
|
B r i c k la y e r s * t e nde r s . ............................................
|
E u i l d i n g l a b o r e r s ....................................................................... .....................................................
C o m p o s i t i o n r e e f e r s ' h e l p e r s .......................................................... .................... .. .............
E l e v a t o r c o n s t r u c t o r s ' h e l p e r s . . . . . .............. ..................« . . . ................................
M a r b l e s e t t e r s ' h e l p e r s ................................. ....................... ..
P l a s t e r e r s 1 l a b o r e r s .............. ...................................... .......................... .............................
F l a r u b e r s ' l a b o r e r s ................. ..................................................... .. ..................... ..
T e r r a z z o w o r k e r s ' l a b o r e r s . . . . . . . .............. .................................................. ..
T i l e l a y e r s ' h e l p e r s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ......................

1 S e e ta b le 11,

fo o tn o te 1.

NO TE: C e n t s - p e r - h o u r and p e r c e n t c h a n g e s w e r e c a lc u la te d by a v ­
e r a g in g y e a r - t o - y e a r in c r e a s e s w ith y e a r - t o - y e a r d e c r e a s e s and n o -c h a n g e
s itu a tio n s , w e ig h te d by c u r r e n t - y e a r m e m b e r s h ip . T h us, r e la t iv e ly s m a ll




21

M id d le
West

C ents
per
hour

Per c e n t

M o u n ta in

Percent

C ents
per
hour

P a c ific

C eii t s
per
hour

P ercent

Percent

51

5 .5

60

6. 8

54

6 .5

71

49

5. 1
8 .6
7 .9
5. 0
4 .6
5 .3
3 .5
1 1 .6
5. 7
3 .7
6 .2
4 .6
7. 4
£ .4
4 .6
6 .6
5. 8
6 .6
5 .8
5 .4
6 .4
5 .4
3 .2
4 .0
5 .3

65
68
55
61
67
57
62
87
61
44
55
27
14
54
63
69
53
84
69
35
15
66
63
73
36

7.1
7 .7
6. 1
6. 6
7 .5
6 .4
6. 5
9. 2
7. C
E.1
6 .1
3. 2
1 .7
6. 1
7 .2
7. 1
6. C
8 .6
8 .0
4 .3
1. 6
6 .8
7. 1
8 .7
4. 2

61
72
137
55
4C
51
78
100
68
14
75
71
34
34
57
45
42
55
35
1 16
115
32
56
72

6 .9
8.6
14.6
e .c
4 .6
6 .3
8. 2
1 1 -2
8 .0
1. o
9. 5
6 .7
4 .1
4 .0
6. 1
5 .2
4 .5
5.9
4. 1
15.8
13 .c
3. 4
6. 0
S. 2

75
82
107
5C
72
78
76
127
86
53
114
26
45
83
68
76
€4
74
79
72
12 9
62
63
62
69

7. 7
6. 3
10. 3
5 .4
7 .8
9 .0
7. 5
12. C
1 0 .0
5 .3
1 1. 4
z. 7
4 .6
8 .7
7.0
7. 1
9 .3
6 .9
7. 9
6. 2
1 5 .S
6 .z
6. 7
8. 2
9.6

40
34
41
56

5 .5
4 .6
5.7
8.4
9 .3
5. 3

33
49
29
70
61
31
4C
37
45

5. 0
6. -J
4. 5

56
68
52
4
79
24
84
5C
75
80

7. 6
8. 8
7 .2
.6
10.7

IS

78
49
44
49
36
116
51
35
62
43
68
47
39
65
53
63
58
53
59
52
31
39
48
56
59
59
46
84
32
52
53
54
42

!
|

I
|
i

7 .8
7 .S
7. 9
6 .9
1 2. 1
3 .7
6 .7
6. 6
6 .6
5. 0

j

73
43

33
87
85

3. 9
10. 7
11-9

11..6
8 .4
4. 2
€ .4
5 .6
6 .0

!
(
!
i

!

7. 7

9. 7
6 .7
9.6
10-9

i n c r e a s e s m a y r e f le c t the in c lu s io n o f c it i e s w h e r e r a te s d e c lin e d or r e ­
m a in e d un ch a n g ed fo r a t r a d e .
I n c r e a s e s fr o m s u r v e y to s u r v e y v a r y p a r tly b e c a u s e of tim in g of
n e g o tia tio n s in r e la tio n to the J uly 1 r e f e r e n c e d a te . I n c r e a s e s r e t r o a c ­
t iv e to J u ly 1 a r e r e p o r te d in the n e x t y e a r 1s s u r v e y .




Table 14. Average wage rates and employer contributions to funds:
Selected cities by population group
(A v e r a g e union h o u r ly w a g e r a te s and e m p lo y e r c o n tr ib u tio n s 1 in the b u ild in g tr a d e s
by c ity , J u ly 1, 1976)

Average
Average
rate
emplo yer
per hour co rtr ibut ionj/
per hour

City by population group

Average
rate plus
employer
contr ibut ionj/
per hour

$9.48

$1. 95

Population group I (1,000,000 and over).....
Chicago, 111........ .................... .
Detroit, Mich............................
Houston, Tex.............................
Los Angeles, Calif......... .......... .
New York, N.Y.............................
Philadelphia, Pa........................ .

10.02
10.03
9. 95
9. 11
1C.25
1 0.13
9.80

2.58
1.58
2. 86
1. 19
3-26
3.17
2.22

12.60
11. 6 1
12.61
10.30
13.50
13.30
12.02

Population group II (500,000 to 1,0Q0,CCC)..
Baltimore, Md............ ............... .
Boston, Mass........................... .
Cleveland, Ohio.............. .............
Columbus, Ohio.................. ........
Dallas, Tex..............................
Denver, Colo................... .........
Indianapolis, Ind............. -..........
Jacksonville, fla.............. ..........
Kansas City, Mo.... ........... .
Memphis, Tenn. ....... ......... ..........
Milwaukee, His...... ................. .
New Orleans, La.......... ................
Phoer.ix, Ariz.............. -.............
Pittsburgh, Pa............ ..........
St. Louis, M e ............................
San Antonio, lex..........................
San Diego, Calif...... .............. .
San Francisco, Calif............... .
Seattle, Hash............ .
Washington, D.C..... .

9.49
9.02
9.70
10.34
9.12
8.26
8.97
S. 39
7-97
9.71
8.85
9. 58
6. 68
9-C5
9.89
9. 67 !
7. 66
9.47
1 C.84
10.22
9. 62

1 .80
1. 17
1. 89
2.50
1.35
.88
1. 64
1.30
1.16
1 .63
.8 1
2.0 5
.89
2.04
1.52
1. 90
1.10
2.84
3.23
1.87
1. 28

11 .30
10. 19
11.59
12 .84
10.47
9. 14
1C.6C
1C.69
9.13
11.34
9. 66
11.62
.9.57
11.09
11. 41
11.58
8.76
12.31
14.07
12. OS
10.SO

Population group III (250,0C0 tc 5CC,CC0)...
Akron, Ohio..................... .........
Atlanta, Ga.................. ..........
Buffalo, N.Y..............................
Cincinnati, Ohio........ ......... .......
Fort Worth, Tex............ ............
nenolulu. Hi..............................
Long Beach, Calif................ .
Louisville, Ky............................
Miami, Fla.......... .
Minneapolis-St. Paul, Minn.......... .
Nashville-Davidson, Tenn......... .
Newark, N.J..................... .
Norfolk, Va.......................
Cara ha, Nebr................... .
Portland, Or eg........... .........
Rochester, N.Y...........................
Sacramento, Calif.... ....... .
Toledo, Ohio..... ..............
Hi chit a, Kans...... ................... .

9.36
9. 63
8.25
1 C-1 9
10.17
8. 48
8. 42
1 0.1 8
S-42
8.70
9. 23
7.94
10.27
7.53
8-89
10.01 ‘
9. 86
10.01
11.06
8. 87

1.70
1. 83
1.2 C
1.81
1.50
. 86
2.44
3.35
1 .22
1.44
1.57
. 76
2.29
.62
1.33
2. 10
1.63
3.44
2.03
. 98

11. 0 6
11.47
9.45
12.01
11. 68
9.24
1 C .86
13.54
10.62
10. 14
1C.8C
8.69
12 .56
8.15
10. 22
12.11
11 .4 S
13.46
12. 09
S. 65

Population group IV (100,000 tc 25C,GCC)....
A1 bany , N.Y........ .
Chattanooga, Tenn................... .
Corpus Christi, Tex.......................
Flint, Mich................ ........... .
Fremont., Calif...........................
Fresno, Calif..... ...............
Grand Rapids, Mich....... ................
Hammond, Ind................ .............
Huntsville, Ala................ .
New Bedford, Mass........................
New Haven, Conn........................ .
Providence, F.I................ ..........
Riverside, Calif..........................
Rockford, 1 1 1 .............................................................................
St. Petersburg, Fla........ .............
Salt lake City, Utah.....................
Santa Ara, Calif......... ............ .
Scranton, Pa ....... ............... .......
Spokane, Hash........ ....................
Stamford, Conn...........................

8 .99
9. 38
8.04
7.51
9.41
10. 41
9.83
8. 49
9.63
7.99
9. 01
9.36
9. 03
9.54
10.23
8. 59
6. 68
9.59
9 .94
9. 66
9. 35

1.62
1. 54
.73
.70
2. 24
3. 43
3. 34
1.68
1.31
.58
1. 61
1. 30
1.77
3-19
1. 10
1.03

10.61
10.92
8.77
8.21
11. 65
13.84
13.17
10.17
10.94
8. £8
1C.62
10. 66
10.80
12.73
11.34
9.62
1 C.CC
12.86
11. 11
11.32
10.73

All cities.......... .......

S e e ta b le 5,

fo o tn o te

1 .33

3.27
1. 17
1. 67
1.38

$ 11.42

NO TE: B e c a u s e of ro u n d in g , s u m s of i n ­
d iv id u a l ite m s m a y n o t eq u a l t o t a ls .

22




Table 15. Average w age rates and employer contributions to funds:
Selected cities by region
( A v e r a g e union h o u r ly w a g e r a te s and e m p lo y e r c o n tr ib u tio n s 1 in the b u ild in g tr a d e s by c ity ,
J u ly 1976)

------ ------ ------------------ ------7
City by region2

j

Average
rate plus
employer t
contrib utio n
per hour

Average
Average
rate
employer
per hour. contrib ution1
per hour

i
All cities............. ............

$9.48

$1.95

$11.43

S.38
9.70
9.0 1
9.36
5.03
9.35 '

1 .63
1.89
1. 61
1.3C
1-77
1.38

11-01
11.59
10.63
10.66
10.80
10.73

9. S8
9.38
10. 19
10. 13
1 C.27
9.80
9.89
9. 66 |
9.94 !
|
8. 90
9.02 !
i
9.42 j
|
7.53 !
5. 62

2.35
1.54
1. 81
3.17
2.29
2.22
1. 52
1.63
,.,7

Southeast............................... j
Atlanta, Ga. (III)......... ..........
Chattanooga, Tenn. (IV).............. |
Huntsville, Ala. (IV)..........
J a c k s o n v i l l e , F l a - ( I I ) ............ ...j
M em phis, T e nn .
( I I ) ..................................................i
M ia m i, F la .
( I l l ) ...........................................
N a s h v ille - D a v id s o n , Tenn.
(111).......
S t . P e t e r s b u r g , F l a . ( I V ) . ---- ,------ !

8.26
8. 25
H. C4 ;
7 .9 9
,

. 94
1.20
.73

7 .9 7
8 .8 5
6. 7 C
7. 94
8 .5 9

1. 16

S o u t h w e s t ......................... ..
C orpus C h r i s t i , Tex. ( I V ) . . . . . . . . . . . . .
D a l l a s , T e x . ( I I ) ................. ... ................................
F c r t W o rth , Tex.
( I I I ) . . . . ...........
H ouston, Tex.
( I ) . . . . . . . . ............
New O r l e a n s , L a . ( I I ) . . . ............................... .
San A n t o n i o , T e x . ( I I ) . . . ..... .

8.1 8
7 .51
8 .2 6
8 . 48
5. 11
€ .b 8
7 . 66

New England...........................
Boston, Mass- (II)............... .
New Bedford, Mass. (IV)..............
New Haven, Conn. (IV) .......... .......!
.j
Providence, E.I. (IV).... .
Stamford, Corn. (IV)..... ............ ■
Middle Atlantic........
Albany, N.Y. (IV)....... .............
Buff ale, N.Y. (III)..___ ______ _____
New York, N.Y. (I)............. .
Newark, N.J. (Ill)..... ........ ......
Philadelphia, Pa. (I) .................
Pittsburgh, Pa. (II)...... ...........
Rochester, N.Y. (Ill)................
Scranton, Pa- (IV)..... ...........
Border States........... ...............
Baltimore, Ma. (II)............... .
Louisville, Ky. (IJI)........ ........
Norfolk, Va. (Ill)...................
Washington, D.C. (II)....... .

G r e a t L a k e s ................................. ......
A k r o n , C h io ( I I I ) ..... ............................... .
C h i c a g o , 111. ( I ) . . . ....... .
C i n c i n n a t i , O h i o ( I I I ) ......................... ..
C l e v e l a n d , O h i o ( I I ) . . . . . . .............. .............. |
C o l u m b u s , O h i o ( I I ) .................................. .
!
D e t r o i t , M ich.
( I ) .... .
F l i n t , M ich.
( I V ) ..... ...............
G r a n d R a p i d s , M i c h . ( I V ) . . . . .........
Ha mmo nd, I n d . ( I V ) ...................
I n d i a n a p o l i s , I n d . ( I I ) . . . . . . ..... .
M ilw a u k e e , W is.
( I I ) ........... .
M in n e a p o lis -S t . P a u l, M inn.
( III) .....
R o c k f o r d , 111. ( I V ) ............. .
T o l e d o , C h i c ( I I I ) . . . ................

9 .8 1
9 .6 3
10.0 3
10. 17
1 0.34
9.1 2
9 .9 5
9. 41
6.49
9 .6 3
9. .59
9. 58
9.23
1 0.2 3
11.0 6

1.C6
1.17
1.22
. 62
1-2 6

- 8

!
'
;
!
!
!
1
1
!
'
i

j
I
I
|
|
|

.81
1 . 44
.76
1.0 3

. 88
!
j
1

.7 C
.88
.66
1.1 9
.89
1. 10

I
I
I
|

1 . 91
1.8 3
1. 56
1 .5 C
2.5 C
1- 55

9.97
10.19
10.63
6.15
1C.9 0
9.20
9.45
8.77
8 .5 8
9 . 13
9.6 6
10.14
8 .6 9
9 .6 2
9 .0 6
8 .21
9 .1 4
9 .3 4
1 C .3 0
9 .5 7
8.76
11.72
11. 47
11-61
11 .6 8
12.84
10.47
12.81
11.65
10.17
10. 94
1C.69
11 . 6 3
10.80
11.34
13.09

2. 86

:
I

12.33
10.92
12.01
13.30
12.56
12.02
11.41
11 .4 9
11-11

2 .2 4
1 .68
1.3 1
1. 30
2 . C5
1.57
1.10

;.c-

M i d d l e W e s t . . . . . . . . . . . .................
K a n s a s C i t y , Mo. ( I I ) . . . . . ....... .
O m a ha , N e b r . ( I l l ) ..... -.............
S t . L o u i s , Mo. ( I I ) ............ .
W i c h i t a , K a n s . ( I l l ) ........... ......

9 .3 5
9. 7 1
8. 8 9
9 .6 7
8.87

Mo u n t a i n ................................
D e n v e r , C o l o . ( I I ) .....................................................
P h o e n ix , A r iz .
( I I ) . . . . . . ........... .
S a l t L a k e C i t y , U t a h ( I V ) .... ........

8.8 7
8.9 7
9 .0 5
6. 68

1 . 64
1.64
2. 04
1 .3 3

10.51
10.60
1 1.09
10.00

9. 98
1 0. 41
9 .83
8 .4 2
10. 18
10. 25
10.01
9 .5 4
10.01
9 . 47
10. 84
9 .5 9
10.22
9.66

2. 9 4
3 .4 3
3 .3 4
2 .4 4

12. 9 2
13.84
1 3 . 17
10. 86
1 3.54
13.50
12.11
12.73
13.46
12.31
1 4 . C7

Pac i f i c ...... ..........................
F re m o n t, C a lif .
( I V ) ...... ...........
Fresno, C a lif .
( I V ) . . . . . ..... .
H o n o l u l u , H i . ( I l l ) ... ...............
lo ng B e a c h , C a l i f .
( I l l ) .... -........
Los A n g e le s , C a l i f .
( I ) . . . . . . . . .................
P o r tl a n d , O reg.
( I l l ) ...... ..........................
R iv e rs id e , C a lif ( I V ) .............. ....................... ..
S a c r a m e n t o , C a l i f . ( I I I ) . . . . . ................. ..
San D i e g c , C a l i f .
( I I ) .......................................... j
San F r a n c i s c o , C a l i f .
( I I ) ..............................
S a n t a Ana , C a l i f .
( I V ) ..........................................
S e a t t l e , Wash. ( I I ) .........................................
S p o k a n e , Wa sh . ( I V ) . . . . . ....................................

1 S e e ta b le 5, fo o tn o te 1.
2 S e e ta b le 11, fo o tn o te 1, fo r d e fin itio n s
of r e g io n s u s e d in th is stu d y . P o p u la tio n s iz e
i s show n in p a r e r t h e . v F a s fo llo w s : G r o u p T 1 ,0 0 0 ,0 0 0
or m o r e ; G r o u p II - =100,000 t o

23

;
;
j
i

1 -5 5

1. 65

i

1 .3 3
1 .90
.98

|

5. 55

i
i

|

3 .2 6
2 . 10
3 .1 9
3.4 4
2. 64
3 .2 3
3 .2 7
1.8 7
1 .6 7

|

10.90
11.34
10.23
11.58
9. 85

12.86
12.09
11.32

1 ,0 0 0 ,0 0 0 ; G roup III = 2 5 0 ,0 0 0 to 5 0 0 ,0 0 0 ; and
G roup IV = 1 0 0 ,0 0 0 to 2 5 0 ,0 0 0 .
NO TE: B e c a u s e of rounding, su m s o f i n ­
dividu al ite m s m a y not eq u a l t o t a ls .




Table 16. Average wage rates and employer contributions to funds,
journeymen and laborers: Selected cities by population group
(A v e r a g e union h o u r ly w a g e r a te s and e m p lo y e r c o n tr ib u tio n s 1 in the b u ild in g t r a d e s , J uly 1, 1976)

C ity

by

p o p u la tio n

Average
A v e r age
ei r.p lo y e r
ra te
p er hour c o n tr ib u tio n1
p e r hour

crcup

A v e r a ge
r a t e p lu s
e m p lo y e r
c o n tr i b u tio n 1
per fo u r

J o u r n eymen
A l l c i t i e s ..............................................................................

$ 9.92

$ 2.02

$ 1 1 . 94

P o p u la tio n group I
{ 1 ,0 0 0 ,0 0 0 and o v e r ) . . . . .
C h i c a g o , 1 1 1 .......................................... .....................................
D e t r o i t , M i c h . . . ...................................................................
rl o i s t on , T e x . . . . . . . . . . . . . . . . ...................................
L o s A n g e l e s , C a l i f ...............................................................
New Y o r k , N . Y ..............................................................................
P h i l a d e l p h i a , P a .....................................................................

1C -4 2
1C.43
10.15
9. 58
1 0 . 45
1 C. 65
10.61

2-67
1 .57
2 .9 6
1. 3 0
3 .2 8
3 .33
2 .4 8

P o p u la tio n group I I
( 5 0 0 , 0 0 0 t o 1, 0 0 0 , 0 0 0 ) . .
E a l t i i D o r e , Md .............................................................................
B o s t o n , H a s s . . . . . . ............................ ............................. ..
C l e v e l a n d , C h i o ......................................................................
C o l u n b u s , C h i o ...........................................................................
D a l l a s , T e x .................... ....................................... .....................
D e n v e r , C o l o ......................... .. ........................ ....................
I n d i a n a p o l i s , I n d .............................................................
J a c k s o n v i l l e , F l a .................................... ..............................
K a n s a s C i t y , M o . . . . . .................... .................. ..
M e m p h i s , T e n n ..................................................................... ..
M i l w a u k e e , Wis . . ......................................................... ..
New O r l e a n s , L a . . . . . . . . . . . ........................................
P h o e n i x , A r i z . . . . . ............................ ............... .. ............. ..
P i t t s b u r g h , P a .............. .. .........................................................
S t . L o u i s , M e ....................................... .. ..................................
San A n t o n i o , T e x . . . . ...................................
San D i e c o , C a l i f ....................................................... ..
San F r a n c i s c o , C a l i f ..................................................... ..
S e a t t l e , h a s h . . . . . . . . .............. .....................................
W a s h i n g t o n , E . C . ....................................................................

1 C.C1
9 .9 1
10. 12
1C. 68
9.8 0
9 .03
9 . 70
10. 17
€ .5 2
9.9 6
9 .2 2
9 .9 1
5. 15
9 .7 C
1 0 .1 4
9 .8 9
€- 31
1 0 .5 1
1 1.28
1 0.49
10. 12

1 .87
1.3 3
2 .0 2
2 .4 5
1 .4 9
.98
1. 82
1 .4 5
1.32
1 .67
.86
2. 14
1.C 1
2 .1 7
1 .5 5
1.95
1 .14
2 .8 9
3.21
1 .8 9
1. 39

1 1 .88
1 1 . 24
1 2 . 14
13.13
11.29
10.01
11.52
11 . 6 2
9.84
11.63
10.07
12.06
10.17
1 1.87
11-68
11.84
S.45
13.40
14.49
12 . 3 8
11.51

P o p u la tio n group I I I
(250,000 t c 5 0 0 , 0 0 0 ) . . .
A k r o n , O h i o ............................................... .................. ...............
A t l a n t a , Ga .................................................... ............................
B u f f a l o , N . Y ................................................................................
C i n c i n n a t i , C h i c . . . . . ......................... ..
F o r t W o r t h , T e x . . . . ............................................................
H o n o l u l u , H i . . . . .....................................................................
L on g B e a c h , C a l i f ...................................................................
L o u i s v i l l e , F y ...........................................................................
M i a m i , F l a . . . . . ...................... .. ............. ..
M i n n e a p o l i s - S t . P a u l , M i n n . . . ............................
N a s h v i l l e ~ D a v i d s o n , T e n n . ......................
N e w a r k , N . J ................................ ................................... ..
N o r f o l k , V a . ................................................................................
Om a ha , N e b r ...................................................... ................ ..
P o r t l a n d , O r e g . . . . ..............................................................
R o c h e s t e r , N . Y .........................................................................
S a c r a m e n t o , C a l i f ..................................................................
T o l e d o , O h i o . ......................... ..................................... ..
W i c h i t a , K a n s .................................................................... ..

9 .8 0
9 .6 8
6. 75
1 C.S 6
10.34
9 .0 7
e. 5s
1 C.6 S
9.75
9 .2 4
9 . 44
8 . 31
10. 53
8 .3 9
9 .6 4
10. 21
10. 40
1 C- €7
11.23
9 . 37

1 .7 7
1.9 1
1.34
1 .8 3
1.6 1
. 93
2 .5 2
3 .4 2
1 .28
1.4 7
1. 6 1
.80
2 .3 8
.74
1.50
2. 0 9
1.6 C
3 .4 C
2. 14
1. 03

11. 56
11.59
1 c . ce
12.79
11.94
10.0 1
11.11
14.11
1 1.03
10. 72
11.04
9.1 2
1 2.91
9 .1 2
11. 15
12.29
12.00
1 4 .2 7
13. 3 7
1C.4C

P o p u la t io n g ro up IV (1 00,000 tc 2 5 0 , 0 0 0 ) . . . .
A l b a n y , N . Y .......................................................... .......................
C h a t t a n o o g a , T e n n . . ............................................................
C o r p u s C h r i s t i , T e x . . . . . . . . .............. ........................
F l i n t , M i c h . . . . . . . . ......................................................
F r e m o n t , C a l i f . . . . . . . . . . . . . . . . .............. ................
F r e s n o , C a l i f . . . . . . . .............. .. ........................................
G r a n d E a p i d s , M i c h ...................... ..................
Hammond, I n d ................... .. ...................................... ..
H untsv i l l e ,
A l a . . . . . . . . . ..............................................
New B e d f o r d , M a s s . . . . . . . . . . . . . . ............................
New H a v e n , C o n n . . . . . . . . . . . . . ....................................
E r o v i d e n c e , E. I ........... .. ........................ .................... ..
R i v e r s i d e , C a l i f .............. ................ ..
R o c k f o r d , 1 1 1 .....................................................................
S t . P e t e r s b u r g , F l a ............................................... ..
S a l t L a k e C i t y , U t a h ..........................................................
S a n t a A n a , C a l i f .................................................. .. ................
S c r a n t o n , P a ................................................................................
S p o k a n e , H a s h . ........................................................... ..
S t a m f o r d , C o n n ..........................................................................

9 .4 0
9 .7 8
8 . 45
7 . S3
9 .5 3
10.92
10.67
8. 90
10.56
8 .8 2
9 . 44
9 .7 7
S. 25
10-27
10.43
8 .9 1
S. 18

1.6 4
1. 52
. 79
.75
2 . 32
3 . 44
3. 24
1.73
1 .4 9
.60
1. 74
1. 37
1 .8 4
3 .2 3
1. 13
1. 08
1 .4 2
3 .3 3
1 .2 1
1.7 6
1 .4 6

11.03
11.31
9 .2 4
8 .68
11.85
14.36
13.91
1 0.6 3
1 2.06
9. 4 2
11.18
11.14
11 . C9
13.50
1 1. 55
9 .9 8
1 0.60
13.41
11. 36
11.88
11.12

S e e fo o tn o te s at end o f ta b le .

24

ic.ce
10.17
10. 12
9. 66

13 . 0 8
1 1.99
13. 12
1 0.86
1 3.73
1 3.97
1 3 . 10




Table 16. Average wage rates and employer contributions to funds,
journeymen and laborers: Selected cities by population group— Continued
( A v e r a g e a nion h o u r ly w a g e r a te s and e m p lo y e r c o n tr ib u tio n s 1 in th e b u ild in g t r a d e s , J uly 1, 1976)

C ity

by

p o p u la tio n

H e lp e rs

]A v e r a g e
ra te
1p e r h o u r

group

Average
e srp l o y e r
c o n trib u tio n 1
p e r hour

A v e r a ge
r a t e p lu s
em p i oy e r
c o n trib u tio n 1
per heur

a nd l a b o r e r s

£ 11 c i t i e s ...............................................................................

J 1 .6 4

$ 9. 16

P o p u la tio n group I
( 1 , 0 0 0 , 0 0 0 a n d o v e r ) ............
C h i c a g o , 1 1 1 . . . ........................................................................
D e t r o i t , M i c h . . . . . . . .................... .. .................................
H o u s t o n , T e x ...............................................................................
L o s A n g e l e s , C a l i f ..............................................................
New Y o r k , N. 1 .............................................................................
P h i l a d e l p h i a , P a . . . .............................................................

17.54
8 .C 3
7 .8 9
8 .3 3
6 .9 7
7. 87
8 .41
7 .7 7

2 .1 1
1.63
2 .07
. 67
2 .9 9
2 .6 3
1.5 7

1 0.14
9 .5 3
10. 40
7 .6 4
1 G. 8 6
11.04
9 .3 4

P o p u la tio n group I I
( 5 0 0 , 0 0 0 t o 1 ,0 C C , 0 0 0 ) . .
E a l t i m o r e , Md..................................................................... ..
B o s t o n , M a s s ..............................................................................
C l e v e l a n d , O h i o ........................................................................
C o l u n r b u s , O h i o ............................................ .. ........................ ..
D a l l a s , T e x . ........................................... ...................................
D e n v e r , C o l o ................................................................................
I n d i a n a p o l i s , I n d ..................................................................
J a c k s o n v i l l e , H a . ......................................
K a n s a s C i t y , Mo.................................................. .................. ..
M e m p h i s , T e n n . ................................. ..
M i l w a u k e e , H i s ................. .. .................................................. ..
New O r l e a n s , L a ..................................................... ..................
P h o e n i x , A r i z ......................... .................. ..
P i t t s b u r g h , P a . . .....................................................................
S t . L o u i s , M e ............................................... .............................
San A n t o n i o , T e x .............. ......................................................
San D i e g o , C a l i f ................. ..................... ....................... ..
San F r a n c i s c o , C a l i f ............ .. .....................
S e a t t l e , H a s h .................................... ........................................
H a s h i n g t a n , D . C . . . . . . . ............................... ..

7 .4 9
7 .0 2
7 . 63
8. 49
7.18
6 .1 2
6 .4 1
7 . 18
£.15
8 .1 9
5 .9 2
8 . 29
6 . 74
7 .3 0
8.0 7
8 . 72
5. 12
7 .2 7
8.3 6
8 .3 7
7. 98

1 .5 2
.80
1. 28
2 .7 9
.95
.59
1.0 1
.87
.35
1 .37
.44
1. 66
.39
1 .68
1.33
1. 71
.95
2 .7 3
3 .3 8
1 .7 1
. 89

9 .01
7 .8 2
8 .9 C
11 .2 8
8 .1 3
6.71
7 .4 2
8.0 4
5 .4 9
9 .5 7
6 .3 6
9 .9 5
7 .1 3
8 .9 8
9. 39
10.42
6 .0 7
10.00
1 1.74
10. 08
8 .8 7

7 .2 8
9 .0 8
5. 63
7.59
9.26
6 . 17
6 . 6S
7 .5 9
7.C 3
6 .7 9
7 .8 6
5. 53
7. 79
4 .7 5
6 .9 7
7 .9 1
8. C1
8 .C 6
10.09
6. 70

1.3 8
. 95
.51
1 .7 6
.95
. 58
1 .6 8
3.06
.72
1.34
1. 29
. 46
1 .4 1
-2 6
-90
2 .2 2
1.7 2
3 .5 4
1.45
. 75

8. 67
1C.02
6 .3 3
9 .3 5
10.21
6 .7 5
8.3 7
11.05
7 .7 5
8. 13
9 . 15
5 .9 6
9 .2 0
5 .0 5
7 .6 7
1C. 14
9.7 3
11 . 6 0
11. £4
7.4 5

1.54
1. 57
.42
.38
1. 18
3 .3 8
3 . 55
1 .4 0
.94
.50
1.24
. 98
1 .2 6
3 .0 8
.9 1
' .72
1 .0 0
3 .0 8
.9 1
1. 35
. 95

8. 86
1 0.14
6 .25
5 .0 4
9 .0 9
11.65
11.60
7 .5 2
8 .6 9
£ .0 2
9.CC
8 .4 9
8 .8 2
10.9 3
9 .4 6
7 . 12
8 .C 1
1 1.12
9. 26
9 .4 7
8.5 1

P o p u la tio n group I I I
( 2 5 0 , 0G0 t c 5 C C , G 0 0 ) . . .
A k r o n , O h i o ................. .. ..............................................................
A t l a n t a , 6 a . . .............. ..............................................................
B u f f a l o , N . Y .............................. ........................ ........................
C i n c i n n a t i , O h i c .................................................. ..................
F o r t H o r t h , T e x .......................................................... ..
H o n o l u l u , H i . ................................................................
L o n g B e a c h , C a l i f ................................. ............... ..
L o u i s v i l l e , K y .................................................. .. .....................
M i a m i , F l a .............. ..............................................................
M in n e a p o lis - £ t. P a u l, M i n n . . . . . . . . . . . . . . . .
N a s h v i l l e - D a v i d s o n , T e n n . . ...........................
N e w a r k , N . J ..................................................................................
N o r f o l k , V a ...................................................................................
Omaha, N e b r ...................................................................................
P o r t l a n d , O r e g ..........................................................................
R o c h e s t e r , N . Y . . . . . . . . . . . . . . ..............................
S a c r a m e n t o , C a l i f ..................................................................
T o l e d o , O h i o ......................... ................................ .. ............. ..
Hi c h i t a, K a n s . . . ....................... .. ..........................................
P o p u l a t i o n g r o u p I V ( 1 0 0 , 0 0 0 t c 2 5 C, 0 0 0 ) . . . .
A l b a n y , N . Y ....................... .. ........................... ..
C h a t t a n o c g a , T e n n ............................................... ..................
C o r p u s C h r i s t i , T e x .................... .. ........................ ..
F l i n t , M i c h ...................................................................................
F r e m o n t , C a l i f . . . . . . . . . ............ ..
F r e s n o , C a l i f .............................................................................
Grand Bapids,
M ich. . . . . . . . . . . . . . . . . . . . . . . .
Ham t r e n d , I n d .............. .............................. .. ................ ..
H u n t s v i l l e , A l a .............. .. ......................................................
New B e d f o r d , M a s s . . . . . ....................................................
New H a v e n , C o n n . . . . . .........................................................
P r o v i d e n c e , E . I ....................................................... ................
R i v e r s i d e , C a l i f . . . . . ........................................................
R o c k f o r d , 1 1 1 . . . . . . . . . . . . . . . . . . . . ......................
S t. P e te rs b u rg , F la . . . . . . . . . . . . . . . . . . . . . . .
S a l t L a k e C i t y , O t a h ..........................................................
S a n t a A r. a , C a l i f .....................................................................
S c r a n t o n , P a . . ............................................................ ..
Spok an e . H a s h ...................
S t a m f o r d . C o n n ..............................

1 S e e ta b le 5,

fo o tn o te

!

7 .32
8. 57
£ . 83
4 .6 6
7 .9 1
8 . 27
8 .0 5
6- 12
7 .7 4
4 .5 2

7. 77
7.5 1
7 . 56
7 .6 5
8 .5 4
6 . 41
7. CO
8 .0 4
8 .34
8 . 12
7 .5 6

!

|

NO TE : B e c a u s e o f rou n d in g, s u m s
d iv id u a l ite m s m a y not eq u a l t o t a ls .

25

of i n ­




Table 17. Average wage rates and employer contributions to funds,
journeymen and laborers: Selected cities by region
(A v e r a g e union h o u r ly w a g e r a te s and e m p lo y e r c o n tr ib u tio n s 1 in th e b u ild in g t r a d e s by c ity ,
July 1, 1976)

C ity

by

re g io n 2

Average
ra te
per hour

A verage
ra te p lu s
e m p lo y e r x
c o n trib u tio n
per hour

Average
eirp l o y e r
c o n trib u tio n 1
per hour

Journeym en
A ll

c i t i e s ............................ ..

$ 9.92

$11.94

$2 . 0 2

New E n g l a n d . ...................... ............................................ ..
B o s t o n , M a s s . ( I I ) . . ...............................................
New B e d f o r d , M a s s . ( I V ) .......................................
New H a v e n , C o n n . ( I V ) ............................................
P ro v id e n c e , R .I.
( I V ) . . . . . ..............................
S ta m fo rc , C orn. ( I V ) . . . . . . . . . . . . . . . . . .

9 .7 7
1C.12
9 .4 4
9. 77
9 . 25
9. 66

1 . 73
2 .0 2
1 .7 4
1 .3 7
1. 8 4
1 .4 6

11.50
12.14
11 . 18
11. 14
11.09
11.12

M i d d l e A t l a n t i c . ................................. ..
A l b a n y , N . Y . ( I V ) ......................................................
B u f f a l o , N . Y . ( I l l ) ..................................................
New Y o r k , N . Y . ( I ) .....................................................
New ark, * . J .
( I I I ) . . ...............................................
P h i l a d e l p h i a , P a . ( I ) ............................................
P i t t s b u r g h , E a . ( I I ) ...............................................
R o c h e s t e r , N . Y . ( I l l ) .............................................
Sc r a n t e n . P a . ( I V ) ................. ..

10. 48
9. 78
1C.96
10.65
10.53
10. 61
1 0.14
1 0.40
10. 17

2. 4 5
1 .52
1 .83
3 .3 3
2. 36
2 .4 8
1 .5 5
1.6 0
1. 21

12.93
11.31
1 2.79
13. 9 7
12.91
13 . 1 0
11.68
12.00
11.38

B o r d e r S t a t e s .............. ........................................................
B a l t i m o r e , fld .
( I I ) . . .............................................
L o u i s v i l l e , F y . ( I I I ) . . . . . . . . . . . . ............
N o r f o l k , V a. ( I l l ) .............. .......................... ..
W a s h i n g t o n , E . C . ( I I ) .............................................

9 .5 3
9 .9 1
9. 75
8 .3 9
10.12

1. 18
1. 33
1 .2 8
.74
1 .3 9

10. 70
1 1.24
11.03
9 .1 2
11.51

S o u t h e a s t ................... ..................... .. .............................
A t l a n t a , G a . ( I l l ) ....................................................
C h a t t a n o o g a , T e n n . ( I V ) ........................................
H u n t s v i l l e , F la .
( I V ) ....................................
J a c k s o n v ille , F la .
( I I ) . . . . . . . . ..............
M e m p h i s , T e n n . ( I I ) . ...............................................
M i a i r i , F l a . ( I l l ) ....................................... ...............
N a s h v ille - D a v id s c n , Tenn.
( III) .......
S t. P e te rs b u r g , F la .
( IV ) .............

8.72
8.7 5
8 . 45
8. 82
6 .5 2
9 .2 2
9 .2 4
8 .3 1
8. S1

1 .00
1.3 4
. 79
. 6C
1 .3 2
.86
1.4 7
. 60
1 . C6

9 .7 3
10. 08
9 .2 4
9.42
9.84
10.07
10. 72
9.1 2
9 .9 8

So u t h w e s t ............................................ .. .................................
C o r p u s Ch r i s t i , T e r .
( I V ) . . . ................. ..
D a lla s , Tex.
( I I ) ........................................................
F o r t W o r t h , T e x . ( I l l ) ..........................................
H o u s t o n , T e x . ( I ) .......................................................
New O r l e a n s , L a .
(II)......................
San A n t c n i c , T e x .
( I I ) . . .............. .

8. 6 7
7 .9 3
S. 03
9 .C 7
9 .5 8
9 . 15
8. 31

. 95
. 75
.96
.S3
1 .3 0
1. 01
1 .1 4

9 . 62
8.6 8
1 C.01
10.01
10. 88
1 0.1 7
9.45

G r e a t L a k e s ................. .................... ..
A k r o n , O h i o ( I I I ) ...........................
C h i c a g o , 1 1 1 . (I) .......................................................
C i n c i n n a t i , O h i o ( I I I ) ...........................................
C l e v e l a n d , O h i o ( I I ) ...............................................
C o lu n r b u s , O h i o ( I I ) ..................................................
D e t r o i t , M i c h . ( I ) .....................................................
F l i n t , F i c h . ( I V ) ........................................................
G ra nd R a p i d s , M i c h . ( I V ) .............. ..
Ha mmo nd, I n d .
( I V ) . . . ............................................
Indianapolis, In d .
(II). . . . . . . . . . . . . . .
M i l w a u k e e , « i s . ( I I ) ...............................................
M i n n e a p c l i s - S t . P a u l , M i n n . ( I l l ) ............
R o c k f o r c , 1 1 1 . ( I V ) . . . . . ....................................
T o l e d o , O h i o ( I I I ) . . . ............. .. ........

10. 12
9.6 8
1 0 .4 3
1 0.3 4
10.68
9. 80
1 0.15
9 .5 3
8 .9 0
10. 56
10.17
9 .9 1
9 . 44
10. 4 3
1 1.23

1. 98
1.91
1 .57
1 .61
2. 45
1 .49
2 .9 6
2 .3 2
1. 73
1 .4 9
1 .45
2 .1 4
1. 61
1 .1 3
2 - 14

12.10
11 .5 9
1 1 .99
11.94
13.13
11.29
13.12
1 1.85
1C.63
1 2.06
11.62
12.06
11.04
11.55
13.37

M i d d l e W e s t .............................................................................
K a n s a s C i t y , Mo. ( I I ) . . . ............ .
Omaha, N e b r - ( I I I ) ..........................
S t . L o u i s , Me. ( I I ) .........................
W i c h i t a , Kans.
( I l l ) ...............................................

9. 77
9.9 6
9 .6 4
9 .8 9
9 .3 7

1 .6 3
1 .67
1 .5 0
1. 95
1 . C3

1 1 . 4C
11.63
1 1. 15
11.84
1 C.4 0

M o u n t a i n . . . . ......................... ...............................................
D enver, C c lc .
( I I ) ....................................................
P h o e n ix , A r i z .
( I I ) ..................................................
S a l t L a k e C i t y , U t a h ( I V ) ..................................

9. 4 8
9 . 70
9 .7 0
9 .1 8

1. 76
1 .8 2
2 .1 7
1.42

1 1.25
11 . 5 2
11.87
10.60

P a c i f i c .........................................................................................
F re iro n t, C a l i f .
( I V ) ...............................................
F r e s n o , C a l i f . ( I V ) ..................................................
H o n o l u l u , H i . ( I I I ) . ................................................
Long Eeach, C a l i f .
( I l l ) ....................................
Los A ng e les, C a l i f .
( I ) ............ ..
P o r t l a n d , O r e g . ( I l l ) ............................................
R i v e r s i d e , C a l i f . ( I V ) ............ .............................
S acram en to, C a l i f .
( I I I ) . . . . ........... ..
San D i e c c , C a l i f .
( I I ) ..........................................
San F r a n c i s c o , C a l i f .
( I I ) . . . . .................
S a n ta Ana, C a l i f .
( I V ) ..........................................
S e a t t l e , W a s h . ( I I ) ..................................................
S p o k a n e , Wa sh . ( I V ) ..................................................

10.43
10.92
10.67
8 . 59
10. 69
10.45
10.21
10.27
10.87
1 0 . 51
11 . 2 8
1 0.08
1 0.49
10. 12

2 .9 5
3 .4 4
3 .2 4
2. 52
3 .4 2
3 .2 8
2 .0 9
2.2 3
2. 40
2 . €9
3.21
3 .3 3
1.89
1. 76

13 .3 8
14.36
12. 9 1
11.11
14.11
13 . 7 3
12.29
13.50
1 4.2 7
13.40
14.49
13.41
12. 38
11 . 8 8

S e e fo o tn o te s at end of ta b le .

26

I




Table 17. Average wage rates and employer contributions to funds,
journeymen and laborers: Selected cities by region— Continued
(A v e r a g e union h o u r ly w a g e r a te s and e m p lo y e r c o n tr ib u tio n s 1 in the b u ild in g t r a d e s by c ity
J u ly 1, 1976)

C ity

Average
ra te
per hour

by r e g io n 2

H e lp e rs

and

Av e r age
e m p loye r
c o n trib u tio n 1
p e r hour

Average
r a t e p lu s
e m p loye r
c o n trib u tio n 1
per hour

la b o re rs
*9 .1 8

$ 7 . 54

$ 1 . 64

Mew E n g l a n d . . ............................ ...........................................
B o s to n , Mass. ( 1 1 ) . . . . . . . . . . . . . . . . . . . .
New E e d f o r d , M a s s . ( I V ) .......................................
New H a v e n , C c n n .
( I V ) .................... .. ......................
P ro v id e n c e , B . I .
( I V ) ............................................
S t a m f o r d , C o n n . ( I V ) .......................................

7 .6 3
7 .6 3
7 .7 7
7.5 1
7 .5 6
7.56

1 . 17
1. 56
1.2 4
.96
1.2 6
.95

8. 80
6 . SC
9 .0 0
8 .4 9
8 .8 2
8 .5 1

M i d d l e A t l a n t i c .......................................................... ..
A l b a n y , N . Y . ( I V ) ........................................................
B u ffa lo , B .I.
( I l l ) ..................................................
New Y c r k , N . Y .
( I ) .....................................................
N e w a r k , N . J . ( I l l ) .....................................................
P h i l a d e l p h i a , Pa. ( I ) ............................................
P i t t s b u r g h , P a . ( I I ) ...............................................
R o c h e s t e r , N . Y . ( I I I ) . . . . .................................
S c r a n t o n , P a . ( I V ) .....................................................

8 .1 9
8.5 7
7 . 59
8. 41
7.7 S
7 .7 7
8 .0 7
6. 01
6.3 4

2 .0 0
1 .57
1. 76
2 .6 3
1 .41
1 .5 7
1. 33
1 .72
.S1

10.19
10. 14
9 .3 5
11 . 0 4
9 .2 0
9. 34
9 .3 9
9.7 3
9 .2 6

B o r d e r S t a t e s ...................................................... ...............
B a l t i m o r e , Md. ( I I ) ..................................................
L o u i s v i l l e , K y . ( I l l ) .............................................
N o r f o l k , V a . ( I I I ) . . . .............................................
W a s h in g to n , D .C .
( 3 1 ) ............................................

6. 70
7 .0 2
7 .0 3
4 .7 9
7 .9 6

.66
.80
.72
• 56
.69

7 .3 6
7 .8 2
7 .7 5
5 .0 £
8 .8 7

S o u t h e a s t ................................. ................................................
A t l a n t a , Ga. ( I l l ) ............................... ....................
C h a t t a n o o g a , l e n n . ( I V ) ...................... ................
H u n t s v i l l e , A l a . ( I V ) ................. ..........................
J a c k s o n v i l l e , F l a . ( I I ) .......................................
M em phis, T e n n .
( I I ) ............................. ....................
M ia m i, F la .
( I l l ) ....................................................
N a s h v i l l e - D a v i d s o n , Tenn.
( I l l ) .................
S t . P e t e r s b u r g , P l a . ( I V ) .................................

5 .8 2
5. 83
5 .8 3
4 .52
5 . 15
5. 9 2
6. 79
5 .5 3
6 .4 1

. 60
.51
.42
.50
.35
. 44
1 .3 4
.46
.75

6 .4 2
6.33
6 .2 5
5 .0 2
5. 49
6 .3 6
8 .1 3
5.98
7. 12

S o u t h w e s t ................... ..............................................................
C o r p u s C b r i s t i , T e x . ( I V ) ..................................
E a l l a s , T e x . ( I I ) .......................................................
P o r t B e rth , Tex.
( I l l ) ..........................................
H o u s t o n , T e x . ( I ) .......................................................
New O r l e a n s , L a . ( I I ) ................. ...........................
S a n A n t o n i o , T e x . ( I I ) ............... ..........................

5 .8 9
4 .6 6
6 .1 2
6 . 17
6 .9 7
6.74
5 .1 2

.54
.38
.59
. 56
.67
.39
.95

6 .43
5 .0 4
6.7 1
6 .7 5
7 .64
7 .1 3
6 .0 7

G r e a t L a k e s .............................................................................
A k r o n , C h i o ( I I I ) .......................................................
C h i c a g o , 1 1 1 . ( I ) .................................... .. ................
C i n c i n n a t i , O h i o ( I I I ) .........................................
C l e v e l a n d , O h i o ( I I ) . . . . . . ...............................
C o l u m b u s , O h i o ( I I ) . . . ..........................................
D e t r o i t , M i c h . ( I ) ......................... ...........................
F l i n t , M ich.
( I V ) .......................................................
G r a n d E a p i d s , M i c h . ( I V ) . . . . . .......................
Ha m m o n d, I n d . ( I V ) ..................................................
In d ia n a p o lis , Ind .
( I I ) .......................................
M i l w a u k e e , B i s . ( I I ) ...............................................
M i n n e a p o lis - S t. P a u l, M inn .
( III) .....
R o c k f o r d , 1 1 1 . ( I V ) ..................................................
T o l e d o , O h i o ( I I I ) ....................................................

6.05
9 .0 8
7 .8 9
9. 26
8.49
7 .1 8
8 . 33
7.91
6.12
7.7 4
7 . 18
8. 59
7.86
8 .5 4
10.09

1 -5 3
.9 5
1. 65
.95
2 .7 9
.95
5. 07
1.16
1 .40
.94
. 87
1.6 6
1 .29
.91
1. 45

9 .58
10.02
9 .5 3
1C.21
11.28
8. 13
1C.40
9 .C 9
7 .5 2
8 .6 9
6 .0 4
9 .9 5
9 .1 5
9 .4 6
11.54

M i d d l e West . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
K a n s a s C i t y , Mo. ( I I ) .............................................
Omaha, N e b r .
( I l l ) .....................................................
S t . L o u i s , M o . ( I I ) ..................................................
W i c h i t a , K a n s . ( I l l ) .................................. ..

7 .7 0
8 . 19
6 . 97
6.7 2
6 .7 0

1 .2 2
1. 3 7
. SC
1 .71
.75

8 . 91
S. 5 7
7 .8 7
10.43
7'. 45

Mo u n t a i n . ..................................................................................
D e n v e r , C o l o . ( I I ) ............................................
P h o e n ix , A r iz .
( I I ) .................................................
S a l t L a k e C i t y , U t a h ( 3 ? ) .................................

6 . 96
6 .4 1
7 . 30
7. 00

1.2 5
1.0 1
1. 66
1 .00

8 .2 1
7-42
6.9 6
8 .0 1

P a c i f i c ........................................................................................
F r e m o n t , C a l i f . ( I V ) ..............................................
F resno, C a lif .
( I V ) ..................................................
H o n o l u l u , H i . ( I l l ) ..................................................
L on g B e a c h , C a l i f .
( I l l ) .....................................
Los A n c e le s , C a l i f .
( I ) . . . . . . . . . ..............
P o r t l a n d , O r eg.
( I I I ) . . . .....................................
R iv e rs id e , C a lif .
( I V ) . . ....................................
S a c r a m e n t o , C a l i f . ( I l l ) ....................................
San D i e g o , C a l i f .
( I I ) ..........................................
S an F r a n c i s c o , C a l i f .
( I I ) . . . .. . . .. . . .
S a n t a A na , C a l i f .
( I V ) ...........................................
S e a t t l e , B a s b . ( I I ) ..................................................
S p o k a n e , B a s h . ( I V ) . . . . . ....................................

7 .9 0
8. 57
8 .0 5
6 .6 9
7 .9 9
7 .8 7
7.91
7 .8 5
8 .0 6
7 . 57
8 . 36
8 .0 4
8 .3 7
8 .1 2

5.88
3 .3 6
3 .5 5
1 .6 8
3. 06
2 .9 9
2 .2 2
3 .0 8
3 .5 4
5. 73
3 .3 6
3 .C 6
1 . 71
1 .3 5

10.76
11.65
11.60
8 .3 7
11.05
10.86
10.14
10.93
11.60
10.00
1 1.74
11 . 1 2
10.08
9 .4 7

A ll

c i t i e s . . . . . . . . .......................................

S e e ta b le 5, fo o tn o te 1.
2 S e e ta b le 11, fo o tn o te 1,
fo o tn o te 2.

and ta b le 15,

27

!

NO TE: B e c a u s e of rounding, su m s
in d iv id u a l ite m s m a y not eq u a l to ta ls

of

Table 18. Cents-per-hour and percent changes in average wage rates: Selected cities
by population group
(C h a n g e s in union h o u r ly w a g e r a te s in th e b u ild in g t r a d e s by c ity , July 1, 1 9 7 5 -7 6 )
C ents- p e r -h o u r
c ity

by p o p u l a t i o n

Percent o f

change

group
A ll
tra d e s

A ll

charges

D e lp e rs
an d
la b o re rs

Journeymen

A ll
tra de s

Journeym en

H e l p c-u.5
and
l a f o r e ra

c i t i e s ............................... .. ............................................

58

61

46

6 .5

6 .5

6 .6

P o p u l a t i o n g r o u p I ( 1 , C C C , 0 0 0 an d o v e r ) . . . . .
C h i c a g o , 1 1 1 ................. ..................................... ..
D e t r o i t , M i c h ................................................................ ..
H o u s t o n , T e x . . . . . . . ............................................................
L o s A n g e l e s , C a l i f . . . . ................. - ................ ..
Ne w Y o r k , N . Y ................. .. ...................................... .................
P h i l a d e l p h i a . P a . . . . . . . . . . . . . . . . . . ................

52
34
47
98
69
50
43

55
29
45
1 02
71
60
47

40
61
59
76
51
16
34

5. 5
3. 5
5 .C
12.0
7 .3
5. 2
4. €

5. 6
2. S
4 .7
12.0
7. 3
6. 0
4 .6

8. 3
7 .7
1a. 2
6. 9
1. 9
4. 6

P o p u la t io n group I I
{ 5 0 0 , 000 t o 1, C0C, C0C) . .
Ea l t i c n c r e , Md - .................. . .................................................
B o s t o n , M a s s .........................................................................
C l e v e l a n d , O h i o .................... ..........................................
C o lu r r b us , O h i o . . . . .................................... .. .....................
D a l l a s , T e x ....................................................... ..
. . l e a v e r , C o l o . . . . . . . ............................................................i
I n d i a n a p o l i s , I n d . ................................................................!
J a c k s o n v i l l e , f l a . ............................................................. J
K a n s a s C i t y , M o . . . . . . . . . ....................
M e m p h i s , T e n n .............. ..................... ..................... ................. !
M i l w a u k e e , W i s .................................................................... . . i
Kev O r l e a n s , L a . . . . . . . . . . . . . . ..............j

57
66
31
60
61
95
67
72
31
65
36
27
65
27
58
61
29
67
75
75
60

59
68
36
63
47
102
67
77
32
67
38
32
61
37
59
€4
32
76
78
75
55

49
61
6
44
102
75
66
57
25
49
22
5
80
1
49
47
17
49
57
74
77

6 .4
7 .9
3 .3
6 .2
7 .2
1 2.9
8. C
8 .3
4. 1
7. 1
4 .3
2 .9
8 .1
3. 1
6. 2
6 .7
3 .9
7 .7
7 .4
7 .9
6 .6

6. 3
7 .3
3 .7
6. 2
5 .0
12. 7
7..4
8 .2
4 .0
7. 2
4. 4
3 .4
7 .2
3.9
6 .2
6 .9
4 .0
7. 8
7. 4
7. 1
5 .7

7 .0
9 .5
. 8
5. 5
16. 5
1 4. C
11.5
8 .6
5. 1
6. 4
3. 9
.6
13. 5
. 1
6.5
5 .7
3. 4
7. 2
7 .3
9 .7
1 C. 7

44
66
48
17

7. 4
4 .6
6 .1
7 .4
3. 1
11.4
10.2
7 .5
5. 3
3 .0
1 2.2
9. C
5 .3
9 .9
6. 5
14.2
1 .3
6 -2
8. C
7 .4

7 .5
4 .4
5 .8
8. 6
3. 1
11 . 0
9 .9
7 .5
5. 6
3 .5
12.1
8 .8
5 .5
10. 3
7. 2
1 4 .7
1 .6
6. 0
7 .7
7 .3

b .5
6.1
8. 9
2. 2
2 .9
13. S
13.7
7. 6
2. C
1. C
13.4
10.5
3 .7
7. 8
4. C
7.1
. 2
7. C
10.3
8.1

7. C
£ .6
8 .5
1 3.9

7 .0
5 .9
6 .1

S t.

L o u is ,

M o ................................................ . .......... . . . . .

S an D i e g o , C a l i f . . . . . . .................................... ............. .. J
Sa n F r a n c i s c o , C a l i f .............. .. ......................................-I
Se a t „ t l e , Hash . . . » ................................... ............... ...
W a s h in g to n , D . C . . . . . . . . . . . . . . . . . . . . . . . . . . . !
P o p u la tio n group I I I
(250 , CGC t o 5 0 0 , 0 0 0 ) . . .
A k r o n , O h i o . . .............................................. ..
A t l a n t a , Ga.......................................... ........................................
B u f f a l o , N . Y .............................................................................. .. i
C i n c i n n a t i , O h i c ........... .. ......................................... ..
f o r t W o r t h , T e x . . . . . . . . . . . . ........... ..........................
K o n o l u l u . H i . . . . . . . ..............
Long B e a c h , C a l i f . . . . . . . . . . . . . . . . . . . . . . . . .
L o u i s v i l l e , K y . . ............................................................... .. |
M i a m i , F l a .................... .................... ..
!
M i n n e a p o l i s - S t . P a u l , M i n n .............. ..
N a s h v i l l e ~ D a v i d s o n , T e n n . ......................... ..
j
N e w a r k , N . J .................................................................................. !
N o r f o l k , V a . . . . .............. ........................ .. ........................... .. i
O rra ha, N e b r . . . . . .............. ................... ................................ !
P o r t l a n d , O r e g . ............................ .........................................
Fo C h e s t e r , N . Y ............................ .............................................
S a c r a i r e n t o , C a l i f ......................................... .......................
T o l e d o , O h i o . . . ............................................... ..
W i c h i t a , K a n s .........................
P o p u l a t i o n g r o u p I Y ( 1 0 0 , 000 t c 25 0 , 0 0 0 ) . . . .
A l b a n y , N . Y . . . . ............................................................ ..
C h a t t a n o o g a , T e n n . . . . . . . . . . . . . .................
C o r p u s C h r i s t i , T e x .............................................................
F l i n t , M i c h .............. ....................................................................
F r e m o n t , C a l i f ................................... ....................
F r e s n o , C a l i f . ................. ........................................................
G r a n d R a p i d s , M i c h .............................................. ..
H a u f f o n d , I n d . ..........................................
H u n t s v i l l e , A l a . . . . . .............. .. ........................................
New B e d f o r d , M a s s . . . . . . . . . ......................... ..
New H a v e n , C o n n . .....................................................................
P r o v i d e n c e , B. I . . . . . . . . . . .................................... .. . .
R i v e r s i d e , C a l i f . . . . ................. .......................... ..
R o c k f o r d , 1 1 1 .............................................................................
S t . P e t e r s b u r g , F l a . . . ........................................
S a l t L a k e C i t y , U t a h ..........................................................
S a n t a A n a , C a l i f . ............ ............... .....................................
S c r a n t o n , P a . . . . * .................................................................
S p o k a n e , W a s h . . . . .................................................................
S t a m f o r d , C o n n . . . . . . . . ......................... ..




64
43
48
71
30
87
U

71
48
26
101
66
52
68
54
124
13
59
82
61
59
50
63
91
46
62
61
43
52
54
28
33
33
60
68
51
66
62
68
69
15

28

|

|
j
I
!
!
!
i

I

68
41
48
87
31
90
78
74
51
31
102
66
55
79
65
131
16
62
80
64
61
54
63
94
48
61
63
47
50
64
34
30
31
65
69
52
76
64
69
72
9

|
|

!
!
|
i
i
j
!
i

75
81
57
20
7
93
53
28
35
27
52
1
53
94
5C
49
4C
6 1

75
22
66

56
23
57
14
11

46
45
49
54
43
42
58
61
6C
50

5. 1

6 .4
6 .6
5 .3
5 .7
7 .3
2.2
3 .6
3.7
6 .7
7. 1
6 .2
8 .5
6 .9
7 .3
7 .7
1 .6

!
:
|
!
I
i

13. 4

5. 2
£ .9
6 .2
5. 5
4. 9
7.6
3 .8
3 .1
3 .4
o. 7
7. 1
6.1
9 .0
o .7
7. 2
7 .6
.9

7.2
4 .9

11. 7
19. 2
2.9
6. 9
7 .5
3. 9
7. 9
3 .2
1 .4
6 .6

6 .4
6 .7
6.6
7.2
6 .4
7. 7
7 .8
8. C
7. 1

Table 19. Cents-per-hour and percent changes in average wage rates:
Selected cities by region
(C h a n g e s in union h o u r ly w a g e r a te s in the b u ild in g t r a d e s by c ity ,

C e n ts -p e r-h o u r
C ity

ty

J u ly 1,

1 9 7 5 -7 6 )

changes

P ercent o f

change

re g io n 1
A ll
tra de s

Journeymen

H e lp e rs
an d
la b o re rs

A ll
tra d e s

Jo urneym en

H e lp e rs
and
la b o r ers

58

61

46

6. 5

6 .5

6 .6

Ne w E n g l a n d .............................................................................
E c s t o n , H a s s . ( I I ) ....................................................
New B e d f o r d , H a s s .
( I V ) .......................................
New H a v e n , C o n n . ( I V ) .......................................
E ro v id e n c e , B . l .
( I V ) ............................................
S t a f f o r d , C o n n . ( I V ) . . . . . . ......................... ..

29
31
28
33
33
15

30
36
34
30
31
9

23
6
11
46
45
50

3. 2
3. 3
5 .2
3 .6
3 .7
1.6

3. 2
3 .7
3 .8
3 .1
3 .4
.9

3. 1
.8
1 .4
6 .6
6 .4
7. 1

M i d d l e A t l a n t i c ..................................................................
A l b a n y , N. Y.
( I V ) ........................................................
E u f f a l o , N . Y . ( I l l ) ..................................................
New Y o r k , N . Y . ( I ) ....................................................
N e w a r k , N . J . ( I l l ) .....................................................
P h i l a d e l p h i a , Ea. ( I ) .............................................
P i t t s b u r g h , P a . ( I I ) ...................................... ..
R o c h e s t e r , N . Y . ( I I I ) . .........................................
S c r a n t o n , Pa. ( I V ) .....................................................

US
5C
7 1
50
52
43
58
12
ee

56
54
87
60
55
47
59
16
6S

25
40
17
16
28
34
49
1
61

5 .2
5 .6
7. 4
5 .2
5 .3
4. 6
6. 2
1.3
7 .3

5 .6
5 .9
8 .6
6 .0
5 .5
4. 6
6 .2
1 .6
7 .2

3 .2
4 .9
2 .2
1 .9
3 .7
4. 6
6 .5
.2
7 .8

E o r d e r S t a t e s ............................ ................................. ..
B a l t i m o r e , Md. ( I I ) ............................................
L o u i s v i l l e , K y . ( I l l ) .............................................
N o r f o l k , V a . ( I l l ) .....................................................
S a s h i n g t e n , D . C . ( I I ) . . . . .............. .. ................

60
66
48
68
60

62
66
51
79
55

54
61
20
35
77

7. 5
7 .9
5 .3
9. 9
6 .6

7 .0
7 .3
5 .6
10.3
5 .7

6 .7
9. 5
3 .0
7 .8
10.7

S o u t h e a s t .......................................... ........................................
A t l a n t a , G a . ( I l l ) .....................................................
C h a t t a n o o g a , T e n n . ( I V ) ...................
H u n t s v i l l e , A l a . ( I V ) .................... ............
J a c k s o n v i l l e , I l a . ( I I ) ...........................
M e m p h i s , T e n n . ( I I ) ....................................... ..
M ia m i, F l a .
( I l l ) ........................ .
N a s h v ille -D a v id s o n , le n n .
( I l l ) ........
S t. P e te rs b u rg , F la .
( I V ) .................

50
48
63
54
31
36

39
46
61
14
25
22
7
53
43

6. 5
6 .1
8 .5
7 .3
4. 1
4. 3
3 .C

66
51

53
46
63
64
32
38
31
66
52

S o u t h w e s t .....................................
C o r p u s C h r i s t i , l e x . ( I V ) .................
D a l l a s , T e x . ( I I ) ...........................
F o r t fc o r th , T e x .
( I l l ) .....................
H o uston, T e x .
( I ) ....................... .
New O r l e a n s , L a . (II)......................
S an A n t o n i o , T e x . ( I I ) .....................

66
S1
S5
87
98
65
29

8S
94
102
90
102
61
32

72
75
75
75
76
8C
17

G r e a t L a k e s .............. ...................... .
A k r o n , C h i o (III)............................
C h i c a g o , 1 1 1 . (I)...........................
C i n c i n n a t i , O h i o (III)................ .
C l e v e l a n d , O h i o (II).......................
C o l u i r b u s , O h i o (II).........................
D e t r o i t , M i c h . (I)........ .
F l i n t , M ich.
( I V ) ...........................
G r a n d R a p i d s , M i c h . ( I V ) ..................
Ha mmon d, I n d .
( I V ) . . . . . ................. .
In d ia n a p o lis , In d .
( I I ) . . . ............ .
M i l w a u k e e , H i s . ( I I ) ..... .......... .
M i n n e a p o li s - S t. P a u l, M inn .
( III) .....
R o c k f o r d , 1 1 1 . ( I V ) .........................
T o l e d o , C h i o ( I I I ) ..........................

50
43
34
30
6C
61
47
46
43
52
72

4S

56
68
61
26

1C1
68
82

4 1
29
31
63
47
45
46
47
50
77
32
102
69
80

M i d d l e W e s t ............. .................. .
K a n s a s C i t y , Mo. ( I I ) ......... ............
O ma ha, N e b r .
( I l l ) ..........................
S t . L o u i s , Mo . ( I I ) .........................
W i c h i t a , K a n s . ( I l l ) ........................

60
65
54
61
61

65
67
65
64
64

40
4S
27
47
50

M o u n t a i n ........................... ..........
D e n v e r, C o lo .
( I I ) . . . . . . . . . . . . . . . . . . . .
P h o e n ix , A r i z .
( I I ) .........................
S a l t L a k e C i t y , U t a h ( I V ) ................

54
67
27
66

61
67
37
76

33

66
1
42

6 .5
8 .0
3 .1
6 .5

P a c i f i c ..................... .
F r e m o n t , C a l i f . ( I V ) . . . ...................
Fresno, C a l i f .
( IV ) . . .. . . . .. . . .. . . . .. .
H o n o lu lu , H i.
( I l l ) .........................
lo ng Eeach, C a l i f .
( I l l ) ..................
Los A n g e le s , C a l i f .
( I ) ...................
P o r t l a n d , O r e g . ( I l l ) ......................
R iv e rs id e , C a l i f .
( I V ) ....................
S acram ento, C a l i f .
( I l l ) ..................
San D i e g o , C a l i f .
( I I ) .....................
San F r a n c i s c c , C a l i f .
( I I ) ...............
S a n t a An a , C a l i f .
( I V ) .....................
S e a t t l e , Wa s h . ( I I ) .........................
S p q k a n e , Wa s h . ( I V ) ...................... .

71
62
61
78
7 1
69
124
60
59
67
75
62
75
69

75
61
63
78
74
71
131
65
62
76
76
64
75
72

56
68
56
81
57
51
52
49
53
49
57
58
74
60

7 .7
6 .4
6 .6
1 0.2
7. 5
7 .3
1 4 .2
6 .7
6. 2
7 .7
7 .4
6 .9
7 .9
7 .7

A l l c i t i e s ................. .. ............. ..




26

21

1 S e e ta b le 11, fo o tn o te 1, and ta b le 15, fo o tn o te 2.

29

44
102
5S
22
23
57
5 7

5
93
54
S4

6 .4
5 .8
8 .1
7 .8
4. 0
4 .4
3 .5
8 .8
6. 1

7 .3
8 .9
11. 7
3. 2
5. 1
3. 9
1. C
10.5
7. 2

11.7
13.9
12. 9
1 1 .4
1 2 .C
8 .1
3 .9

11 .4
13.4
12. 7
11.0
12 .0
7 .2
4 .0

14.0
19.2
1 4 .C
1 3. 8
1 2.2
13. 5
3. 4

5 .4
4. 6
3. 5
3. 1
6 .2
7 .2
5 .0
5.1
5 .3
5 .7
8. 3
2 .9
12.2
7. 1
8. C

5.1

7. 5
8. 1
8-3
2 .9
5 .5
16- 5
7 .7
2 .9
3. 9
7 .9
8 .6
.6
13.4
6 .8
10.3

9.0

6 .2

6. 8
7 .

1

6 .5
6 .7
7. 4

4. 4
2 .9
3 .1
6 .2
5 .0
4 .7
5 .3
5 .5
4 .9
8 .2
3 .4
12.1
7. 1
7 . 7

7. 1
7 .2
7 .2
7. 3

5 .5
6 .4
4. C
5. 7
8. 1

6 .9
7. 4
3. S
9 .C

5 .0
11. 5
.1
6 .4

7. 7
5 .9
6 .2
9 .9
7 .5
7 .3
14.7
6 .7
6. 0
7 .8
7 .4
6 .7
7 .7
7 .6

7. 6
6 .9
7. 5
13.7
7 .6
6 .S
7 .1
6 .7
7 .0
7 .2
7 .3
7 .7
9 .7
8 .0

6.9

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities
(U nion h ou rly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u rs and e m p lo y e r in s u r a n c e , p e n s io n ,
b u ild in g t r a d e s , Ju ly 1, 1975 and J u ly 1, 1976)
JULY 1,
1975

v a c a tio n

J UL Y

and o th e r c o n tr ib u tio n s to funds in the

197 6

1,

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR1

PER
WEEK2

INSURANCE4

PENSION

i

VACATION

OTHER5

1
DOLLARS

AKBOM,

PERCENT

DOLLARS
1
i
i
j
i

OHIO

' ~

PERCENT
DOLLARS
_ . . _____ 1__________
!

+

PERCENT

DOLLARS j PERCENT
j

I
i

i

I

B UI LD IN G CONSTBUCTION

i
J

$ 9,8 35
1 0.480
1 0.070
8 . 200
1 0.000
10.090
9 . 0 20

$9.1 35
9 .8 8 0
1 0.040
8. 17 0
9 .6 0 0
9 .4 9 0
8 .4 2 0

40.0 0
4 0 .0 0
40.0 0
4 0.00
4 0.0 0
4 0.00
4 0.0 0

0.5 0 0
.600
.570
.5 7 0
.4 0 0
.50 0
.500

10.107
6 .5 2 5
11.305

4 0.0 0
40.0 0
40.0 0

.470
.47 0
.44 5

11.010

11.910

.46 0

o
o

o

1 1.390

1 0.490

o
o

9 .5 6 7
6 .2 5 5
9 .7 7 0

o
a-

-

!
i

0 .8 0 0
1 .0 0 0
.500
.50 0
.50 0
.6 0 0
.60 0

.50 0

-

1.0 0 0

.29 0

1 .0 0 0

|

j
,

-

j
|
j
|
'
I

- 61 . 5 0 0
! 61 . 000
1
6. 9 00
j
6. 900
i 61 . 000
!
I

i
1 .0 0 *I
1.0 0 ;
I

!
I

1 1.230

-

.46 0

1 0.880

9 . 17 0

1 0.070

40.0 0

|

1 .0 0 0

.46 0

-

1.0 0 0

.46 0

-

1 .0 0 0

-

1
!
1
!

-

J
1 0.0 0*1
6 .0 0

.02 0
.020
.26 0

-

|
!

-

.130
i
j
i
I
I

.130

i
s
-

I
9 .9 8 0

"
.08 0
.080
.06 0

i
i
I
ii

I

;
j
;
!
!
i
;

j
!

|

0 .0 3 0
;
j

1
1
;

I
o
o

10.330

-

. 130

-

. 130

-

.130

-

. 130

-

-

. 130
.230
-

-

1
1

I
1

-

i

i
o
o

o

j

|

8 .5 1 0
9 . 100

8 . 2 80
9 .4 9 0
9 .1 9 0
8. 760
8 .7 6 0
9 .4 0 0

.460
.55 0
‘ .57 0
.5 2 0

!

4 0.0 0
4 0.00

.520
.620

9 .6 5 0

9 .5 0 0
9. 600
9 . 100
9 .0 5 0
8 .2 9 0
9 .0 5 0
9. 170
9 .0 0 6
9 .0 0 6
8 .8 7 4
10.040
9. 170
8. 510

9 . 800
9 .9 0 0
9 . 40 0
9 .3 6 0
9.9 6 0
9 .3 6 0
1 0.8 70
10.490
10.490
9 . 105
1 0.070
10.870
8 .7 6 0

4 0.0 0
4 0.0 0
4 0.0 0
40.0 0
1 4 0.0 0
i 40.0 0
4 0.0 0
4 0.0 0
40.0 0
4 0.00
1 4 0 .0 0
! 40.0 0
1 4 0.0 0
j
!

9 .2 5 0
9 .2 5 0

4 0 .0 0
4 0.00

i
j
!

:

|

o
o

9. 350

o

I
|
|

4 0.0 0
4 0.0 0
4 0 .0 0
40.0 0

-

o
o

7 .7 8 0
8 .9 9 0
8 .9 4 0
8 .5 1 0

.46 0

o

9 .7 4 0

8 .8 4 0

-

{
1
!
j

i
!

5 .4 2 1
6 .3 2 5
7 .2 2 8

1
i
|
!
|

1 .0 0 0
. 77 0
6. 2 5 0
.45 0

.620

-

.60 0

.620
.6 2 0
.620
.790
.50 0
.790
.600
.57 0
.57 0
.450
.570
.6 0 0
.520

-

.600
. 6 00
.60 0
. 90 0
.6 0 0
.900
. 80 0
. 550
. 55 0
.800
.500
.800
.45 0

!
i

.500
.500

:
|
|
|

. 4 50
.60 0

j

i

8 .6 5 0
8 .6 5 0

1.0 0 0

j
!

-

_
-

.3 0 0
.3 0 0

i
!
i
i

i
j
I

I

!

HELPERS AND LABORERS

BRICKLAYERS* TENDERS............
B U IL D IN G LABORERS....................
COMPOSITION ROOFERS'
HELPERS:
F I R S T YEAR.................................
SECOND YEAR ............................
T HI RD YEAR...............................

j

-

-

.460

s

!

o

ASBESTOS WORKERS.......................
BOILERMAKERS.................................
BRICKLAYERS ....................................
R E S I D E N T I A L ............................
CARPENTERS.......................................
CEMENT MASONS..............................
R E S I D E N T I A L ............................
ELE CT R IC IA NS (I N S I D E
WIRERS) :
AGREEMENT A ............................
AGREEMENT B ............................
ELEVATOR C O N S TR U C TO R S. .. .
ENGINEERS— POWER E Q U IP MENT OPERATORS:
MASTER MECHANICS...............
GROUP A— A IR COMPRESSORS ON STEEL ER EC T I O N , CRANES, DERR IC K S , HOES, POWER
S H O V E L S . .................................
GROUP B— ASPHALT PA ­
VERS, SCRAPERS, B UL L­
DOZERS, END-LOADERS,
POWER GRADERS, SCOOPS
GROUP C— ASPHALT ROL­
LER S, F O R K LI FT S ,
HO IS T S .......................................
GROUP D— COMPRESSORS
ON B U IL D IN G CONSTRUC­
T I O N , CONVEYORS, MIX­
ERS, WELDER OPERATORS
GROUP E— BACKFIL LER S
AND TAMPERS, BULL
FLOATS, CONCRETE
SPREADING MACHINES,
TRACTORS.................................
GROUP F— O IL E R S , HELP­
ERS, SIGNALMEN, PUMPS
G L A Z I E R S ............................................
LATHERS...............................................
MARBLE SETTERS............................
MOSAIC AND TEBRAZZO
WORKERS..........................................
P A IN TE R S , BRUSH.........................
SWING STAGE, STRUCTUR­
AL STEEL UNDER 50 FT.
SWING STAGE, STRUCTUR­
AL STEEL OVER 50 F T . .
SPRAY GUN.................................
PAPERHANGERS.................................
P I P E F I T T E R S ....................................
PLASTERERS.......................................
PLUMBERS............................................
REINFORCING IRON WORKERS.
ROOFERS, CO MPO SITIO N............
ROOFERS, SLATE AND T I L E . .
SHEET-METAL WORKERS...............
STONEMASONS....................................
STRUCTURAL IRON WORKERS..
T I L E LAYERS....................................

o

,

-

-

:
-

i 6 1.0 0 0
6 1 . 150

-

61 . 1 5 0

-

-

_
_

61. 2 5 0

-

61 . 2 5 0
6i . o o o
1 .1 6 0
1 .1 6 0
61 . 155
6. 90 0
61 . 0 0 0
61. 150

i

i
-

_
-

_
;

|

-

'
1
i
!
!
|
J

-

.
-

I
6 .2 9 0
7 .3 4 0
8 .3 9 0

4 0 .0 0
40.0 0
40.0 0

.570
.57 0
.570

-

.550
. 550
.55 0

-

-

1. 160
1. 160
1. 160

-

i
I
!
;
i

i
I
I
!
!
j
1

:
!
i
j
i
i
-

. 130
.130
.030

-

.02 0
.080
.03 0

I
:
'
-

j

:
|
!

_

.080
.080
_

-

-

-

-

-

i
!

I

J.
S e e fo o tn o te s at end o f ta b le .




o
o

JOURNEYMEN

NO TE: L e t te r s of th e a lp h a b et w e r e u s e d to d e s ig n a te th e v a r io u s a g r e e m e n t s in c it i e s hav in g
m o r e than o n e u nion r a te . T h e s e q u e n c e o f l e t t e r s d o e s not in d ic a te th e r e la t iv e im p o r ta n c e o f th e
a g r e e m e n t s o r th e r a t e s .
H o u rs a r e 40 p e r w e e k u n le s s o t h e r w is e in d ic a te d .

30

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
[U nion h o u r ly w age r a te s and s t r a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
build in g t r a d e s , Ju ly 1, 1975 and July 1, 1976)
JULY 1 , ,
1975
j____________

_________

_

J UL Y 1 , 197 6
________________________

_

EMPLOYER CONTRIBUTIONS
TO FUNDS3
CITY AND JOB
CLASSIFICATION

RATE
PER
HOUR1

RATE
PER
HOUR1

HOURS
PER
WEEK 2

PENSION

INSURANCE 4
DOLLARS

DOLLARS

PERCENT

!
j

VACATION

PERCENT

DOLLARS

OTHER*

PERCENT | DOLLARS

AKBOV, OHIO
-CONTINUED

PERCENT

1
!

BUILDING CONSTRUCTION
-CONTINUED

1
i

i

HELPERS AND LABORERS
-CONTINUED
|

ELEVATOR CONSTRUCTORS'
HELPERS....... . . ......
MARBLE SETTERS' HELPERS..
PLASTERERS’ LABORERS.....
PLUMBERS' LABORERS. . . . . . . . . . . . . . .
TERRAZZO -WORKERS'
HELPERS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
TILE LAYERS' HELPERS.....
HIGHWAY AND STREET
CONSTRUCTION

$ 7 .
8 .
9 .
9 .

$ 6 . Q UO

8 . 0 1 0
8 . 8 0 0
8 . 8 0 0
8 . 0 1 0
8 . 0 1 0

9 1
2 6
4 5
4 5

4
0
0
0

4
4
4
4

8 . 2 6 0
8 . 2 6 0

0
0
0
0

.
.
.
.

0
0
0
0

0
0
0
0

4 0 . 0 0
4 0 . 0 0

0 .
.
.
.

4
5
5
5

4
2
0
0

5
0
0
0

. 5 2 0
. 5 2 0

-

0 . 2
. 4
. 3
. 3

-

!
-

9
5
0
0

0
0
0
0

. 4 5 0
. 4 5 0

;

i
i

|
|
|
j
|
|

-

1

6 . 0 0 %

i

0 . 2 6 0

-

|
1
j
i
1

. 0 8 0
. 0 8 0

j
j
|

_
_
_
_

|

_

|

_

61 . 1 5 0

_

_
* 1 . 1 5 0
6 1 . 1 5 0

-

i
_

-

|
j

JOURNEYMEN

1 0 . 6 3 0

1 1 . 4 8 0

1 0 . 3 8 0

1 1 . 2 3 0

4 0 . 0 0
4 0 . 0 0

-

. 4 0 0
. 5 0 0

!

. 5 0 0
-

o
©

1 0 . 0 0 0
9 . 9 8 0

. 4 6 0

!

. 8 0 0

©
©

9 . 6 0 0
9 . 2 8 0

. 4 6 0

1 . 0 0 0

j

~

I

i
|
!
1

-

|

. 0 9 0 !

o

o

i

. 8 0 0

©
o

J©

1 1 . 1 3 0

j

. 4 6 0

-

-

_

l
!

. 0 9 0 :

-

-

-

!

. 0 9 0 1

!

i
1 0 . 2 8 0

-

-

. 0 6 0
. 0 5 0

*

. 8 0 0

i

!

I

1 0 . 0 9 0

8 . 7 7 0

9 . 6 2 0

o
©

9 . 2 4 0

•p
o

1
. 4 6 0

I
i

. 8 0 0

-

-

-

.090>

-

-

-

. 0 9 0 !

-

-

-

-

. 0 9 0
. 0 3 0

-

-

-

. 0 5 0

I

7 . 7 3 0
9 . 1 7 0

!

3 . 2 3 0
1 0 . 8 7 0

4 0 . 0 0

4 0 . 0 0
4 0 . 0 0

. 4 6 0

. 8 0 0

-

!

. 4 6 0 !
. 6 0 0

. 8 0 0
. 8 0 0

o
o
o

CARPENTERS..............
CEMENT FINISHERS...... . . . . . . . . . . . . . .
ENGINEERS— POWER EQUIPMENT OPERATORS:
MASTER MECHANICS......
CLASS A--AIR COMPRESSORS ON STEEL ERECTION, POWER SHOVELS,
CRANES, DERRICKS....
CLASS B— ASPHALT PAVERS, BULLDOZERS, ENDLOADERS, POWER GRADERS, POWER SCRAPERS..
CLASS C— MIXERS, CON­
CRETE ROLLERS {AS­
PHALT) , ASPHALT PLANT
ENGINEERS............
CLASS D — BACKFILLERS,
COMPRESSORS (PORT­
ABLE, SEWER), CON­
CRETE SAWS___ _ . .....
CLASS E— DRUM FIREMEN, |
HELPERS, OILERS, SIG­
NALMEN. . ............. !
STRUCTURAL IRON WORKERS..

j

-

i

HELPERS AND LABORERS
LABORERS................

8 . 1 5 0

7 . 6 0 0

4 0 . 0 0

. 5 5 0

. 4 0 0

OTHER HEAVY CONSTRUCTION

i

I
j

JOURNEYMEN
9 . 6 0 0
9 . 2 8 0

4 0 . 0 0
4 0 . 0 0

9 . 9 4 0
9 . 9 8 0

. 4 0 0
. 5 0 0

~

. 5 0 0

_

-

-

_

-

-

. 0 6 0
. 0 5 0

-

-

. 0 9 0

-

-

6 1 . 0 0 0

_
-

©

©
©

. 4 6 0 !

■p

1 1 . 2 3 0

o

1 0 . 3 8 0

. 4 6 0

o
o

1 0 . 6 3 0

-p
CD

j

o

!

. 8 0 0

!

I
-

. 8 0 0

. 0 9 0 j

i

1 1 . 1 3 0

P
©

1 0 . 2 8 0

©
©

I
1
. 4 6 0

-

. 8 0 0

•
i

1 0 . 0 9 0

i
j

!

I
9 . 2 4 0

4 0 . 0 0

. 4 6 0

-

.80 0

. 0 9 0 1

-

I

i

!

|

-

-

;

.090,

|

8 .7 7 0

9 .6 2 0

4 0 .0 0

.46 0

-

.80 0

-

-

-

7 .7 3 0
9 .1 7 0

8 .2 3 0
10.870

4 0 .0 0
4 0.0 0

.460
.600

-

-

-

-

~

.800
.80 0 j

7 .6 0 0

8 . 150

©
©

CARPENTERS..............
CEMENT FINISHERS........
ENGINEERS— POWER EQUIP­
MENT OPERATORS:
MASTER MECHANICS..... ,
CLASS A— AIR COMPRES­
SORS ON STEEL EREC­
TION, POWER SHOVELS, I
CRANES, DERRICKS....
CLASS B— ASPHALT PAV­
ERS, BULLDOZERS, ENDLOADERS, POWER GRAD­
ERS, POWER SCRAPERS..
CLASS C— MIXERS, CON­
CRETE ROLLERS (AS­
PHALT) , ASPHALT PLANT
ENGINEERS .............
CLASS D— BACKFILLERS,
COMPRESSORS (PORT­
ABLE, SEWER) , CON­
CRETE SAWS ................
CLASS E— DRUM FIREMEN,
HELPERS, OILERS, SIG­
NALMEN ................... . .
STRUCTURAL IRON WORKERS.. |

|

.550

-

.4 0 0

-

:

!

.090!

I
j

l

*1 .0 0 0

-

'
!
|

J

.09 0
.03 0

-

.05 0

-

HELPERS AND LABORERS
i

o

LABORERS................. .

S e e f o o tn o te s at end of ta b le




31

-

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u rs and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , J u ly 1, 1975 and J uly 1, 1976)
1,, 1976

JULY

JULY 1,
1975

EMPLOYER CONTRIBUTIONS
TO FUNDS3
RATE
PER
HOUR1

RATE
PER
HOUR1

C I T Y AMD JOB
C L A S S I F I C A T IO N

HOURS
per

WEEK

PENSION

INSURANCE

DOLLARS

PERCENT

DOLLARS

OTHER

VACATION

PERCENT

PERCENT

DOLLARS

DOLLARS

PERCENT

i
ALBANY*

M«Y«

B U IL D IN G CONSTSUCTION
j
JOURNEYMEN

ASBESTOS WORKERS......................
BOILERMAKERS.................................
BR ICKLAYER S ....................................
CARPENTERS. ... ...............................
MILLWR IGH TS ............................
R E S I D E N T I A L ............................
CEMENT F I N I S H E R S .......................
ELECTR ICIAN S ( I N S I D E
H I R E R S ) ................. .......................
ELEVATOR C O N S T R U C T O R S .. ..
ENGINEERS— POWER E Q U IP MENT OPERATORS:
GUARANTEED WORKWEEK:
HEAVY EQUIPMENT:
SHOVELS....................................
CRANES.......................................
DERRICKS .................................
MEDIUM EQUIPMENT:
LETOURNEAU G R A D E R S ...
TRENCHING M A C H I M E S . ..
ONE DRUM HO IST S...............
BULLDOZERS............................
L IG H T EQUIPMENT:
COMPRESSORS.........................
MECHANICAL H E A T E R S . . .
PUMPS..........................................
BROKEN T I M E :
HEAVY EQUIPMENT:
SHOVELS....................................
CRANES.......................................
DE RRICKS .................................
MEDIUM EQUIPMENT:
LETOURNEAU G R A D E R S .. .
TRENCHING M A C H I N E S . . .
ONE-DRUM HO IST S ...............
BULLDOZERS............................
L IG H T EQUIPMENT:
COMPRESSORS.........................
MECHANICAL H E A T E R S . . .
PUMPS..........................................
G L A Z I E R S ............................................
LATHERS...............................................
WARBLE SETTERS............................
MOSAIC AND TERRAZZO
WORKERS..........................................
P A IN TE R S , G E N E R A L . . ...............
BRID GE ..........................................
OPEN STEEL STRUCTURE..
SWINGING SCAFFOLD............
SAND B LA S TI N G ......................
SPRAY GUN.................................
PAPERHANGERS.................................
PLASTERERS.......................................
PLUMBERS............................................
REINFORCING IRON WORKERS.
ROOFERS, COMPO SITION............
ROOFERS, SLATE AND T I L E . .
SHEET-METAL WORKERS...............
R E S I D E N T I A L ............................
STONEMASONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
T I L E LAYERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

$ 9,6 80
1 0.000
10.040
8 .7 0 0
9 .2 0 0
6 . 5 00
10.040

$10.280
1 0.680
1 0.490
9 .4 0 0
9 . 900
6 .7 0 0
1 0.490

3 5.0 0
4 0.0 0
3 5.00
3 5.0 0
35.0 0
40.0 0
3 5.00

0 .4 7 0
.750
.70 0
.60 0
.60 0
.600
.70 0

_

10.550
9 .4 8 0

11.050
10.040

3 5 .0 0
4 0.0 0

.45 0
.495

-

-

I

0.2 8 0
.350
.600
.600
.60 0
. 35 0
.50 0
.32 0

_
10.00*
-

_

_

_

-

-

0.080
.120
.120
.620
.08 0

6
° . 500
6. 5 0 0
6 .500
-

1 .0 0
-

I
!

■

_

I
!
-

-

6 .0 0 *

6 . 300
-

I
I

9 .02 0

>
|

9. 930
9 .9 3 0
9 .9 3 0

7 9 .9 3 0
7 9 .9 3 0
7 9 .9 3 0

3 5.0 0
35.0 0
3 5.0 0

.50 0
.50 0
.500

-

. 500
.500
.500

-

-

-

9. 8 63
9 .8 6 3
9 .6 6 4
9 .4 9 7

7 9 .8 6 3
7 9 . 86 3
79.6 6 4
7 9 .4 9 7

35.0 0
3 5.0 0
35.0 0
3 5.00

.500
.50 0
.50 0
.50 0

-

.50 0
. 500
. 5 00
. 5 00

-

-

-

9 .2 6 4
9 .2 6 4
9 .2 6 4

7 9 . 264
7 9 . 264
7 9 . 264

35.0 0
3 5.0 0
35.0 0

.50 0
.500
.500

_
-

.500
. 50 0
. 50 0

-

-

-

10.390
10.390
10.390

71 0 . 390
710 . 3 9 0
71 0 . 3 9 0

3 5 .0 0
3 5.00
35.0 0

.500
.500
.500

-

.500
. 50 0
. 500

-

-

-

10.210
10.210
10.060
9 .7 3 0

71 0 . 210
71 0 . 210
71 0. 06 0
79 . 730

35.0 0
3 5.00
35.0 0
3 5.00

.50 0
.500
.500
.50 0

-

.50 0
. 500
.50 0
. 500

_
-

-

9 . 5 40
9 . 5 40
9 .5 4 0
8. 4 9 0
9 . 110
9 . 2 50

7 9 . 540
7 9 . 540
79 . 540
8 .6 6 0
9 . 56 0
8. 950

3 5.0 0
3 5.0 0
3 5.0 0
39.0 0
3 5.0 0
40.0 0

.500
.50 0
.50 0
.48 0
.700
.7 0 0

-

.5 0 0
.50 0
.500
.25 0
.30 0
. 3 50

-

-

9 .2 5 0
8 .6 7 0
9 .4 2 0
9 .4 2 0
9 . 170
9 .7 7 0
9 .7 7 0
8. 670
10.040
9 .2 1 9
8 .9 9 0
8 .6 0 0
8 .6 0 0
9 .4 6 0
4 .8 3 0
10.040
9 .2 5 0

8 .9 5 0
9 .2 1 0
9 . 960
9 .9 6 0
9 .7 1 0
1 0.310
1 0.310
9 . 210
1 0.490
9 .9 1 9
9 .6 0 0
9 . 100
9 . 100
9 . 460
6 .1 2 0
10.490
78 . 9 50

4 0.0 0
3 5.00
3 5.00
35.0 0
35.0 0
35.0 0
3 5.00
3 5.00
3 5.00
3 5.0 0
4 0 .0 0
3 5 .0 0
3 5.00
3 5.00
4 0 .0 0
35.0 0
4 0.0 0

.700
-

-

-

-

.70 0
.560
.690
.77 0
.77 0
.70 0

-

-

-

.700
.700

-

9
9
9
9

.40 0
.400
.400
.400

_
-

9 .40 0
9 .400
9 .400
9

_
_

|

I

-

9 .40 0
9 .400
9 .400

9 .400
9 .400
9 .400

j

~
!

|

.3 5 0
.350
.350
. 35 0
.3 5 0
.350
.3 5 0
.350
. 350
.87 0
.850
.40 0
.40 0
.50 0
.100
.350
. 3 50

j

-

-

-

-

6.250
6 .250
. 6 . 250
6 .25 0
6 .25 0
6 . 25 0
6 .2 5 0
-

6 .571
6 .500
6 1 . 000
61 . 000
6 .50 0
6 . 100

!

I
I
I

I

-

-

-

-

_
_

9 .400
9 .400
9 .400
.010
. 130

_
-

-

-

.40 0
.400
.400
.40 0

9
9
9
9

-

I

.020
.020
.020
.020
.02 0
.020
.020
.080
. 170
. 140
.070
.070
.420
.06 0
.080

-

-

j
!

HELPERS AND LABORERS

o
o

o

B U I L D IN G LABORERS . . . . . . . . . . . . . . . . . . . . .
ELEVATOR CONSTRUCTORS'
HELPERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
MARBLE SETTERS' HE L PE RS ..
TERRAZZO WORKERS'
HELPERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
T I L E LAYERS' HELPERS . . . . . . . . . . . . .

8 .2 0 0

8 .6 0 0

6 .6 4 0
8 . 3 80

7 .0 3 0
8 .8 1 0

4 0.00
4 0.00

8 .3 8 0
8 .3 8 C

8 .8 1 0
8 .8 1 0

40.0 0
4 0 .0 0

.90 0

_

-

-

.320
. 3 50

-

-

-

.3 5 0
.3 5 0

-

.700
.49 5

S e e f o o tn o te s at end o f ta b le .




32

_

.120

_

9 .02 0

-

-

-

-

-

-

_

8 _

-

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
( U n i o n h o u r l y w a g e r a t e s a n d s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s t o funds in the
b u i l d i n g t r a d e s , J u l y 1, 197 5 a n d J uly 1, 1976)
j JULX 1,
1975

JUL Y

i ,

197 6

!

C IT Y AND JOB
C L A S S I F I C A T IO N

I
j
!

EMPLOYER CONTRIBUTIONS
TO FUNDS3
RATE
PER
HOUR1

!

HOURS
PER
WEEK2

RATE
PER
HOUR1

,

INSURANCE

PENSION

OTHER

VACATION

I
:

DOLLARS

—

PERCENT

DOLLARS

PERCENT

DOLLARS

PERCENT

DOLLARS 1 PERCENT
1

!
I

1

ALBANY, H o le
-C ONTINUE D

j

HIGHWAY AND STREET
CONSTRUCTION

JOU8NEYMEN

$ 8 ,6 2 0
8 .6 5 0

$ 9 . 120
9 . 150

4 0.00
40.0 0

0 .6 0 0
.70 0

_

0 .6 0 0
.350I

_

j
o
©

8 .7 0 0

9 . 690

8 .4 0 0

9 .3 7 0

4 0.00

.55 0

7 .8 5 0

8 .6 9 0

40.0 0

.55 0

.55 0

9a

.6 0 0

-

.6 0 0

-

-

-

n n

.60 0

9. 4 0 0
1

4 0.0 0

.70 0

7 .8 4 0

p

7 .6 4 0

.900

.70 0

.900

9. 0 7 0

7 .8 4 0

8 .0 4 0

40.00

.70 0

.90 0

9. 0 7 0

8 .6 2 0
8 .650

9 . 120
9 . 150

.60 0
.70 0

• J JU

8 .7 0 C

9 .6 9 0

.55 0

nn
• *OUv

9 .4 0 0

8. 400

9 . 3 70

.550

.60 0

9. 40 0

7 .8 5 0

8 .6 9 0

4 0.0 0

.55 0

.6 0 0

9.4 0 0

7 . 15 0

7 .9 0 0

p

7 .6 4 0

.700

.550

. 6 00

9. 400

7 .2 4 0

7 .4 4 0

.70 0

.90 0

9.07 0

7 .4 4 0

7 .6 4 0

•p
o

7 .4 4 0

40.0 0

o
o

7 .4 4 0

.700

.900

9. 0 7 0

7 .6 4 0

7 . 8 40

■p
o

o
■S’

7 .2 4 0

i
|

.60 0

o
o

7. 900

o
o

7. 150

.55 0

.700

.9 0 0

9• cU/
n U
n

7 .8 4 0

8 .0 4 0

40.0 0

.700

.900

9 .—m
%J f nu

o

o
o

GENERAL LABORERS, D R I L L
HELPERS, FLAGMEN.................
BULL FL OA TS , CHAIN SAWS, I
CONCRETE AGGREGATE, BIN!
HANDLERS OF STEEL MESH. '
ACETYLENE TORCHES, AS­
PHALT RAKERS, ROCK
OR D R I L L I N G
MAC HI NES.................................. ..
BLASTERS, FORM SETTERS,
STONE OR GRANITE CURB
S E T T E R S . .......................................

-

.90 0

*
-

“

"

9. 0 7 0

OTHER HEAVY CONSTRUCTION

JOURNEYMEN

o

o
o

o

o
o
o
o

o
o

o

©

4 0 .0 0

o

o
o

CARPENTERS....................................... !
CEMENT F I N I S H E R S .......................!
ENGINEERS— POWER E Q U IP ­
MENT OPERATORS:
CLASS A---- BACKHOES,
CRANES, DRA GLINES,
P IL E D R I V E R S .........................
CLASS B— CONCRETE
PUMPS, ONE-DRUM
HOI ST S, HOLLERS,
TRENCHERS...............................
CLASS C— F O R K L I F T S ,
HYDRAULIC HAMMERS,
CONCRETE PAVEMENT
SPREADERS AND F I N ­
I SH ER S. ....................................
CLASS D— CONCRETE M IX ­
ERS ( 1 6 5 AND UNDER),
FORM TAMPERS, TRAC­
TORS............................................

• 6 00

9
1 1 *

c
^

.030

HELPERS AND LABORERS

S e e fo o tn o te s at end o f ta b le .




i
1

9. 400 j

HELPERS AND LABORERS

GENERAL LABORERS, D R I L L
HELPERS, FLAGMEN ...................
BULL FLOA TS , CHAIN SAWS,
CONCRETE AGGREGATE, BIN
HANDLERS OF STEEL MESH.
ACETYLENE TORCHES, AS­
PHALT RAKERS, ROCK OR
D R I L L I N G MACHINES............ ..
BLASTERS, FORM SETTERS,
STONE OR GRANITE CURB
SETTERS............................... ...

_

10 0 .0 2 5
1 x. 030

—

!

o

CARPENTERS . . . . . . . ................................
CEMENT F I N I S H E R S . . . . ................ I
ENGINEERS— POWER E Q U IP MENT OPERATORS;
CLASS A— BACKHOES ,
CRANES DRAGLINES,
P I L E D R I V E R S . ......................
CLASS B— CONCRETE
PUMPS, ONE-DRUM
HO IS T S, ROLLERS,
TRENCHERS... . . . . . . . . . . . . . . . . . . .
CLASS C— F O R K L I F T S ,
HYDRAULIC HAMMERS,
CONCRETE .PAYEMBNT
SPREADERS AND F I N ­
ISH ERS.
...... ..................
CLASS D— CONCRETE M I X ERS (16S AMD UNDER),
FORM TAMPERS, TRAC­
TORS...........................................

33

Table 20. W age rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s t r a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , Ju ly 1, 1975 and J u ly 1, 1976)
JULY 1 ,
1975

J UL Y

1, r 1 97 6
EMPLOYER CONTRIBUTIONS
TO FUNDS3

C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR1

HOURS
PER
WEEK2

INSU RA NCE 4

DOLLARS

ATLA NTA ,

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER5

PERCENT

DOLLARS

PERCENT

I

GA„

B U I L D IN G CONSTBUCTION

JOURNEYMEN
I
ASBESTOS WORKERS......................
BOIL E RM A KE RS ................................
B R I C K L A Y E R S . . . . .........................
CARPENTERS.......................................
MI LLW RI GH TS ............................
P IL E D R I V E R S ............................
CEMENT F I N I S H E R S ......................
TROWELING MACHINE OP—
ERATORS....................................
ELECTRICIANS
(INSIDE
W I R E R S )..........................................
ELEVATOR C O N S TR U C TO R S .. ..
ENGINEERS— POWER E QU IP­
MENT OPERATORS:
GROUP A— A I R COMPRESSORS, CRANES, DER­
R I C K S , DRAGLINES,
H O IS T S , SHOVELS,
TRENCHING MACHINES
(OVER 6 F T . D E P T H ) . . .
GROUP B — TRENCHING MA­
CHINES (TO 6 F T . ) ,
SCRAPERS, BULLDOZERS,
TRACTORS, SPECIA L
EQUIPMENT..............................
GROUP C— A I R COMPRES­
SORS (6 0 0 CU. F T . OR
BATT ERIES OF 2 , 3 00
CU. FT . AND O V E R ). . . .
GROUP D— PUMPS (OVER
4 I N . UP TO BATTERIES
OF 4 ) ...................................................
GROUP E— MIXERS (S K IP
T Y P E ) , EXCEPT PAV IN G ,
ROLLERS ............................................
GROUP F — A IR COMPRES­
SORS, (UP TO AND I N ­
CLUDING 3 0 0 CU. F T . ) ,
PUMP (4 I N . OR LESS) .
G L A Z I E R S ......................................................
LATHERS ..........................................................
MARBLE S E T T E R S . ...............................
MOSAIC AND TERRAZZO
WORKERS.......................................
P A I N T E R S : ..........................................
STEEL AND SWING STAGE.
SPRAY .......................................................
PAPER HANGERS .........................................
P I P E F I T T E R S .............................................
PLASTERERS ................................................
PLUMBERS ......................................................
REINFORCING IRON WORKERS.
ROOFERS, C O M P O S I T I O N . . . . .
ROOFERS, SLATE AND T I L E . .
SHEET-METAL WORKERS..................
STONEMASONS ............................................
STRUCTURAL IRON WORKERS..
SHEETERS .............................................
T I L E LAYERS ...................................

$7,6 00
8. 2 0 0
7 .8 0 0
8 .1 0 0
8 .8 5 0
8 .2 5 0
7 .9 0 0

$ 8,650
8 . 800
8 . 200
8 .7 5 0
8 . 850
8 .9 0 0
8 .3 5 0

4 0 .0 0
40.0 0
40.0 0
40.0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0

0 .4 5 0
.600
.5 5 0
.40 0
.45 0
.40 0
.40 0

8 .0 3 0

8 .4 8 0

4 0 .0 0

.40 0

8.7 8 6
8 .6 3 5

8 .9 7 0
8 . 9 20

4 0.00
40.0 0

.495

-

0 .5 0 0
1 .0 0 0
.4 0 0
.45 0
.25 0
.45 0
. 5 50

-

.55 0

-

8 .0 0 $
-

.3 2 0

6 0 .5 0 0
-

-

-

6. 6 50
-

-

-

0 .0 8 0
-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

9 .00X
-

-

I

6 8 .0 0 *j
126 .0 0 !

.020

2 .3 0 $

j
|
8 .5 0 0

4 0 .0 0

.45 0

-

.50 0

-

-

7 .7 5 0

8 . 150

4 0.0 0

.45 0

-

.50 0

-

-

|

-

6 . 1 80

6 .4 8 0

4 0 .0 0

.45 0

-

.50 0

-

-

!

-

5 .6 3 0

5 .9 3 0

4 0 .0 0

.450

-

.50 0

-

-

-

-

5 .9 8 0

6 .2 8 0

4 0.0 0

.4 5 0

-

.50 0

-

-

-

-

4 .9 6 0
7 .4 5 0
7 .5 0 0
7 .6 0 0

5 . 260
7 .9 5 0
7 .9 0 0
8 .0 0 0

40.0 0
4 0.0 0
40.0 0
4 0.0 0

.4 5 0
.550
.400
.550

-

.50 0
.3 3 0
.35 0
.400

-

-

-

-

-

-

4 .60 0
.5 0 0
6 .7 0 0

-

183
100
.100

7 .6 0 0
8 .1 0 0
8 .6 0 0
9 . 100
8 .3 5 0
8 .7 0 0
7 .7 7 0
8 .7 0 0
8 . 10C
6 .5 0 0
6 .7 5 0
8 .3 0 0
7 .8 0 0
8 . 100
8 .3 5 C
7 .6 0 0

8 .0 0 0
8 .7 0 0
9 .2 0 0
9 .7 0 0
8 .9 5 0
9 .2 5 0
8 . 5 70
9 .2 5 0
8 .6 0 0
6 .7 5 0
7 .0 0 0
8 .6 0 0
8 .2 0 0
8 .6 0 0
8 .8 5 0
8 .0 0 0

4 0 .0 0
40.0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0.0 0
4 0.00
4 0 .0 0
40.0 0
4 0 .0 0
40.0 0
40.0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0

.550
.450
.45 0
.450
.450
.500
.40 0
.5 0 0
.450
.30 0
.300
.500
.5 5 0
.45 0
.450
.55 0

-

-

6 .7 0 0

-

.10 0

-

-

-

6 .500

-

5 .3 0 0
5 .3 2 0
5 .3 0 0

5 .8 0 0
5 . 9 20
5 .8 0 0

4 0.0 0
4 0 .0 0
40.0 0

.20 0
.20 0
.20 0

6 .0 4 0
5 .3 0 0
5 .3 0 0
4 .9 0 0

6 .2 4 0
5 .8 0 0
5 .8 0 0
5 .0 0 0

4 0.00
4 0.0 0
4 0 .0 0
40.0 0

.49 5
.2 0 0
.20 0
.300

8 . 100

-

i

-

-

-

.40 0
.55 0
.55 0
.55 0
.55 0
.50 0
.55 0
.500
.57 0
. 2 00
.200
.6 6 0
.400
.57 0
.57 0
.40 0

-

-

6

.

500

-

-

6 .50 0
6 .650

-

.

.

-

-

*

-

-

-

.06 0
100
.060
.

-

-

-

-

-

6 .7 0 0

-

-

_
_
-

-

-

-

-

-

-

-

-

-

-

.080

.

-

100

HELPERS AND LABORERS

BRICK LAY ER S' TENDERS ...............
MORTAR M IX E R S ......................
B U I L D IN G LABORERS....................
ELEVATOR CONSTRUCTORS'
HELPERS.............................................
PLASTERERS' LABORERS............
PLUMBERS' LABORERS.................
ROOFERS' HELPERS ...................... !

_
-

S e e f o o tn o te s at end o f ta b le .




34

.25 0
.25 0
.25 0
.320
.2 5 0
.25 0
.2 0 0

_

_

-

-

-

-

-

-

126 .0 0
-

.050
.050
.050
.020
.05 0
.050

_
2 .3 0
-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w age r a te s and s tr a ig h t -t im e w e e k ly h o u rs and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , J u ly 1, 1975 and J u ly 1, 1976)
JULY 1
... 197 5

J UL Y

1,

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C IT Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR

PER
HOUR

PER
WEEK2

INSURANCE

DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER

PERCENT

DOLLARS

PERCENT

ATLANT A, GA«
-C ONTINUED

OTHER HEAVY

CONSTRUCTION

7 .7 0 0

6 .3 3 0

6 .4 8 0

6 .8 8 0

7 .0 3 0

o
o

$8,5 00

7 .5 5 0

4 0.00
o

BALTIMORE,

$ 8,3 50

o
o

ENGINEERS— POWER E Q U I P MENT OPERATORS;
GROUP A— CONCRETE
PUMPS, CRANES,
P IL E D R I V E R S .........................
GROUP B— FIREMEN (S T A TIONARY OR PORTABLE) .
GROUP C— A IR COMPRESSORS 6 0 0 CF AND OVER.
GROUP D— OILERS-TRUCK
AND LOCOMOTIVE.................
GROUP E— CONCRETE
PUMPS-BOOM TYPE, WA~
TERPUMPS-OVER 4 INCH
AND BATTERY OF 4 ............
GROUP F— A IR COMPRESSORS (UP TO AND INCLUDING 300 CF) , WATER
PUMPS (4 INCHES OR
L E S S ) , SAND BLASTING
MACHINES.................................

■tr
O

JOURNEYMEN

4 0.00

0 .4 5 0

-

0 .5 0 0

-

-

-

-

4 .2 2 '

.45 0

-

.50 0

-

-

-

-

4 .2 2

.45 0

-

.50 0

-

.4 5 0

-

.50 0

-

-

|
!
j

-

4 .2 2

-

4 .2 2

I
|

5 . 260

o
o

.p
o

5 .1 1 0

.450

-

o
o

5 .9 3 0

o

5 .7 8 0

■e-

I

.45 0

-

I

.50 0

-

-

.50 0

'

-

4 .2 2

-

4 .2 2 .

!

!

HD,

I
I

B UI LD IN G CONSTRUCTION
i|

I

JOURNEYMEN
|
ASBESTOS WORKERS......................
BOILERMAKERS.................................
B R I C K L A Y E R S . .................................
CARPENTERS................. .....................
MI LLW RI GHT S ............................
R E S I D E N T I A L ............................
CEMENT F I N I S H E R S .......................
ELE CT R IC IA NS ( I N S I D E
H I R E R S ) ..........................................
ELEVATOR C O N S TR U C TO R S .. ..
ENGINEERS— POWER EQ U IP ­
MENT OPERATORS:
HEAVY EQUIPMENT— DER­
R IC K S , POWER CRANES,
SHOVELS, ELEVATING
GRADERS....................................
MEDIUM EQUIPMENT— TEM­
PORARY ELEVATORS,
CONCRETE PUMPS, S I N ­
GLE DRUM H O I S T S . . . . . .
L IG H T EQUIPMENT:
COMPRESSORS, P U M P S . . .
G L A Z I E R S ............................................
LATHERS...............................................
MA C H IN IS TS ............................ . . . .
MARBLE MASONS...............................
MOSAIC AND TERRAZZO
WORKERS..........................................
P A IN TE R S ............................................
STRUCTURAL STEEL ...............
SPRAY............................................
PAPERHANGERS.................................
P I P E F I T T E R S ....................................
PLASTERERS.......................................
PLUMBERS............................................
REINFORCING IRON WORKERS.
ROOFERS, COMPO SITIO N ............
MOPMEN..........................................
ROOFERS, SLATE AND T I L E . .
PRECAST SLAB .........................
SHEET-METAL WORKERS...............
STONEMASONS....................................
STRUCTURAL-IRON WORKERS..
T I L E SETTERS.................................

-

-

.60 0
.545

-

.300
.35 0

4 0.0 0

.65 0

-

.65 0

-

9 . 170
1 0.200
9 .8 5 0
9 .8 0 0
9 . 900
7 .8 4 0
1 0.0 20

40.0 0
4 0.0 0
4 0 .0 0
40.0 0
40.0 0
4 0.00
4 0.00

.60 0
.700
.400
.75 0
.750
.75 0
.60 0

9 .6 0 0
9 .5 6 0

10.000
10.415

40.0 0
4 0.00

8 .9 3 0

9 .8 5 0

_
-

1.005!
-

-

-

I

-

I
j

|
|
I

-

0 .1 0 0
.02 0
.02 0
.02 0
.020
.400
.02 0

4.0 05!

-

-

|
|
8 .3 8 0

9 .3 0 0

40.0 0

.65 0

-

.65 0

-

7 .9 3 0
9. 070
9 .0 9 0
9 . 2 50
9 .2 5 0

8 . 85 0
9 .7 7 0
9 .5 9 0
1 0.000
9 .8 5 0

40.0 0
4 0.0 0
4 0.00
4 0.0 0
4 0.0 0

.650
.800
.550
.40 0

-

.65 0
1 .5 3 0
. 35 0
.50 0

7 .4 6 0
8 .3 0 0
8 .8 0 0
8 .5 5 0
8. 450
9 .9 1 0
8 .7 0 0
9 . 68 0
9. 070
7 .0 0 0
7 .4 5 0
7 .4 5 0
8 .0 0 0
8 .9 7 0
9 .2 5 0
9 .0 7 0
7 .4 6 0

8 .0 1 0
9 .2 0 0
9 .7 0 0
9 .4 5 0
9 .3 5 0
1 0 . 480
8 .9 5 0
1 0.300
9 .7 7 0
7 .7 5 0
8 .2 0 0
8 . 200
8 . 75 0
1 0 . 120
9 .8 5 0
9 .7 7 0
8 .0 1 0

4 0.00
40.0 0
40.0 0
4 0.0 0
40.0 0
40.0 0
40.0 0
4 0.00
4 0.00
4 0 .0 0
4 0.0 0
4 0 .0 0
4 0.0 0
40.0 0
4 0.00
4 0.0 0
40.0 0

.40 0
.850
.850
.850
.85 0
.700
.600
.750
.800
.350
.350
.350
.35 0
.75 0
.40 0
.80 0
.40 0

-

.5 0 0
.50 0
.500
.500
.50 0
.800
.40 0
.8 0 0
1 .5 3 0
.40 0
.400
.40 0
.40 0
.70 0
.50 0
1 .5 3 0
.5 0 0

S e e fo o tn o te s at end of ta b le .




_

.750
1 .0 0 0
.500
.69 0
.690
.690
. 55 0

7 .9 2 0
9 .4 0 0
9 .2 5 0
9 .0 0 0
9 .1 0 0
7 .2 0 0
9 . 1 20

35

;
l

-

-

-

0 .4 6 2
-

-

-

-

-

-

i

I

j
-

I
-

-

!
I
i
!
i
i
I
!
|
j

.385
. 100
!
. 100

-

.070
.070

i

I
.070
. 100
.10 0

•
-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w age r a te s and s t r a ig h t - t im e w e e k ly h o u rs and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in th e
b u ild in g t r a d e s , Ju ly 1, 1975 and J uly 1, 1976)
JULY 1 ,
1975

JULY

1,

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

BATE
PER j
HOUR

RATE
PER
HOUR

HOURS
PER
WEEK

INSURANCE

DOLLARS

PENSION

PERCENT

DOLLARS

OTHER 3

VACATION

PERCENT

DOLLARS

DOLLARS

PERCENT

BALTI MOR E, HD*
-CONT INUE D

j

i

BUILDING CONSTRUCTION
-CONTINUED

j
j

HELPERS AND LABORERS
BR ICKLAYERS' TENDERS............
B U I L D IN G LABORERS....................
ELEVATOR CONSTRUCTORS'
HELPERS............................................
MARBLE SETTERS' HE LPE RS ..
PLASTERERS' LABORERS............
HOD C A R R I E R S . . . . ...............
MORTAR M IX E R S ......................
PLUMBING LABORERS....................
TERRAZZO W O R K E R S ' . . . ............
T I L E LAYERS' HELPERS...........

PERCENT

$ 6,5 50
6 .3 5 0

$7.0 50
7 .0 0 0

4 0 .0 0
4 0 .0 0

0 .3 0 0
.30 0

6 .6 9 0
6 .5 0 0
6 .5 0 0
6 .7 5 0
6 .5 5 0
6 .3 5 0
6 .5 0 0
6 .5 0 0

7 . 2 90
6 .6 2 5
7 . 150
7 .4 0 0
7 . 050
7 .0 0 0
6 . 62 5
6 . 625

4 0 .0 0
4 0.0 0
40.0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0
40.0 0
4 0 .0 0

.545
.35 0
.3 0 0
.300
.300
.30 0
.350
.350

-

_

0 .5 0 0
.50 0

_
-

_
-

.35 0
.20 0
.50 0
.50 0
. 5 00
. 5 00
.2 0 0
.20 0

-

-

|

-

!
|

-

-

Ij

I
’

0 .0 2 0

4 .0 0
I
;

.020
-

-

_
-

.020

-

-

HIGHWAY AND STREET
CONSTRUCTION

JOURNEYMEN

CARPENTERS.......................................
CEMENT MASONS...............................
ENGINEERS— POWER E Q U IP MENT OPERATORS:
HEAVY EQUIPMENT— DERR I C K S , POWER CRANES,
SHOVELS, ELEVATING
GRADERS....................................
L IG H T EQUIPMENT— TRAC­
TORS WITH ATTACHMENTS
COMPRESSORS, FUEL
TRUCKS, GREASE.................
STRUCTURAL IRON WORKERS..

|
9 .0 0 0
9 . 120

9 .0 0 0
10.020

4 0.0 0
4 0 .0 0

.75 0
.600

_
-

.69 0
.5 5 0

_

_

-

Ir
|

I

'

_

I

-

|
i
|
I
I

|

.0 2 0 !
. 020;

i
!
I

7 .9 7 0

8 .8 7 0

4 0.0 0

.65 0

-

.65 0

-

-

-

7 .4 7 0

8 .3 7 0

4 0.0 0

.650

-■

.6 5 0

-

-

-

j

-

9 .0 7 0

7 .8 7 0
9 .7 7 0

4 0.0 0
4 0.0 0

.650
.80 0

-

.65 0
1 .5 3 0

-

*

-

I

-

j

-

5 .4 0 0

5 . 850

4 0 .0 0

.30 0

-

.50 0

-

-

-

'

,

~

~

i

HELPERS AND LABORERS

CONSTRUCTION

LA B O R E R S ....

i

j

OTHER HEAVY CONSTRUCTION
j
JOURNEYMEN

CARPENTERS.......................................
MIL LW RI GH TS ............................
CEMENT MASONS...............................
ENGINEERS— POWER E Q U IP ­
MENT OPERATORS:
HEAVY EQUIPMENT— DER­
RICKS, PILEDRIVER S,
WHIRLE YS .................................
L IG H T EQUIPMENT— TRAC­
TORS WITH ATTACHMENTS
COMPRESSORS, FUEL
TRUCKS, GREASE TRUCKS
STRUCTURAL IRON WORKERS..

_

_

_

-

-

-

9 .0 0 0
9 .9 0 0
1 0.020

40.0 0
40.0 0
40.0 0

.750
.7 5 0
.6 0 0

7 .9 7 0

8 .8 7 0

40.0 0

.650

-

.650

-

-

-

7 .4 7 0

8 .3 7 0

4 0 .0 0

.6 5 0

-

. 6 50

-

-

-

.650
.800

-

.65 0
1 .5 3 0

-

-

-

9 .0 7 0

7 . 8 70
9 .7 7 0

4 0 .0 0
40.0 0

-

. 6 90
.69 0
.55 0

_

9 .0 0 0
9. 100
9 .1 2 0

-

LA B O R E R S ....

B IRMIN GHA M,

B U I L D IN G

!

HELPERS AND LABORERS

CONSTRUCTION

*

5 .4 0 0

5 .8 5 0

4 0 .0 0

.30 0

8 .1 1 0
8 .2 0 0
8 .2 5 0
7 . 300
7 .3 0 0
8 .7 0 0
7 .5 0 0

8 .9 1 0
8 .8 0 0
8 .7 5 0
7 .7 5 0
7 .7 5 0
9 . 150
7 .9 5 0

40.0 0
4 0 .0 0
4 0 .0 0
4 0.0 0
40.0 0
40.0 0
4 0 .0 0

.40 0
.60 0
.25 0
.40 0
.40 0
.4 0 0

-

.50 0

-

-

.020
.020
.020

_

_
-

-

!

-

i
I
|
;

ALA.

CONSTRUCTION

JOURNEYMEN

ASBESTOS WORKERS......................
BOILERMAKERS..................................
BR ICKLAYERS ....................................
CARPENTERS.......................................
FLOORLAYERS............................
MI LLW RI GHT S ............................
P I L E D R I V E R S . . ......................

S e e f o o tn o te s at end of ta b le .




36

_
~ |

i
.30 0
1 .0 0 0
.25 0
.25 0
.25 0
.25 0

_
-

-

6 0 . 500
- •
~

_
~

.05 0
.03 0
.030
.030
.030
.030

_
-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion hourly w a g e r a t e s and s t r a i g h t - t i m e w e e k ly h o u r s and e m p l o y e r i n s u r a n c e , p e n s io n , v a c a t io n ,
b u i l d i n g t r a d e s , J u ly 1, 1 97 5 a n d J u l y 1, 1 97 6 )
JULY 1,
1975

JUL Y

1,

an d o t h e r c o n t r i b u t i o n s to f u n d s in t h e

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C IT Y AND JOB
C L A S S I F I C A T IO N

RATE
PER A
HOUR

HOURS
PER
WEEK

RATE
PER j
HOUR

INSURANCE

DOLLARS

PENSION

DOLLARS

PERCENT

OTHER

VACATION

PERCENT

DOLLARS

DOLLARS

PERCENT

i PERCENT
!

B IB f lI H G H A H , ALA*
'-CONTINUED

B U IL D IN G CONSTRUCTION
-CONTINUED
i

HELPERS

$ 7 ,5 30

8 .5 0 0
8 .4 6 0

9 .6 0 0
9 . 140

0 .5 0 0

o
o

$ 7.1 30

40.0 0
4 0.00

-

.300
.49 5

~

i

j

0 .4 0 0
.3 2 0

_
1 .0 0 *
-

-

-

0. 03 0

-

12 6 . 0 0 *

.020

.030

2 .3 0 X

7 .6 9 0

8 . 140

4 0.0 0

.300

-

.20 0

-

-

-

7 .4 7 0

7 .9 1 0

40.0 0

.30 0

-

. 200

-

-

-

.030 1

-

6 .7 4 0

7 . 140

.30 0

-

.20 0

-

-

-

.03 0

-

8 .3 5 0
8 . 3 50
8 .3 5 0

8 . 840
8 . 84 0
8 . 840

40.0 0
4 0.00
4 0 .0 0

.300
.3 0 0
.300

-

.20 0
.200
.20 0

-

.030 ;
.030
.030 !

-

7 . 960

8 .4 3 0

4 0.0 0

.30 0

-

.200!

-

!
!
I

-

.030

-

-

I
I
I

7 .9 6 0

8 .4 3 0

!1
|

7. 2 7 0
7 .2 7 0
7 .2 3 0
7 . 5 80

4 0.0 0
40.0 0
4 0.0 0
40.00

7 .6 0 0
7 .4 5 0
7 .3 0 0
7 .9 5 0

8 .2 0 0
7 . 800
7 .7 5 0
8 . 300

40.0 0
4 0 .0 0
40.0 0
4 0.00

8 .3 0 0
7 .9 5 0
10.250
7 .6 7 0
1 0.250
8 .5 0 0
7 .5 0 0
7 .7 5 0
9 .8 5 0
8 .7 5 0
8 . 500
8 .5 0 0
8 . 2 00

40.0 0
4 0.0 0
4 0.00
4 0.0 0
40.00
40.0 0
4 0.0 0
40.0 0
40.0 0
40.0 0
4 0 .0 0
4 0.00
4 0 .0 0

|
I
I
|

.2 0 0 l

j

-

.030
1

6 .8 6 0
6 .8 6 0
7. 080
7 . 1 30

7 .9 5 0
7 .6 0 0
9 . 4 00
7 .2 7 0
9 .4 0 0
8 .2 5 C
6 .8 0 0
7 .0 5 0
9 .3 5 0
8. 250
8. 250
8. 2 5 C
7 .6 0 0

-

.30 0

4 0.00

AND LABORERS

.30 0
.300
.40 0
.650
.500
.65 0
.600
j
.650
.25 0
.600
.600
-

-

. 200
. 200
.400
.100

-

-

.4 0 0
. 50 0
. 500
. 500

-

|

-

.50 0
.5 0 0
.4 0 0
.40 0
.81 5
.20 0
. 2 00
.70 0
.25 0
.81 5
.8 1 5
.40 0

-

!
I

.3 0 0
. 300
.30 0

_

_

-

-

-

. 30 0

-

-

-

. 320
.30 0

“

-

~
j

I
!

60 . 250
6 .2 5 0

-

.03 0
.03 0 i
.030 !

-

-

-

.050
.050
.050

-

-

.050
.050
.04 0
.03 0
.040
.030
.025
.030
.030
.03 0

-

-

|

|
I
“

~

~

I
|
5 .4 0 0
5. 500
5 . 4 00

5 .3 0 0

5 . 550

5 .9 2 2
5 .2 0 0

6 . 40 0
5 .4 5 0

4 0.0 0
4 0 .0 0
4 0.00
o

5 . 150
5. 2 50
5 .1 5 0

o
o

BRICKLAYERS* TENDERS............
MORTAR M IX ER S .......................
B U I L D IN G LABORERS....................
A IR OR ELE CTRIC TOOL
OPERATOR.................................
ELEVATOR CONSTRUCTORS•
HELPERS............................................
PLASTERERS' LABORERS............

4 0.0 0
4 0.00

|
I
I

.200 !
.200
.20 0

j

-

.200

—

.495
.20 0

-

1
j
1
j
l

i
1
!

HIGHWAY AND STREET
CONSTRUCTION

j

5 .0 0 0

5.6 0 0

o
o

ENGINEERS— POWER E QU IP ­
MENT OPERATORS:
GROUP A:
j
P I L E DRI VE RS ,
j
I
H O I S T S , MIXERS,
SHOVELS, D O Z E R S . . . .

o

JOURNEYMEN

.30 0

S e e fo o tn o te s at end o f ta b le .




-

j
I

o
o
o

CEMENT F I N I S H E R S ......................
ELE CTR ICIAN S ( I N S I D E W IR E RS ) ..........................................
ELEVATOR CONSTRUCTORS. . . .
ENGINEERS— POWER E Q U IP MENT OPERATORS:
BU IL D IN G CONSTRUCTION:
GROUP A :
MOTOR GRADERS AND
BULLDOZERS....................
GROUP B:
PUMPS, OVER 4 I N CHES.................................
GROUP C:
O I L E R S . . . . . . . ............
STEEL CONSTRUCTION:
GROUP A:
CRANES, DERRICKS,
DRA GLINES ......................
H O IS T S .................................
P IL E D R I V E R S ....................
GROUP B:
TRACTORS............................
AIR COMPRESSORS
OVER 125 (2 OR
LESS) .................................
GROUP C:
A IR COMPRESSORS 125
AND UNDER (2 OH
L E S S ) ......... ..........................
O I L E R S .................................
G L A Z I E R S . . .......................................
LATHERS................. .............................
MOSAIC AND TERRAZZO
. W O R K E R S . . . . .........................
i
P A I N T E R S : .................................... .
R E S I D E N T I A L ............................ !
SPRAY............................................ !
STRUCTURAL STEEL,
SWING STAGE.........................
PAPER HANGERS............... ...............
P I P E F I T T E R S ....................................
PLASTERERS.......................................
PLUMBERS............................................
REINFORCING IRON WORKERS. |
ROOFERS, COMPO SITIO N ............ !
ROOFERS, SLATE AND T I L E . . j
SH £E$-METAL WORKERS...............
STONEMASONS...................................
STRUCTURAL IRON WORKERS..
5HEETERS....................................
T I L E L AY E R S ....................................

■p
o

JOURNEYMEN
-CONTINUED

37

.20 0

~

i
j

:6 .0 0 *
~

1
1
.06 0
.060 j
.06 0
I
. 0 6 0 i1
.02 0
.060

_
2 .3 0 *
-

Table 20. Wage rates, hours, and employer contibutions to funds: Selected cities— Continued
(Unio n h o ur ly wa ge r a t e s and s t r a i g h t - t i m e w e e k l y ho ur s and e m p l o y e r i n s u r a n c e , p e n s i o n , v a c a ti o n , and o th er c o nt ri bu ti o ns to funds in th
build ing t r a d e s , July 1, 1975 and Jul y 1, 1976)
JUL Y

JULY 1 ,
197 5

1,

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS3
HOURS
PER
WEEK

BATE
PEB .
HOUB.

BATE
PEB t
HOUS

C IT Y AND JOB
C L A S S I F I C A T IO N

'
INSU RA NCE 4

DOLLARS

VACATION

PENSION

PERCENT

PERCENT

DOLLARS

-C ONTINUED

'

” .....................
OTHER5

i
I
|

[
i

JOURNEYMEN
-CONTINUED

!
|

i
i

4 0 . 0 0

$ 5 . 5 0 0

5 . 0 0 0

4 . 4 0 0

0 . 3 0 0

‘

!

i

-

-

-■

-

1
1

HELPERS AND LABORERS

LABORERS (G E N E R A L ) ..
BATCH TRUCK DUMPERS.
AIR TOOL OPERATORS..
MORTAR M I X E R S . . . . . . .
P IP E LAYERS......................

-

. 2 0 0

-

!
]
i

i
I
j
I
1

0 . 2 0 0

. 3 0 0

o
o

$ 4 , 8 5 0

•p
©

GBOUP B:
CRUSHERS,
BREAKERS,
F I N I S H I N G MACHINES,
WINCH TRUCKS....................
GROUP Cl
AIR COMPRESSORS,
PUMPS, HOI ST S, FRONT
END LOADERS......................

I
i
;

I

i

PERCENT

i
i
j

!

-C ONTINUED

ENGINEER-POWER EQUIPMENT
OPERATORS -CONTINUED

|

DOLLARsj PERCENT
DOLLARS
■j ■ ■
H—

8IRHISC9AH, ALA.
HIGHWAYS AND STREET
CONSTRUCTION

T “ " ....... .

3
3
3
3
3

. 0 6
. 0 6
. 3 4
. 3 4
. 4 4

3
3
3
4
3

0
0
0
0
0

.
.
.
.
.

7 5 0
7 5 0
9 0 0
0 0 0
8 5 0

!

4
4
4
4
4

0
0
0
0
0

.
.
.
.
.

0
0
0
0
0

i
|

0
0
0
0
0

.
.
.
.
.

2
2
2
2
2

0
0
0
0
0

0
0
0
0
0

.

|
|
,

.
.
.
.
.

:
|
i

3 0 0
3 0 0
3 0 0
3 0 0
3 0 0

-

0 .
.
.
.
.

!
-

j

0
0
0
0
0

3
3
3
3
3

0 I
0 |
0 !
0 !
0 ;

-

t

OTHER HEAVY CONSTRUCTION

j

;

|

JOURNEYMEN
j
7 . 3 5 0
7 . 5 5 0
7 . 3 8 0

. 2 5 0
. 2 5 0

4 0 . 0 0
4 0 . 0 0
4 0 . 0 0

. 4 0 0
. 4 0 0
. 3 0 0

-

4 0 . 0 0

. 4 0 0

-

CARPENTERS.................................
P I L E D R I V B R S .......................
CEMENT F I N I S H E R S .................
ENGINEERS— POWER EQUIP­
MENT OPERATORS
GROUP A:
BULLDOZERS, BOOM
TRA CT O RS . ....................
CRANES; D ER R IC K S ,
D R A G L I N E S, CONCRETE
P U M P S . . . . .......................
PUSH TRACTORS............
COMPRESSORS, 2 OR
MORE WIT HIN 2 0 0 FT
R A D I U S ............................
HOISTS (2 DRUMS OR
MORE)...............................
MIXERS (5 BAGS OR
J

6 . 7 0 0
6 . 9 0 0
7 . 2 3 0

7 . 9 1 0

|

8 . 4 1 0

4 0 . 0 0

. 4 0 0

O V E R ) .........................................I

7 . 9 1 0
7 . 9 1 0
7 . 9 1 0

|
|
j

8 . 4 1 0
8 . 4 1 0
8 . 4 1 0

4 0 . 0 0
4 0 . 0 0
4 0 . 0 0

. 4 0 0
. 4 0 0
. 4 0 0

7 . 9 1 0
7 . 9 1 0

8 . 4 1 0
8 . 4 1 0

4 0 . 0 0
4 0 . 0 0

. 4 0 0
. 4 0 0

-

. 3 0 0
. 3 0 0

7 . 5 7 0

7 . 9 7 0

4 0 . 0 0

. 4 0 0

-

. 3 0 0

7 . 5 7 0

7 . 9 7 0

4 0 . 0 0

. 4 0 0

I
!

8 . 4 1 0

7 . 9 1 0

-

,

. 0 3 0
. 0 3 0
. 0 3 0

!

. 0 3 0

!
>

. 0 3 0
. 0 3 0

|

8 . 4 1 0
8 . 4 1 0

7 . 9 1 0
7 . 9 1 0

-

. 3 0 0

_

. 4 0 0
. 4 0 0

4 0 . 0 0
4 0 . 0 0

-

. 3 0 0
. 3 0 0

p

o

1 0

o
o

8 . 4

7 . 9 1 0

l
I

. 4 0 0

_

|

j

i
-

. 3 0 0

~

;
!

_

!
j

i

i
-

. 0 3 0

1

|

1

-

. 3 0 0

-

. 3 0 0
. 3 0 0
. 3 0 0

1
i
j
i

-

j

:
1i

-

-

-

!

!

_

j
l

_

1

. 3 0 0

. 0 3 0

-

. 0 3 0
. 0 3 0
. 0 3 0

-

-

-

_

i

j

. 0 3 0
. 0 3 0

J

i

. 0 3 0

i

. 0 3 0

-

. 0 3 0

-

-

j

7 . 9 7 0

• Cr
O

7 . 4 2 0

7 . 7 2 0

4 0 . 0 0

. 4 0 0

7 . 4 2 0

7 . 7 2 0

7 . 4 2 0

7 . 7 2 0

4 0 . 0 0

©
©

O
o

7 . 5 7 0

&

j
. 3 0 0

. 4 0 0

!
1
i

-

1

. 0 3 0 i

-

. 3 0 0

. 4 0 0

-

. 3 0 0

. 4 0 0

-

. 3 0 0

-

-

. 3 0 0

-

-

-

-

-

-

-

:

6 . 9 1 0

7 .

1 6 0

4 0 . 0 0

. 4 0 0

6 . 9 1 0
6 . 9 1 0

7 . 1 6 0
7 . 1 6 0

4 0 . 0 0
4 0 . 0 0

. 4 0 0
. 4 0 0

-

. 3 0 0
. 3 0 0

-

-

4 . 8 0 0

5 . 2 5 0

4 0 . 0 0

. 2 5 0

-

. 3 0 0

-

-

4
4
4
5

5
5
5
6

4
4
4
4

.
.
.
.

-

.
.
.
.

-

-

-

-

. 8 0
. 9 0
. 9 0
. 6 3

0
0
0
0

.
.
.
.

2 5 0
3 5 0
3 5 0
0 8 0

0
0
0
0

.
.
.
.

0
0
0
0

0
0
0
0

2
2
2
2

5
5
5
5

0
0
0
0

-

-

3
3
3
3

0
0
0
0

0
0
0
0

i
i

'
i

. 0 3 0

!

. 0 3 0

_

!
!
t

j

i

!
1
;

5 . 4 0 0
5 . 6 5 0

4 0 . 0 0
4 0 . 0 0

. 2 5 0
. 2 5 0

33

_
-

. 3 0 0
. 3 0 0

_

_

-

-

1

i
|

~

!

j
1

-

. 0 3 0
. 0 3 0

-

. 0 8 0

-

.
.
.
.

0
0
0
0

8
8
8
8

0
0
0
0

1
4 . 9 5 0
5 . 2 0 0

-

. 0 3 0

-

"

Se e fo o tn o t e s at end of ta bl e .




-

[
I

©

ROLLERS, A S P H A L T . . . J
MOTOR GRADERS...................j
P I L E DR IV E RS , SCRAP-!
ERS, SHOVELS...............
TRENCHING MACHINES.
GROUP B:
HOI ST S, 1 D R U M . . . . .
ROLLERS (OTHER THAN
A S P H A L T ) .........................
PUMPS (2 OR MORE
4 - INC H AND OVER)
WI THI N 2 0 0 * R A D . .
GROUP C:
A IR C O M P RE S SO RS .. ..
BLADE GRADERS
(PULL T Y P E ) .................
MIXERS (UNDER 5
B AG S ) .................................
GROUP D:
A IR COMPRESSORS
(1 2 5 AND UND ER ). . . .
PUMPS, 3 OR UNDER
(UNDER 4 - I N C H ) ...............
O I L E R S ....................................
HELPERS AND LABORERS
CONSTRUCTION L A B O R E R S . . . .
BATCH TRUCK DUMPERS, HAND
BLADE O P E R A T O R S . . ....................
MORTAR MIXERS...............................
P IPE LA Y E R S .......................................
POWDERMEN AND B L A S T E R S . . .
ASPHALT RAKERS, SIDE R A I L
SETTERS, VIBRATOR AND
A I R TOOL OPERATORS...............
TUNNEL LABORERS.........................

j

i
;
!
!
!

. 0 8 0
. 0 8 0

i
1

~

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(Union hour ly wa ge r a te s and s t r a i g h t - t i m e w e e k l y hour s and e m p l o y e r i n s u r a n c e , p e n s i o n , v a c a ti o n , and o th er co n t ri b u t i o n s to funds in the
building t r a d e s , July 1, 1975 and July 1, 1976)
JULY 1,
1975

J UL Y

1,

197 6

EMPLOYER 'CONTRIBUTIONS
C L A S S I F I C A T IO N

PER x
HOUR

PER
HOUR

PER
WEEK

INSURA NCE 4

DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER5

PERCENT

DOLLARS

PERCENT
|

BOSTON,

HASS.
!

B U IL D IN G

i
i

CONSTRUCTION

I

i

JOURNEYMEN

AND

$ 9,2 60
10.680
9 . 900
1 0 . GOO
10.200

40.0 0
4 0 . 00
40.0 0
4 0.00
4 0.0 0

9. 600
10.105

10.000
10.665

40.0 0
4 0.00

I
i

_

0 .8 0 0
.75 0
.850
.60 0
.750

-

.500
.49 5 |

i
|
!
i

_

!
i
;

i
0 .8 0 0
13 _

-

1 .0 0 0
-

-

1.050
-

“
10. 00JI.

1 .1 0 0
1 .000;
.450
;
1 .5 5 0 |
. 3 20
;

10.610

10.240

10.490

'

~

. 80 0

!

8 .6 5 0
9 .2 0 0
9 .0 0 0
9 .0 5 0

I
I
I
|
;

9 .0 5 0
9 .4 6 0
10.460
11.580
10.360
10.230

!
!
[

1 0.360
8 .5 5 0
10.200
9 .7 4 0
8 .9 5 0

,
|
i
!

8 .9 5 0
8 .9 5 0
9 .6 3 0
9 .7 5 0
9 .7 4 0
9 .7 4 0

j
!
|
j
S
!

1
!

!
s
i
i
j

9 . 0 5 0

o
o

o

40.0 0
4 0.0 0
4 0.0 0
4 0 .0 0

1 .1 0 0
.520
.450
.700

9 .7 5 0
9 .7 6 0
1 0.760
11.880
1 0.760
1 0.980

40.0 0
4 0.0 0
4 0.00
4 0.0 0
4 0.00
4 0.00

.70 0
.720
.720
.72 0
.940
.60 0

10.760
9 .2 5 0
10.800
9 .7 4 0
9 .5 0 0

4 0.00
4 0.0 0
4 0 .0 0
40.0 0
4 0 .0 0

9 .5 0 0
9.5 0 0
9 .8 3 0
9 .9 0 0
9 .7 4 0
9 .7 4 0

4 0 .0 0
4 0.00
40.0 0
4 0.00
4 0.00
40.00

.700
.70 0
1.1 6 0
.8 5 0
.700
.70 0

9 . 7 5 0

4 0 . 0 0

. 7 0 0

8 .8 6 0
9 . 800
9.7 5 0
9 .7 5 0

!
j

|
'!
s
i
j
!
j

.940 I
.450 I
.700 I
.700
.700

-

. 800
. 590
.550
.80 0

_

.8 0 0
1 .0 5 0
1 .0 5 0
1 .0 5 0
1 .0 0 0
.8 0 0

i

_
-

-

-

_

I
j
;
;

I ' 1 - 100 i
-1.500
131 . 5 o o S
13. 8 0 0 i

~
_

i
Ii

-

;

~

-

i
i
;

!

7 . 5 0 0
7 . 5 0 0
7 . 5 0 0
7 . 0 7 0
8 . 3 5 0

7 . 7 5 0
7 . 7 5 0

!
j

|
I
!
j

:

7 . 7 5 0
7 . 7 5 0
9 . 9 5 0
8 . 7 1 0

8 . 6 5 0
8 . 3 5 0

I
HIGHWAY AND STREET
CONSTRUCTION

7 . 4 6 5
8 . 7 1 0

j

1

!!

i

i
i
:
i
;
!
l
i
j

!

. 6 0 0
. 6 0 0

. 400
. 2 50
. 250

_
_
-

.250
. 250
.300

-

. 2 50
. 2 50

4 0 . 0 0
4 0 . 0 0
4 0 . 0 0

!

!
I

4 0 . 0 0
4 0 . 0 0
4 0 . 0 0
4 0 . 0 0
4 0 . 0 0
4 0 . 0 0

i

-

;

-

. 7 0 0
. 7 0 0

. 6 0 0
. 6 0 0
. 6 0 0

-

. 4 9 5
. 8 5 0

-

. 6 0 0

-

.600

. 3 2 0

. 8 5 0

-

i

!
!

|
-

i
i
i
j

-

I
:
!

—

-

;

-

-

. 7 0 0
. 7 0 0

-

. 2 5 0
. 2 5 0

!

-

. 2 5 0

-

i
|
S

i
_
,
!

i

!
i
I

. 120
1 .4 5 0
.05 0
.06 0
. 120
.120
.120
. 100
. 180
.060
.06 0
-

I

9 . 6 2 0

_
_
-

j
j
1
!
|
i
i
i
I

10.000 !
10.2 00 |

40.0 0

.60 0

4 0 . 0 0

. 7 5 0

_ _ _ _ _ _ _ _ _ _ _ _ I

39

_

-

;

. 1 7 0
. 1 7 0

-

!

. 1 7 0
. 0 7 0

-

I

. 1 7 0
I
6 .0 0 ,i
|
_

. 2 6 6

I
-

. 17 0
. 1 7 0

-

. 0 5 0

-

. 4 5 0

_

~

I
|

j

i

1 .0 0 0

~
-

si
I

Se e fo o tn ot es at end of tab le.




!

I

!
i
10.000

!

:
—

I
i
!

JOURNEYMEN
CARPENTERS.......................................
CEMENT F I N I S H E R S ......................

:

i
.05 0
.050
.050
.05 0
. 120
.020

I

i

.280

i

s

. 7 0 0
. 7 0 0
. 7 0 0

I
I

|
i
i
i

•

!I

i
7 . 5 0 0
7 . 5 0 0
7 . 5 0 0

!
7 . 7 5 0
7 . 7 5 0

4 0 . 0 0
4 0 . 0 0

-

.500

!

7 . 7 5 0
7 . 7 5 0

-

i

i
!

_
~
-

LABORERS

BRICKLA YER S' TENDERS:
AGREEMENT A . . . . . ................. I
AGREEMENT B ......................... ..
B U I L D IN G LABORERS:
AGREEMENT A . . ....................... |
AGREEMENT B............................ 1
AGREEMENT C................. ...
.
ELEVATOR CONSTRUCTORS'
H E L P E R S . . ... ...................................
MARBLE SETTERS' HE L PE RS .. [
PLASTERERS' TENDERS:
AGREEMENT A ..............................
AGREEMENT
............
TERRAZZO WORKERS'
j
HELPERS..........................................|
T I L E LAYERS' HELPERS............|

|
j
I 14
I
1.0 5 0
6 .0 0 %
.266

_
-

!

_
-

0 .180
.02 0

!|

!
i

i
i

i
!

-

i
!
I

1 .0 0 0
13. 8 5 0
131 . 5 0 0
131 . 2 0 0 i
i
! 31 . 2 0 0
l31 . 2 0 0 ,
J31 . 1 0 0 i

~

I

!

-

.80 0

!
!

-

I
I
|
j

!
i
1 .1 0 0 !
I

_

!

l

1
10.360

o
o

HELPERS

$ 8 ,6 6 0
10.000
9 .7 5 0
1 0.000
9 .6 2 0

o
o
o
cj-

ASBESTOS WORKERS......................
BOILERMAKERS.................................
BR ICKLAYER S ....................................
CARPENTERS.......................................
CEMENT F I N I S H E R S ......................
E LEC TR ICI AN S ( I N S I D E
H I R E R S ) ..........................................
ELEVATOR C O N S TR U C TO R S .. ..
ENGINEERS— POWER E Q U IP MENT OPERATORS;
HEAVY EQUIPMENT:
POWER SHOVELS, P I L E DR IV ER S, HO IST ING
ENGINES .................................
MEDIUM EQUIPMENT:
BULLDOZERS, GRADERS,
SCRAPERS (21 YARDS
STRUCK OR L E S S ) ............
LIGH T EQUIPMENT:
PUMPS, COMPRESSORS,
WELDING MACHINES_____
G L A Z I E R S ............................. .............
LATHERS......................................... .
MARBLE SETTERS............................
MOSAIC AND TERRAZZO
WORKERS..........................................
P A I N T E R S ............................................
SPRAY........... ..............................
STRUCTURAL STEEL...............
P I P E F I T T E R S ....................................
SPRINKLER F I T T E R S . . . . .
REFRIGERATION AND AIR
CON DI TI O NI NG MECHAN­
I C S . ............................................
PLASTERERS......... .............................
PLUMBERS.............. .............................
R EI NF OR CI NG I RON WORKERS.
ROOFERS, C O M P O S I T I O N ............
WATERPROOF AND DAMPPROOF. .................................... .
ROOFERS, SLATE AND T I L E . .
SHEET-METAL W O R K E R S . . . . . .
STONEMASONS....................................
STRUCTURAL I RON WORKERS..
E L EC TR IC W E L D E R S . . . . . .
T I L E LAY ER S....................................

.02 0

Table 20. W age rates, hours, and employer contibutions to funds: Selected cities— Continued
(U n ion h o u r ly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , Ju ly 1, 1975 and J u ly 1, 1976)
JUL Y

JULY 1,
1975

1,

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER j
HOUR

RATE
PER
HOUR

PER
WEEK

PENSION

INSURANCE4

DOLLARS

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER 5

PERCENT

DOLLARS

PERCENT

BOSTON, HASS.
-C ONTINUED
HIGHWAY AND STREET
CONSTRUCTION
-C ONTINUED
JOURNEYMEN
-CONTINUED

1 .1 0 0

-

0 .8 0 0

-

-

-

-

4 0.00

1 .100

-

.80 0

-

-

-

-

4 0 .0 0
4 0.00

1.1 0 0
.70 0

-

.80 0
131 . 5 0 0

-

0 .2 5 0

-

.700

-

-

-

. 180

1 .0 0 0
.450

_

_

_

-

-

-

-

.020
-

1. 100

-

.8 0 0

-

-

-

-

p

I
|

1 .1 0 0

-

.80 0

-

-

-

-

4 0 .0 0
4 0.0 0

1.1 0 0
.70 0

-

-8 0 0
•’ 1 . 5 0 0

-

-

-

-

7 . 50 0

4 0 .0 0

.60 0

-

.70 0

-

10.410
1 0.600
1 1.490
1 0.4 30
1 0.4 30
10.430
1 1.630

4 0.00
4 0 .0 0
4 0.00
4 0 .0 0
4 0.0 0
4 0 .0 0
4 0.00

1 .020
.700
15 1 . 2 5 0
15 1 . 2 5 0
15 1 . 2 5 0
-

_
-

.5 5 0
1 .0 0 0
1 .2 5 0
1 .4 0 0
1 .4 0 0
1 .4 0 0
1.2 5 0

-

1 .2 5 0
1.2 5 0
1 .2 5 0

-

-

.80 0
.80 0
.32 0

o
o
o

ENGINEERS_POHER EQUIPMENT
OPERATORS:
HEAVY EQUIPMENT:
POWER SHOVELS, P I L E DRIV E RS , L I G H T E R S . .
MEDIUM EQUIPMENT:
BULLDOZERS, CEMENT
M IX ER S, STEAM
B O I L E R S ...............................
L IG H T EQUIPMENT:
PUMPS, COMPRESSORS,
WELDING MACHINES,
CONCRETE M I X E R S . . . .
STRUCTURAL IRON WORKERS..

$10,360

$ 1 0 . 61 0

10.240

10.490

8 .6 5 0
9 .7 4 0

8 . 8 60
9 .7 4 0

7 .5 0 0

7 . 5 00

10.000
9 .6 2 0

1 0.000
1 0.2 00

40.0 0
4 0 .0 0

.60 0
.75 0

10.360

10.610

40.0 0

10.240

1 0.490

8 .6 5 0
9 .7 4 0

8. 860
9 .7 4 0

7 .5 0 0

9 .8 1 0
9 .8 5 0
10.640
9 . 5 80
9 .5 8 0
9 . 5 80
10.880

-

-

0 .0 6 0

-

HELPERS AND LABORERS

o
o
o

GENERAL L A B O R E R S . . . . ............

.600

i
!

OTHER HEAVY CONSTRUCTION

CARPENTERS.......................................
CEMENT F I N I S H E R S ......................
ENGINEERS— POWER EQ U IP ­
MENT OPERATORS
HEAVY EQUIPMENT:
POWER SHOVELS,
P I L E DRIVERS
L IG H T E R S .................................
MEDIUM EQUIPMENT:
BULLDOZERS,
CEMENT MI XER S,
STEAM B O I L E R S ....................
L IG H T EQUIPMENT:
PUMPS, COMPRESSORS,
WELDING MACHINES,
CONCRETE MIXERS...............
STRUCTURAL IRON WORKERS..

©
o
o

JOURNEYMEN
_

.250

-

-

.06 0

-

-

.170

_

_

_

-

-

-

-

_
-

-

HELPERS AND LABORERS

GENERAL LABORERS.......................

BU FFALO,

B U I L D IN G

I.T o

CONSTRUCTION

JOURNEYMEN

ASBESTOS WORKERS......................
BOILERMAKERS..................................
BRICK LAY ER S ....................................
CARPENTERS.......................................
MI LLW RI GH TS ............................
P I L E D R I V E R S . . . ....................
CEMENT F I N I S H E R S .......................
MACHINE OPERATORS,
FLOOR.......................................
SWING............................................
MACHINE O P E R A T O R S . . . . .
E LE C TR IC IA N
(INSIDE
H I R E R S ) ..........................................
R E S ID E N T IA L W I R E H E N . . .
ELEVATOR C O N S T R U C T O R S .. ..

11.050
11. 150
1 1.300

1 1.8 0 0
1 1.900
12.050

40.0 0
40.0 0
4 0 .0 0

t l O . 872
9 .9 4 0
10.555

1 1.616
9 .9 4 0
10.990

3 5 .0 0
35.0 0
4 0.0 0

.550
.55 0
.495

S e e fo o tn o t e s at end of t a bl e .




40

161 .0 0 %
1.0 0

_
.630
.070
.070
.070
-

_
-

-

-

-

-

-

-

-

-

-

.050
.05 0
9. 0 2 0

-

6. 8 7 4
8_

-

Table 20. Wage rates, hours, and enployer contributions to funds: Selected cities—Continued
(U nion h o u r l y w a g e r a t e s an d s t r a i g h t - t i m e w e ek ly h o u r s and e m p l o y e r i n s u r a n c e ,
b u i l d i n g t r a d e s , July l , 1 9 7 5 a n d J u l y 1, 1976)

JULY 1,
1975

vacation,

a n d o t h e r c o n t r i b u t i o n s to f u n d s i n t h e

JOLI 1, 1976
-------------------

—

RATE
PER
HOUR

CITY AND JOB
CLASSIFICATION

pension,

RATE
PER
HOUR

HOURS
PER
WEEK

EMPLOYEE CONTRIBUTIONS
TO FUNDS3
i
!

!

DOLLARS! PERCENT I DOLLARS ! PERCENT
!

DOLLARS i PERCENT

DOLLARS |PERCENT

BUFFALO* H o le
-C ONTINUED

BUILDING
CONSTRUCTION
-CONTINUED
JOURNEYMEN
-CONTINUED
1
i
!
!
i
,
1
i $11,435 :
i
!
i 1 1.240 i 40.00 ;
; 11.280 i 40.00
!
I
!
9.400
40.00 !
:
9. 555
40.00
9.740 1 40.00 ;
'10.920 i 40.00 ,
11.450 ! 40.00 '
1 1.205 I 40.00 ,
|
1 1 . 1 1 0 i 40.00 i
10.255 j 40.00 ;
40.00 :
10.505
10.755 1 40.00 I
10.505 1 40.00 !
11.920
40.00 ,
40.00
* 10.255
| 1 1.920
35.00
! 11.690
40.0 0
11.060
40.00
11.530
35.00
40.00 i
6. 870
40.00 1
j
10.880
!
9.740
40.00 j
1
9. 890
40.00 j
i 11.480 ! 35.00 ;
11.490 | 40.00
| 10.880 , 40.00
i
I 10.880 I 40.00
i
11.110 | 40.00

HELPERS

AND

LABORERS

o
o
o

ENGINEERS— POWER EQUIPKENT OPERATORS:
HEAVY EQUIPMENT— SHOVELS, CRANES, DERRICKS
$10,4 35
MEDIUM EQUIPMENT:
HOISTING ENGINEERS,
CONVEYOR OPERATORS..
10.240
TRENCHING MACHINES...
10.280
LIGHT EQUIPMENT:
COMPRESSORS, MECHANICAL HEATERS.......
9.400
PUMPS...............
9.555
GLAZIERS.......... ......
9.030
LATHERS.................
10.920
MACHINISTS. . . ............
11.450
MARBLE SETTERS..........
10. 355
MOSAIC AND TERRAZZO
WORKERS...............
10.260
PAINTERS......................
8.655
SPRAY.. .... ........... . .
8. 905
STEEL. ______ ______ . . . . . .
9. 155
8.905
SWING SCAFFOLD ..........
HIGH BRIDGE..............
10.320
PAPER HANGERS...... ......
8.655
PIPEFITTERS.... ............
10.120
SPRINKLER FITTERS .......
10.840
PLASTERERS..... .............
11.060
PLUMBERS.......... ...........
11.190
RESIDENTIAL.............
7.060
REINFORCING IRON WORKERS. ! 10.270
ROOFERS, COMPOSITION..... 1
8.92G
ROOFERS, SLATE AND TILE.. !
9.070
SHEET-METAL WORKERS..... 1 10.730
STONEMASONS.. ........... ; 10.640
STRUCTURAL-IRON WORKERS..
10.270
ORNAMENTAL IRON WORK­ i
ERS................. I 10.270
T I L E L A Y E R S ..................
10.260

1
0.500!
1
1
.500!
.50 0:
I
.500'
.500
.700

!
I
I
- !
i
I
!
j
I

-

-

~

i
!
!
j

“
-

-

.800
i

~

1

-

.525:
.5251
.525!
* 525 j
.525
.525
.500
.600
-

.740;
.740;
.980!
.890 !
.890
.500 |

i

I
.500
.50Q

-

. 500(
.500)
. 550i
. iool
.500 j
1.250

-

1.250!
. 300
. 30Q!
. 300i
. 300:
. 300
.300 !
.930;
.9 00)

-

|
i
j
!
!
!
!
|
!

~
-

!

-

I
- I
j
- i
- |
t
!
- i
-

_

!
I
!
!
I

-

-

i
I

-

I
:
i
;
:

-

!

-

i
!

-

i
i

'
!

i
;
-

-

j
j

-

-

-

|

-

!
i

17.720
1?.720
.800)
.03 0!
i8 _ j
. 63 o|

-

.630!
.610)
.610!
.610
.610
.610
.610
.770
.150
. 150
.070
.04 0
.04 0)
.660;
.630:
.070;

-

.070:
.630)

-

-

;
!

"

j

!
-

!

8.055
7.955

8.155
8.055

i
I

I

40.00
40.00

.950
.950

1.300
1.300

-

-

|
!
i

)

!
5.000

5.350

-

40.00

-

_

!
|

!

.520)
.550)

-

7.390
8.360

7.690
8.910

40.00
: 40.00

.495
.550

|

_

-

i

. 320
. 400 '

S~

;
!
!

8.360
8.460
8.360

8.910
9.010
8.910

-

-

I

I 40.00
j 40.00
| 40.00

|

.550
.550
.550

.400
. 400
.400

-

:

~

I

1
1
!

j

9 .020
1 .000

!

i
i
-

_

i
i
i
i

_

1 .000
1.000
1.000
I

j

l

!

-

!

i

!

I
!

1

|

-

j

!

I

-

!
!

;

i
i

I

9. 580
9.580
10.880

10.430
10.430
1 1.630

40.00
40.00
40.00

151.250
151.250

!

_

_

.

-

-

-

.500

-

-

-

9 .670

.500

-

-

-

9 .670

.500

-

1.400
1.400
1.250

;

|

o
o

.500

!

o

o

o

10.980

.500

i

o

o

o

I

9. 240

.500
J___________1

Se e fo ot no t e s at end of ta bl e.

41

_

9.670
1_ _ _ _ _ _ _ _

'

I
-

!

11.120

o

HOES, PAVERS ........... | 10.220
MEDIUM EQUIPMENT — ROLL­
ERS,
HOI ST IN G E NGI N­
EERS OPERATORS ....... •„* S 1 10. 080
L IG H T EQUIPMENT— COM­
PRESSORS, HEATING
B OI L E RS .....................................
9.240

.070
.070
!

l

ELS, CRANES, BACK-




i

-

i

!

CARPENTERS ...................
P I L E DRI VERS ..............
CEMENT F I N I S H E R S ...........
ENGINEERS — -POWER E Q U IP ­
MENT OPERATORS:
HEAVY EQUIPMENT — SHOV­

-

!

|

|

!

JOURNEYMEN

17.720i
17.720

-

4 .QQ%(

-

•

HIGHWAY AND STREET
CONSTRUCTION

-

J
17
i
0-720

I
!

BUILDING LABORERS:
A G R E E M E N T A .............. |
A G R E E M E N T B .............. |
A G R E E M E N T C:
!
R E S I D E N T I A L ........ .
ELEVATOR CONSTRUCTORS'
H E L P E R S . .............. ...... |

MARBLE SETTERS' HE LPE RS ..
TERRAZZO WORKERS'
H E L P E R S . ....................
GRINDERS ..................
T I L E LAYERS' HELPERS ......

!

-

!
:

I

-

1
i
1
!

~

!

.8501
. 850!
1.230 !
1. 300;
1. 300’
.800!
1.250!
1.230!
1.230
1.250 '

-

j

i

-

-

-

-

0. 50C

!

.98 0
.980

j
j
!

Table 20. W age rates, hours, and employer contributions to funds: Selected cities— Continued
( U n i o n h o u r l y w a g e r a t e s an d s t r a i g h t - t i m e w e e k l y h o u r s an d e m p l o y e r i n s u r a n c e ,
b u i l d i n g t r a d e s , J u l y 1, 1 9 7 5 an d J u l y 1, 1 97 6)

p ension,

vacation ,

JU LY

JULY 1,
1975

1,

an d o t h e r c o n t r i b u t i o n s to f u n d s in th e

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

PER
HOUR

t

PER
HOUR1

PER
WEEK

PERCENT

DOLLARS

VACATION

PENSION

INSURANCE4

DOLLARS

PERCENT

]DOLLARS

OTHER5

PERCENT

1DOLLARS

JPERCENT

BUFFALO* N „ Y .
-CONT INUE D

HIGHWAYS AND STREET
CONSTRUCTION
—CONTINUED
JOURNEYMEN
-CONTINUED
STRUCTURAL IRON WORKERS..

$10. 2 70

$ 10,880

4 0.00

0 .9 8 0

1 .2 3 0

0.0 7 0

7 .9 5 5

8 .0 5 5

4 0.00

.95 0

1 .3 0 0

9. 520

HELPERS AND LABORERS

GENERAL LABORERS......................
OTHER HEAVY

CONSTRUCTION

JOURNEYMEN

CARPENTERS, WHARF B U I L D ­
ERS, P IL E DRIVERS, DOCK
CARPENTERS.................................
CEMENT F I N I S H E R S ......................
ENGINEERS
POWER E QU IP­
MENT OPERATORS:
HEAVY EQUIPMENT— SHOV­

—

9 . 5 80
1 0.880

-

1 0 . 4 30
1 1 . 6 30

4 0.0 0
4 0.0 0

6 1 .2 5 0
-

1 1. 120

40.0 0

.500

.5 0 0

9.67 0

1 0.980

40.0 0

.50 0

. 50 0

9. 6 7 0

9 .2 4 0
1 0.880

4 0.0 0
4 0.00

-

1 .4 0 0
1 .2 5 0

I
!
I

-

-

-

.070
-

_

ELS, CRANES, BACK-

.......... ............... t 1 0 . 2 2 0
—
............. .
110 . 0 8 0
—
......... t 9 . 2 4 0

HOES
MEDIUM EQUIPMENT
ROLL­
ERS,
HO IS T IN G ENGINE
OPERATORS
L IG H T EQUIPMENT
COM­
PRESSOR OPERATORS,
HEATING BOIL ERS
STRUCTURAL IRON WORKERS..
ORNAMENTAL IRON
WORKERS....................................

10. 2 70

.50 0
.98 0

-

.50 0
1 .2 3 0

.98 0

-

1 .2 3 0

!1

-

9.670
.070

-

-

.07 0

-

1 7. 550
9.52 0

-

I
10.270

10.880

8 . 3 55
7 .9 5 5

8 .4 5 5
8 .0 5 5

40.0 0

-

HELPERS AND LABORERS
|

MIN ER-LABORERS ............................
GENERAL LABORELS......................

4 0 .0 0 I
4 0.00

.95 0
.95 0

1 .3 0 0
1 .3 0 0

-

-

-

-

.200
1 .0 0 0
. 3 00
.35 0
.35 0
-

-

6 1.0 0 0
-

-

-

.20 0
.3 2 0

CHATTANOOGA# TEHMo
I
B U I L D IN G

CONSTRUCTION

JOURNEYMEN

ASBESTOS WORKERS......................
BOILERMAKERS.................................
BR ICK LAYERS. ................................
CARPENTERS.......................................
MIL LW RI GH TS ............................
CEMENT F I N I S H E R S ......................
ELE CT R IC IAN S (I N S I D E
H I R E R S ) ..........................................
ELEVATOR CONSTRUCTORS------ENGINEERS— POWER EQ UIP­
MENT OPERATORS:
GROUP A— BULLDOZERS,
CRANES, DRAG LINES,
HO I S T S , SHOVELS,
SCRAPERS, TRENCHING
MACHINES.................................
GROUP B— CENTRAL COM­
PRESSOR PLANTS, PAV­
ING MACHINES, TRAC­
TORS, CONCRETE PUMPS,
EARTH AUGERS, FORK­
L I F T S ..........................................
GROUP C— PORTABLE COM­
PRESSORS, PUMPS ( 2 ,
NOT MORE THAN 3) ,
WELDING MACHINES,
OILERS (C O M B IN A T IO N ).

7 .3 9 0
8 .2 0 0
8 .6 5 0
7 .5 8 0
8. 030
7 .5 5 0

7 . 880
8 .8 0 0
9 .2 5 0
8 . 180
8 .6 3 0
8 . 100

40.0 0
4 0 .0 0
40.0 0
40.0 0
40.0 0
40.0 0

.300
.600
.35 0
.40 0
.400
-

8 .0 3 0
7 .1 8 0

8 . 532
8 .6 6 0

4 0.0 0
40.0 0

.60 0
.495

7 .3 5 0

7 .9 5 0

4 0 .0 0

.30 0

.2 5 0

.020

6 .5 5 0

7 .1 5 0

40.0 0

.300

.25 0

.020

5 .9 5 0

6 . 550

4 0 .0 0

.30 0

S e e f o o tn o t e s at end of ta bl e .




42

-

.250

1.0 0 %
-

-

_
-

-

-

6 2 .5 0 %
12 6 .0 0

-

.020
.020
.020
.020

-

.020

_
-

-

6 2 .5 <
2.31

-

Table 20, Wage rates, hours, and employer contributions to funds: Selected cities— Continued
( U n i o n h o u r l y w a g e r a t e s and s t r a i g h t - t i m e w e e k l y h o u r s an d e m p l o y e r i n s u r a n c e ,
b u i l d i n g t r a d e s , J u l y 1, 1 9 7 5 and J u l y 1, 1 97 6)

pen sion ,

JULY 1,
1975

v acation ,

JULY

1,,

and o t h e r c o n t r i b u t i o n s to f u n d s in t h e

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C IT Y AND JOB
C L A S S I F I C A T IO N

RATS
PER
HOUR

RATE
PER
HOUR

HOURS
PER
WEEK

INSURJkNCE4

DOLLARS

PENSION

DOLLARS

PERCENT

OTHER5

VACATION

PERCENT

DOLLARS

PERCENT

DOLLARS _..PERCENT

CHATTANOOGA, TEH I ©
•COMTIHOED
BU IL D IN G CONSTRUCTION
-CONTINUED
JOURNEYMEN
-CONTINUED

ENGINEER—POWER EQUIPMENT
OPERATORS -CONTINUED
GROUP D— A IR COMPRES­
SORS (1 POR TAB LE) ,
FIREMEN, PORTABLE
CRUSHERS............................ ..
G L A Z I E R S ...................... .....................
LATHERS .............. ................................
M A C H I N I S T S . . . . .........................
WELDERS.......................................
MARBLE S E T T E R S . . ......................
MOSAIC AND TERRAZZO
WORKERS..........................................
P AI NTE RS , R E S ID E N T IA L AND
COMMERCIAL....................................
PAPERHANGERS......................... ..
P I P E F I T T E R S ............................ ..
P LA ST ER ER S. ....................................
PLUMBERS.............. .............................
RE I NFORCI NG IRON WORKERS.
ROOFERS, C O M P O S I T I O N ............
ROOFERS, SLATE AND T I L E . .
SHEET- METAL WORKERS...............
STONEMASONS.............. ....................
STRUCTURAL IRON WORKERS..
T I L E LAYERS....................................
HELPERS

$5,650
6 .8 3 0
7 .7 5 0
9 . 150
9 .1 5 0
8. 650

$ 6,250
7 . 4 60
8 .3 5 0
1 0.070
10.070
9 . 250

4 0.00
4 0.00
4 0.00
4 0.0 0
4 0.00
40.0 0

0 .3 0 0
.35 0

-

0 .2 5 0
.30 0

8 .6 5 0

9 .2 5 0

4 0 .0 0

.35 0

_

. 300

_

_

_

.25 0
. 2 50
.40 0
.40 0
.3 5 0
. 1 00
. 1 00
.50 0
.300
.350
.300

_

_
60 . 200

_

7 . 500
7 .7 5 0
9 . 00 0
8 .4 5 0
9 .0 0 0
8 .6 1 0
8 . 200
8 . 400
9 . 340
9 . 250
8 . 6 10
9 . 250

7 .0 0 0
7 .2 5 0
8 .5 0 0
7. 9 5 0
8 . 500
7 .8 6 0
7 .6 0 0
7 .8 0 0
8 .3 5 0
8 .6 5 0
7 .8 6 0
8 .6 5 0

_

_

4 0 .0 0
4 0.0 0
4 0.00
4 0.0 0
40.0 0
4 0.00
4 0.0 0
4 0 .0 0
4 0.0 0
40.0 0
4 0.00
4 0 .0 0

.4 7 0
.3 5 0
.4 0 0
.350

.35 0
.350
.400

-

-

-

-

I
-

~

_

.020
_

-

. 2 00
j

I

0 .0 2 0
.020

4 .0 0 %
-

_

. 10 2
. 102 |
.020 j
i
i
I
I
i

-

. 100 i
.020
.020
.020
i

"

AND LABORERS
!
I
5 .3 0 0
5 .2 0 0

5 .9 0 0
5.8 0 0

40.0 0
4 0 .0 0

.200
.20 0

5. 0 26
5 .3 0 0
5 .2 0 0
5 . 200

6 . 062
5 .9 0 0
5 .8 0 0
5 .8 0 0

4 0 .0 0
4 0 .0 0
40.0 0
4 0.0 0

.495
.200
.20 0
.200

5 . 30 0
5 .3 0 0

5 .9 0 0
5 .9 0 0

4 0 .0 0
40.0 0

.200
.20 0

9 .9 6 0
10.550
9 .9 5 0
10.150
9 .7 5 0
10.000

1 0 . 51 0
11.550
1 0.410
1 0.150
9 .7 5 0
1 0.000

4 0 .0 0
3 7.50
4 0.00
4 0 .0 0
4 0 .0 0
4 0 .0 0

.81 0
.750
. 7 00
.65 0
.82 0
.82 0

~
-

.7 2 0
1 .0 0 0
.75 0
.8 3 0
.850
.85 0

4 0.00
4 0.00

.770
.54 5

_
-

.78 0
.350

BRICKLAYERS* TENDERS............
B U IL D IN G LABORERS....................
ELEVATOR CONSTRUCTORS*
H E L P E R S . . .......................................
MARBLE SETTERS' HE LPE RS ..
PLASTERERS* L A B O R E R S . . . . .
PLUMBERS' LABORERS.................
TERRAZZO WORKERS*
H E L P E R S . ..... ................................
T I L E LAYERS* HELPERS............
CHICAGO,

-

|

.2 0 0
.20 0

i|
1
!
j

_
“
_
_

-

-

.32 0
.20 0
.2 0 0
. 2 00

_

_

-

-

.20 0
.20 0

_

_

j
i

-

_

1 26 . 0 0
j
1
~

.020
.020

j

2 .3 0 %
-

.02 0
.02 0
.020

_

.020
.02 0

~

“

IL L *

B U IL D IN G CONSTRUCTION

JOURNEYMEN
I

i

1 0.7 50
11.910

I

1 .0 0 %
-

.65 0
.65 0

_

.850

_

8 . 1 00

8 . 100

4 0 .0 0

.650

_

.85 0

_

6 .8 5 0
9 .3 9 0
9 .0 6 0
10.470

6 .8 5 0
9 .8 3 0
9 . 310
1 1.020

4 0.00
4 0 .0 0
4 0 .0 0
4 0.00

.6 5 0
.28 0
.58 0
.530

-

.85 0
.69 0
.44 5
.45 0

-

. 400
6. 7 5 0
-

9 .6 2 0

9 .9 0 0

.700

_

_

. 800

9 .3 0 0
8 .6 0 C
8 .6 0 0

9 .8 5 0
8 .9 5 0
8 .9 5 0

.7 0 0
.5 7 5
.575

_

o
o

4 0.00

9 .2 5 0

o

10.550

9 .2 5 0

o
o

4 0.00
4 0 .0 0
40.0 0

43

.85 0

.65 0
-

10.550

Se e fo ot no t e s at end of ta ble .




61.0 0 0
6 . 2 50
6.30 0
6 .300

-

■C

10.750
10.260

j

o

ASBESTOS WOR KE RS ...................
BOILERMAKERS.................................
BRICKLAYERS ......................... ..
C A R P E N T E R S . . .................................
CEMENT F I N I S H E R S . . . ...............
SWING S C A F F O L D . . ...............
EL E CT R IC IA NS { I N S I D E
W IR E R S ) ............................ .............
ELEVATOR C O N S T R U C T O R S . . . .
ENGI NEE RS — POWER E Q U I P ­
MENT OPERATORS:
CLASS 1:
CRANES. . .............................. .
CLASS 2 :
TRACTORS.................................
CLASS 3 :
AIR COMPRESSORS...............
CLASS 4 :
O I L E R S ............................ .. . . .
G L A Z I E R S ..........................................
LATHERS. . . .............................. . . .
M A CH IN IS TS .......................................
MARBLE SETTERS AND
C U T T E R S . . . .................................
MOSAIC AND TERRAZZO
WORKERS.........................................
P A I N T E R S ............................................
PAPERHANGERS..............
....

_

-

_
.25 0
.45 0
.45 0

_
6 .0 0

.05 0
.470
.050
.010
.01 0

i
|

!
!

5 .0 0
-

. 150
.020 j

2.3 1

_

. 400

_

'

.400

_

_

.40 0

_

_

_
6 .1 0

_
6 1 .0 0 0
.07 5
-

_
-

_

_

_

_

_

_

_

-

-

-

. 189
6 .200
6 .20 0

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s t r a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in th e
b u ild in g t r a d e s , July 1, 1975 and J u ly 1, 1976)
JULY 1,
1975

JU LY

1,

1 97 6

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR1

HOURS
PER
WEEK

INSURANCE4

DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER5

DOLLARS

1—
PERCENT

I
I
!

1

PERCENT

CHICAG O, I L L c
-C ONTINUED

B U IL D IN G CONSTRUCTION
-CONTINUED
JOUBNEYHEN
-CONTINUED

i

P IP E F I T T E R S ................. ..................
SPRINKLER F I T T E R S ............
PLASTERERS.......................................
PLUMBERS............................................
REINFORCING IRON WORKER^.
ROOFERS, COM POSITIO N............
ROOFERS, SLATE AND T I L E . .
SHEET-METAL WORKERS...............
STONEMASONS....................................
STRUCTURAL-IRON HORKERS..

$ 10,850
9 .5 0 0
9 .5 0 0
10.178
10.750
10.600
10.740
10.800
9 .9 5 0
1 0.750

$ 11 ,50 0
1 0.1 00
9 .6 0 0
1 0.920
1 1.050
1 0.700
11.090
1 1.450
10.410
1 1.050

4 0.0 0
40.0 0
4 0.0 0
4 0 .0 0
4 0.00
4 0 .0 0
40.0 0
4 0.0 0
4 0 .0 0
40.0 0

0 .7 0 0
.750
.6 0 0
.700
1 .0 9 0
.960
.96 0
.50 0
.700
1 .0 9 0

_
-

0 .8 5 0
.900
.81 0
.60 0
1 .5 3 0
.80 0
.50 0
. 590
.75 0
1 .5 3 0

_
-

ARCHITECTURAL IRON
F I N I S H E R S ...............................
T I L E LAYERS ....................................

9 .9 8 0
9 .8 0 0

1 0.500
10.300

4 0 .0 0
4 0 .0 0

.650
.30 6

-

.5 7 5
.52 5

-

-

“

-

7 .5 5 0
7 .2 0 0

8 .0 5 0
7 .8 0 0

4 0 .0 0
4 0 .0 0

.570
.570

HELPERS

-

_
-

_
-

6 0 .0 2 0
1 .000
.125
6 .550
.310
.020
-

-

0 .300
6 .25 0

-

1
-

.320
.05 0
6 .31 0

-

6 .50 0
.075

-

-

-

AND LABORERS

BRICKLAYERS* TENDERS............
B U I L D IN G LABORERS....................
ELEVATOR CONSTRUCTORS'
HELPERS............................................
MARBLE SETTERS' HE LP E RS ..
PLASTERERS' LABORERS............
TERRAZZO WORKERS *
HELPERS
FLOOR MACHINES....................
BASE MACHINE OPERATORS
T I L E LAYERS' HELPERS............
HIGHWAY AND STREET
CONSTRUCTION

7 .1 5 5
8 .7 0 C
7 .2 0 0

8 .3 4 0
9 .0 0 0
7 .8 0 0

4 0 .0 0
40.0 0
4 0.0 0

.54 5
.620
.570

8 .4 0 C
8 .6 5 0
8 .6 0 0

9 .0 0 0
9 .2 5 0
9 .0 5 0

4 0 .0 0
4 0 .0 0
4 0.00

.45 0
.450
.30 6

1 0.150
9 .7 5 0
10.000

10.150
10.050
10.300

4 0.0 0
4 0 .0 0
40.0 0

.650
.8 2 0
.820

10.200

10.200

.65 0

_

1 .1 0 0
1 . 100

-

_

_

-

-

_
-

I

-

.35 0
1 .1 0 0

-

-

6.0 0 $!

-

-

-

-

-

“

-

.83 0
.8 5 0
.85 0

_
-

_

-

6.300
6.30 0

_
-

-

.85 0

-

.40 0

-

~

2 .3 1 5
-

|
I

.4 0 0
.4 0 0
.5 2 5

-

.020

-

.330

i
-

!

-

.17 3
.173
.075

-

I

HELPERS

|

_

_

_

-

.01 0
.01 0

_

-

i
I

!

9 .6 5 0

9 .6 5 0

8 .9 0 0

8 .9 0 0

7 .8 0 0
6 .8 0 0
10.750

7 .8 0 0
6 . 8 00
11.050

o
©

j

©

i
I

4 0 .0 0
4 0 .0 0
4 0 .0 0

.650

-

.85 0

-

. 400

.650

-

.85 0

-

. 400

-

.650
.65 0
1 .0 9 0

-

.850
.8 5 0
1 .5 3 0

-

.400
.400
-

-

-

-

!
-

j

AND LABORERS

.29 0

-

i
7 .2 0 0

7 .8 0 0

©
o
o

CONSTRUCTION L A B O R E R S . . . .
OTHER HEAVY

O

i
j

©
©
o

CARPENTERS.......................................
CEMENT F I N I S H E R S ......................
SWING SCAFFOLD....................
ENGINEERS— POWER EQ UIP­
MENT OPERATORS:
HEAVY EQUIPMENT— DER­
R I C K S , CRANES, KOEHRING SCOOPERS, POWER
SHOVELS....................................
MEDIUM EQUIPMENT—
TRACTORS, END LOAD­
ERS, AND S IM I L A R
MACHINES .................................
L IG H T EQUIPMENT:
F O R K L I F T S ..............................
PUMPS, TWO OB MORE
WELDING M A C H I N E S . . . .
O I L E R S .......................................
STRUCTURAL IRON WORKERS..

O
o

JOURNEYMEN

.560

1 .1 0 0

-

-

j

-

CONSTRUCTION

-

!

JOURNEYMEN

10.150
9 .7 5 0

1 0.150
9 .7 5 0

40.0 0
4 0 .0 0

.650
.820

©
O

1 0.2 00

&

10.200

.65 0

S e e fo o tn o t e s at end of t a bl e .




.83 0
.8 5 0

-

|

_

-

6 .30 0

!

©

CARPENTERS.......................................
CEMENT F I N I S H E R S .......................
ENGINEERS— POWER E QUI P­
MENT OPERATORS:
CLASS I :
DE RRICKS, CRANES,
KOEHRING SCOOPERS,
POWER SHOVELS....................

44

.85 0

.40 0

_

_
-

.010

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
( U n i o n h o u r l y w a g e r a t e s and s t r a i g h t - t i m e w e e k l y h o u r s a n d e m p l o y e r i n s u r a n c e ,
b u i l d i n g t r a d e s , J u l y 1, 1 97 5 and J u l y 1, 1 97 6)

pen sion ,

vacation,

J UL Y

JULY 1,
1975

1,

and o t h e r c o n t r i b u t i o n s to fu n d s in th e

1 97 6

EMPLOYER CONTRIBUTIONS
TO FUNDS3
RATE
PER !
HOUR

C I T Y AMD JOB
C L A S S I F I C A T IO N

RATE
PER j
HOUR

PER
WEEK

PENSION

IN SURANCE4

DOLLARS

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER5

PERCENT

DOLLARS

PERCENT

CHIC AG O, I L L .
-C ONTINUED
OTHEB HEAVY CONSTRUCTION
-C ONTINUED

0 .6 5 0

o
o

$ 9,6 50

$ 9,6 50

-

0 .8 5 0

8 . 90C

8 .9 0 0

.65 0

-

. 85 0

7 .8 0 0

7 .8 0 0

4 0.0 0

.65 0

-

.85 0

6 .8 0 0
10.000
10.750

6 .8 0 0
10.000
11.050

40.0 0
4 0.0 0
40.0 0

.65 0
.82 0
1 .0 9 0

-

.850
.85 0
1 .5 3 0

o
o
o

ENGINEER-POWER EQUIPMENT
OPERATORS -CONTINUED
CLASS I I :
TRACTORS, END LOADERS
SCOOPS AND S IM I L A R
MACHINES....................................
CLASS I I I :
F O R K L I F T S , STONE............
CLASS I V :
PUMPS, 2 OR MORE............
CLASS V:
O I L E R S .......................................
SWING SCAFFOLD....................
STRUCTURAL IRON WORKERS..

■c
o

JOURNEYMEN
-CONTINUED

L A B O R E R S ....

CINCINN ATI*

0 . 400

-

.400

~

. 400

~

“

“

. 400
6 . 300

~
-

~
0 .0 1 0
6 .290

-

-

-

“

~
~

|

HELPERS AND LABORERS

CONSTRUCTION

“

7 . 2 00

7 .8 0 0

4 0.0 0

.570

-

1 .1 0 0

-

10.760
8 .5 5 0
10.<145

11.510
9 . 0 50
1 0.795

4 0.00
4 0.00
4 0 .0 0

.600
.60 0
.45 0

-

.850
1 .0 0 0
.350

-

6 1.1 0 0
6 . 450

-

.020
1.000
. 145

-

10.795
1 0.550
9.6 9 0
9 .6 7 0

4 0 .0 0
40.0 0
40.0 0
40.0 0

.45 0
.600
.500
.55 0

-

. 35 0
. 6 50
.850
.60 0

-

6.450
6 .75 0
6 1 .0 0 0

-

. 145
.025
.125
.035

-

9 .9 3 6
10.635

4 0.0 0
4 0.00

.400
.495

-

.30 0
.32 0

6 8 .0 0 %
4 .0 0

.200
.020

OHIO

BU IL D IN G CONSTRUCTION

JOURNEYMEN
ASBESTOS WORKERS......................
BOILERMAKERS.................................
B R I C K L A Y E R S....................................
CLEANERS, POINTERS,AND
CAULKERS.....................................
CARPENTERS.................... ..................
MI L LW RI GH TS ............................
CEMENT F I N I S H E R S ......................
E LE C TR IC IA N (I N S I D E
W I R E R S )..........................................
ELEVATOR C O N S TR U C TO R S. .. .
ENGINEERS-POWER EQUIPMENT
OPERATORS:
GROUP A:
CRANES, DERRICKS,
POWER SHOVELS.................
GROUP B:
BULLDOZERS, POWER
GRADERS...............................
GROUP C:
A IR COMPRESSORS,
ASPHALT ROLLERS,
PUMPS................. ..................
GROUP D:
COMPRESSORS, MI XER S,
ROLLERS.................................
GROUP E:
B A C K FI L LE R S , CON­
CRETE SPREADERS ..............
GROUP F ;
O I L E R S , PUMPS.................
G L A Z I E R S ............................................
LATHERS...............................................
MA CH IN IS TS , CONSTRUCTION
AND EREC TION............................
MARBLE SETTERS............................
TERRAZZO WORKERS......................
PAINT ER S:
COMMERCIAL...................
I N D U S T R I A L ...............................
R E S I D E N T I A L ............................
PAPERHANGERS:
COM MER CIAL . ............................
I N D U S T R I A L .............. ...............
R E S ID E N T IA L ............................
P I P E F I T T E R S . .................................
PLASTERERS............................ ..
PLUMBERS............................................
REINFORCING IRON WORKERS.
ROOFERS, COM POSITIO N............
SHEET-METAL WORKERS...............
STONEMASONS....................................
STRUCTURAL AND ORNAMENTAL
IRONWORKERS...............................
T I L E LAYERS....................................

j
!
!
!
|
!
I
|
!
I

10.445
10.550
9 .4 4 0
9 .3 9 5
9 .9 3 6
9 .9 1 0

j
|
|
i

-

10.460

1 1 . 1 10

40.0 0

.4 6 0

-

1 .0 0 0

-

-

-

.08 5

i
|

10.300

10.950

4 0 .0 0

.460

-

1 .0 0 0

-

-

-

.085

I
|

9 .9 4 0

10.590

4 0.00

.46 0

-

1 .0 0 0

-

-

-

.085

9 .1 6 0

9 . 810

40.0 0

.46 0

-

1 .0 0 0

-

-

.085

8 .8 3 0

9 . 480

4 0.0 0

.460

1 .0 0 0

-

-

.085

-

8 . 0 30
1 0.700
10.670

4 0 .0 0
4 0.00
4 0 .0 0

.460
-

-

1 .0 0 0
. 5 00
. 2 50

-

6 1 .0 0 0

-

.085
.20 0

-

!
!

9 .5 0 0
9 .8 8 5
9 .8 8 5

9 .7 5 0
10.235
1 0 . 185

4 0.00
4 0 .0 0
40.0 0

.45 0
.450

-

.350
. 350

-

. 449
.45 0
6 .450

-

.37 5
.025
.02 5

-

I
i
I
I

9 .4 5 0
9 .6 0 0
9 .1 3 0

9.9 0 0
10.050
9 .5 8 0

4 0.0 0
40.0 0
40.0 0

-

.250
.250
.250

-

6.50 0
6 .50 0
6 .50 0

-

-

-

9 .4 5 0
9 .6 0 0
9 .1 3 0
10.105
9 .9 9 5
10.020
9 .9 9 5
9 .7 4 5
9 .9 3 5
10.445

9 .9 0 0
1 0.050
9 .5 8 0
1 0.669
1 0 . 195
10.640
1 0.430
1 0.480
9 . 935
10.795

4 0 .0 0
4 0 .0 0
40.0 0
4 0.00
4 0.0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0.00
40.0 0

66 .0 0
-

.365
.235
6. 4 3 0
.410
.14 5

-

9 .995
9 .8 8 5

11.080
1 0.185

4 0.00
4 0.00

“

.03 0
.025

-

;

I

!

-

|

.650
.400
.75 0
.500
.450

-

.75 0
.450

-

45

~

j
|
!
|

.25 0
.25 0
.2 5 0
1 .1 5 0
.50 0
1 .0 5 0
1.4 5 0
.85 0
.75 0
.3 5 0
.8 5 0
.35 0

- •
“
-

-

|
j
|

2 .3 1 %

7 . 7 30
8.85C
10.145

I

See f o o t n o t e s a t e n d o f t a b l e .




1.0 0%
-

6 .50 0
6 .500
6 • 500
6 1 .2 5 0
.750
6
1 .0 0 0
*.50 0
6. 450
6. 45 0

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
( U n i o n h o u r l y w a g e r a t e s an d s t r a i g h t - t i m e w e e k l y h o u r s a nd e m p l o y e r i n s u r a n c e ,
b u i l d i n g t r a d e s , J u l y 1, 1 9 7 5 and J u l y 1, 19 76)
|

p ension,

JULY 1 ,
197 5

v a cation ,

JUL Y

|
RATE
PER
HOUR

RATE
PER
HOUR1

HOURS
PER
WEEK

INSURANCE4

DOLLARS

|

HIGHWAY AND STREET
CONSTRUCTION
-CONTINUED

|

HELPERS AND LABORERS

,

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS3

C I T Y AND JOB
C L A S S I F I C A T IO N

C I N C I N N A T I , OHIO
-CONTINUED

1,

and o t h e r c o n t r i b u t i o n s to f u n d s in t h e

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

PERCENT

DOLLARS

PERCENT

i

!
j

!

DOLLARS

OTHER5

1
$ 9 , 500
9 .3 0 0

$9,2 50
9 .0 5 0

BRICKLAYERS* TENDERS............j
B U IL D IN G LABORERS....................
ELEVATOR CONSTRUCTORS'
HELPERS....................................... .. .
MARBLE SETTERS' HE L PE RS ..
MARBLE POLISHERS ...............
TERRAZZO WORKERS'
HELPERS................. ..........................
BASE GRINDERS ......................
T I L E L A Y E R S ' HELPERS...............

6 .9 4 0
8 .7 3 5
8 .9 0 0

7 .4 4 0
8 .9 3 5
9 .1 0 0

8 .6 8 5
9 .1 0 5
8 .6 3 5

8 . 885
9 . 305
8 . 835

4 0.00
40.0 0

i
!
:
|

|

0 .5 5 0
.550

4 0.00
4 0.00
4 0.00

.49 5

.32 0

-

!

1
i
~

-

4 0.00
4 0.00
4 0.0 0

j
"

I

_

0 .4 0 0
.40 0

|
I
!

_

_

i
|
I
I
l

I

-

60.500
6. 500 j

-

6. 5 0 0 :
6. 500
6 .5 0 0

;

_

~

-

0.050
.050

-

i
I

-

.020
-

4 .0 0 %
-

2.3 1 %
-

~

!
j

-

-

-

~

"

HIGHWAY AND STREET
CONSTRUCTION
1
JOURNEYMEN
!
10.550
10.550
9 .3 9 5

CARPENTERS.......................................
P IL E D R I V E R S ............................
CEMENT F I N I S H E R S ......................
ENGINEERS— POWER E Q U IP MENT OPERATORS:
CLASS A— CONCRETE
PUMPS, CRANES, DER­
R IC K S , DRAGLINES,
P I L E D R I V I N G MACHINES

lj

9 .5 2 0

10.370

8 .4 8 0

9 . 330

j

.48 0

!
1
!
!
!

_

j
!
1

-

'
1
i

!
!

.460

:
!
i

.46 0

8 .9 0 0

4 0.0 0

6 .8 4 0
9 .9 9 5

7 .3 4 0
11.080

40.0 0
4 0 .0 0

LABORERS.................

|

OTHER HEAVY CONSTRUCTION

i

!
61 . 0 0 0

.050
.05 0
.050

I

“
-

.46 0
.750

.09 0

-

I
i
.800

-

!
1
!
1
i
!

. 8 00

-

-

i
!I

_

I
Ii

-

.09 0

-

.090

.800

-

-

-

.8 0 0
.85 0

-

~

-

|

!

.090

-

.090
.030

-

-

1

7 . 7 20

7 .1 2 0

i

4 0.00

I
!

.55 0

.40 0

-

I

i

!
;
!

•

-

|

-

.05 0

i

|
10.550
10.550
9 .3 9 5

10.550
10.550
8 .9 8 0

40.0 0
40.0 0
4 0.00

i
1
;

.60 0
.60 0
.500

. 6 50
.65 0
-

-

I
I
_
-

j

I
-

61. 000

|

.05 0
.050
.050

j

9 .5 2 0

1 0.3 70

o
o
o

1 0.490

!
I
-

-

.090

-

-

-

.090

-

-

-

.09 0

. 8 00

-

-

-

.09 0

-

. 8 00
.850

-

.090
.03 0

-

.460

-

.80 0

.46 0

-

.800

.460

-

. 8 00

©
o

©

1

I
I

8 .4 8 0

9 .3 3 0

■C
o
©
o

|
I
|
I

j

8 .0 5 0

8 .9 0 0

4 0.00

.460

6 . 8 40
9 .9 9 5

7 .3 4 0
11.080

4 0 . 00
4 0.00

.46 0
.750

1
i
i

-

|

i
-

|
I
I

7 .1 2 0

7 .7 2 0

o
o
o

LABORERS.............................................

_

|
i

9 .6 4 0

i
|

j

HELPERS AND LABORERS

!
!

.55 0

S ee fo o tn o te s at en d of t a b l e .




-

I
. 8 00

JOURNEYMEN

CARPENTERS.......................................
P I L E D R I V E R S ........... ...............
CEMENT F I N I S H E R S ......................
ENGINEERS— POWER EQUIP­
MENT OPERATORS:
CLASS A— CONCRETE
I
PUMPS, CRANES, DER­
R IC K S , DRAGLINES,
P I L E D R I V I N G MACHINES
CLASS B— ASPHALT PAV­
ERS, BULLDOZERS, POW­
ER GRADERS. .........................
CLASS C— CONCRETE MIX ­
ERS, ASPHALT ROLLERS,
WELDING MACHINES............
CLASS D— COMPRESSORS,
CONCRETE SAWS, CRUSH­
ERS, D R I L L S , ......................
CLASS E— O I L E R S , S I G ­
NALMEN.......................................
STRUCTURAL IRON WORKERS..

_
-

-

-

I

ii
)
|
i

AND LABORERS
I

B U I L D IN G

.480

4 0.0 0

8 .0 5 0

_

.65 0
.65 0
i

4 0.0 0

I
!

_
-

.60 0
.600
.50 0

zT

HELPERS

10.490

9 .6 4 0

!
i
!
!
;

O
O
O

CLASS B— ASPHALT PAV­
ERS, BULLDOZERS, POW­
ER GRADERS............................
CLASS C— CONCRETE M IX ­
ERS, ASHPALT ROLLERS,
WELDING MACHINES............
CLASS D— COMPRESSORS,
CONCRETE SAWS, CRUSH­
ERS, D R I L L S .........................
CLASS E— O IL E R S , S IG ­
NALMEN...................... ...............
STRUCTURAL IRON WORKERS..

4 0 . 00
4 0.00
4 0.00

1 0.550
1 0 . 550
8 . 9 80

46

i
i

j

.40 0

-

-

-

.050

|

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
( U n i o n h o u r l y w a g e r a t e s an d s t r a i g h t - t i m e w e e k l y h o u r s a nd e m p l o y e r i n s u r a n c e ,
b u i l d i n g t r a d e s , J u l y 1, 1 9 7 5 an d J u ly 1, 1 97 6)

pen sion ,

JULY 1,
1975

JULY

v a cation ,

1,

and o t h e r c o n t r i b u t i o n s to fu n d s m th e

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C IT Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR

RATE
PER
HOUR

HOURS
PER 2
WEEK

[
INSURANCE4

DOLLARS

C I.BfZI.iN D ,

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER5

PERCENT

DOLLARS

PERCENT

OHIO

B UI LD IN G CONSTBOCTION
j

JOURNEYMEN
_

_

-

-

1 .0 0 0
1 .0 0 0
1 .0 0 0
1 .0 0 0
1 . 150
1.000

-

-

-

-

6 2 . 450
6 1 .0 0 0
6 1 .2 5 0
6 1 .2 5 0
6 1 .0 0 0
6 1 .2 5 0
6 1 .000
6 2 . 000

539
35 0

-

6 .75 0

-

-

1 . 0 00

-

-

$ 10.610
9 .4 8 0
9 .9 0 0
1 0 . 400
10.600
1 0.200
1 0.600
10.830

4 0.00
40.0 0
40.0 0
4 0.00
4 0.0 0
4 0.0 0
4 0.00
4 0.00

0.6 0 0
.95 0
.9 5 0
.67 0
.670
.67 0

11.330
11.230

11.910
11.955

4 0.00
4 0.0 0

.500
.545

-

.

-

.

11.020

1 1.670

.460

-

11.020

11.670

o

40.0 0

-

-

-

_

-

-

.070
.070
.070
.040
.0 7 0
.040

-

-

6 . 27 0
. 02 0

-

6.00)1

-

1 .60%
i
i

.460

1 .0 0 0

-

~

-

-

.090 j

-

-

i
j

-

1 1. 5 20

10.520

1 1.170

9. 7 40
9 .4 2 0
9 . 74 0
8. 340
9 . 180
10.210
8 .5 0 0
9 .3 5 0

10.390
10.070
1 0.390
8 . 6 40
9 . 780
1 0 . 680
9 . 500
9 .9 0 0

9 .3 5 0
9 .7 5 0
10.450
10.150
10.050
10.450
9 .7 5 0
10.670
10.670
10.250
9 .7 3 0
9 .9 2 0
9. 4 80
9. 4 8 0
10.130
9 .3 5 0
9 .9 2 0
9. 4 9 5

9 . 900
10.310
1 1 .0 1 0
10.710
1 0.610
11.010
10.310
11.390
11.390
11.180
1 0.430
10.870
1 0 . 310
1 0 . 3 10
10.360
9.9 0 0
1 0.870
10.345

o

10.870

.46 0

-

1.0 0 0

-

-

.46 0

~

i.o a o

"

-

.090

4 0.00
4 0.00
4 0.0 0
4 0 . 00
40.0 0
40.0 0
4 0.0 0
40.0 0

.46 0
.46 0
.460
.460
.400

-

1 .0 0 0
1 .0 0 0
1 .0 0 0 i

-

4 0.0 0
4 0.00
40.0 0
4 0.0 0
40.0 0
4 0.00
40.0 0
4 0.0 0
40.0 0
4 0 . 00
4 0.00
4 0.0 0
4 0.0 0
4 0.0 0
4 0.0 0
40.0 0
40.0 0
4 0 . 00

.950
.63 0
.630
.63 0
.63 0
.630
.630
.800
.80 0

j

.090

~

;

.09 0

-

i

-

j

|
j
j

o

o

I

-

.950

-

.750
.600
.25 0
.250
-

-

u o o o

.650
1 .5 0 0
i

1 .0 0 0

I

1.0 0 0
. 740
.74 0
.74 0
.7 4 0
.740
. 74 0 I
.70 0 |
.7 0 0

_

_

-

-

-

1 .0 0 0
.800
. 500
. 50 0
1 .1 0 0
1 .0 0 0
. 800
6 1.3 6 0

-

.950
. f 00

-

-

!
-

61 . 500
61 . 500
. 260
1 .250

!

|
!

-

-

-

|
i

-

-

-

j

-

61 . 000
61 . 250
61 . 0 0 0
6 1.000

-

j

-

!

-

-

-

!
-

.20 8
.06 0
.08 0 !

-

-

!

.090
.090
.090 j
-

6 1 . 250
b . 500
6 • 500
6 . 500
6 . 500
6 . 500
6 . 500
61 . 000
6 1 . 000
62 . 000
61 . 000
1 .0 0 0

!

-

. 09 0

!

!
-

;
;

-

■

j

-

^

-

i

330 i
. 330
.0 8 0 !
.080
.030
*2 .0 4 0
2 . 04 0
6.100
.07 0 j
.030 :

-

-

.

-

;

HELPERS AND LABORERS

BRICKLAYERS1 TENDERS .....................
B U IL D IN G LABORERS................. ..
ELEVATOR CONSTRUCTORS'
H E L P E R S . . ...................................
MARBLE SETTERS' HE LPE RS ..
PLASTERERS' LABORERS............
PLUMBERS* LABORERS.................
TERRAZZO H E L P E R S . ....................
BASE MACHINE OPERATORS
~ -r vr LAYERS' HELPERS............

* 0.060

-

i
o
o

L IG HT EQUIPMENT:
PUMPS (4 INCHES AND
OVER) , .................................................
COMPRESSORS, PORTABLE
ROLLERS, ASPHALT............
O I L E R S , SMALL PUMP S..
G L A Z I E R S ............................................................
LATHERS ....................... .......................................
M A C H IN IS TS .....................................................
MARBLE S E T T E R S , . . . .......................
MOSAIC AND TERRAZZO
WORKERS........................... ............................ i
P AI NT E RS ......................................... ....
STRUCTURAL STEEL ....................
SPRAY GUN ..............................
SWING STAGE ..............................
TAPERS ................ .......................................
PAPERHANGERS .............................................
P I P E F I T T E R S . ........................................ .....
REFRIGERATION F I T T E R S .
PLASTERERS.................................... .....
PLUMBERS ................................................................................
REINFORCING IRON WORKERS.
ROOFERS, COM POSITIO N .....................
ROOFERS, SLATE AND T I L E . .
SHEET-METAL WORKERS.. ____
STONEMASONS............................................................
STRUCTURAL IRON WORKERS..
T I L E L A Y E R S . .................................

_

$9,7 60
8 .8 8 0
9 .3 5 0
9. 85 0
10.000
9 .8 5 0
9 .8 5 0
10.030

o
o

ASBESTOS WORKERS......................
BOILERMAKERS.................................
BR ICKLAYERS, GENERAL............
CAISSON AND SEWER............
CARPENTERS.......................................
MIL LW RI GH TS ............................
P IL E D R I V E R S ............................
CEMENT F I N I S H E R S ......................
ELECTR ICIAN S
( I N S I D E W I R E R S )....................
ELEVATOR CONSTRUCTORS. . . .
ENGINEERS — POWER E Q U IP ­
MENT OPERATORS:
HEAVY EQUIPMENT:
CRANES (A L L T Y P E S ) . . .
POWER SHOVELS,
DERRICKS......................... .... .
MEDIUM EQUIPMENT:
BULLDOZERS AND POWER
GRADERS................... .....
TRENCH MACHINES
(UNDER 24 I N C H E S ) . . .

7 .9 7 0
7 .9 7 0

8 .4 2 0
8 .4 2 0

40.0 0
40.0 0

.870
.870

7 .8 6 0
1 0.460
7 . 9 70
8 .1 2 0
10. 8 7 0
10.870
10.990

8 . 370
11.060
8 .4 2 0
8 .4 2 0
11.570
11.570
11.590

4 0.00
4 0.00
40.0 0
4 0.00
4 0.0 0
4 0.00
40.0 0

.'54 5
.870
.870
-

_

6 1.0 0 0
6 1 .0 0 0

-

-

-

I

.350
, .5 °°
1 .0 0 0
6 1 .0 0 0 !
.5 0 0
.50 0
.50 0

_

!
J

-

I

1.0 0 0
1 .0 0 0

-

-

-

1 .0 0 0
1 .0 0 0
-

-

_

j

.340
. 340

6.00%|
I
-

.02 0

-

.340
.340
.050
.050

!
-

1.60%
i
!

i

~

i
j

HIGHWAY AND STREET
CONSTRUCTION
I
JOURNEYMEN

CARPENTERS.......................................
P I L E D R I V E R S . . . ..............
CEMENT F I N I S H E R S ............................... ..

10.000
9 .8 5 0
9 .7 4 0

10.600
10.600
1 0 . 530

40.0 0
4 0.00
4 0.0 0

.67 0
.670
.500

_
-

1.0 0 0
1.0 0 0
~

_
~

61 . 000
61 . 0 0 0
-

_
-

~

_

.04 0
.040

-

~

J ______

S e e f o o t n o t e s at e n d of t a b l e .




47

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
( U n i o n h o u r l y w a g e r a t e s an d s t r a i g h t - t i m e w e e k l y h o u r s an d e m p l o y e r i n s u r a n c e ,
b u i l d i n g t r a d e s , J u l y 1, 1 97 5 a n d J u l y 1, 1 97 6 )

p ension,

vacation,

J UL Y

JULY 1,
1975
!
C IT Y AND JOB
CL A S S I F I C A T IO N

RATE
PER j
HOUR

RATE
PER
HOUR

HOURS
PER
WEEK

1,

and o t h e r c o n t r i b u t i o n s to f u n d s in th e

1 976

EMPLOYER CONTRIBUTIONS
TO FUNDS3

INSURANCE4

DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER5

PERCENT

DOLLARS

PERCENT

CLEVELAND, OHIO
-CONTINUED
HIGHWAYS AND STREET
CONSTRUCTION
-CONTINUED
JOURNEYMEN
-CONTINUED
ENGINEERS— POWER E Q U IP MENT OPERATORS:
HEAVY EQUIPMENT—
CRANES, POWER SHOVELS , DERRICKS .................
MEDIUM EQUIPMENT—
BULLDOZERS, POWER
GRADERS, TRENCH MACHINES UNDER 24 I N . .
L IG H T EQUIPMENT:
PUMPS 4 I N . AND OVER,
ASPHALT ROLLERS............
PORTABLE COMPRESSORS.
STRUCTURAL IRON WORKERS..

$10,380

$11.230

40.0 0

0.4 6 0

-

0 .8 0 0

-

-

-

0.04 0 !

10. 28 0

1 1.130

4 0 .0 0

.46 0

-

.800

-

-

-

.040

9 .2 4 0
8 .7 7 0
9 .9 2 0

10.090
9 . 620
10.870

4 0 .0 0
4 0.0 0
4 0.0 0

.460
.46 0
.600

~

.80 0
. 8 00
.80 0

-

61 . 000

-

.04 0
.040
.030

~

8. 230
8 .3 5 5
8 .4 3 0
8 .5 8 0
8 .8 8 0

8 . 830
8.9 5 5
9 .0 3 0
9 . 180
9 .4 8 0

4 0.00
4 0 . 00
40.0 0
4 0.00
4 0.0 0

.550
.55 0
.55 0
.550
.550

“

. 40 0
. 4 00
. 4 00
.4 0 0
.40 0

-

-

-

.050
.05 0
.050
.050
.050

~

.040
.040
.04 0

_

HELPERS AND LABORERS

COMMON LABORERS:
GROUP I .......................................
GROUP I I ....................................
GROUP I I I . . . , ......................
GROUP I V ....................................
GROUP V .......................................

“

-

OTHER HEAVY CONSTRUCTION

JOURNEYMEN

!

_

CARPENTERS...............................« ...
MIL LW RIGH TS ............................
P IL E D R I V E R S ............................

10.000
9 .8 5 0
9 .8 5 0

1 0.600
10.200
10.600

40.0 0
4 0.00
4 0.0 0

CEMENT F I N I S H E R S ......................
SEWAGE TREATMENT
PLANTS.......................................
ENGINEERS— POWER E Q U IP ­
MENT OPERATORS:
HEAVY E Q U I P M E N T -

9 .7 4 0

10.530

40.0 0

.500

-

9 .7 4 0

11.960

40.0 0

.50 0

-

-

CRANES,

P OWE R

.67 0
.670
.670

_

1.0 0 0
1. 150
1 .0 0 0

_

61 . 000
61 . 250
61 . 000

-

-

-

-

-

-

-

-

-

-

-

-

-

-

t

SHOV­

ELS , DERRICKS .................
MEDIUM EQUIPMENT—
BULLDOZERS, POWER
GRADERS, TRENCH MA­
CHINES UNDER 24 I N . .
L IG H T EQUIPMENT:
PUMPS 4 I N . AND OVER,
ASPHALT ROLLERS............
PORTABLE COMPRESSORS.
STRUCTURAL IRON WORKERS..

10.380

11.230

40.0 0

.46 0

10. 2 80

1 1.130

40.0 0

.460

10.090
9 . 620
10.870

40.0 0
40.0 0
4 0.00

.46 0
.460
* .60 0

i

.80 0

‘

-

.80 0 I

-

.09 0

I
.09 0 j
I

I
9 .2 4 0
8. 77 C
9. 9 20

-

-

.80 0
.800
.80 0

-

6 1.0 0 0

_

~

.09 0 ;
.090 I
.030 I

~

l

HELPERS AND LABORERS

COMMON LABORERS:
GROUP I .......................................
GROUP I I ....................................
GROUP I I I .................................
GROUP I V ....................................
GROUP V .......................................

-

8 .2 3 0
8 . 355
8 .4 3 0
8 .5 8 0
8 .8 8 0

8 . 83 0
8 .9 5 5
9 .0 3 0
9 . 180
9 .480

4 0.00
4 0 . 00
40.0 0
4 0.00
4 0.0 0

.550
.55 0
.55 0
.550
.550

9 .8 2 0
8. 550
9. 740
9 . 120
9 . 120

9.8 2 0
9. 050
10.390
9 .3 7 0
9 .3 7 0

4 0.0 0
4 0 .0 0
40.0 0
4 0.00
4 0.0 0

.450
.600
.450
.40 0
.40 0

-

-

.40 0
. 40 0
. 4 00
.40 0
.40 0

-

-

-

.05 0
.05 0 j
.050 |
. 05 0 i
.050

-

COLUMBUS, OHIO

B UI LD IN G CONSTRUCTION

JOURNEYMEN
|
ASBESTOS WORKERS......................
BOILERMAKERS.................................
BR ICKLAYERS ....................................
CARPENTERS.......................................
R E S IL I E N T FLOOR LAYERS

_

~

.850
1 .0 0 0
.70 0
.50 0
.50 0

_
~

6. 7 5 0
-

_
“

.06 0
1 .0 0 0
.01 0
.030
.03 0

_
~
i___ _______

S ee f o o tn o te s at en d of t a b le .




48

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
( U n i o n h o u r l y w a g e r a t e s an d s t r a i g h t - t i m e w e e k l y h o u r s an d e m p l o y e r i n s u r a n c e ,
b u i l d i n g t r a d e s , J u l y 1, 1 9 7 5 an d J u l y 1, 1 97 6 )

pen sion ,

JULY 1,
1975

vacation,

JUL Y

1,

and o t h e r c o n t r i b u t i o n s to fu n d s in th e

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C L A S S I F I C A T IO N

RATE
PER j
HOUR

PER j
HOUR

HOURS
PER
WEEK

INSURANCE

DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER

PERCENT

DOLLARS

PE 1CENT
'

COLUMBUS* OHIO
-C O I T I V U E D

j

B U IL D IN G CONSTRUCTION
-CONTINUED
JOURNEYMEN
-CONTINUED
$ 9,350

■p
o

o
©

$8,8 50
9 .8 3 0
9 .8 0 5

10.980
10.121

4 0.00
40.0 0

0 .5 0 0

-

0 .2 0 0

.280
.495

-

.60 0
.3 2 0

-

-

1.0 0%
-

-

1 1 . 1 10
1 1.110
1 1.110

10.300

10.950
10.590
9 . 810

9. 940
9 . 160

4 0.0 0
40.0 0
4 0.0 0

o

10.460
10.460
1 0.460

. 130
.020

40.0 0
40.0 0

1 .0 0 0
1 .0 0 0
1.0 0 0

-

-

-

.46 0

-

.460
.460

-

1 .0 0 0 I
!
1.0 0 0
1 .0 0 0

"

-

-

-

-

9 .9 4 0
9 .9 4 0
9 .9 4 0

1 0.590
1 0.590
10.590

4 0 .0 0
40.0 0
4 0 .0 0

.460
.46 0
.460

-

1.0 0 0
1 .0 0 0
1 .0 0 0

-

8. 830
7 .7 3 0
9 .0 2 0
8 . 3 00
9 .0 0 0
9 .0 0 0
8 .9 5 0
9 .4 5 0
9 .2 5 0
9 . 2 50
8 .9 5 0
9 .3 2 0
8. 340
9 . 3 20
9 .7 5 0

9 . 48 0
8 .0 3 0
9 .5 7 0
8 .4 0 0
10.000
10.000
9 .4 5 0
9 .9 5 0
9.7 5 0
9 .7 5 0
9.4 5 0
9 .6 7 0
8 .7 4 0
9 .6 7 0
10.350

40.0 0
4 0.0 0
40.0 0
4 0.0 0
4 0.0 0
4 0.0 0
40.0 0
4 0.0 0
40.0 0
40.0 0
4 0.0 0
40.0 0
4 0.00
4 0.00
40.0 0

.46 0
.460
.55 0
.55 0
.550
.55 0
.550
.400
.500
.400
1.750

-

1.0 0 0
1 .0 0 0
. 320
6 .40 0
i
.3 0 0
. 300
.30 0
. 300
.30 0
. 800
.30 0 I
.80 0
1 .3 5 0

-

10.350
10.350
1 0.350
10.350
9 .4 4 5
9 . 44 5
10.420
10.390
10.350
1 0.350
10.000

4 0.00
4 0.00
40.0 0
40.0 0
4 0.00
4 0.00
40.0 0
4 0.0 0
40.0 0
4 0 .0 0
4 0.0 0

1 .750
1.750
1 .750
1 .7 5 0
.60 0
.60 0
.45 0
.45 0
1.7 5 0
1 .7 5 0
-

- ■
-

1 .3 5 0
1 .3 5 0
1 .3 5 0
1 .3 5 0
. 6 50
.65 0
.80 0
. 700
1 .3 5 0
1 .3 5 0
-

6 .2 5 0
6 .0 5 0

7 .2 9 0
7 .0 9 0

4 0.0 0
4 0.00

.55 0
.550

6 .6 8 0
4 .9 0 0
7 .2 5 0
6 .2 5 0

7 .0 8 5
5 .0 7 8
8 .0 0 0
7 .2 9 0

40.0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0

.495
.495

7 .2 5 0
7 .6 0 0
7 .4 0 0
7 .2 5 0

8 .0 0 0
8 . 3 50
8 . 150
8 .0 0 0

40.0 0
40.0 0
40.0 0
4 0.0 0

9 . 120
8 .8 3 0

9 . 370
9 . 430

4 0.00
4 0.00

9 .7 5 0
9 .7 5 0
9 .7 5 0
9 .7 5 0
8 . 84 5
8 .8 4 5
9 .6 4 0
9 .7 4 0
9 .7 5 0
9 .7 5 0
9 .0 0 0

!

!
!
j
I
j
I
|
I
I
I

!

j

6 i .60 c

i
!
-

.460
.4 6 0
.460

-

0.020

7 .6 0 % |

-

I

o
o

CEMENT F I N I S H E R S ......................
ELEC TR ICIAN S ( I N S I D E
H I R E R S ) .........................................
ELEVATOR C O N S TR U C TO R S .. ..
ENGINEERS--POHER E Q U IP MENT OPERATORS
HEAVY EQUIPMENT:
CRANES (A L L T Y P E S ) . . .
POWER SHOVELS.................
DERRICKS .................................
MEDIUM EQUIPMENT:
POWER GRADERS, B U L L DOZERS....................................
TRENCH MACHINES ( 24
I N . AND UNDER)...............
ROLLER B R I C K , GRA DE ..
L IG H T EQUIPMENT:
PUMPS, 4 I N . AND OVER
PORTABLE COMPRESSORS.
ASPHALT ROLLERS...............
BAC KF IL LE RS , CONCRETE
SPREADERS......................
O I L E R S , SHALL P UMP S..
G L A Z I E R S ............................................
LATHERS...............................................
MARBLE SETTERS............................
TERRAZZO WORKERS.......................
P A IN TE RS ............................................
SPRAY.............................................
STRUCTURAL STEEL ..............
SWING STAGE............................
PAPERHANGERS.................................
P I P E F I T T E R S ....................................
PLASTERERS.......................................
PLUMBERS............................................
REINFORCING IRON WORKERS.
RIGGERS AND MACHINERY
MOVERS.......................................
WELDERS.......................................
FENCE ERECTORS....................
SHEETERS....................................
ROOFERS, COM POSITION ............
ROOFERS, SLATE AND T I L E . .
SHEET-METAL WORKERS...............
STONEMASONS....................................
STRUCTURAL-IRON WORKERS..
ORNAMENTAL IRON WORKER
T I L E LAYERS.....................................

!
|

“
-

-

I
j
I

1
j
j

I
i
|

~
-

!

.07 0 !
.07 0 1
.07 0

.07 0

-

.070
.070

-

.070
.070
.070

j
|
b 0. 200
I
|
6 1 .000
; 61 .000
!
|
I
!
i

-

i
1

!
;
!
!

-

j

!

“

“

!
:
!
|

6 1 . 000 !
6i . o o o '

-

-

!

i
j
i

i
1
1
i

.07 0
.070
61 . 2 5 0
-

-

-

.220
.52 0
.22 0
. 100
. 100
. 100
.100
. 100
. 120
.010
. 100
. 100

1

I
!
!
i

!
!
i
!
I
1

3.00
' -

HELPERS AND LABORERS

BRICKLAYERS' TENDERS............
B U IL D IN G LABORERS....................
ELEVATOR CONSTRUCTORS'
HELPERS
AFTER 6 MONTHS.......................
F I R S T 6 MONTHS......................
MARBLE SETTERS' HE LP E RS ..
PLASTERERS' LABORERS............
TERRAZZO WORKERS'
HELPERS..........................................
BASE GRINDERS......................
FLOOR GRINDERS....................
T I L E LAYERS' H E L P E R S . . . . .

-

.55 0
-

_

.400
. 4 00

-

-

-

|
I
I

.32 0
.320
—
.400

i

_
-

-

-

-

-

-

-

-

-

-

-

7.60%
7 .6 0

.020
.02 0

66 '•1 .6 0 a
1 .6 0
-

6. 47 0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

_

_

_

-

-

-

i

_

6. 470
6. 4 7 0

HIGHWAY AND STREET
CONSTRUCTION

JOURNEYMEN

CARPENTERS.......................................
CEMENT F I N I S H E R S ......................

.400
.50 0

S e e f o o tn o te s at end o f ta b le .




40

.500

.030
.050

_

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
( U n i o n h o u r l y w a g e r a t e s and s t r a i g h t - t i m e w e e k l y h o u r s an d e m p l o y e r i n s u r a n c e ,
b u i l d i n g t r a d e s , J u ly 1, 1 97 5 an d J u l y 1, 1 9 7 6 )

p en sion ,

JULY 1 ,
1975

vacation,

JUL Y

and o t h e r c o n t r i b u t i o n s to fu n d s in t h e

1976

1,

EMPLOYER CONTR IBUT ION S
TO FUNDS3
C L A S S I F IC A T I O N

RATE
PER j
HOUR

RATE
PER
HOUR

PER
WEEK

4
INSURANCE

DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OT H ER 5

PERCENT

DOLLARS

PERCENT

COLUMBUS, OHIO
-CO NT IN UE D
HIGHWAY AND STREET
CONSTRUCTION
-CONT INUE D
JOURNEYMEN
-CON TIN UED
EN G IN EE R S — POWER E Q U I P ­
MENT OPERATORS:
HEAVY EQUIPMENT ...................
POWER GRADERS, BULL­
DOZERS, TRENCH MACHINES.*
ASPHALT RO LLE RS, PUMPS
(4 I N . AND O V E R ) ................
ROLLERS, BRICK GRADE,
PORTABLE COMPRESSORS.
STRUCTURAL IRO N WORKERS..
HELPERS

0 .090

0. 800

$ 9 ,6 4 0

$ 1 0 ,4 9 0

4 0 .0 0

0 .4 6 0

9. 520

10. 370

4 0 .0 0

.460

_

. 800

-

-

-

.0 9 0

-

8 .4 8 0

9 . 330

4 0 .0 0

.4 6 0

_

.8 0 0

-

-

-

.0 9 0

-

8 .0 5 0
9 .750

8 .900
1 0 .3 5 0

4 0 .0 0
4 0 .0 0

.4 6 0
.7 5 0

_

.8 0 0
1 .350

_

_

_

.090
.100

-

7 . 120

7 .7 2 0

.5 5 0

_

.4 0 0

-

. 100

-

~

~

“

AND LABORERS
o
o

o

COMMON LABORERS...........................

-

OTHER HEAVY CONSTRUCTION

I

JOURNEYMEN
CARPEN TER S ..........................................
CEMENT F I N I S H E R S ........................
ENGINEERS— POWER E Q U I P ­
MENT OPERATORS
HEAVY EQ UI PM EN T ..................
POWER GRADERS, BULL­
DOZERS , TRENCH MACHINES •
ASPHALT R OL LER S, PUMPS
(4 I N . AND O V E R ) .............
RO LLERS, BRICK GRADE,
PORTABLE COMPRESSORS.
STRUCTURAL IRON WORKERS..

9 .1 2 0
8. 830

9 .3 7 0
9 . 430

4 0 .0 0
4 0 .0 0

.4 0 0
.5 0 0

-

. 500
-

CORPUS C H R I S T I ,

-

.030
.0 5 0

i

9 .640

1 0 .4 9 0

4 0 .0 0

. 800

.4 6 0

I
-

.0 9 0

.

.090

_

9. 520

1 0 .3 7 0

4 0 .0 0

.4 6 0

_

.800

_

_

_

8 .4 8 0

9 .330

4 0 .0 0

.4 6 0

_

.8 0 0

-

-

-

.0 9 0

-

8 .0 5 0
9 .7 5 0

8. 900
10 .3 5 0

4 0 .0 0
4 0 .0 0

.4 6 0
.7 5 0

_

.800
1 .3 5 0

_

-

-

-

~

.0 9 0
. 10 0

_

_

. 100

-

-

.0 6 0
-

-

6 4 .00*
6 .0 0

.0 2 0

“

HELPERS AND LABORERS

COMMON LABORERS...........................

-

I
7 . 120

7 .7 2 0

4 0 .0 0

.550

_

8 .3 0 0
8 .000
7. 280
6 .3 4 0
7 .5 5 0
6 .9 5 0

9 .2 9 0
9 .0 0 0
7 .9 1 0
7 . 090
8 .550
7 .6 5 0

4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0

.5 0 0
.5 0 0
.2 3 0
.270
-

-

.5 0 0
1 .0 0 0
.300
. 300
-

7 .5 3 6
7 .9 9 0

9. 072
9 .0 7 0

4 0 .0 0
4 0 .0 0

.3 5 0
.5 4 5

_

_

6 .650
5 .8 2 5
5 .8 7 0
7 .3 0 0

7 .3 5 0
6 .4 2 5
6 .3 4 0
7 .7 5 0

4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0

.2 8 0
.2 8 0
.3 0 0

6 .7 3 0

7. 280

.4 0 0

-

TEXAS

BU ILD ING CONSTRUCTION

6 .4 8 0
6 .8 8 0
6 .730
6 .9 8 0
6 .8 8 0
8 .2 0 0
7 .5 0 0
6 .0 9 0
5 .5 2 5
5 .5 2 5
7 .2 0 0
6 .0 9 0

7 . 180
7 .5 8 0
7 .4 3 0
7 .6 8 0
7 .5 8 0
9 .0 5 0
8 .4 0 0
6 .6 4 0
5 .925
5. 925
8. 280
6 .640

o

_

4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0

.2 5 0
.2 5 0
.2 5 0
.2 5 0
.2 5 0
-

.2 5 0
.5 5 0
.2 3 0
.5 5 0

S e e fo o tn o te s at end o f ta b le .




50

-

*
-

1.0 0 *
-

_

-

_

_

-

.3 5 0

-

.4 5 0
.4 5 0
.2 0 0
.2 0 0

-

1 .0 0 0

-

_

. 150

_

_

_

_

_

.2 5 0
.2 5 0

_

_

_

_

_

-

-

-

_

_

_

-

-

-

o

ASBESTOS WORKERS........................
BOILERMAKERS....................................
BRICK LAY ER S .............« .......................
C AR PEN TER S ..........................................
M ILL W RIG HTS ..............................
CEMENT F I N I S H E R S ........................
EL E C T R IC IA N S (I N S I D E
W I R E R S ) .............................................
ELEVATOR C O N S T R U C T O R S . . . .
ENG IN EE R S— POWER E Q U I P ­
MENT OP ER ATORS:
HEAVY EQUIPMENT ..................
LIG HT EQU IPMENT...................
G L A Z I E R S ................................................
LA TH ERS ...................................................
MOSAIC AND TERRAZZO
WORKERS................................................
P A IN TE RS
CO M M ER CIA L: .................................
SPRAY..............................................
IN D U S T R I A L :
BRUSH.............................................
SPR AY.............................................
PAPERHANGERS....................................
P LA S TE RE R S ...........................................
PLUMBERS................................................
RE IN FO R C IN G IRON WORKERS.
RO OF ER S, C O M P O S I T IO N .............
RO OF ER S, SLATE AND T I L E . .
SHEET-METAL WORKERS................
STRUCTURAL IRON WORKERS..

■Cr
O

JOURNEYMEN

_
_
-

”

.2 5 0
.2 5 0
.250
-

. 250
.600
.2 0 0
.2 0 0
.2 5 0
. 600

-

-

.0 5 0

-

-

-

-

-

I

2.401

-

.

-

.080
-

-

-

Table 20, Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U n i o n h o u r l y w a g e r a t e s an d s t r a i g h t - - t i m e w e e k l y h o u r s an d e m p l o y e r i n s u r a n c e ,
b u i l d i n g t r a d e s , J u l y 1, 1 9 7 5 a n d J u l y 1, 1 97 6)

pen sion ,

vacation,

JU LY

JULY 1,
1975

an d o t h e r c o n t r i b u t i o n s to f u n d s in th e

197 6

1,

EMPLOYER CONTRIBUTIONS
TO FUNDS3
RATE
PER
HOUR

C I T Y AND JOB
C L A S S I F I C A T IO N

1

RATE
PER ,
HOUR

HOURS
PER
WEEK

DOLLARS

COBPUS C H R I S T I ,
-CONTINUED

PENSION

in s u r an c e'

PERCENT

DOLLARS

OTHER5

VACATION

PERCENT

DOLLARS

DOLLARS

PERCENT

PERCENT

TEXAS

B U IL D IN G CONST RUCTION
-CONTINUED
HELPERS AND LABORERS

BR ICKLAYERS' TENDERS............
CONSTRUCTION L A B O R E R S . . . .
ELEVATOR CONSTRUCTORS'
HELPERS...............................................
PLASTERERS' LABORERS............
DA LLA S ,

$4,0 50
3 .8 5 0

$ 4 ,8 0 0
4 . 600

4 0 .0 0
4 0.0 0

0 .280
.280

5 . 59 0
4 .0 5 0

6 .3 5 0
4 . 800

4 0.00
40.0 0

.54 5
.280

_
-

0 . 100
. 100
.350
. 100

_

_

_

_

_

-

-

-

-

-

-

-

-

6 .0 0

TEXAS

0 .020
-

2.4 0
-

I
!

B UI LD IN G CONSTRUCTION
!
JOURNEYMEN

7 .9 8 0
8 .0 0 0
8. 490
7 .8 1 0
8. 440
7 .4 8 5

9 . 380
9 .0 0 0
8 . 880
9 . 010
9 .6 4 0
8 .4 3 5

4 0.0 0
4 0.00
4 0.0 0
4 0.0 0
40.0 0
4 0.00

.325
.50 0
.450
.300
.300
.550

8 .7 4 6
8 .2 1 0

9 .7 4 4
9 .3 3 0

40.0 0
40.0 0

.54 5

4 .0 0 %
-

.68 5
1 .0 0 0
. 50 0
.30 0
!
.5 0 0 I
.35 0

_

_

_

-

-

“

|

-

j
!
i

-

6 4 .0 0
6 .0 0

5 .0 0
-

.040
.020

_
2 .4 0

j
|

o

o
o

ASBESTOS WORKERS.............. ..
BOILERMAKERS.................................
BRICKLAYERS....................................
CARPENTERS.......................................
M IL L W R IG H T S ........ . . . .
CEMENT F I N I S H E R S ......................
ELE CTR ICI AN S (I N S I D E
W I R E R S ) . . . . . ................. ..
ELEVATOR C O N S TR U C TO R S .. ..
ENGINEERS— POWER EQUIP­
MENT OPERATORS:
HEAVY EQUIPMENT— BU LL ­
DOZERS AND CATS, CAR­
RY ALLS, MIXERS (1 4
CU. F T . ) , CRANES,
DERR ICK S, DRAGLINES,
HOISTS (2 DRUMS OR
O V E R )..........................................
L IG H T E Q U I P M E N T HOISTS (S IN G LE DRUM) ,
MIXERS (LESS THAN 14
CU. F T . ) , ROLLERS (10
TONS OR LESS) , SCRAP­
ERS
(3 CU. YDS. OB
L E S S ) , SIN GL E A IR
COMPRESSORS.........................
G L A Z I E R S .............................................
LAT HERS ...............................................
M A C H IN IS TS .......................................
MARBLE SETTERS............................
MOSAIC AND TERRAZZO
WORKERS..........................................
P A I N T E R S ............................................
R E S I D E N T I A L ............................
SPRAY P A I N T E R S .................... j
STRUCTURAL STEEL SWING I
STAGE............................................
PAPERHANGERS.................................
P I P E F I T T E R S ......................... ..
PLASTERERS.......................
PLUMBERS............................................
REINFORCING IRON WORKERS.
ROOFERS, COMPOSITION............
ROOFERS, SLATE AND T I L E . .
SHEET-METAL WORKERS...............
STONEMASONS................. ..................
STRUCTURAL IRON WORKERS..
T I L E LAYERS....................................

|
_

.400

-

.500

-

-

4 0.00
4 0.0 0
4 0 .0 0
4 0.00
4 0.00

.400
.250
-

-

.50 0
.40 0
-

-

0.500
.500
-

8.7 0 0
8 . 525
7 .6 5 0
8 .9 0 0

4 0.0 0
4 0.00
4 0.0 0
4 0.00

.350
.350
.35 0

-

.40 0
. 4 00
.40 0

-

-

8 .9 0 0
8 .7 7 5
9. 280
8 .9 4 0
9 .2 8 0
8 .3 9 0
8 . 180
8 .3 3 0
9 . 135
8 .8 8 0
8 .3 9 0
9 .1 0 0

4 0.00
4 0.00
4 0.00
4 0 .0 0
4 0.00
4 0.0 0
40.0 0
4 0 .0 0
40.0 0
40.0 0
40.0 0
4 0.0 0

.350
.350
.430
.350
.430
.550
.450
.45 0
.550

-

.40 0

-

8 .4 5 3

8 .6 5 3

8 .0 5 3
7 .3 4 0
9 . 2 30
8 .3 0 0
8 .6 0 0

8 .253
7 . 940
9 .2 8 0
11.100
9 .2 0 0

8 .4 0 0
7. 425
6 .5 5 0
7 .8 0 0
7 .8 0 0
7 .6 7 5
8 .5 3 0
8 . 39 0
8 .5 3 0
7 .1 2 5
7 .6 3 0
7 .8 7 0
7 . 8 35
8 .4 9 0
7 .1 2 5
8 .6 0 0

-

-

!

~

.40 0
.900
.9 0 0
.60 0
.250
.25 0
.50 0
.50 0
.6 0 0
.30 0

'

6 .25 0
.5 0 0
6 . 250 ,
-

'

'

_

-

-

-

-

-

.080
-

-

-

.050
-

-

-

.050
.080
.050
.07 5
.04 0
-

-

_

-

j
i

-

HELPERS AND LABORERS

BR ICK LAYERS' TENDERS............
MORTAR MIX ER S .......................
B U IL D IN G LABORERS....................
ELEVATOR CONSTRUCTORS• . . .
MARBLE SETTERS'
HELPERS............................................

5 .5 2 0
5 .5 2 0
5 .2 7 0
5 .7 5 0

6 . 270
6 .2 7 0
6 .0 2 0
6 . 5 30

4 0.0 0
4 0.0 0
40.0 0
40.0 0

7 .2 0 0

4 0.00

_

.275
.275
.275
.545

-

_____________ l

S e e fo o tn o te s at end o f ta b le .




51

.300
.30 0
.30 0
. 350

6 .0 0 9

.020
.020
.020
.020

-2 .401

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h ou rly w age r a te s and s t r a ig h t -t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , J u ly l, 1975 and J u ly 1, 1976)
J UL Y

JULY 1 ,
1975
|
C I T Y AND JOB
CL A S S I F I C A T IO N

■Ba t e
per

HOUR1

RATE
PER
HOUR

1,

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS3
HOURS
PER
WEEK

DOLLARS

DOLLARS

PERCENT

OTHER5

VACATION

PENSION

INSURANCE4

PERCENT

PERCENT

DOLLARS

DOLLARS

PERCENT

DA L LA S , TEXAS
-C ONTINUED

B U IL D IN G CONSTBUCTION
-CONTINUED
HELPERS AND LABORERS
-CO NT [NUbD

PLASTERERS' LABORERS............
TERRAZZO WORKERS'
HELPERS............................................
T I L E LAYERS' HELPERS............

DENYEfi,

$ 5,5 20

$ 6 .2 70

4 0 .0 0

0 .2 7 5

5 . 520

6 . 270
7 .4 0 0

40.0 0
40.0 0

.27 5
~

_

0. 3 00

_

.3 0 0
~

„

_

_

~

“

”

0.0 2 0
_

.020

“

COLO*

j

B U I L D IN G CONSTRUCTION

i

l
JOURNEYMEN

ASBESTOS WORKERS......................
BOI L E RM A KE RS . ..............................
BRICK LAY ER S ....................................
S.iWER WORKERS......................
CARPENTERS.......................................
R E S I D E N T I A L ............................
MI LLW RI GHT S ............................
CEMENT F I N I S H E R S ......................
COMPOSITION FLOOR LAY­
ERS AND MACHINE
Oi?ER ATORS.................................
ELE CT R IC IA NS (I N S I D E
H I R E R S ) ..........................................
CABLE S P L I C E R S ....................
R E S ID E N T IA L W I R E R S . . . .
ELEVATOR C O N S TR U C TO R S. .. .
ENGINEERS--POWER E Q U IP ­
MENT OPERATORS
GROUP 5 :
DERRICKS, MU LTI PLE
DRUM H O IS T S, SHOVELS
GROUP 4 :
TRACTORS (OVER 7 0
H P ) , CONCRETE PAV­
ERS, 2-DRUM H O I S T S . .
GROUP 3 :
D R I L L S , LOADERS, 1 DRUMS H O I S T S ....................
G SOUP 2 :
COMPRESSORS, PUMPS,
F O R K L I F T S ............................
GROUP 1:
TRACTORS (UNDER 70
H P ) , O I L E R S ......................
G L A Z I E R S ............................................
LATHERS...............................................
MA'RBLE SETT ERS............................
MOSAIC AND TERRAZZO
WORKERS..........................................
P A IN TE R S ............................................
SPRAY ............................................
PAPESHANGERS.................................
P IP E F I T T E R S ....................................
PLASTERERS.......................................
PLUMBERS............................................
REINFORCING IRON WORKERS.
ROOFERS, COM POSITIO N ............
ROOFERS, SLATE AND T I L E . .
SHEET-METAL WORKERS...............
STONEMASONS.....................................
STRUCTURAL-IRON WORKERS..
T I L E LAYERS.....................................

8 .0 2 0
9 .4 5 0
9 .2 5 0
9 .5 0 0
8 . 8 35
8 .8 3 5
8 .5 8 2
7 .7 4 0

8 .8 1 0
9 .4 5 0
9 .6 0 0
9 .8 5 0
9 .0 8 5
9 .0 8 5
8 .9 1 2
8 .4 4 0

4 0.00
40.0 0
40.0 0
40.0 0
40.0 0
4 0 .0 0
40.0 0
40.0 0

.38 0
.70 0
.600
.600
.68 0
.680
.680
.470

-

;
;

1 .0 2 0
1 .0 0 0
.70 0
.70 0
.75 0
.75 0
.7 5 0
1.1 5 0

!

1 .2 0 0
-

-

-

. 250
.25 0
. 550
.55 0
. 600

-

-

-

-

6 .0 0
-

!
:
!
i
J
;

.300
.300

.150

-

I
8 . 2 40

8 .9 4 0

4 0.0 0

.47 0

9 .5 8 5
9 .8 2 0
6. 480
8 .6 3 0

10.940
1 1.190
6 .6 3 4
9 .8 1 0

4 0.0 0
4 0 .0 0
4 0 .0 0
40.0 0

.70 0
.700
.570
.495

7 .4 0 0

8 . 150

40.0 0

.40 0

.65 0

.300

7 .2 5 0

8 . 000

40.0 0

.400

.6 5 0

. 300

1 . 150
_
-

.50 0
.500
.32 0

.60 0
_

1 .0 0 X
1.00
1 .0 0
-

-

!

.150

4 .0 0 I
4 .0 0 !
4 .0 0
6 .0 0

.09 5

!

.05 0

-

2.40
2.40
-

.050

j
7 . 100

7 .8 5 0

4 0.00

.400

.65 0

. 300

.050

6 .7 5 0

7 . 500

40.0 0

.40 0

.65 0

.3 0 0

.050

6 .4 0 0
9 . 170
8 .4 4 0
8 .8 0 0

7 . 150
9 . 658
9 . 140
9 .3 5 0

40.0 0
4 0.0 0
4 0.0 0
40.0 0

.400

8 .8 0 0
8 .5 6 0
9 .0 4 0
8 .7 6 0
9 .5 0 0
8 .9 4 0
9 .5 0 0
9 .2 0 0
9 .0 0 0
9 .0 0 0
9 .1 2 0
9 .2 5 0
9 .2 0 0
8 .8 0 0

9 .3 5 0
8 .9 1 0
9 .3 9 0
9 . 110
1 0.3 50
9 .6 4 0
1 0.150
9 .7 5 0
9 .4 1 0
9 .4 1 0
10.170
9 .6 0 0
9 .7 5 0
9 .3 5 0

4 0.0 0
40.0 0
4 0 .0 0
4 0.00
4 0 .0 0
4 0 .0 0
4 0.00
4 0 .0 0
4 0.00
4 0 .0 0
4 0.00
40.0 0
4 0.0 0
4 0 .0 0

.710
.650
.65 0
.65 0
.600
.650
.71 0
.700
.700
.40 0
.600
.7 1 0
.710

6 .3 0 0
5 .6 5 0
6 .1 5 0

7 .0 0 0
6 .3 0 0
6 .8 0 0

40.0 0
4 0.00
4 0.0 0

.470
.47 0
.47 0

.650
-

-

.710

-

-

. 5 00
.700

_

.70 0
.7 0 0
.70 0
.70 0
.65 0
.80 0
1 .1 5 0
.25 0
.25 0
1 .1 5 0
.70 0
1 .1 5 0
.70 0

~

. 300
-

-

*

4 .0 0 I
-

.050
-

.200
.050

-

.050
.100
. 100
.100
.100
.20 0
.150
_
_

_
_

-

.50 0
.40 0

_
-

.400
.75 0
.750
.750
. 500
.500
.50 0
.50 0
.25 0
-

.

.400

~

.050

-

-

.200
.200
.20 0

-

-

'
'
-

!
1
j

.140
.300
_

3.0 C
_
_

HELPERS AND LABORERS
BRICKLAYERS* TENDERS............
B U I L D IN G LABORERS....................
PIP E LA Y E RS ...............................

b e e fo o tn o te s at end o f ta b le .




52

-

.52 0
.52 0

-

-

“

.5 2 0

~

“

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
( U n io n h o u i ' l y w a g e r a t e s a n d s t r a i g h t - t i m e w e e k l y h o u r s a n d e m p l o y e r i n s u r a n c e ,
b u i l d i n g t r a d e s , J u l y 1, 197 5 a n d J u l y 1, 1 97 6)

pension,

JULY 1 ,
1975

vacation,

JUL Y

1,

an d o t h e r c o n t r i b u t i o n s to fu n d s in t h e

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C IT Y AND JOB
CLASSIFICATION

PER
HOUR

PER
HOUR1

PER
W EEK

INSURANCE4

DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

DOLLARS

PERCENT

I
!

PERCENT

OTHER5

DOLLARS

PERCENT

0 .0 9 5
.050
.200

-

DENVER, COLO.
-CO NTINUED
I
!

BUILDING CONSTRUCTION
-— CONTINUED
HELPERS AND LABORERS
— CONTINUED
ELEVATOR CONSTRUCTORS*
H EL P ER S ................................................
MARBLE S E T T E R S ' H E L P E R S . .
PLASTERERS* LABORERS.............
PLUMBERS' LABORERS
(DRAIN L A Y E R S ) ...................
TERRAZZO WORKERS*
H E L P E R S ................................................
BASE AND WALL MACHINE
G R IN D E R S ....................................
FLOOR MACHINE GRINDERS
T I L E LAYERS' H ELP ER S ______

!

!
!
i
$ 6,0 40
6 .8 7 0
6 . 3 00

$ 6.8 70
7 . 440
7 . 000

4 0.00
4 0.0 0
4 0.00

0.4 9 5
.710
.470

6 .3 0 0

7 . 000

4 0.00

.47 0

6 .8 7 0

7 . 440

4 0.0 0

.710

7 . 5 70
7 .0 2 0
6 .8 7 0

8 . 140
7 . 590
7 .4 4 0

4 0.0 0
4 0.00
4 0.00

.71 0
.710
.710

0 .3 2 0
.70 0
.52 0

-

.52 0

-

j

.20 0

-

-

.70 0

-

|

. 400

.05 0

-

-

.7 0 0
. 70 0
.70 0

_
-

;
i
|

.400
.400
.400

.05 0
.050
.050

_
-

“
!

!
0 .4 0 0
-

|

6 .0 0 % I
~

i

~

i
|

i

i

HIGHWAY AND STREET
CONSTRUCTION

-

|I

JOURNEYMEN
CARPENTERS ..........................................
CEMENT F I N I S H E R S ........................
ENGINE ER S— POWER EQ U IP ­
MENT OPERATORS:
GROUP 1— TRACTORS UN­
DER 70 H . P ..............................
GROUP 2 — AI R COMPRES­
SORS, PU M PS ..............................
GROUP 3— CONVEYORS,
D R I L L S , GRADERS................
GROUP 4 — CRANES (UNDER
5 0 T O N S ) ....................................
GROUP 5 — CRANES (OVER
5 0 T O N S ) ........................... ...
STRUCTURAL IROM WORKERS..

7 . 190
7 .0 7 0

7 .9 9 0
7 .5 1 0

4 0.0 0
40.0 0

.68 0
.470

.75 0
1.1 5 0

-

!

!

. 150

i

i
6 .4 0 0

7 .1 5 0

40.0 0

.40 0

6 .7 5 0

7 . 500

40.0 0

.400

-

.65 0

7 . 100

7 . 850

40.0 0

.40 0

-

.65 0

7 .2 5 0

8 .0 0 0

4 0.0 0

.400

-

8 .1 5 0
9 .7 5 0

4 0.00
40.0 0

.40 0
.710

7 .4 0 0
9 .2 0 0

I

.650

;

. 300
i
-

i

_

.650

5 .5 5 0

!

6 .2 0 0

4 0.0 0

.47 0

.52 0

i

JOURNEYMEN

j

!
!
i

ii
i

;
8 .8 3 5
7 .0 7 0

9 . 085
7 .5 1 0

.010

. 300

.01 0

40.0 0
40.0 0

.680
.470

.7 5 0
1 .1 5 0

i
i

-

. 300

6 .4 0 0

7 .1 5 0
7 . 500

I

4 0.00

.40 0

4 0.00

.40 0

!
|

-

I

~

i
.070

i
|
i

.55 0
. 600

~

.65 0

j
i

. 6 50

-

!

|

i

.150

!
i

6 .7 5 0

!

.01 0
.010

j

'

|

OTHER HEAVY CONSTRUCTION

. 300

!

i

-

.010

.300
!

.65 0
1 .1 5 0
~

i

CA RPEN TERS...........................................
CEMENT F I N I S H E R S ........................
ENG INE ER S— POWER E Q U I P ­
MENT OP ERATORS:
GROUP 1— TRACTORS UN­
DER 70 H . P ..............................
GROUP 2 — A I R COMPRES­
S O R S , PUMPS ........................
GROUP 3 — CONVEYOR S,
D R I L L S , GRADERS................
GROUP 4 — CRANES (UNDER
5 0 TONS) ....................................
GROUP 5 — CRANES (OVER
5 0 T O N S ) ....................................
STRUCTURAL IRON WORKERS..

|
i
i

|

HELPERS AND LABORERS
CONSTRUCTION L A B O R E R S . . . .

. 550
. 600

-

.300

_

.010

_

. 300

-

.01 0

-

7 . 100

7 .8 5 0

4 0.00

.400

-

.65 0

-

. 300

-

.010

7 .2 5 0

8 .0 0 0

4 0.0 0

.400

-

. 650

-

. 300

-

.010

-

7 .4 0 0
9. 200

8 . 150
9 . 750

40.0 0
40.0 0

.40 0
.710

_

_

.300 '

_

.010

_

5 .5 5 0

6 .2 0 0

4 0 .0 0

.47 0

9 .5 2 0
10.070
1 0.190

10.140
10.900
1 0.780

40.0 0
4 0.00
40.0 0

.84 0
.800
.800

10.190
10.190
9 .9 1 7
9 .6 0 0

10.780
10.,780
10.480
1 0.100

40.0 0
4 0.0 0
25.0 0
4 0.00

.80 0
.80 0
.75 3
.800

-

.650
1 .1 5 0

~

~

-

.520

-

-

“

HELPERS AND LABORERS
CONSTRUCTION

LA B O R E R S....

DE T R O I T ,

.

!
j

.070

MICH.

B UIL DI NG CONSTRUCTION

JOURNEYMEN
ASBESTOS WORKERS........................
BOI LERMAKERS....................................
BRI CKLAYERS .......................................
CL EANERS , CAULKERS AND
P O I N T E R S . ............... ...................
CEMENT BLOCK L A Y E R S . . .
CA RPENTERS..........................................
M ILL W RIG HTS .................................

1 .1 9 0
1 .0 0 0
.96 0

_
-

.96 0
.960
-

~

'

I

S ee fo o tn o te s at end of ta b le .




-

-

53

8 .0 0 V
11.00

61 .2 5 0
1.5 0 0
“

2 . 121

11.00

.420
. 100

-

11.00
11.00
11.00

.100
.10 0
.030

-

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U n i o n h o u r l y w a g e r a t e s and s t r a i g h t - t i m e w e e k l y h o u r s an d e m p l o y e r i n s u r a n c e ,
b u i l d i n g t r a d e s , J u ly I, 19 7 5 an d J u ly 1, 1 97 6)

pen sion ,

vacation,

JUL Y

JULY 1,
1975

1,

and o t h e r c o n t r i b u t i o n s to f u n d s in t h e

~ v m

----------

EMPLOYER CONTRIBUTIONS
TO FUNDS3
RATE
PER
HOUR

RATE
PER j
HOUR

CIT Y AND JOB
CL A S S I F I C A T IO N

PER
WEEK

INSURANCE

DOLLARS

PENSION

DOLLARS

PERCENT

OTHER5

VACATION

PERCENT

DOLLARS

PERCENT

DOLLARS

PERCENT

j

DE TR O IT , HICHo
-CONTINUED

!
!

I
B UI LD IN G CONSTRUCTION
-CONTINUED

l
JOURNEYMEN
-CONTINUED
$9,288

$ 9,500

4 0.00

0 .8 0 0

9 . 874
10. 52 0

1 0.302
11.170

35.0 0
4 0.00

1 .0 0 0
.495

~

10.749

10.749

40.0 0

.550

~
~
~
-

10.521
10. 2 93
1 0.067
9 .1 5 0
8 .5 2 6
8 . 800
9. 800
10.280

10.521
10.293
1 0 . 067
9.1 5 0
8.5 2 6
9 . 150
9 .9 2 0
10 .4 9 0

4 0 .0 0
4 0 . 00
4 0.00
4 0.00
4 0.00
40.0 0
35.00
4 0.0 0

.550
.55 0
.55 0
.550
.55 0
.550
.870
.5 0 0

9 .5 5 0
9 . 300

9 . 740
1 0 . 000

4 0.00
4 0.00

.50 0
.740

9 .8 0 0
9 . 30 0
9. 550
9 .2 1 5
9 .9 0 0
1 0.390
9 .1 7 0
9. 06 3
9 .3 1 0
10.060
9 . 31 0

10.500
10.000
10.250
9 . 600
10.400
10.390
9 .4 7 0
9 .0 6 3
9.9 1 0
1 0.910
9 .9 1 0

4 0.00
40.0 0
40.0 0
4 0 .0 0
40.0 0
40.0 0
40.0 0
4 0.0 0
40.0 0
4 0.0 0
4 0.0 0

.740
.740
.74 0
.70 0
.500
.700
.700
.98 0
.80 0
.800
.80 0

9. 730
8 .7 8 0
10.190
9 .7 5 0
9 .1 0 0
9 .8 6 0

10.135
9 .4 1 0
10.780
9 .7 5 0
9 .5 0 0
1 0 . 100

40.0 0
4 0.00
4 0.00
4 0.0 0
40.0 0
4 0.0 0

.900
1 .3 9 0
.80 0
1 .0 0 0
.500

7 .6 2 0
7 .6 2 0
7 .6 2 0

8 .3 7 0
8 .3 0 0
8 . 2 20

7 . 36 0
8 .5 9 0
9 .4 1 0

7 .8 2 0
8 .6 6 0
10.010

8 .8 6 0

9 . 120

■fc
o

CEMENT MASONS..............................
ELECT RIC IANS ( IN S ID E
W I R E R ) ............................................
ELEVATOR CON S TR UC TO RS .. ..
ENGINEERS— POWER E QU IP­
MENT OPERATORS
BOOM AND J I B OR LEADS
2 20 FT. OR L O N G E R . . . .
BOOM AND J I B OR LEADS
140 FT. OR L O N G E R . . . .
CRANE OPERATORS.................
REGULAR ENGINEERS............
COMPRESSORS............................
FIREMEN AND O I L E R S ____
GLAZIERS ( O U T S I D E ) .................
LATHERS...............................................
MARBLE SETTERS...........................
MOSAIC AND TERRAZZO
WORKERS.........................................
P AI N TE R S ............................................
SPRAY OR SWING (UNDER
40 F E E T ) .................................
PAPERHANGERS.................................
DRYWALL TAPERS....................
P IP E F I T T E R S ....................................
SPRINKLER F I T T E R S ............
PLASTERERS.......................................
PLUMBERS............................................
REINFORCING IRON WORKERS.
ROOFERS, COMPOSITION............
ROOFERS, SLATE AND T I L E . . |
PRECAST T I L E .........................
SHEET-METAL WORKERS:
AGREEMENT A ...........................
AGREEMENT B............................
STONEMASONS....................................
STRUCTUAL—IRON WORKERS...
RIGGERS.......................................
T I L E LAYERS....................................
j

i
!
!

9 .2 6 0
8 .5 9 0

9 .5 7 0
8 . 660

4 0.0 0
40.0 0

9 .9 1 6
9 .7 2 0

1 0.480
1 0 . 400

35.0 0
40.0 0

|
j
I

!
|

HELPERS AND LABORERS
40.0 0
4 0.00
4 0.00
40.0 0
4 0.00
4 0.0 0

!
i

!

_

1 .0 0 *

_

-

6 9 .0 0
6 .0 0

0 .7 8 0
.02 0

.7 5 0

-

-

10.00

.030

.75 0
.75 0
.75 0
. 7 50
.75 0
.65 0
. 69 0
.70 0

-

6. 350
* 6.6 9 0
. 750

10.00
10.00
10.00
10.00
10.00
-

.03 0
.03 0
.030
.030
.03 0
.35 0
-

i

.700
1 .0 0 0

-

.750
1 .0 0 0

-

. 100
-

-

;

1 .0 0 0
1 .0 0 0
1 .0 0 0
1. 100
.80 0
.500
1 . 100
.800
.80 0
.80 0

15.00
-

1.0 0 0
1 .0 0 0
1 .0 0 0
i . 350
6’ . 300
.60 0
1.2 5 0
1.0 0 0
1 .000
1.000

-

-

1 .070
. 150
-

15.00
-

1 . 120
.300
. 160
. 160
. 16 0

-

-

1. 124
1 .2 7 0

14.00

1.5 2 0
. 750

~
--

I

_

10.00%
-

1 .0 0 0
.32 0

8 .0 0 *
j
l

1 .1 2 4
1 .3 3 0
.96 0
.85 0
. 700

{

I

j

-

11.00
17.00
-

2 .3 1 *

1 .2 0
-

_
-

-

.87 0
.690
.100
.020
.02 0
.050

-

i

I
!
i

o
o

BRICKLAYERS' T E N D E R S . . . . .
MORTAR MIXER S ......................
B U IL D IN G LABORERS....................
ELEVATOR CONSTRUCTORS'
HELPERS............................................
MARBLE SETTERS' HELP E RS ..
PLASTERERS' TENDERS..............
.MOSAIC AND TERRAZZO
WORKERS* HELPERS.................
BASE MACHINE OPERATORS
OR BASE GRINDERS..............
T I L E LAYERS' HELPERS...........

_

.700
.70 0
.70 0

|
j

.49 5
.50 0
.70 0

!

-

|

-

1

. 6 00
.6 0 0
.60 0

_

6.750
.80 0
. 800

_
-

. 100
. 120
. 120

_
-

.800
.750

6 .0 0
-

.02 0
.150
-

2 .3 1
-

'
i

-

.32 0
. 6 50
.7 4 0

-

.50 0

-

. 400

-

.500
.500

_

_

-

.4 0 0
. 6 50

.750
.50 0

-

.25 0

.85 0

-

-

. 100

-

-

. 100
. 150

-

_
-

1 1.00
-

.030
_

_
_

-

.65 0
‘

. 650
. 800

HIGHWAY AND STREET
CONSTRUCTION
JOURNEYMEN

8 .8 5 0

.800

-

8 .6 3 0

4 0 .0 0

.80 0

-

.850

7 .7 7 0

8 . 170

40.0 0

.80 0

-

.850

7 .6 3 0
9 .7 5 0

8 . 040
9 .7 5 0

4 0.0 0
4 0.00

.800
-

.85 0
~

o
o

8 .4 5 0
8 .2 2 0

o

CARPENTERS.......................................
CEMENT MASONS..............................
ENGINEERS— POWER EQU IP­
MENT OPERATORS:
CLASS I — ASPHALT ROL­
LER S, CRANES, PAVERS
(5 BAGS OR MORE),
GRADALLS, BULLDOZERS,
TRENCHING M A C H I N E S . ..
CLASS I I — BACKHOES,
SWEEPERS, CRU SH ER S .. .
CLASS I I I — A IR COM­
PRESSORS, CONCRETE
BREAKERS.................................
CLASS I V — OI LE RS , F I N ­
I S H IN G MACHINES, ENDLOADERS (UNDER 1 YD) .
STRUCTURAL IRON WORKERS..

S e e fo o tn o te s at end of ta b le .




54

8 .0 0

8 .0 0
-

-

10.00

_

_

_

10.00

_

_

-

_

10.00

_

_

1 4.00

-

10.00
17.00

-

_

-

.02 0

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w age r a te s and s tr a ig h t - t im e w e e k ly h o u rs and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , July 1, 1975 and J uly 1, 1976)
JULY 1,
1975

JULY

1, T S 7 3 ---------- EMPLOYER CONTRIBUTIONS
TO FUNDS3

C I T Y AND JOB
C L A S S I F I C A T IO N

BATE
PER
HOUR

RATE
PER l
HOUR

PER
WEEK2

INSURANCE4

DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER5

PERCENT

DOLLARS|

PERCENT .

DE TRO IT * HICHo
-C ONTINUED
I

HIGHWAY AND STREET
CONSTRUCTION
-CONTINUED

i

|
i

I

HELPERS AND LABORERS
i
HIGHWAY LABORERS.......................

$ 7,4 50

$ 7 ,9 00

4 0 .0 0

i

0 .5 5 0

i
!

i
!

0 .0 4 0 i
I
!

0.5 5 0

0 . 300

OTHER HEAVY CONSTRUCTION
I
1
j

JOURNEYMEN

C A R P E N T E R S . . .................................
CEMENT MASONS...............................
ENGINEERS — POWER E QU IP­
MENT OPERATORS:
UNDERGROUND:
MASTER MECHANICS...............
CLASS I .......................................
CLASS I I ....................................
CLASS I I I .................................
CLASS I V ....................................
STEE L:
HOISTING E N G I N E E R S . . . .
COMPRESSOR AND WELDER
OPERATORS...............................
CRANE OPERATORS.................
COMBINATION BOOM AND
J I B 140 F T . OR MORE.
COMBINATION BOOM AND
J I B 220 F T . OR MORE.
STRUCTURAL IRON WORKERS..

9 .9 1 6
9 .7 2 0

10.480
10.400

3 5.0 0
4 0.00

.75 0
.500

9 .1 3 0
8 .9 0 0
8 .7 8 0
8 . 1 20
7 .6 0 0

9 .4 0 0
8 .9 0 0
8 .7 8 0
8 . 120
7 .6 0 0

4 0.00
4 0.00
4 0.0 0
4 0.0 0
40.0 0

.80 0
.800
.800
.80 0
.80 0

10.700

10.700

4 0.00

.55 0

9 . 6 10
10.850

9 .6 1 0
1 0.850

4 0.0 0
4 0 .0 0

.550
.550

11.330

11.330

4 0 .0 0

.550

'
i

_

. 750

11.570
9 .7 5 0

1 1.570
9.7 5 0

40.0 0
4 0.00

.550

;

_

• 7 50

6 .9 5 0
6 .9 6 0

7 .2 6 0
7 . 450

4 0 .0 0
4 0.00

,

!

.25 0

-

-

i
,

I
-

i
|

!

8 .0 0 *
-

!

.75 0

i
j

.75 0
. 7 50

1 1 .0 0 *
-

.030
-

-

-

10.00
10.00
10.00
10.00
10.00

.010
.01 0
.010
.010
.010

-

.020

_

-

10.00

!
.020 i
.02 0 |
!
.020

10.00
17.00

.020
.020

i
i

.7 5 0
.750
.7 5 0
.75 0
. 750

|

-

j

I
1
|
|
j
!

I
I
!
|

10.00
I
I

j

|

I

10.00
10.00

1

_

I

8 .0 0 %

14.00

1

_

HELPERS AND LABORERS
1
DISTRIBUTION L A B O R E R S .... i
UNDERGROUND L A B O R E R S . . . . .

.550
.70 0

I
j
!
i
I

F L IN T ,

'

. 300
.60 0

(I

!
!

.550
.550

!
!

|

.04 0
.060

j

i

|

I
i
j

HICHo
i
I

B UI LD IN G CONSTRUCTION
|
I
JOURNEYMEN

!
i

ASBESTOS W O R K E R S . . . . ............
BOILERMAKERS................................
BR ICKLAYERS ................. . ................
CARPENTERS.......................................
MI LLW RI GH TS ......................
CEMENT F I N I S H E R S .......................
EL E CT R IC IA NS (I N S I D E
W IR E R S ) ..........................................
ELEVATOR C O N S T R U C T O R S .. ..
ENGINEERS— POWER E QU IP­
MENT OPERATORS:
CRANES WITH BOOM AND
J I B 220 FEET OR
LONGER (CLASS A ) ............
CRANES WITH MAIN BOOM
AND J I B 140 FEET OR
LONGER (CLASS B ) ............
GRADERS, DOZERS, AND
HOISTS (CLASS C ) ............
A I R TUGGERS, WINCH
TRUCKS (CLASS D ) ............
PUMPS OVER 6 INCHES
(CLASS E ) ............................ ..
A IR COMPRESSORS, PUMPS
UNDER 6 INCHES (CLASS
* ) ..................................................
G L A Z I E R S ............................................
LATHERS .............. .. .................. ...
MARBLE MASONS. . . . ....................
MOSAIC AND TERRAZZO
WORKERS..........................................

I
|
!

9 .0 1 0
10.070
9 .9 0 0
8 .2 4 0
9 .6 0 0
8 .4 3 0

I

10.250
9 .7 3 5

9 .3 5 0
1 0.900
10.050
8 ,9 4 0
1 0.1 00
9 . 480

40.0 0
4 0.00
40.0 0
40.0 0
40.0 0
40.0 0

10.750
10.420

40.0 0
40.0 0

i
!
|
’
!

j
.79 0
.80 0
.50 0
.600
.80 0
.400

_
-

;

_

.400
.445

1 .2 8 0
1 .0 0 0
1 .0 0 0
.400
. 350

-

.75 0
. 2 90 •

-

.8 5 0

-

9 .7 2 0

!

10,215

4 0 .0 0

.800

1.2 5 0
. 500
6. 50 0
. 500
61. 150

I
11.00
_
-

I
!

.
-

i
j
1
I

9 .9 4 5

-

.060
.02 0
-

2 1.00

6. 50 0
I
i
|

5 .0 0

!
!
;

!
l

_

.260

-

i
.02 0

6 10.00
j

!
9 .9 9 0

4 0.0 0

.800

I

.850

| 6 10.00

I

.020

s
!

9 .4 9 5

9 .7 6 5

40.0 0

.800

9 .1 8 0

9.3 6 0

40.0 0

.800

_

.85 0

i
|
!

9 .0 0 0

9 . 180

4 0.00

.80 0

_

.850

8 .0 5 5
8. 590
8 .2 5 0
9 .9 0 0

8 . 190
8 .7 9 0
8 . 140
10.050

4 0.00
40.0 0
4 0.00
40.0 0

.80 0
.550
.740
.500

-

.850
.60 0
.20 0
1 .0 0 0

8 .7 9 0

9 . 140

4 0.0 0

.500

I

. 8 50

55

]
!
|
i
|

1.0 0 0
J_____ 1

S e e fo o tn o te s at end of ta b le .




i
i

_

_

_

_

_

6 10.00

.020

_

-

_

6 10.00

.02 0

_

6 10.00
6 .0 0
-

.020
.15 5
6 .0 1 0
.060

-

-

.005

-

_
6.500
6.5 0 0
6. 500

-

6 10.00

’

.020

_

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , J u ly 1, 1975 and July 1, 1976)
JULY 1
1975

C IT Y AND JOB
C L A S S I F I C A T IO N

r

jo ly

1976

EMPLOYEE CONTR IBUT ION S
TO FUNDS3
RATE
PER
HOUR

RATE
PER
HOUR1

HOURS
PER
WEEK

INSURA NCE 4

DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER5
‘ T
DOLLARS j PERCENT

PERCENT

|
F L I N T * MICH .
“ ’ CONTINUED
B U IL D IN G CONSTRUCTION
-CONTINUED

I
I

JOURNEYMEN
-CONTINUED
8 .0 0 %
-

0 .6 0 0
. 60 0
.60 0
.6 0 0
.60 0
1 .0 0 0
. 25 0
1.0 0 0
.400
.40 0
1 .1 0 0
1 .0 0 0
1 .0 0 0

15.00%
-

-

60 . 600
6. 600
6. 6 0 0
*.60 0
6. 600
71.000

i
1

_

j
J

-

$7,750
8 .0 5 0
8 .0 5 0
7 .7 5 0
8. 050
9. 090
8 .8 3 0
9 .0 9 0
9. 0 6 3
1 0.350
10.700
8 .0 4 0
9 .9 0 0
9 .7 5 0
8 .7 9 0

$ 8,0 00
8 .3 0 0
8 .3 0 0
8 .0 0 0
8 .3 0 0
9 . 74 0
9 .8 3 0
9 .7 4 0
9.0 6 3
1 0.850
11.200
8 .6 9 0
1 0.050
9 .7 5 0
9 . 140

40.0 0
4 0 .0 0
40.0 0
4 0 .0 0
40.0 0
4 0 .0 0
4 0.0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0.00
4 0 .0 0

0 .5 0 0
.50 0
.5 0 0
.50 0
.500
.800
.500
.800
.980
.600
.6 0 0
.690
.500
.50 0

7 .8 9 0
7 .7 9 0

8 . 09 0
7 .9 9 0

4 0 .0 0

_

.40 0

-

. 250

_

.040

_

-

.4 0 0

-

.25 0

-

.04 0

-

15 .0 0%
17.00

a 1 * 010
61 .0 0 0
61 . 0 0 0
6. 500
6. 500

o
©

P AI NT E RS ............................................
SPRAY............................................
SWING STAGE............................
DRYWALL T A P E R S . .........................
PAPERHANGERS.................................
P I P E F I T T E R S ....................................
PLASTERERS.......................................
PLUMBERS............................................
REINFORCING IRON WORKERS.
ROOFERS, COMPO SITIO N............
ROOFERS, SLATE AND T I L E . .
SHEET-METAL WORKERS...............
STONEMASONS....................................
STRUCTURAL IRON WORKERS..
T I L E LAYERS....................................

_

!
0.0 1 0
.08 0
.01 0
.30 0
. 100
.060
.020
.00 5

-

-

o
©
o
a-

.550
.55 0

6 .7 8 0

7 .0 8 0

©
©

BR ICKLAYERS' TENDERS............
B U I L D IN G LABORERS....................
COMPOSITION ROOFERS'
HELPERS............................................
ELEVATOR CONSTRUCTORS'
HELPERS............................................
PLASTERERS' LABORERS............

p
o

HELPERS AND LABORERS

.60 0

-

.400

-

6 .8 1 5
7 .8 9 0

7 .2 9 0
8 .0 9 0

40.0 0
4 0.0 0

.445
.550

-

.2 9 0
.40 0

-

8 .5 3 0
9 .0 2 0

9 .4 8 0
1 0.500

40.0 0
4 0 .0 0

.60 0
.400

_

"

-

. 250

-

-

5 .0 0
-

.260
.04 0

-

HIGHWAY AND STREET
CONSTRUCTION

JOURNEYMEN
i
-

.40 0
.250

_

_

. 300
-

-

.

-

|

-

1
8 .4 5 0

8 .8 5 0

4 0 .0 0

.80 0

-

.85 0

-

-

10.00

-

. 85 0

-

-

.80 0

-

.85 0

-

-

-

.85 0

-

-

7 .7 7 0

8 . 170

7 .6 3 0
9 .7 5 0

8 .0 4 0
9 .7 5 0

4 0 .0 0
4 0 .0 0

.800
-

8 .0 0

7 .0 1 0

7 .6 1 0

4 0.0 0

.40 0

-

8 .5 3 0
9 .0 2 0

9 .4 8 0
10.500

4 0 .0 0
40.0 0

.600
.4 0 0

9 .7 2 0

10.215

9 .9 4 5

9 .9 9 0

9 .4 9 5

9 .7 6 5

40.0 0

©
©

o
©

.80 0

p

8 .6 3 0

p

8 .2 2 0

o
©
o

j

o

CARPENTERS.......................................
CEMENT F I N I S H E R S ......................
ENGINEERS— POWER EQU IP­
MENT OPERATORS:
CLASS I — CRANES, SHOV­
E L S , PAVERS.........................
CLASS I I — CRUSHERS,
BACKHOES WITH
LESS
THAN 3 / 8
YD. BUCKET.
CLASS I I I — A IR COM­
PRESSORS.................................
CLASS I V — BOOM OR
WINCH H O I S T S , ROLLER
OPERATORS...............................
STRUCTURAL IRO N WORKERS..

-

!
1

10.00

-

-

10.00

-

-

10.00
17.00

.020

.04 0

-

HELPERS AND LABORERS

.30 0

-

. 55 0

-

.40 0
.250

_

_

-

.30 0
-

_

-

-

-

o
©
©
a-

LABORERS............................................

.8 0 0

-

.85 0

-

-

4 0.00

.80 0

-

.85 0

-

-

.80 0

-

.85 0

-

-

.85 0

-

-

.85 0

-

-

OTHER HEAVY CONSTRUCTION

JOURNEYMEN

-

.800

-

56

©

40.0 0

©
©

9 . 180

©

9 .0 0 0

-

.020

-

o
©

.800

-

.020

o

40.0 0

.020

o
o

9 .3 6 0

-

o

9 .1 8 0

-

.02 0

©
o

|

S e e f o o tn o te s at end o f ta b le .




_

o
o
o

CARPENTERS.......................................
CEMENT F I N I S H E R S ......................
ENGINEERS— POWER EQU IP­
MENT OPERATORS:
AGREEMENT A:
CLASS A— CRANES WITH
BOOM AND J I B 2 20 F T .
OR LONGER............................
CLASS B— CRANES WITH
BOOM AND J I B 140 FT.
OR LONGER............................
CLASS C— GRADERS, DOZ­
ERS, HOISTS ....................
CLASS D— A I R TUGGERS,
WINCH TRUCKS....................
CLASS E— PUMPS OVER
6 I N CH E S ...............................

.020

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w age r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , Ju ly 1, 1975 and J uly 1, 1976)
JU LY 1,
1975

1 ,, 1 9 7 6

JU LY

EM PLOYER
TO
R ATE
PER
HOUR 1

C IT Y AN D JO B
C L A S S IF IC A T IO N

R ATE
PER
HOUR 1

HOURS
PER
WEEK

IN S U R A N C E 4
DOLLARS

C O N T R IB U T IO N S
FU N DS3

P E N S IO N

PERCENT

D O LLAR S

V A C A T IO N

PER CEN T

DO LLAR S

O TH ER *

PER CEN T

DO LLAR S

PERCENT

F L IN T , M IC H .
-C O N T IN U E D
O T H E R H E A V Y C O N S TR U C TIO N
-C O N T IN U E D
JOURNEYMEN
-C O N T IN U E D

H ELPERS

AND

.0
.0
.8
.4

9 1
0 0
0 0
55

$ 8 . 190
8
8
7
7

. 150
.0 5 0
.8 5 0
.5 1 0

8 .9 0 0

9 .2 7 0

8 .7 8 0

9 .5 0 0

4 0 .0 0
4
4
4
4

0
0
0
0

.
.
.
.

0
0
0
0

0 .8 0 0

0
0
0
0

.8
.8
.8
.8

0
0
0
0

0 .8 5 0

_

0
0
0
0

-

-

.6 0 0

4 0 .0 0

.6 0 0

o

8
8
7
7

o

$ 8 ,0 5 5

•
p
o

E N G IN E E R -P O W E R E Q U IP M E N T
O PE R A TO RS -C O N T IN U E D
C LA S S F — A IB CO M PRES­
SO R S, PUMPS UNDER
6 I N C H E S ............................
AGREEM ENT B:
C L A S S I .................................
C L A S S I I - A .........................
C L A S S I I - B ..........................................
C L A S S I I I ..............................................
A G R E E M E N T C (U N D E R ­
GROUND) :
C L A S S I —C R A N E S ,
B A C K H O E S ............................
C L A S S I I —D O Z E R S ,
T R E N C H E R S .........................
C LASS I I I — COM PRES­
S O R S .............................................
CLASS IV — R O L L E R S ....
S T R U C T U R A L IR O N W O R K E R S ..

8 . 120
7 .6 0 0
9 .7 5 0

8 .4 8 0
7 .9 6 0
9 .7 5 0

4 0 .0 0
4 0 .0 0
4 0 .0 0

.6 0 0
.6 0 0

6 .6 8 0

6 . 860

4 0 .0 0

.4 5 0

7
7
7
7

5
5
5
5

0
0
0
0

-

.8 5 0
.8 5 0
.8 5 0

-

-

-

-

_
_

_
_

-

-

1 4 .0 0 %

-

.00%

61 0

_

_

.8 5 0

_
_
8 .0 0 %

“

.
.
.
.

-

*1
1
1
1

0
0
0
0

.0
.0
.0
.0

0 .0 2 0

0
0
0
0

.0
.0
.0
.0

1
1
1
1

0
0
0
0

1 0 .0 0

.0 2 0

1 0 .0 0

.0 2 0

1 0 .0 0
1 0 .0 0
1 7.. 0 0

i

.0 2 0
.0 2 0
.0 2 0

_
-

_
_
-

-

LABO R ERS

L A B O R E R S ................................................

-

.4 0 0

-

0 .2 5 0

_

.0 4 0

_

I

FO RT

W O RTH*

TEXAS

!
B U IL D IN G

C O N S T R U C T IO N

I

JOUR NEYM EN
I

A
B
B
C

S B E S T O S W O R K E R S ........................
O I L E R M A K E R S ....................................
R I C K L A Y E R S .......................................
A R P E N T E R S ...........................................
M I L L W R I G H T S .........................
C E M E N T M A S O N S ........................ ...
E L E C T R IC IA N S
(IN S ID E
W I R E R S ) .............................................
E LE V A T O R C O N S T R U C T O R S ....
E N G IN E E R S — PO W ER E Q U IP ­
MENT O PER ATO R S:
H E A V Y E Q U I P M E N T ............. ..
L I G H T E Q U I P M E N T ...................
G L A Z I E R S ................................................
L A T H E R S ...........................................
M O S A IC AND T E R R A Z Z O
W O R K E R S ......................................
P A I N T E R S ........................................
S P R A Y , S W IN G S T A G E ,
S T R U C T U R A L S T E E L ...........
P L A S T E R E R S ...................................
P L U M B E R S ........................................
R E IN F O R C IN G IR O N W O R K E R S .
R O O F E R S , C O M P O S I T I O N ..................
R O O FER S, S LA TE AND T IL E ..
S H E E T - M E T A L W O R K E R S ......................
S T R U C T U R A L IR O N W O R K E R S ..
T I L E L A Y E R S .......................................................
H ELPER S

AND

7
8
8
7
8
7

.
.
.
.
.
.

9
0
4
8
4

8
0
9
1
4
54

0
0
0
0
0
0

9
9
8
9
9
8

. 380
.0 0 0
.8 8 0
.0 1 0
.6 4 0
.7 4 5

4
4
4
4
4
4

0
0
0
0
0
0

.0
.0
.0
.0
.0
.0

0
0
0
0
0
0

;

|
i
|
I

.3
.5
.4
.3
.3
.2

2
0
5
0
0
5

5
0
0
0
0
0

8 .8 8 3
8 .2 1 0

9 .5 3 2
9. 330

4 0 .0 0
4 0 .0 .0

.4 0 0
.5 4 5

7
7
7
9

8
8
7
9

4
4
4
4

.4 0 0
.4 0 0
.2 5 0

.4
.0
.3
.2

5
5
4
3

0
0
0
0

.4
.0
.9
.7

2
2
4
8

5
5
0
0

0
0
0
0

.
.
.
.

0
0
0
0

0
0
0
0

8 .6 0 0
7 .8 9 5

9. 100
9 .0 9 5

4 0 .0 0
4 0 .0 0

8
9
8
7
7
7
8
7
8

9
9
9
8
8
8
9
8
9

4
4
4
4
4
4
4
4
4

. 145
.2 6 0
.5 3 0
.9 2 5
.8 6 5
.8 6 5
.4 0 5
.9 2 5
.6 0 0

.3 4 5
.8 1 0
. 280
.2 9 0
.4 1 5
.5 6 5
. 205
.2 9 0
.1 0 0

0
0
0
0
0
0
0
0
0

.
.
.
.
.
.
.
.
.

0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0

-

-

_

.6 8 5
1 .0 0 0
. 5 0 0
.3 0 0
-

.4 5 0

_

-

.3 5 0

-

.6 2 5
.6 2 5
.4 0 0

-

-

~

-

-

-

-

-

_

5 .0 0 %

-

-

-

I

~

. 500

-

-

-

-

-

_

_

.0 2 0

-

-

-

-

-

-

-

.

_

.

-

-

-

-

-

.3 0 0
.2 0 0

_

-

-

-

_

_

.

_

_

_

-

-

.2 0 0

-

-

_

.0 8 0
.0 4 0

-

-

-

-

-

-

-

_

..

-

.4
.5
.2
.2
.4
.5

3
5
5
5
5
5

0
0
0
0
0
0

-

-

.9 0 0
.7 0 0
-

.3 0 0
.7 0 0
.3 0 0

-

*6 .0 0 ,
*6 .0 0

-

.0 4 0

6. 2 5 0
-

.2 5 0
.2 5 0
.2 0 0
-

-

-

.0 9 5

_

LABO R ERS

B R I C K L A Y E R S ' T E N D E R S ..................
B U I L D I N G L A B O R E R S ..................
ELEVATO R C O N STR U C TO R S'
H E L P E R S ........................................
M A R B LE S E T T E R S ' H E L P E R S ..
P L A S T E R E R S ' L A B O R E R S ..........
TER R AZZO W O RKERS'
H E L P E R S ...................................
T I L E L A Y E R S ' H E L P E R S ...........

5 .5 2 0
5 .2 7 0

6 .2 7 0
6 .0 2 0

4 0 .0 0
4 0 .0 0

.2 7 5
.2 7 5

-

.3 0 0
.3 0 0

-

-

-

-

5 .7 5 0
6 .7 0 0
5 .5 2 0

6 .5 3 0
7 .2 0 0
6 .2 7 0

4 0 .0 0
4 0 .0 0
4 0 .0 0

.5 4 5

_

_

.
-

.0 2 0

.3 0 0

-

6 .0 0

.2 7 5

-

.3 5 0

5 .5 2 0
6 .9 0 0

6 .2 7 0
7 .4 0 0

4 0 .0 0
4 0 .0 0

.2 7 5

_

.3 0 0

_

.

-

I
S e e fo o tn o te s at end o f ta b le .




57

-

-

.

.
-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in th e
b u ild in g t r a d e s , July 1, 1975 and J u ly 1, 1976)
JUL Y

JULY 1 ,
1975

1,

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AMD JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR

PER
HOUR1

PER
WEEK2

DOLLARS
FREMONT,

PERCENT

PERCENT

DOLLARS

OTHER5

VACATION

PENSION

INSURANCE4

DOLLARS

DOLLARS

PERCENT

PERCENT

i

CALIF®

B U IL D IN G CONSTRUCTION

JOURNEYMEN

$ 10 ,70 0
9 .9 5 0
10.350
9 .9 5 0
10.150
10.450
10.100
10.100
9 .4 6 0

$ 11.990
12.000
1 0 . 950
1 0.500
10.650
11.000
1 0 . 6 50
1 0.653
10.000

4 0.0 0
4 0.00
4 0.0 0
3 6.0 0
3 6 .0 0
3 6.0 0
3 6.00
6 0 .0 0
40.0 0

0 .9 7 0
.75 0
1 .0 5 0
1 .220
1.2 2 0
1.220
1.2 2 0
1.220
1 .150

_
-

0 .9 5 0
1 .0 0 0
1 .0 5 0
1 .7 1 0
1 .7 1 0
1 .7 1 0
1 .7 1 0
1 .7 1 0
1 .4 3 0

10.372
10.890

1 0.3 72
12.390

3 6 .0 0
4 0.0 0

.800
.49 5

-

.90 0
.32 0

8 .5 8 0
8 .7 7 C

9 .0 5 0
9 .2 4 0

4 0 .0 0
4 0 .0 0

1.120
1 .1 2 0

_
-

2 .0 0 0
2 .0 0 0

-

.90 0
.900

9 .2 7 0
9 .4 6 0

9 .8 1 0
1 0.0 20

4 0.0 0
40.0 0

1.120
1 .1 2 0

-

2 .0 0 0
2 .0 0 0

-

.900
.90 0

9 .5 9 0

10.170

4 0.0 0

1.1 2 0

-

2 .0 0 0

-

. 900

I

1.0 7 0
*.50 0
* . 950
6.750
*.75 0
*.7 5 0 I
‘ .750
*.75 0
1 .5 0 0

-

-

-

1 .00 %
-

_
-

0 .0 6 0
~
i
1 9. 250
.060
.06 0
.06 0
.06 0
.060

*10.00%
8 .0 0

.020

|

!

_

.240
.240

I

~

-

I
!
|

.24 0
.240

_
1.0 0 %
_

|
1
S
i

-

.240

!
1 0.310

4 0.0 0

1.1 2 0

-

2 .0 0 0

-

. 900

-

.24 0

1 0.720

4 0 .0 0

1.1 2 0

-

2 .0 0 0

-

.900

-

.24 0

-

1 0.290

1 0.940

4 0 .0 0

1.1 2 0

-

2 .0 0 0

-

. 900

-

.24 0

-

1 0.470

11.120

1 .1 2 0

-

2 .0 0 0

-

.900

-

.240

1 0.570

1 1.250

4 0 .0 0

1.1 2 0

-

2 .0 0 0

-

.9 0 0

-

.24 0

o
o

9 .7 3 0
1 0.090

■p
o

ASBESTOS WORKERS......................
BOILERMAKERS...................... . . . .
BRICKLAYERS ....................................
CARPENTERS.......................................
FLOOR LAYERS .........................
MIL LW RI GH TS ............................
SH ING LER S .................................
POWER SAW O PER AT O RS ...
CEMENT F I N I S H E R S ......................
ELE CT R IC IA NS (I N S I D E
WIRERS) . . . .................................
ELEVATOR C O N S TR U C TO R S. .. .
ENGINEERS— POWER EQUIP—
MENT OPERATORS:
COMPRESSORS...........................
ROSS C A R R I E R S , ....................
MATERIAL HOISTS (1
DRUM)..........................................
COMPRESSORS (OVER 2 ) . .
SMALL RUBB ER -TIRE D
TRACTORS............................ .. .
MATERIAL HOISTS (2 OR
MORE DRUMS) .........................
DOZERS, TRACTORS, EUC L I D S , T - P U L L S .................
TRACTORS (WITH BOOH)
D6 OR LARGER......................
MU LTIPLE ENGINE EARTHMOVING MACHINES..............
EACKHOES (H Y D R A U LI C ),
POWER SHOVELS, CLAM­
S HE LLS , DRAGLINES (UP
TO 1 CU. YD. MRC) . . . .
POWER SHOVELS, CLAM­
SHE LLS , DRAGLINES,
BACKHOES, GRADE-ALLS
(OVER 1 AND UP TO 7
CU. YDS. MRC)....................
POWER SHOVELS AND
DRAGLINES (OVER 7 CU.
YDS. M R C )...............................
LOADERS (OVER 18 CU.
Y D S .) . .......................................
REMOTE-CONTROLLED
EARTHMOVING EQUIPMENT
G L A Z I E R S ............................................
L AT H ER S...............................................
M A C H IN IS TS .......................................
MARBLE MASONS...............................
P A IN T E R S ............................................
PAPEHHANGERS.................................
P I P E F I T T E R S ............ .......................
PLASTERERS.......................................
PLUMBERS............................................
ROOFERS, SLATE AND
T ILE ,
AND COMPOSITION.
SHEET METAL WORKERS...............
STONEMASONS....................................
STRUCTURAL & REINFORCING
IRON WORKERS............................
TERRAZZO WORKERS......................
T I L E LAYERS....................................

j

;

-

-

|
!
_

.90 0

-

.240

-

2 .0 0 0

-

.90 0

-

.240

-

2 .0 0 0

-

.900

-

.240

-

-

2 .0 0 0
1 .1 3 0
.765
.50 0
.830
1 .1 0 0
1 . 100
2 .2 9 0
1 .0 5 0
2 .2 9 0

-

.900
‘ .6 5 0
*1 .0 0 0
1 .0 3 0
.400
.400
*1 .2 0 0
6 .7 0 0
61 . 300

-

.240
.37 0
. 160
.060
.400
.40 0
. 170
. 190

-

.9 2 0
.660
1.0 5 0

-

1 .1 0 0
1 .9 5 0
1 .0 5 0

-

.60 0
“
.95 0

4 0 .0 0
3 5 .0 0
4 0 .0 0

1.090
1 .0 0 0
.78 0

-

1 . 8 30
.83 0
1 .0 0 0

-

8 . 14 0
8 .0 3 5

40.0 0
4 0 .0 0

.95 0
1 .0 0 0

-

1 .7 5 0
1 .7 0 0

8 .6 7 0
7 . 220
8 .4 7 0
6 . 110

40.0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0

.495
.65 5
.950
.92 0

-

.650
.65 0
.65 0
.650
.69 0

—
-

11.420

4 0.0 0

1.1 2 0

-

2 .0 0 0

12.390

4 0 .0 0

1.1 2 0

-

1 2.640

40.0 0

1.120

-

1 2.900
9 .4 8 0
9 .3 6 0
11.400
1 0.640
1 0 . 920
10.920
13.300
9 .4 0 0 1 1.8 90

4 0.0 0
36.00
4 0 .0 0
4 0 .0 0
3 5 .0 0
3 6.0 0
3 6 .0 0
4 0 .0 0
3 1 .5 0
4 0 .0 0

1. 120
.77 0
.740
.74 9
1 .000
.99 0
.990
1 .250
.74 5
1 .2 5 0

9 .8 7 0
10.840
10.350

10.190
11.250
10.950

4 0 .0 0
4 0 .0 0
3 5 .0 0

10.230
10.320
9 .7 0 0

1 1.030
1 0 . 320
11.000

7 .6 0 0
7 .5 3 5
7 .6 2 0
7 .2 2 0
8 .3 7 0
5 .9 2 0

1 0.730

|

I

!
11.700
11.950
12.210
9 .4 8 0
9 .3 6 0
10.200
9 ,7 5 0
10. 3 00
10.300
11.750
9 . 400
11.800

!
I
|
I
i

-

-

i
I
I
I

-

8 .0 0
-

1 .1 5 0
1.0 0 0
1 . 100

-

6. 700
.90 0

_

-

. 100
.220
.25 0
.070
.250
.19 5

4 .0 0
-

HELPERS AND LABORERS

BRICKLAYERS* TENDERS............
B U I L D IN G LABORERS....................
ELEVATOR CONSTRUCTORS'
HELPERS............................................
MARBLE SETTERS' HE L PE RS ..
PLASTERERS' LABORERS............
ROOFERS' HELPERS ......................
TERRAZZO WORKERS'
HELPERS............................................
BASE MACHINES......................
WET MACHINES.........................
TERRAZZO P O L I S H E R S . . . .
T I L E SETT ERS' H E L P E R S . . . .

8 .6 6 0
9 .0 6 0
8 .6 6 0
8 .6 6 0
8 .2 3 0

9 .4 6 0
9 .8 6 0
9 .4 6 0
9 .4 6 0
8 . 5 50

3 5.00
3 5.0 0
35.0 0
3 5.0 0
4 0.0 0

S e e fo o tn o te s at end o f ta b le .




58

-

-

-

_
-

-

.3 2 0
.25 0
1 .7 5 0
1 .1 0 0

-

-

-

1.4 7 0
6 .700
.6 0 0

-

.550
. 55 0
.55 0
.55 0
.51 0

-

1 .000
1 .0 0 0
1 .0 0 0
1 .0 0 0
.68 4

-

-

-

-

-

8 .0 0
-

-

_
.100
.020
-

_
-

. 100

-

.200
.200
.20 0
.200

-

-

-

T

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w age r a te s and s t r a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n trib u tio n s to funds in the
build in g t r a d e s , J u ly l , 1975 and J u ly 1, 1976)
JULY 1 ,
1975

J UL Y

1976

1,

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR1

HOURS
PER
WEEK2

INSURANCE4

DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER5

PERCENT

DOLLARS j PERCENT
|

FRSHOUT, C A L IF o
“ CONTINUED
!
i
i
!

OTHER HEAVY CONSTBUCTION
I:
JOURNEYMEN

$9,9 50
9 .4 6 0

$10,500
10.000

8 . 580

9 .0 5 0

3 6 .0 0
4 0.0 0

o
©
o

1 .2 2 0
1 .1 5 0

1 .1 2 0

_
-

1 .7 1 0
1 .4 3 0

-

2 .0 0 0

_
-

*0 .7 5 0
1 .5 0 0

-

.90 0

_
-

0.060
-

-

.240

.
-

-

1.1 2 0

-

2 .0 0 0

-

.90 0 !

.24 0

-

4 0.00
4 0.0 0

1 .1 2 0
1 .1 2 0

-

2 .0 0 0
2 .0 0 0

-

.900
.900

-

.24 0
.240

-

-

2 .0 0 0

-

.900

-

.240

-

-

2 .0 0 0

-

.90 0 '

-

.240

-

10.940

1 0.470

1 1.120

10.570

1 1.250

10.730

11.420

4 0 .0 0

11.700

12.390

4 0 .0 0

1 .120

11.950

12.640

1.1 2 0

10.230

11.030

4 0.0 0

1.0 9 0

7 .5 3 5

8 .0 3 5

1 .0 0 0

1 .1 2 0

-

2 .0 0 0

-

.90 0

-

.240

-

1.1 2 0

-

2 .0 0 0

-

.900

-

!
!

.240

~

1 .120

-

2 .0 0 0

-

.90 0

-

|

.24 0

-

o

10.720

10.290

o
o
o

10.090

o
o
o

10.170
10.310

■t
o

1.120

9 .5 9 0
9 .7 3 0

■P
O

1.120

o

4 0.0 0

o
©

9 .2 4 0
9 . 810
10.020

o
o

8 .7 7 0
9 .2 7 0
9 .4 6 0

o

1. 120

-

2 .0 0 0

-

.900

-

.24 0

1 .120

-

2 .0 0 0

-

.90 0

-

.24 0

-

2 .0 0 0

-

.900

-

.240

-

-

2 .0 0 0

-

.900

-

.240

-

1 .8 3 0

“

1. 150

-

.07 0

-

.900

-

.100

_
-

1.0 7 0
.50 0
1 .0 0 0
.75 0

4 0 .0 0

o
o

o
o

CARPENTERS......................................
CEMENT F I N I S H E R S ......................
ENGINEERS— POWER E Q U IP MENT OPERATORS:
COMPRESSORS........... ................
SELF PROPELLED A UTOM A T I C A L L Y -A P P L I E D
CONCRETE CURING MACH INE S .......................................
MATERIAL HOISTS ( 1 DRUM)..........................................
COMPRESSORS (OVER 2 ) . .
CONCRETE SAWS (S E L F P RO PEL LED ) ............................
MATERIAL ROISTS (2 OR
MORE DRUMS) .........................
GROOVING AND GRINDING
MACHINES.................................
TRACTOR (WITH BOOM) D6
OR LARGER...............................
M U LT IP LE -E N G IN E EARTHMOVING MACHINES...............
BACKHOES, POWER SHOVE L S , CLAMSHELLS,
DRAGLINES (UP TO 1
CU. YD. MRG)......................
BACKHOES, POWER SHOV­
E L S , CLAMSHELLS,
I
DRAGLINES (UP TO 7
CU. YDS. MR C) ....................
BACKHOES, POWER SHOV­
E L S , CLAMSHELLS,
DRAGLINES (OVER 7 CU.
YDS. MR C) ...............................
LOADERS (OVER 1, CU.
Y D S . ) ..........................................
STRUCTURAL & REINFORCING
IRON WO RK ER S.. ......................

CONSTRUCTION

L AB O R E R S ....

O
o

HELPERS AND LABORERS

-

1 .7 0 0

FRESNO, C A L IF o

B U IL D IN G

i

CONSTRUCTION

JOURNEYMEN

10.850

11.400

11.200
10.970
9 .4 6 0

1 1.750
1 0.970
1 0.460

40.0 0
4 0.0 0
4 0.00

-

10.360
10.890

1 0.760
12.390

40.0 0
4 0.0 0

8 .5 8 0
9 .4 6 0

9 .0 5 0
10.020

9 .2 7 0

9 .8 1 0

9 .5 9 0

10.170

_

-

.95 0
1 .0 0 0
1 .0 0 0
1 .7 1 0

1 .2 2 0

-

1.7 1 0

-

.75 0

-

.060

-

1.2 2 0
1 .2 2 0
.900

-

-

.75 0
.75 0
1.2 5 0

-

.06 0
.060
. 140

-

-

1 .7 1 0
1 .7 1 0
1 .2 5 0

-

.750
.495

-

.9 0 0
.3 2 0

_

*1 .0 0 0
-

.005
-

-

4 0 .0 0
4 0 .0 0

1 .1 2 0
1 .120

-

2 .0 0 0
2 .0 0 0

-

.90 0
.90 0

-

.23 0
.230

-

4 0.0 0

1 .1 2 0

-

2 .0 0 0

-

.900

-

.230

-

1 .1 2 0

-

2 .0 0 0

-

.900

-

.230

-

-

-

-

.060
.25 0
.06 0

-

-

6 .0 0 %

-

|

o
o

o




_

.970
.75 0
.95 0
1 .2 2 0

o
o

11.990
1 2.000
9 . 350
1 1.250

S e e fo o tn o te s at end o f ta b le .

4 0.0 0
4 0 .0 0
4 0.0 0
40.0 0

_

1 0.900
10.850
8 .7 7 0
1 0.700

o

ASBESTOS WORKERS.......................
BOILERMAKERS..................................
BR ICKLAYERS.....................................
CARPENTERS.......................................
FLOOR LAY ERS, PATENT
SCAFFOLD ERECTORS,
SHIN GLE RS ...............................
MI LLW RI GHT S, SAW
OPERATORS...............................
DRY WALL.....................................
CEMENT MASONS...............................
E L E CT R IC IA NS ( I N S I D E
W I RE RS ) ..........................................
ELEVATOR CO N S T R U C T O R S . . . .
ENGINEERS— POWER E QUI P­
MENT OPERATORS:
COMPRESSORS............................
COMPRESSORS (2 TO 6 ) . .
MATERIAL HOISTS
( 1 - D R U M ) .................................
SMALL RUB BER-TIRED
TRENCHING MACHINES
AND S I M I L A R SMALL
EQUIPMENT...............................

.

-

Table 20, Wage rates, hours, and employer contributions to funds: Selected cities—Continued
(U nion h o u r l y w age r a t e s and s t r a i g h t - t i m e w e e k ly h o u r s and e m p l o y e r i n s u r a n c e ,
b u i l d i n g t r a d e s , J u l y 1, 1 9 7 5 a n d J u l y 1, 1976}

pension,

vacation,

JULY

1,

an d o t h e r c o n t r i b u t i o n s to fu n d s in the

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C IT Y AND JOB
C L A S S I F I C A T IO N

HOUBS
PEB
WEEK

INSURANCE

[ DOLLARS ! PERCENT | DOLLARS
) LLASS

DOLLARS

PERCENT

PERCENT

Id o l LABS 1 PERCENT

FRESNO, CALIFo
-CONTINUED
BUILDING CONSTRUCTION
-CONTINUED

I

JOURNEYMEN
-CONTINUED

i
i

|

|

|

i
|

!

!

!

$10,720

4 0.0 0

1 .1 2 0

2 .0 0 0

-

0-900

2 .0 0 0

-

.90 0

-

.23 0

1 .1 2 0

2 .0 0 0

-

.90 0

-

.23 0

1 .1 2 0

2 .0 0 01
|

-

.90 0

-

. 23 0 j

-

2 .0 0 0

-

.90 0

-

.230

-

2 .0 0 0

-

.9 0 0

-

.230 ^

-

2 .0 0 0
2 .0 0 0
1 .0 4 0
. 55 0

.90 0
.90 0
.545

-

!
- 2301
. 2 30'
.310,
. 100 j

0. 230

!
I

I

10,720

4 0.0 0

1 .1 2 0

|
i
o

10.940

o

I

j

-j
o

o

|

o

ENGINEERS-POWER EQUIPMENT
OPERATORS—CONTINUED
!
TRACTORS, DOZERS,
SCRAPERS, 3HEEPSFOOT,!
SELF-PROPELLED COMj
PACTORS WITH DOZER
|
AND PUSH-CATS........ j $ 1 0 , 0 9 0
EUCLIDS, T-PULLS,
!
DW-10, 20, 21 AND
|
SIMILAR (WITH EARTH- j
MOVING EQUIPMENT UP j
TO AND INCLUDING 45 i
10.090
CU. YDS. STRUCK MRC) .
TRACTORS (WITH BOOM)
i
D-6 OR LARGER, AMD
I
SIMILAR) ...........
! 10.290
CRANES {NOT OVER 25
;
TONS, HAMMERHEAD AND j
GANTRY).... ..........
POWER SHOVELS, CLAM!
SHELLS, DRAGLINES,
BACKHOES, GRADEALLS
i
(UP TO AND INCLUDING ;
j
1 YARD).. .......
10. 5 7 0
GRADEALLS (OVER 1 YARD;
UP TO AND INCLUDING
!
7 CU. YDS.) ...... .... 1 1 0 . 7 3 0
UNIVERSAL LIEBHERN
j
AND TOWER CRANES
|
(AND SIMILAR TYPES)..
10.730
FIREMEN, OILERS....... '
8 .2 6 0
GLAZIERS..............
|
8 . 145
9 .6 3 0
LATHERS..... . ... ........ !
MOSAIC AND TERRAZZO
8 .4 7 0
WORKERS. ............... .
PAINTERS... . ..............I
9 .4 6 0
9 .7 1 0
SPRAY................. i
PAPERHANGERS... ........ 1
9 .7 1 0
11.100
PIPEFITTERS.............. j
PLASTERERS..........
j
7 .2 4 0
PLUMBERS. ................. i 1 1 . 1 0 0
REINFORCING IRON WORKERS.! 1 0 . 2 3 0
7 .4 5 0
ROOFERS, SLATE AND TILE.. j
9 .8 6 0
SHEET-METAL WORKERS......!
7 .4 0 0
RESIDENTIAL........... |
STRUCTURAL-IRON WORKERS.. 1 1 0 . 2 3 0
ORNAMENTAL IRON WORK- :
ERS.................. I 1 0 . 2 3 0
9 .3 4 0
FENCE ERECTORS........ !
8 .4 7 0
TILE LAYERS.............. |

1 1.250

40.0 0

11.250

40.0 0

1 .1 2 0
1

j

1 1.420

4 0.0 0

1.1 2 0
|

11.420
8 .7 0 0
9 .0 9 0
10.530
!
j
j
1
1
I
I
;

!
|
!

8 .7 5 0
9 .9 1 0
9 .9 6 0
9 .9 6 0
11.600
8 .9 9 0
1 1 . 6 00
1 1.030
9 .2 0 0
1 0.640
7 .9 5 0
11.030

1
!
1
;

I
,

j
!

I
!
|
,

4 0.0 0
4 0.0 0
40.0 0
4 0 .0 0

1

1.120!
1 .1 2 0
.810!
.550

4 0.00
4 0.0 0
4 0.0 0
4 0.0 0
3 6.0 0
4 0.00
3 6.00
4 0.00
4 0.0 0
40.0 0
4 0 .0 0
4 0.00

.90 0
.610
.61 0
.61 0
1 .3 7 0
.76 0
1 .3 7 0
1.0 9 0
.600
.66 0
.660
1 .0 9 0

4 0.00
4 0.00
4 0.00

1 .0 9 0
1.09 01
.90 0

!
!
|
|

-

-

|

.50 0
.20 0
.20 0
. 200
2 .0 0 0
1.2 5 0
2 .0 0 0
1 .8 3 0
. 800
1 .2 0 0
1.2 0 0
1 . 8 30

i
'

11.030
1 0.140
8 .7 5 0

!

1 .8 3 0
1 .8 3 0
.500

_
-

-

_

.75 0
.75 0
.75 0
.75 0
1 .0 0 0
1 .000
1 .000
1. 150
1.0 0 0

-

-

-

1 .1 5 0

_

1. 150
1. 150
.750

-

6 .0 0 %
-

_
-

-

070!
.070:
.070:
.140
_
-

-

120
.12 0

.

-

_
-

,

_

10.00
10.00

!
i

_

i

-

!

_
-

-

-

-

_

_

_

-

-

-

!
HELPERS AND LABORERS

BR ICK LAY ER S' TENDERS
B U I L D IN G LABORERS....................
ELEVATOR CONSTRUCTORS'
HELPERS............................................
PLASTERERS' LABORERS............
TERRAZZO WORKERS'
HELPERS..........................................
BASE MACHINE OPERATORS
T I L E LAYERS' HELPERS............

i

7 .3 0 0
7 .5 3 5

8 .4 0 0
8 . 043

4 0.0 0
4 0 .0 0

1 .0 0 0
1 .0 0 0

7 .6 2 0
7 . 350

8 .6 7 0
8 . 50 0

40.0 0
40.0 0

.49 5
1 .0 0 0

5 .9 6 0
5 .9 6 0
5 .9 6 0

6 .4 6 0
6.4 6 0
6 .4 6 0

4 0.0 0
40.0 0
4 0 .0 0

.7 5 0
.750
.75 0

GRAND RAPIDS, MICH*

-

1 .7 0 0
1 .7 0 0
.32 0
1 .7 0 0

-

.90 0
.900
-

.90 0

6 .0 0
-

.15 0
. 100
_

.15 0

-

_
-

_

_

_

_

_

_

_

-

-

-

-

-

-

_

l
I

B U IL D IN G CONSTRUCTION

|

JOURNEYMEN

ASBESTOS WORKERS,
BR ICKLAYERS ............
HOMEBUILDERS. .
CARPENTERS................
MILLW RIGHTS.. ,

8 .3 1 0
8 . 100
6. 480
8. 250
9 .7 5 0

9 . 350
8 .3 0 0
6 . 640
8 . 55 0
10.300

j
!

40.0 0
4 0.0 0
40.0 0
4 0 .0 0
4 0.0 0

.79 0
.45 0
.450
.600
.60 0

S ee fo o tn o te s at end of ta b le .




60

-

-

1 .2 8 0
.25 0
.25 0
. 500
. 500

-

-

1 .250
.34 0
.34 0
6 . 300
. 300

-

.06 0
.060
.02 0

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w age r a te s and s t r a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , Ju ly 1, 1975 and J u ly 1, 1976)
JULY 1
1975

JULY

1,

1976

EMPLOYEE CONTRIBUTIONS'
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

PER
HOUR1

PER
HOUR1

PER
WEEK2

INSURANCE

DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER

PERCENT

DOLLARS

PERCENT

GBAMD RAPIDS, MICHe
-CONTINUED
B U IL D IN G CONSTSUCTION
-CONTINUED
JOUENEYMEN
-CONTINUED

$7.1 90
7 .1 0 0

$7,4 90
7 .3 0 0

4 0 . 00
4 0.00

0 .5 0 0
.45 0

8 .9 7 0
8 .8 9 0

9 . 120
9 .4 4 0

40.0 0
4 0.00

.400
.49 5

_

0 .2 5 0
.250
.35 0
.325

1.0 0 %

6. 500
~

0 .0 6 0

-

_
8 .0 0 %

-

_
.020

1.60%

"

-

-

9 .4 9 5

9.7 6 5

.800

-

.85 0

-

-

o

9 . 180
9 .0 0 0

9 .3 6 0
9 . 180

40.0 0
4 0.00

.80 0
.800

.85 0
.85 0

-

-

8 .0 5 5
7 .4 2 5
7 .3 5 0
8 .2 5 0
7 .1 0 0

8 .1 9 0
7 . 560
7 .9 5 0
8 . 190
7 .7 0 0

40.0 0
4 0.00
4 0 .0 0
4 0.00
4 0.00

.800
.80 0
.35 0
.15 0
.45 0

_
-

.85 0
.850
. 300
.74 0
.25 0

_
-

7 . 100
7 .2 0 0
7 .7 0 0
7 .4 5 0
7 .4 5 0
7 .7 0 0
7 .4 5 0
9 . 270
8 .4 3 0
9 . 27 0
8 .8 5 0
6 .4 5 0
6 .7 0 0
7 .9 5 0
8 .8 5 0
8 . 1 00
7 . 100

7 .7 0 0
7 .4 5 0
7 .9 5 0
7 .7 0 0
7 .7 0 0
7 .9 5 0
7 .7 0 0
9 . 170
8 . 830
9 . 170
9. 4 50
6 .8 5 0
7 . 100
8 .4 5 0
9 .4 5 0
8 .3 0 0
7 .7 0 0

4 0 . 00
4 0.0 0
40.0 0
4 0.0 0
4 0.0 0
4 0.0 0
40.0 0
4 0.0 0
4 0 .0 0
40.0 0
40.0 0
4 0.00
40.0 0
4 0.00
4 0.0 0
40.0 0
4 0.00

.45 0
.400
.400
.400
.40 0
.40 0
.40 0
.500
.500
.50 0
.500
.35 0
.350
.69 3
.50 0
.45 0
.450

-

.25 0
.2 5 0
.25 0
. 250
. 250
.2 5 0
. 2 50
.500
.250
.500
.75 0
.2 5 0
.25 0
.55 0
.75 0
.250
.25 0

~
-

-

~

-

-

o

-

.850

o
o

-

-

o

.85 0

.800

o
o

-

4 0.0 0

.020

_

.020

-

o'
o

.800

10.215

o
o

10.215

9 .7 2 0

o

9 .9 4 5

.02 0

-

61 0 . 0 0
61 0 . 0 0

.020
.02 0

-

. 200
6. 500
. 340

61 0 . 0 0
61 0 . 0 0

.02 0
.020

-

.010
.060

. 340
6. 100
6. 100
. 100
6. 100
6. 100
6 .1 0 0
.820
61 . 0 0 0
. 820
1.0 0 0
. 350
.35 0
6. 670
61 . 0 0 0
. 340
.34 0

-

.060
-

-

-

-

- .
. 100
.05 0
. 100
.020
.02 0
.02 0
.060
.060

-

-

!

HELPERS AND LABORERS

B RICK LAY ER S' T E N D E R S ..,
MORTAR M IX E R S .............. .
B U I L D IN G LABORERS.............
ELEVATOR CONSTRUCTORS'
H E L P E R S . . . . ......................... .
PLASTERERS' L AB O RE RS ...
TERRAZZO WORKERS'
HELPERS...................................
BASE MACHINE.................
FLOOR MACHINES .............
T I L E LAYERS' HE L PE RS ..

60. 960
. 340

“

o
o
o

CEMENT F I N I S H E R S :
AGREEMENT A ............................
AGREEMENT B ............................
E LEC TR ICIAN S ( I N S I D E
H I R E R S ) ......... ....................
ELEVATOR C O N S TR U C TO R S .. ..
ENGINEERS— POWER E QU IP­
MENT OPERATORS
CRANES WITH MAIN BOOM
AND J I B 2 2 0 ' OR MORE.
CRANES WITH MAIN BOOM
AND J I B 1 4 0 ' OR MORE.
CRANES, SCRAPERS,
DOZERS, GRADERS,
H O IS T S, FRONT END
LOADERS....................................
A IR TUGGERS (SING LE
DRUM), FORKS, MATER­
I A L H O IS T S, WINCHES,
(NONSWINGING), BOBCATS
PUMPS 6 I N
OR O V E R . . .
A IR COMPRESSORS, WELD­
ERS, PUMPS UNDER 6 I N
O IL E R S , FI REMEN .................
G L A Z I E R S ............................................
LATHERS.............................................
MARBLE SETTERS............................
MOZAIC AND TERRAZZO
WORKERS........................................
P A IN TE R S ............................................
SPRAY AND SWING STAGE.
SWING STAGE............................
BRIDGES OVER HIGHWAYS.
BRIDGES OVER W A T E R . . . .
PAPERHANGERS.................................
P I P E F I T T E R S ....................................
PLASTERERS............................... ..
PLUMBERS.............. .............................
REI NFORCI NG I RON WORKERS.
ROOFERS, C O M P O S I T I O N ............
ROOFERS, SLATE AND T I L E . .
S HEET- METAL WORKERS...............
STRUCTURAL IRON WORKERS..
STONEMASONS....................................
T I L E LAYERS....................................

5 .9 6 0
5 .9 6 0
5 .8 1 0

6 . 160
6 .1 6 0
6 . 010

4 0 .0 0
40.0 0
40.0 0

.55 0
.550
.550

6 .2 2 3
5 .9 6 0

6 .6 1 0
6 . 160

4 0 .0 0
4 0.0 0

.495
.55 0

_

6 .1 6 0
6 .7 1 0
6 .3 6 0
6 . 160

6 .7 6 0
7 .3 1 0
6 .9 6 0
6 .7 6 0

4 0 .0 0
40.0 0
4 0.0 0
4 0 .0 0

.40 0
.400
.400
.400

_
-

8 .4 0 0
8 .4 3 0

9 . 350
9 . 140

4 0.0 0
4 0 .0 0

.500
.500

8 .3 7 0

8 .7 7 0

4 0.0 0

.60 0

-

-

-

.350
.35 0
.3 5 0
.32 5
.3 5 0
.2 0 0
.200
.20 0
.20 0

-

6. 550
6. 55 0
6. 550

-

6 .5 5 0

-

•

-

-

8 .0 0
“

-

-

-

~

-

-

.050
.05 0
.05 0
.02 0
.05 0

-

1 .6 0 !
-

-

-

-

-

HIGHWAY AND STREET
CONSTRUCTION

JOURNEYMEN
CARPENTERS.......................................
CEMENT F I N I S H E R S .......................
ENGINEERS-POWER EQUIPMENT
OPERATORS (ZONE 2) :
CLASS I - A S P H A L T PLANTS
AND PAVERS, CRANES,
SHOVELS, PAVER OPERA­
TORS (5 BAGS OR MORE]

.4 0 0
.250

-

S e e fo o tn o te s at end of ta b le .




61

.850

6. 300
6. 96 0

-

-

10.00

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
( U n i o n h o u r l y w a g e r a t e s and s t r a i g h t - t i m e w e e k l y h o u r s an d e m p l o y e r i n s u r a n c e ,
b u i l d i n g t r a d e s , J u l y 1, 1 9 7 5 and J u l y 1, 1 97 6 )

p en sion ,

JULY 1,
197 5

v a cation ,

JUL Y

1,

and o t h e r c o n t r i b u t i o n s to f u n d s in t h e

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR1

HOURS
PER
WEEK2

INSURANCE4

PENSION

VACATION

I
| DOLLARS

PERCENT

DOLLARS

PERCENT

DOLLARS

OTHER5

PERCENT

DOLLARS

PERCENT

GRAND R A P I D S , MICH*
-C ONTINUE D
HIGHWAY AND STREET
CONSTRUCTION
-CONTINUED
I

JOURBEIBEM
-CONTINUED

|

$8.1 00

$8,510

7 .6 5 0

8 .0 5 0

4 0.00

0.6 0 0

-

0 .8 5 0

.60 0

-

.850

i

-

-

10.00%

-

-

-

10.00

-

6i . o o o

10.00
-

0 .0 2 0

-

o

o

o

■p

j

j
j
7 .3 9 0
8 .8 5 0

7 . 8 00
9 .4 5 0

40.0 0
40.0 0

.600
.50 0

*

.85 0
.75 0

-

GENERAL LABORERS.......................

7 .3 1 0

7 .7 6 0

4 0.0 0

.55 0

_

6. 300

_

. 550

_

8 .3 5 0
8 . 4 30

8 .5 5 0
9 . 140

4 0.0 0
4 0.0 0

.60 0
.500

-

.50 0
.25 0

-

6. 300
6. 9 6 0

-

.04 0
.020
-

_

C A R P E N T E R S . . .................................
CEMENT F I N I S H E R S ......................
ENGINEERS— POWER E Q U IP MENT OPERATORS:
CRANES WITH MAIN BOOM
AND J I B 2 2 0 * OR MORE.
CRANES WITH MAIN BOOM
AND J I B 140* OR MORE.
CRANES, SCRAPERS, DOZ­
ERS, GRADERS, H O IS T S,
FRONT END LOADERS............
A IR TUGGERS (SING LE
DRUM), FORKS, MATER­
I A L H O IS T S, WINCHES
(NONSW INGIN G), BOBCATS
PUMPS 6 I N OR O V E R . . . .
A IR COMPRESSORS, WELD­
ERS, PUMPS UNDER 6 I N
O IL E R S , FI REMEN .................
STRUCTURAL IRON WORKERS..

9 .9 4 5

1 2.160

p-

ENGINEEBS— POWER E Q U IP BENT OPERATORS:
-C ONTINUED
CLASS I I - B A C K H O E (WITH
3 / 8 YD. BUCKET
L E S S ) , CRUSHERS
SWEEPER SCREENING
PLANTS .......................................
CLASS I I I - A I R COMPRESSORS, CONCRETE BREAKERS, TRACTORS WITH
ATTACHMENTS.........................
CLASS I V - O I L E R S , F I N IS H IN G MACHINES, BOOM
OR WINCH HO IST S...............
STRUCTURAL IRON WORKERS..

.800

-

.85 0

-

610 .G 0

.020

-

.850

-

-

61 0 . 0 0

.02 0

-

AND LABORERS

1

.80 0

_

.800

-

.85 0

-

-

o
o

1 1.440

I
I
I

o

9 .4 9 5

40.0 0

o
o

11.920

o

9 .7 2 0

o
o

!

o

HELPERS

!
j

.020

610.00
610.00

.02 0
.020

610.00
610.00

.020
.020
.020

-

l
1 1.230
1 1.000

40.0 0
40.0 0

.80 0
.800

-

.8 5 0
.8 5 0

-

-

8 .0 5 5
7 .4 2 5
8 .8 5 0

9 .9 8 0
8 . 88 0
9 . 450

4 0 .0 0
40.0 0
4 0.00

.80 0
.80 0
.50 0

-

.8 5 0
.850
.7 5 0

-

61 . 0 0 0

7 .3 1 0

7 .7 6 0

.550

-

9. 180
9 .0 0 0

!

;
I

I

_

HELPERS AND LABORERS

B UI LD IN G

o

HAMMOND,

o
o

GENERAL LABORERS......................

. 3 00

. 550

-

.040

61 . 0 0 0

_

.05 0
.040
.01 0
.04 0
.02 0

IHD*

CONSTRUCTION
j*
i

JOURNEYMEN

!
j

9 .9 6 0
10.050
1 0.050
10.090
9 .8 2 0
10.300
11.310

I

1 0.5 10
10.850
10.800
10.910
1 0.2 90
10.300
2 0.8 43

40.0 0
4 0 .0 0
4 0.00
4 0 .0 0
4 0.0 0
4 0.00
40.0 0

.810
.800
.45 0
.50 0
.85 0
.545

_

-

5 .0 0 %
-

.72 0
1 .000
.55 0
. 570
.55 0
.35 0

|

~
-

-

I

6. 500
6. 420
6. 500
-

-

6 .3 0 %
-

-

6 .0 0

40.0 0

.65 0

-

.850

-

0 .5 0 %
2 .3 1

-

.8 5 0

4 0.0 0
4 0.0 0
4 0 .0 0
4 0 .0 0
40.0 0
4 0 .0 0

.65 0
.65 0
.400
.5 3 0
.45 0

-

.85 0
.85 0
.30 0
.40 0
.45 0
.55 0

7 .9 0 0
8 .6 5 0

9 . 000
1 0.800

4 0 .0 0
4 0 .0 0

.49 0
.490

-

.3 5 0
. 3 50

-

o

-

.010

!

-

.010
.010
-

6. 200
6. 200
b. 200
6. 550

.650

8 . 0 50
7 .0 5 0
9 .5 5 0
1 0.440
1 1.020
1 0.800

o

!

-

9 .6 0 0

8 .0 5 0
7 .0 5 0
9 .4 0 0
9 .7 5 0
10.470
1 0.050

-

.010

-

9 .6 0 0

-

!

-

1 0.100

-

j

6. 200

10.100

-

-

-

-

-

-

6 .1 0

.50 0

.040

I

-

-

i
|
~

-

-

-

~

S e e f o o tn o te s at end of t a b le .

62

~

I




_

!

!

o

ASBESTOS WORKERS......................
BOILERMAKERS.................................
BR ICKLAYER S ....................................
CARPENTERS.......................................
CEMENT F I N I S H E R S .......................
E L E C T R IC IA N S ................................
ELEVATOR C O NS TR UC TO RS .. ..
ENGINEEBS— POWER EQU IP­
MENT OPERATORS:
CLASS I — CRANES.................
CLASS I I — TRACTORS AND
BULLDOZERS............................
CLASS I I I — A IR COM­
PRESSORS.................................
CLASS I V — O I L E R S ...............
G L A Z I E R S .............................................
LATH ER S ...............................................
M A C H IN IS TS .......................................
MARBLE SETTERS............................
PAINTERS
R E S ID E N T IA L AND COM­
ME RC IA L ............ . ' . . . . . . . . . . . . . . . . . . . . . . .
I N D U S T R I A L ...............................

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
( U n i o n h o u r l y w a g e r a t e s and s t r a i g h t - t i m e w e e k l y h o u r s an d e m p l o y e r i n s u r a n c e ,
b u i l d i n g t r a d e s , Ju ly 1, 1 97 5 and J u l y 1, 19 7 6 )

pen sion ,

JULY 1,
1975

v a cation ,

J UL Y

1,

and o t h e r c o n t r i b u t i o n s to fu n d s in th e

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C L A S S I F I C A T IO N

RATE
PEE
HOUR1

PER
HOUR 1

HOURS
PER
WEEK?

INSURANCE4

DOLLARS

PENSION

PERCENT

OTHERS

VACATION

DOLLARS

PERCENT

0 .3 5 0
.850
. 550
.70 0
1 . 180
. 35 0
.35 0
.95 0
.55 0
1 .1 8 0
.55 0
. 550

-

DOLLARS

PERCENT

DOLLARS

PERCENT

HAMMOND* IND®
-CONT INUE D
i
BU IL D IN G CONSTRUCTION
-CONTINUED
JOURNEYMEN
-CONTINUED

PAPERHANGERS.................................
P IP E F I T T E R S ...................... .............
P L AS TER ER S.......................................
PLUMBERS....................................... .. .
REINFORCING IRON WORKERS.
ROOFERS, COMPO SITION............
ROOFERS, SLATE AND T I L E . .
SHEET-METAL WORKERS...............
STONEMASONS....................
STUCTURAL IRON WORKERS...
TERRAZZO WORKERS.......................
T I L E LAYERS....................................

$ 8.1 50
10.850
8 .9 9 0
10. 120
9. 8 80
11.390
11.390
10.120
10.050
9 .8 8 0
10.050
9 . 3 00

$9,250
11.500
8 . 990
1 0.920
10.980
11.860
1 1.860
1 0.510
10.800
1 0.980
10.800
10.700

9 0 .0 0
90.00
90.00
90.0 0
9 0.00
9 0 .0 0
90.0 0
9 0.0 0
9 0.00
9 0 .0 0
90.0 0
9 0.0 0

0 .9 9 0
.700
.850
.80 0
.50 0
.55 0
.550
.650
.95 0
.50 0
.95 0
.950

7 . 150
7 . 150

7 .7 0 0
7 .7 0 0

90.0 0
9 0.0 0

.50 0
.50 0

5 .5 6 0

5 .9 3 0

9 0.00

_
-

-

_

_

_

60 . 5 0 0
6. 7 5 0
61 . 250
.700
.700
6. 500
61 . 2 5 0
6. 500
6. 500

_

_

0.090
. 100
.02 0
.080
.08 0
6 .6 7 0
.09 0
.020
.09 0
.090

~

-

. 120
. 120

-

-

.08 0

-

-

HELPERS AND LABORERS

BRICKLAYERS' TENDERS............
B U IL D IN G LABORERS....................
COMPOSITION ROOFERS'
HELPERS............................................
ELEVATOR CONSTRUCTORS'
HELPERS.................................... ..
MARBLE SETTERS' HE L PE RS ..
PLASTERERS' LABORERS............
PLUMBERS' LABORERS.................
TERRAZZO WORKERS'
HELPERS..........................................
BASE MACHINE OPERATORS
T I L E LAYERS' HELPERS............

7 .9 2 0
9 . 150
7 .9 5 0
7 . 150
9 . 150
9 .9 0 0
9 . 150

highway and street

CONSTRUCTION
CARPENTERS.......................................
CEMENT F I N I S H E R S . . . ..............
ENGINEERS— POWER EQUIP­
MENT OPERATORS:
CLASS I — CRANES.................
CLASS I I - T R A C T O R S ............
CLASS I I I — FO R K L I F T S ,
END L O A D E R S . . ....................
CLASS I V — A IR COMPRES­
SORS AND CON VE YOR S...
CLASS V— OILERS
O I L E R S .......................................
STRUCTURAL IRON WORKERS..

10.090
9 .6 0 0

|
I
I

13.860
9.3 6 0
8 .0 0 0
7 .7 0 0

90.0 0
9 0.0 0
90.0 0
9 0.0 0

I

9 .3 6 0
9 .7 1 0
9 .3 6 0

90.0 0
90.0 0
90.0 0

i
!
I
!

1 0.910
9 .6 0 0

9 0.00
9 0.0 0

9 .9 5 0
9 . 50 0

90.0 0
9 0.0 0

!
|

9 .8 5 0
9 .7 0 0
9. 0 50

_

_

_

-

-

-

.9 5 0
.95 0

.55 0

-

.3 5 0

-

.59 5
.500
.500

-

. 350
.9 5 0
.950

-

-

-

-

-

-

-

-

I

j

!i

. 700

6 .0 0 %
!
~

_

.020
.10 8
.12 0
. 120

-

.10 8
. 108
. 108

6. 920
6 .5 0 0

-

.010
-

-

2 .3 1 %
-

-

I

9.0 5 0

90.0 0

i

.500
.600

-

.65 0
.650

i
;
!

.5 7 0
.550

-

. 850
. 8 50

-

6. 900
6. 9 0 0

-

-

-

!
j

.65 0

-

. 8 50

-

%900

-

.85 0

-

6. 900

-

;

.850
1. 180

-

6 .9 0 0
61. 2 5 0

-

!

“

.90 0

-

-

-

7 .9 5 0

7 .9 5 0

9 0.0 0

.65 0

-

7 .0 0 0
9 .8 8 0

7 .0 0 0
1 0.980

90.0 0
9 0 .0 0

.65 0
.50 0

-

6 .6 0 0

7 .3 0 0

90.0 0

.500

-

-

.020

-

-

~

HELPERS AND LABORERS

L A B O R E R S .. .......................................

.110
!

OTHER HEAVY CONSTRUCTION
|

CARPENTERS.......................................
CEMENT F I N I S H E R S ......................
ENGINEERS— POWER EQU IP­
MENT OPERATORS:
CLASS I — CRANES.................
CLASS I I - T R A C T O R S ............
CLASS I I I — FO RK LI FT
TRUCKS, END LOAD ERS ..
CLASS I V ---- A IR COMPRES­
SORS AND CON VE YOR S. ..
CLASS V— OILE RS
O I L E R S ................. .....................
STRUCTURAL I RON WORKERS..

10.090
9 .6 0 0

1 0.910
9 .6 0 0

90.0 0
9 0.0 0

.500
.600

-

.57 0
. 55 0

9 .8 5 0
9 .7 0 0

9 . 950
9 . 500

90.0 0
9 0.0 0

.650
.6 5 0

-

.85 0
.85 0

-

9 .0 5 0

9 .0 5 0

90.0 0

.650

-

.85 0

-

7 .9 5 0

7 .9 5 0

90.0 0

.65 0

-

7 .0 0 0
9 .8 8 0

7 .0 0 0
1 0.980

9 0.00
90.00

.65 0
.50 0

-

7 .1 5 0

7 .7 0 0

.P
©

JOURNEYMEN
-

_

!
J

6. 900
6. 9 0 0

-

-

I
I

6. 900

-

j

.85 0

-

6. 90 0

-

-

-

.850
1 .1 8 0

-

6. 9 0 0
61 . 2 5 0

-

.50 0

-

.95 0

-

-

**

-

-

6. 920
6. 500

|

.01 0

_
-

-

_
-

-

I
-

-

-

.020

-

.120

-

HELPERS AND LABORERS

!
©
©

LABORERS............................................

S ee fo o tn o te s at end of ta b le .




63

Table 20. W age rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s t r a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in th e
b u ild in g t r a d e s , July 1, 1975 and J u ly 1, 1976)
JULY 1 ,
1 975

JULY

1,

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS5
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR1

HOURS
PER
WEEK2

INSURAN CE4

DOLLARS

HONOLULU,

PENSION

PERCENT

DOLLARS

HA WAI I

VACATION

PERCENT

DOLLARS

OThERS

PERCENT

DOLLARS

PERCENT

I
I

B U IL D IN G CONSTBUCTION

JOURNEYMEN

ASBESTOS WORKERS.......................
BOILERMAKERS.................................
BR ICK LAY ER S ....................................
CARPENTERS.......................................
CEMENT F I N I S H E R S ......................
EL E CT R IC IA NS ( I N S I D E
WIRE MEN ) .......................................
ELEVATOR C O N S TR UC TO RS .. ..
ENGINEERS— POWER EQU IP­
MENT OPERATORS:
LOCOMOTIVES (UP TO 30
T O N S ) .................... , ..................
BOOM TRUCKS............................
A G R I- C A T S .................................
TRENCHERS.................................
M IX ER HO BI 1 ES .........................
LOCOMOTIVES (TO 1 00
T O N S )..........................................
WHEEL TRANCHERS.................
BULLDOZERS..............................
LOCOMOTIVES (OVER 100
TO N S )..........................................
CRANES (UNDER 25 TONS)
CRANES (OVER 25 TONS) .
DERRICKS....................................
G L A Z I E R S ............................................
LATHERS...............................................
M A CH IN IS TS .................................... ..
MARBLE SETTERS............................
MOSAIC AND TERRAZZO
WORKERS.......................................
P AI NT E RS ............................................
SPRAY............................................
PAPERHANGERS.................................
P I P E F I T T E R S ....................................
PLASTERERS.......................................
PLUMBERS............................................
REINFORCING IRON WORKERS.
ROOFERS, COMPO SITIO N............
ROOFERS, SLATE AND T I L E . .
S H E E T -M E T A L

_

_

_

$ 7,6 00
8 .2 6 0
7 .4 5 0
7 .4 3 0
7 . 180

$ 8 .5 3 0
9 .1 5 0
8 .4 1 0
8 . 2 40
8 . 100

4 0.0 0
4 0.00
4 0.00
4 0 .0 0
4 0.0 0

0 .5 8 0
.400
.85 0
.59 0
.850

-

1 .4 0 0
1 .0 0 0
1 .0 0 0
1 .3 5 0
1 .0 0 0

8 .2 5 0
9 .4 7 0

9 . 00 0
10.680

4 0.0 0
40.0 0

.570
.49 5

-

1 .7 4 0
.32 0

5 .9 3 0
6 .2 0 0
6 .5 1 0
7 . 160
7 .4 8 0

6 .9 3 0
7 .2 0 0
7 .5 1 0
8 . 160
8 . 480

4 0 .0 0
40.0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0

.65 0
.65 0
.65 0
.650
.650

-

1 .5 5 0
1 .5 5 0
1 .5 5 0
1 .5 5 0
1 .5 5 0

-

.70 0
. 700
.700
.700
. 70 0

-

.170
. 170
.17 0
.17 0
.17 0

-

7 .5 9 0
7 .7 0 0
7 .9 3 0

8 . 59 0
8 .7 0 0
8 .9 3 0

4 0.0 0
4 0.00
40.0 0

.65 0
.650
.650

-

1 .5 5 0
1 .5 5 0
1 .5 5 0

-

.700
.700
.700

-

.170
. 170
.170

-

7 .9 9 0
8 . 140
8 .2 9 0
8 .6 5 0
8 .3 7 0
8 .8 5 0
7 . 21 0
7 .4 5 0

8 .9 9 0
9 .1 4 0
9 . 290
9 .6 5 0
8 .9 2 0
9 .8 6 0
7 .8 2 0
8 .4 0 0

40.0 0
4 0.00
40.0 0
4 0 .0 0
4 0.0 0
4 0.0 0
4 0 .0 0
4 0 .0 0

.650
.65 0
.650
.65 0
.73 0
.66 0
.85 0

-

1 .5 5 0
1 .5 5 0
1 .5 5 0
1 .5 5 0
.750
.8 5 0
.5 0 0
1 .0 0 0

-

.70 0
.70 0
.70 0
.70 0
.72 0
. 300

-

. 170
. 170
.17 0
.170
.46 3
.160
.30 1
.07 0

-

7 .4 5 0
7 .9 1 0
8.41C
7 .9 1 0
8 .7 0 0
8 .2 4 0
8 .7 0 0
8 . 15 0
7 .5 5 0
8 .0 5 0
8 .9 0 0
7 .4 5 0
8 . 150
8 .4 5 0
7. 840
7 .4 5 0

8 .4 0 0
8 .3 7 0
8 . 845
8 . 370
9 .3 0 0
8 .9 5 0
9 .3 0 0
9 . 150
8 . 148
8 .8 7 6
9 .2 0 0
8 . 410
9 . 150
9 .2 6 3
8 . 240
8 .4 0 0

4 0.0 0
40.0 0
4 0.00
4 0.0 0
40.0 0
4 0.0 0
40.0 0
4 0.00
40.0 0
4 0.0 0
40.0 0
4 0.0 0
4 0.00
4 0.00
4 0.0 0
4 0.00

.850
.62 0
.620
.62 0
.97 0
.850
.97 0
.600
.70 0
.70 0
.63 0
.85 0
.60 0
.660
.59 0
.8 5 0

7 .3 5 0

8 .3 1 0

4 0.0 0

.500

5 .7 1 0

6 . 660

40.0 0

.5 9 0

_

W O R K E R S . . . ____

STONEMASONS. ........................................
STRUCTURAL IRON WORKERS..
TAPERS, DRYWALL ...............................
DRYWALL A P P L I C A T O R S . . .
T I L E LAYERS .............................................
CARPET, LINOLEUM, AND
SOFT T I L E LAYERS ...............

-

-

-

1 .0 0 0
1 .5 0 0
1 .5 0 0
1 .5 0 0
1 .4 5 0
1. 300
1 .4 5 0
.550
.45 0
.45 0
1 .5 0 0
1 .0 0 0
. 550
.60 0
1 .3 5 0
1 .0 0 0

-

-

-

-

0 .5 0 0
.30 0
. 800
.300
-

1 3. 0 0%
-

-

-

.30 0

-

6_

6_

b_
.55 0
. 150
. 550
.75 0

-

6_

-

6.82 0
. 300
.75 0

-

.40 0

6_

800
.3 0 0
.

.

5 .4 0 %
6 .0 0

5 .0 0
5 .0 0
5 .0 0 3 .0 0
3 .0 0
-

0 .0 5 0
.500
.070
.02 0
.070
.290
.308

150

8 .6 0 %
-

-

-

-

.070
.080
.080
.080
.46 0
. 120
.460
.060
. 100
.10 0
.650
.070
. 150

5 .0 0
-

-

-

-

-

.110
.07 0
.

-

100

HELPERS AND LABORERS
j

.76 0

_

.33 0

.700

-

.45 0

-

6-

3 .0 0

.

-

.32 0
1 .0 0 0
.76 0

-

-

6 .0 0

6 .0 6 3

CJ-

o

o

o

B U I L D IN G LABORERS....................
COMPOSITION ROOFERS'
HELPERS............................................
ELEVATOR CONSTRUCTORS'
HELPERS .......................................................
MARBLE SETTERS' HE LPE RS ..
PLASTERERS' LABORERS ...............
TERRAZZO WORKERS'
HELPERS .......................................................
T I L Z LAYERS' HELPERS ...............

7 . 10 0
5 . 8 20
5 .7 6 0

7 .4 8 0
6 . 34 0
6 .7 1 0

40.0 0
4 0 .0 0
40.0 0

.49 5
.850
.590

5 .8 2 0
5 .8 2 0

6 .3 4 0
6 .3 4 0

4 0.0 0
4 0.0 0

.850
.85 0

6 .0 0 0

-

-

1 .0 0 0
1 .0 0 0

-

-

-

.3 0 0
.33 0
.30 0
.3 0 0

_

-

.200

_

100

-

.221
.070
.20 0

-

.070
.070
!

HIGHWAY AND STREET
CONSTRUCTION

JOURNEYMEN

ENGINEERS-POWER EQUIPMENT
OPERATORS:
SELF PROPELLED, AUTO­
MATI CA LLY A PPL IE D
CONCRETE CURING
MACHINE..................................

5 .9 3 0

6 .9 3 0

4 0.0 0

.65 0

“

|

1 .5 5 0

“

.17 0

.70 0
'

S e e f o o tn o te s at end of ta b le .




-

-

64

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w age r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in th
build in g t r a d e s , July 1, 1975 and J u ly 1, 1976)
JULY 1 ,
1975

JULY

1,

1976

EMPLOYES CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR1

HOURS
PER
WEEK2

INSURANCE 4

DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER5

PERCENT

DOLLARS

PERCENT

HONOLULU-CONTINUED
HIGHWAY AND STREET
CONSTRUCTION
-CONTINUED
JOURNEYMEN-CONTINUED
ENGINEERS-POWER EQUIPMENT
OPERATORS-CONTINUED
CONCRETE SAWS AND/OR
GRINDERS..............................
F I N I S H I N G MACHINE
OPERATORS...................

$ 7.1 60

$ 8 .1 6 0

4 0.00

0 .6 5 0

7 .5 9 0

8 . 590

4 0.00

.650

-

1 .5 5 0

-

.700

-

. 170

-

7 .4 3 0
7 . 180
8 . 150

8 .2 4 0
8 . 100
9 . 150

40.0 0
4 0.00
4 0.00

.59 0
.85 0
.60 0

-

1 .3 5 0
1 .0 0 0
.55 0

-

.800
.3 0 0
.75 0

_
-

.02 0
.070
.150

~

5 .7 1 0

6 .6 6 0

4 0.0 0

.59 0

1 .5 5 0

0 .7 0 0

0 .1 7 0

OTHER HEAVY CONSTRUCTION

JOURNEYMEN

CARPENTERS.......................................
CEMENT F I N I S H E R S ......................
STRUCTURAL IRON WORKERS..

-

_

HELPERS AND LABORERS

CONSTRUCTION L A B O R E R S . . . .
HOUSTON*

.76 0

.330

.200

TEXAS

I

|

BU IL D IN G CONSTRUCTION
I
JOURNEYMEN

ASBESTOS WORKERS...................... I
BOILERMAKERS.................................
BR ICKLAYERS .................................... I ;
CARPENTERS.......................................
M I L L W R I G H T S . . . . .................
P IL E D R I V E R S ............................
CEMENT F I N I S H E R S ...................... i |
ELE CT R IC IA NS ( I N S I D E
H I R E R S ) ............................ ..
ELEVATOR C O N S TR U C TO R S. .. .
ENGINEERS— POWER E Q U IP ­
MENT OPERATORS:
HEAVY EQUIPMENT— CAT
TRACTORS, SCRAPERS
(HEAVY TY P E , OVER 3
CU. Y D S . ) , BULLDOZ­
ERS, CRANES, DER­
R I C K S , DR AG LIN ES,
HOISTS (2 OR MORE
DRUMS), MIXERS (1 4
CU. FT . OR MORE),
P I L E D R I V E R S , SHOVELS.
L IG H T EQUIPMENT— A I R
COMPRESSORS, MIXERS
(LESS THAN 14 CU.
F T . ) , SCRAPERS (3 CU.
YDS. OR L E S S ) , PUMPS,
SINGLE-DRUM H O I S T S . . .
G LA ZI E RS .............................................
LATHERS...............................................
MA CH IN IS TS .......................................
MARBLE S E T T E R S . . . ....................
MOSAIC AND TERRAZZO
WORKERS..........................................
PAI NT E RS :
COMMERCIAL BRUSH WORK.
COMMERCIAL SPRAY WORK.
IN D U S T R IA L BRUSH WORK.
IN D U S T R I A L SPRAY WORK.
ALL P A I N T I N G OVER 60
FE E T ............................................
PAPERHANGERS..................................
P I P E F I T T E R S ....................................
PLASTERERS.......................................
PLUMBERS............................................
REINFORCING IRON WORKERS.
ROOFERS, FL AT ROOF AND
COMPOSITION...............................

8 .9 5 0
8 .0 0 0
8 .6 9 0
8 .6 7 5
9 .0 0 5
8 .6 7 5
8 .3 2 C

1 0.000
9 .0 0 0
1 0 . 130
9 .4 0 0
9 .7 6 0
9 .4 0 0
9 . 120

40.0 0
4 0.00
4 0.0 0
40.0 0
40.0 0
4 0 .0 0
4 0 .0 0

.70 0
.500
.380
.650
.65 0
.65 0
.490

9 .2 6 4
7 .7 9 0

10.387
8 .6 0 0

4 0.0 0
4 0.0 0

.40 0
.49 5

8 .8 8 0

9 .8 7 0

4 0 .0 0

.350

7 .5 2 0
8 .0 7 0
8 .3 7 0
10.100
7 .5 6 0

8 .3 8 0
8 .9 2 0
9 .0 2 0
10.100
9. 260

40.0 0
4 0.00
4 0.0 0
40.0 0
4 0 .0 0

.35 0
.500
.50 0
-

40.0 0

_

7 .5 6 0

9 .2 6 0

7 .5 4 5
7 .9 2 0
7 .6 4 5
7 .9 7 0

9 .2 9 5
9 .6 7 0
9 .3 9 5
9 .7 2 0

40.0 0
40.0 0
4 0.00
4 0.0 0

.365
.36 5
.365
.36 5

8 . 1 70
7 .7 9 5
8 .1 0 0
7 .6 8 0
8 .3 6 0
8 .7 7 0

9 .9 2 0
9 .5 4 5
9 . 100
9 . 175
9 .3 7 0
9 .6 3 0

4 0 .0 0
4 0.00
40.0 0
40.0 0
40.0 0
4 0.00

.365
.365
.40 0
.52 0
.400
.550

7 .5 4 0

8 . 140

4 0 .0 0

.200

S e e fo o tn o te s at end of ta b le .




65

_

.700
1 .0 0 0
.50 0
.60 0
.60 0
.60 0
.55 0

_
-

.320

-

_
_
_
3 .0 0 %
-

.500
_
_
_
_

-

_
_
_
_
_
„
66 . 0 0
-

.06 0

_
_
_

.120

_

_
_
_

_
_

.020

8 .4 0 %

0 .6 5 0

-

-

_
_
-

_

.65 0
.42 5
.3 5 0
-

_
.35 0
.350
.35 0
.35 0

-

.350
.35 0
.60 0
.30 0
.60 0
.850

-

.250

-

-

-

-

_
_

. 150
.50 0
.250
.250

-

.40 0
.40 0
.40 0
. 400

-

.40 0
.400
.800
6 .5 2 5
.500

-

-

-

.250

-

_

.060
”
. 150
.150

.

.

-

-

\

I
I
|

-

-

_
_

_
-

-

-

.06 0
.085
_

.10 0

-

_

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w age r a te s and s tr a ig h t -t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in th e
b u ild in g t r a d e s , J u ly 1, 1975 and J u ly 1, 1976)
JULY

JULY 1
1975

1,

1976

EMPLOYES CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR

RATE
PER
HOUR1

HOURS
PER
tf BEK2

INSURANCE’

DOLLARS

PERCENT

DOLLARS

PERCENT

DOLLARS

PERCENT

DOLLARS

PERCENT

HOUSTON* TEXAS
-CONTINUED
B U I L D IN G CONSTRUCTION
-CONTINUED
JOURNEYMEN
-CONTINUED
ROOFERS, SLATE AND T I L E . .
SHEET-METAL WORKERS...............
STONEMASONS....................................
STRUCTURAL-IRON WORKERS..
SHEETERS AND BUCKERSUP..................................................
T I L E LAYERS....................................

$ 8 ,2 9 0
8 .5 8 5
8 .6 9 0
8 .77C

$ 9 ,0 4 0
9 .4 6 5
1 0 .1 3 0
9 .6 3 0

4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0

0 .2 0 0

8 .7 7 0
7 .5 6 0

9 .630
9 .2 6 0

4 0 .0 0
4 0 .0 0

.5 5 0

6 .3 8 5
6 .4 8 5
6.210
6 .3 8 5

7 . 105
7 . 205
6 .9 3 0
7 . 105

4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0

,280
280
280
280

5 . 4 50
5 .4 5 0
6 .4 8 5

6.020

4 0 .0 0
4 0 .0 0
4 0 .0 0

,4 9 5

320

6 .9 0 0
7 .205

,2 8 0

400

5 .4 5 0
5 .7 5 0
5 .6 0 0
5 .4 5 0

6 .900
7 .2 0 0
7 .0 5 0
6 .9 0 0

4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0

8 .6 7 5

9 .4 0 0

4 0 .0 0

650

600

9 .3 3 0
7 .040
4 .7 5 0

9 .3 3 0
7 .0 4 0
4 .7 5 0

4 0 .0 0
4 0 .0 0
4 0 .0 0

500
500
,500

600
600
600

8 .8 8 0

9 .8 7 0

4 0 .0 0

,3 5 0

650

7. 520
6 .870

8. 380
7 .660

4 0 .0 0
4 0 .0 0

350
,350

650
650

.2 7 5
.3 8 0
.5 5 0

0 . 250
.475
.5 0 0
.8 5 0

0.100

0 . 250

.200

.080

.1 2 0

250

. 15 0

HELPERS AND LABORERS

BRICKLAYERS* TENDERS............
MORTAR M IX ER S ................. ..
B U IL D IN G LABORERS....................
A IR TOOL O P E R A T O R ^ . . . .
ELEVATOR CONSTRUCTORS*
HELPERS............................................
MARBLE SETTERS* HE LP E RS ..
PLASTERERS* LABORERS............
TERRAZZO WORKERS*
HE L P E R S . ......... .............................
BASE MACHINES......................
FLOOR MACHINES....................
T I L E LAYERS* HELPERS............

.0 20
.020
. 02 0
.0 20

400
400
400
400

020
250

1 50

020
250
250
250
250

1 50
150
150
150

500

050

OTHER HEAVY CONSTRUCTION

JOURNEYMEN

P ILEDRIVE CARPENTERS....
ENGINEERS— POWER E QU IP ­
MENT OPERATORS:
HEAVY P I P E L I N E :
GROUP I - H E A V Y ................
GROUP I I - L I G H T . ...........
GROUP I I I - O I L E R S . . . .
HEAVY IN D U S T R I A L
PLANTS:
HEAVY EQUIPMENT
OPERATORS.................... .
L IG H T EQUIPMENT
O P E R A T O R S ...............................

O I L E R S ............................... .

HUNTSVILLE, ALA.

B U IL D IN G

,

CONSTRUCTION

JOURNEYMEN

ASBESTOS WORKERS.......................
BOILERMAKERS.................................
BRICKLAYERS.....................................
CARPENTERS.......................................
MI LLW RI GH TS ............................
CEMENT F I N I S H E R S ......................
EL E CT R IC IA NS ( I N S I D E W IR E R S ) ..........................................
ELEVATOR C O N S T R U C T O R S .. ..
ENGINEERS— POWER EQ U IP ­
MENT OPERATORS:
GROUP A— BULLDOZERS,
CRANES, DERRICKS,
DR AG LIN ES, H O IS T S ,
SHOVELS, SCRAPERS,
TRENCHING M A C H I N E S . . .
GROUP B— CENTRAL COM­
PRESSORS, FRONT END
LOADERS, PAVING MA­
CH IN E S , PORTABLE
HOISTERS, WALK-BEHIND
TRENCHING MACHINES,
YARD MASTERS.......................

8.110
8.200

8 .9 1 0
8 .8 0 0
9 .4 0 0
7 .8 6 0
8 .270
8 .6 5 0

4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0
4 0 .0 0

400
,6 0 0

1.000

8 .8 0 0
7 .4 9 0
7 .8 8 0
8 .0 5 0
8 .3 5 0
8 .4 6 0

9 .0 5 0
9 . 140

4 0 .0 0
4 0 .0 0

,4 0 0
,495

300
320

8 .4 3 0

8 .7 8 0

4 0 .0 0

300

300

7 .1 6 0

7 .4 4 0

4 0 .0 0

300

300

S e e f o o tn o te s at end o f ta b le .




66

.3 0 0

1. 0 0 %

“ 6 . 00 %

020

2.30%

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w age r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , -v acation , and o th e r c o n tr ib u tio n s to funds in the
build in g t r a d e s , Ju ly 1, 1975 and J uly 1, 1976)
JULY

JULY i ,
197 5

C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR'

HOURS
PER
WEEK2

______

PENSION

INSURANCE*

DOLLARS

1,r 1 9 7 6
EMPLOYER CONTRIBUTIONS
TO FUNDS3

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER5

PERCENT

DOLLARS

PERCENT

HUNTSVILLE, ALA.-CONTINUED
BU IL D IN G CONSTRUCTION
-C ONTINUED
JOURNEYHEN-CONTINUED
ENGINEERS—POWER EQUIPMENT
OPERATORS-CONTINUED
GROUP C— PORTABLE AIR
COMPRESSORS, CONVEY­
ORS, PUMPS, WELDING
MACHINES, O I L E R S ............
MARBLE SETTERS............................
MOSAIC AND TERRAZZO WORKERS....................................................
P A IN TE R S ............................................
R E S I D E N T I A L ............................
I N D U S T R I A L ...............................
P IP E F I T T E R S ....................................
PLASTERERS.......................................
PLUMBERS............................................
REINFORCING IRON WORKERS.
ROOFERS, COM POSITIO N............
ROOFERS, SLATE AND T I L E . .
SHEET-METAL WORKERS...............
STONEMASONS....................................
STRUCTURAL IRON WORKERS..
T I L E LAYERS....................................

I

$ 6,4 80
8 .8 0 0

$ 6,7 30
9 . 4 00

40.0 0
40.0 0

0 .3 0 0
-

-

0 .3 0 0
-

-

-

-

-

-

8 .5 5 0
7 .0 0 0
5 . 150
7 .7 5 0
8 .5 0 0
8 .3 0 0
8. 500
8 .0 0 5
6 .8 0 0
7 .0 5 0
9 .2 5 0
8.80C
8 .0 0 5
8 .5 5 0

9 . 150
7 .5 0 0
5 .2 5 0
8 .2 5 0
9 .4 5 0
8 .9 0 0
9 . 450
8 .4 0 5
7 .5 0 0
7 .7 5 0
9.7 5 0
9 .4 0 0
8 .4 0 5
9 . 150

40.0 0
4 0.0 0
4 0.00
40.00
4 0 .0 0
4 0.00
4 0.00
4 0.00
4 0.0 0
4 0 .0 0
4 0.00
4 0.0 0
4 0.0 0
40.0 0

.45 0
.45 0
.4 0 0
.650
.400
-

-

.25 0
.2 5 0
.25 0
.450
.45 0
.35 0
.2 0 0
. 200
.700
.35 0
-

-

-

-

-

-

0 .0 2 5
-

-

-

-

“

-

-

4 .3 8 0
4 .3 8 0

4 .5 2 0
4 . 520

4 0.00
40.0 0

.200
.20 0

.300
.300

_
-

_

_

_

_

-

-

-

-

-

5 .9 2 0
4 .3 8 0
4 .3 8 0

6 .4 0 0
4 . 520
4 .5 2 0

4 0 .0 0
40.0 0
4 0.00

.49 5
.200
.200

-

.320
.30 0
.30 0

-

-

12 6 . 0 0
-

4 .3 8 0
4 .3 8 0

4 .5 2 0
4 . 520

40.0 0
40.0 0

.20 0
.2 0 0

-

.300
.30 0

-

-

-

-

-

“

-

~

-

_

_

~

-

HELPERS AND LABORERS

BRICKLAYERS' TENDERS............
B U IL D IN G LABORERS....................
ELEVATOR CONSTRUCTORS'
H E L PE RS :..........................................
PLASTERERS' LABORERS............
PLUMBERS' LABORERS.................
TERRAZZO WORKERS'
HELPERS..........................................
T I L E LAYERS' HELPERS............

_

-

.02 0 !
!
-

2 .3 0

i

INDIANAPOLIS, IND„

B U I L D IN G

CONSTRUCTION

JOURNEYMEN

ASBESTOS WORKERS.......................
BOILERMAKERS.................................
BR ICKLAYER S ....................................
POIN TE RS , CLEANERS AND
CAULKERS....................................
CARPENTERS.......................................
MIL LWR IGH TS ............................
P IL E D R I V E R S ............................
CEMENT F I N I S H E R S ......................
E LEC TR ICIAN S ( I N S I D E
W I RE RS )..........................................
ELEVATOR C O N S T R U C T O R S .. ..
ENGINEERS— POWER E QU IP­
MENT OPERATORS
HEAVY EQUIPMENT:
CRANES.......................................
H O IS T S .......................................
DE RR IC K -B UL L W H E E L . . .
MEDIUM EQUIPMENT:
CONCRETE MIXERS
(21 CU. F T . ) ......................
CONCRETE PUMPS.................
TRACTOR SHOVELS...............
L IG H T EQUIPMENT:
WELDING MACHINES............
A IR COMPRESSORS...............
PUMPS (W ATE R) ....................
G LA ZI E R S .............................................
LATHERS...............................................
MARBLE SETTERS............................
MOSAIC AND TERRAZZO WORK­
ERS.....................................................
PAI NTERS.............................................
SPRAY............................................
HANDBOLLER...............................
SANDBLASTING .........................

!

_

_

10.430
1 0.850
10.040

40.0 0
40.0 0
40.0 0

.50 0
.800
.400

9 .3 4 0
9 .4 5 0
9 .4 5 0
9 .4 5 0
8 .2 6 0

1 0.040
1 0 . 150
10.150
10.150
8 .5 6 0

4 0.00
40.0 0
40.0 0
40.0 0
40.0 0

.400
.50 0
.50 0
.50 0
.65 0

9 .3 5 8
9 .4 5 5

1 0 . 1 18
1 0.680

40.0 0
4 0.00

.54 5

9 .9 0 0
9 .9 0 0
9 . 90 0

10.550
1 0 . 550
1 0.550

40.0 0
4 0.00
40.0 0

.400
.400
.40 0

-

.4 0 0
.40 0
.400

-

-

-

-

-

9. 0 5 0
9 .9 0 0
9 .9 0 0

9 .7 0 0
1 0.550
10.550

40.0 0
40.0 0
4 0.00

.40 0
.400
.400

-

.40 0
.4 0 0
.40 0

-

-

-

-

-

7 .2 0 0
7 .2 0 0
7 .2 0 0
10.840
8 .7 5 0
8 .9 1 0

7 .5 5 0
7 .5 5 0
7 .5 5 0
11.590
9 .7 9 0
9 . 4 60

4 0 .0 0
4 0.00
4 0.00
40.0 0
40.0 0
40.0 0

.400
.4 0 0
.400
.610
.40 0

-

.40 0
. 4 00
.40 0
.35 0
.300

-

6. 500
6. 5 00

-

8 .6 5 0
7 .7 0 0
8 . 5 00
7. 700
8 .5 0 0

9 . 150
8 .9 1 0
9 .9 1 0
8 .9 1 0
9 .9 1 0

4 0.00
40.0 0
4 0.0 0
4 0 .0 0
4 0 .0 0

.400
.390
.39 0
.39 0
.39 0

-

.30 0
.2 0 0
.2 0 0
.2 0 0
.20 0

-

6.
6.
6.
6.
6.

~

!

}

-

.350
1 .0 0 0
.30 0

-

.30 0
.60 0
. 60 0
. 600
.25 0

4 .0 0 %
-

“

-

.35 0

S e e fo o tn o te s at end o f ta b le .

67

61 . 0 0 0
6. 5 00
6.
6.
6.
6.
6.

500
500
500
500
500
-

5 .0 0
-

I

I




_

9 .3 1 0
10.050
9 .3 4 0

500
400
400
400
400

-

6 .0 7 0

-

-

6. 0 7 0
.030
.03 0
.030
.03 0

-

5 .0 0
4 .0 0

.020

.07 0
-

*

I
1 .6 0

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h ou rly w a g e r a te s and s tr a ig h t -t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
buiLding t r a d e s , July 1, 1975 and J uly 1, 1976)
JULY 1,
197 6

JU LY

1,

'
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

1 97 6

EMPLOYER COI JTRIBUTIONS
TO FU1IDS3

RATE
PER
HOUR1

PER
WEEK2

INSURANCE4

DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER5

PERCENT

DOLLARS

PERCENT
!

IN D IA N A PO LIS , IN D .
—CONTINUED

B U IL D IN G CONSTBUCTION
-CONTINUED
i

JOURNEYMEN
-CONTINUED
PAPERHANGERS.................................
P I P E F I T T E B S ....................................
PLASTERERS.......................................
PLUMBERS............................................
REINFORCING IRON WORKERS.
ROOFERS, COMPO SITION............
ROOFERS, SLATE AND T I L E . .
SHEET-METAL WORKERS...............
STONEMASONS....................................
STRUCTURAL IRON-WORKERS
(ERECTO RS )...............................
F I N I S H E R S .................................
MACHINE MOVERS AND
RIGGERS....................................
SHEETERS. . .
.......................
T I L E LAYERS....................................
HELPERS

!
$8,910
9 . 8 00
9 . 500
9 .8 0 0
10.500
1 0.230
1 0.480
10.800
10.040

4 0.0 0
4 0 .0 0
40.0 0
4 0.00
4 0.0 0
40.0 0
4 0 .0 0
4 0.0 0
40.0 0

0.3 9 0
.500
.800
.50 0 I
.75 0
.3 5 0
.35 0
.55 0
.400

_
-

1 0.000
10.000

10.500
1 0.500

4 0 .0 0
4 0.00

.750
.750

1 0.000
10.000
8 .9 1 0

1 0.5 00
10.500
9 . 460

4 0 .0 0
4 0 .0 0
4 0 .0 0

.75 0
.75 0
.40 0

$7,7 00
9 .1 5 0
8 .9 5 0
9 .1 5 0
1 0.000
9 .4 9 0
9. 740
9 .9 1 0
9 . 34 0

,

0.2 0 0
.70 0 j
:
.70 0
1 .1 0 0
.40 0
.40 0
.600
.300

-

*0 .4 0 0
J . OOO
*1 .0 0 0
1.0 0 0

-

1 .1 0 0
1 .1 0 0

-

-

-

1 .1 0 0 j
1 .1 0 0 i
. 300;

-

I
I

-

_

i
!

_

i
;
ij

.500

"

|

i
j

BR ICKLAYERS' TENDERS............
B U IL D IN G LABORERS....................
COMPOSITION ROOFERS'
HELPERS............................................
ELEVATOR CONSTRUCTORS'
HELPERS............................................ •
MARBLE SETTERS' HE LP E RS ..
PLASTERERS' LABORERS............
TERRAZZO WORKERS'
HELPERS..........................................
BASE MACHINES ......................
FLOOR MACHINES AND
EDGING.......................................
T I L E LAYERS' HELPERS............

i
!

-

_
-

0 .0 6 0
6. 0 7 0 |
.06 0
.03 0 :
;

~
_
_

-

6. 140 j
.070
!
.030
.030 ’

_
_

.03 0 !
.03 0
-

~

. 120 1
. 120

-

-

.400
. 4 00

.35 0

-

.40 0

-

-

.545
.500

-

.3 5 0
.40 0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

7 .2 5 0
6 .9 5 0

4 0.0 0
4 0.0 0

.500
.50 0

7 .9 9 0

8 .7 3 0

4 0.00

-

_

-

6 .7 0 0
6 .4 0 0

!

!

-

-

I
6 .6 2 0
7 .9 0 0
6 .7 0 0

7 .4 8 0
8 .5 5 0
7 .2 5 0

4 0 .0 0
40.0 0
4 0.00

7 .9 5 0
8 .2 5 0

8 .6 0 0
8 .9 0 0

4 0.00
40.0 0

-

7 .9 5 0
7 .9 0 0

8 .6 0 0
8 .5 5 0

4 0.00
40.0 0

-

-

I

HIGHWAY AND STREET
CONSTRUCTION

4 .0 0 %
i
!

.020 ;
.120

!
!

i
9. 850
8 . 560

8 .8 8 0
8 .2 6 0

40.0 0
40.0 0

.500
.65 0

-

-

j
6 .5 0 0 i

-

.5 0 0
.250,

-

1 . 6(
-

I

i

JOURNEYMEN

HELPERS

_
-

:
6. 500

AND LABORERS

CARPENTERS.......................................
CEMENT F I N I S H E R S .......................
ENGINEERS— POWER E Q U IP ­
MENT OPERATORS:
HEAVY EQUIPMENT—
CRANES, SCOOPS (KEY­
ST O NE ), AUTO P A TR O L ..
MEDIUM EQUIPMENT:
TRENCH MACHINES (UN­
DER 24 I N ) ............................
BULLDOZERS............................
L IG H T EQUIPMENT:
TRACTORS.................................
COMPRESSORS, P U M P S .. .
STRUCTURAL IRON WORKERS..

j
i
I
!
j
i
I
I
!

j

.020 '
.030

|

_
-

!

I
!

i

9 .7 0 0

4 0.0 0

.400

-

.40 0

-

-

-

8 .2 0 0
9 .1 0 0

8 .7 0 0
9 .7 0 0

40.0 0
40.0 0

.40 0
.40 0

-

. 4 00
.400!

-

-

-

7 .7 7 0
6 .9 6 0
10.000

8 . 27 0
7 .4 6 0
10.500

4 0.00
4 0.00
4 0.00

.40 0
.400
.7 5 0

-

.400
.400,
1 .1 0 0 !

-

-

-

5 .9 0 0

6 .7 0 0

.5 0 0

-

.40 0

-

-

-

9 . 100

J

l
I

|

!

*

I

_

II
I
j

j

.030 |

-

AND LABORERS
o

o
o

CONSTRUCTION L A B O R E R S . . . .
OTHER HEAVY CONSTRUCTION

i
!

I

JOURNEYMEN
CARPENTERS.......................................
CEMENT FINISHERS . . . . . . . . .
ENGINEERS— POWER EQU IP­
MENT OPERATORS:
GROUP I : CRANES, SCO­
OPS, AUTO P A T R O L S . . . .
GROUP I I :
A-FRAMES,
WINCHES....................................
GROUP I I I : T R A C T O R S . . .
GROUP I V : COMPRESSORS,
PUMPS..........................................
STRUCTURAL IRON WORKERS..

. 130

i
_

6. 500

_
-

.40 0

-

-

-

.4 0 0
. 400

-

-

-

.40 0
1 .1 0 0

-

-

-

-

-

-

.03 0

-

-

-

.12 0

9 .8 5 0
8 .5 6 0

4 0.0 0
4 0 .0 0

.500
.65 0

-

. 5 oo!
.25 0

9 .7 0 0

10.350

40.0 0

.400

-

8 .8 5 0
7 .9 5 0

9 .4 5 0
8 .3 0 0

4 0.0 0
40.0 0

.400
.400

-

7 .2 0 0
1 0.000

7 .5 0 0
10.500

4 0 .0 0
4 0 .0 0

.400
.75 0

-

5 .9 5 0

6 .3 5 0

4 0 .0 0

.500

"

_
-

8 .8 8 0
8 .2 6 0

_

.020
.03 0

!

-

-

-

HELPERS AND LABORERS
CONSTBUCTION

LABORERS. . . .

-

. 40C
I______

S e e fo o tn o te s at end of ta b le .




68

-

Table 20. W age rates, hours, and employer contributions to funds: Selected cities— Continued
( U n i o n h o u r l y w a g e r a t e s an d s t r a i g h t - t i m e w e e k l y h o u r s an d e m p l o y e r i n s u r a n c e ,
b u i l d i n g t r a d e s , J u l y 1, 1 97 5 and J u l y 1, 1 9 7 6 )

p en sion ,

vacation,

JULY

JULY 1 ,
1975
r
C IT Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOU R 1

RATE
PER
HOUR1

HOURS
PER
WEEK2

1 97 6

1,

EMPLOYER CONTRIBUTIONS
TO FUNDS3

PENSION

INSURANCE4

DOLLARS
JA C K SO N V IL L E *

an d o t h e r c o n t r i b u t i o n s to fu n d s in th e

PERCENT

DOLLARS

OTHER5

VACATION

PERCENT

DOLLARS

PERCENT

DOLLARS

PERCENT

F L lo

I

B U IL D IN G CONSTRUCTION

JOURNEYMEN

$ 8,4 60
8. 200
8 .3 1 0
8 .0 0 0
8 .7 3 0
7 . 030
8. 500
8.62C

ASBESTOS WORKERS.......................
BOILERMAKERS.................................
BRICKLAYERS ....................................
CARPENTERS.......................................
M IL LW RI GH TS ..............................
CEMENT F I N I S H E R S .......................
ELECTR ICIAN S ......................... ..
ELEVATOR C O N S TR U C TO R S. .. .
ENGINEERS— POWER EQU IP­
MENT OPERATORS:
GROUP I — DERRICKS,
DRAG LINES, P I L E D R I VERS, MOTOR PATROLS,
HOISTS (MULTI-DRUM
FOR R I G G I N G ) , SHOVE LS , GRADERS................. ..
GROUP I I — BULLDOZERS,
SCRAPERS, HOISTS
(OTHER THAN RIGGING) .
GROUP I I I — TRACTORS,
A IR COMPRESSORS (2 OR
MORE)..........................................
GROUP I V — A IR COMPRES­
SORS (1) , PUMPS, ROLL­
ERS ...........................................
G L A Z I E R S ............................................
LATHERS........................................
MARBLE SETTERS............................
MOSAIC AND TERRAZZO
WORKERS........................................
PAI NT E RS :
BRUSH............................................
SPRAY.................................... ..
ROLLER..........................................
S T E E L .............................................
DRYWALL F I N I S H E R S ....................
PAPERHANGERS..................................
FURNISH OWN TOOLS............
P IP E F I T T E R S ....................................
A IR CO NDIT ION ING AND
REFRIGERATION F IT TE R S
PLASTERERS.......................................
PLUMBERS................................. ..
REINFORCING IRON WORKERS.
ROOFERS, COMPO SITIO N............
KETTLEMEN.................................
SHEET-METAL WORKERS...............
STONEMASONS.............. .....................
STRUCTURAL AND ORNAMENTAL
IRON WORKERS...............................
T I L E LAYERS.........................
HELPERS

$8.8 60
8 .8 0 0
8 . 46 0
8 . 100
8 . 8 80
7 . 120
9 .0 0 0
9 .3 1 5

0 .4 5 0
.600 1
.450
.480 j
.48 0 |
.450 1
.40 0 j
.49 5 I

4 0 .0 0
40.0 0
4 0.0 0
40.0 0
4 0.00
4 0.0 0
4 0 .0 0
40.0 0

_

0 .3 0 0
1 .0 0 0
.50 0
.400
.40 0
.40 0
. 56 0
.32 0

~

~
~

_
i
!

61 . 0 0 0

_

6. 350

-

|

;
1.00% j
-

. 560

0 .0 3 0
20. 170
.020
.02 0
.02 0

12 ~
6 .0 0 %

!

2.30 %

I

i
i

8.78C

8 .9 8 0

4 0 .0 0

.600

-

.35 0

-

7 .6 9 0

7 .8 6 0

40.0 0

.50 0

-

.35 0

-

6 .7 8 0

6 .9 2 0

40.0 0

.500

-

.35 0

-

5 .7 6 0
8 .0 0 0
7 .3 3 0
7 .0 1 0

5 . 8 70
8 .0 0 0
7 . 330
7 .2 9 0

40.0 0
4 0.0 0
4 0 .0 0
40.0 0

.5001
.250
.400

-

.35 0
.2 0 0
. 100
.50 0

-

7 .0 1 0

7 . 290

4 0.00

.40 0

. 5 00

7 .4 5 0
7 .9 7 0
7 .8 6 0
7 .9 7 0
7 .8 5 0
7 .8 5 0
8 . 120
13 .6 5 0

7.6 5 0
8 . 170
8 . 0 60
8 . 170
7 .8 5 0
8 .0 5 0
8 . 570
9 .3 5 0

4 0.0 0
4 0.0 0
4 0.0 0
4 0.00
4 0.0 0
4 0.00
4 0.00
40.0 0

|
.400
.400 1
.40 0 1
.40 0
.40 0
.400
.400
.5 0 0

8 .6 5 0
7 .6 6 0
t 8 . 6 50
8 .2 5 0
8 .0 3 0
4 .4 0 0
8 . 130
8 . 3 10

9 . 350
7 . 66 0
9 . 350
8 . 550
8 . 280
6 .2 1 0
8 . 500
8 . 460

40.0 0
4 0 .0 0
40.0 0
40.0 0
4 0.00
40.0 0
4 0 .0 0
4 0 .0 0

8 .2 5 0
7 .0 1 0

8 . 550
7 .2 9 0

40.0 0
4 0 .0 0

4 .8 5 0

5 . 100

4 0 .0 0

i

!
!
I
!
;
j
i
I
j
i
*
|
I
I
;

-

-

-

-

-

-

-

-

6 ~
6. 520

-

-

-

-

.45 0
.45 0
.450
. 450
.450
.4 5 0
.45 0
. 5 00

-

-

-

-

-

. 500
. 3 00 I
. 5 00
.75 0
.250
.250
.400
. 5 00

-

-

.750
. 5 00

~

-

.500
.40 0
.500
.550
.50 0
.50 0
.800]
.45 0

-

.55 0
.400

1
j
i
I

!
6. 600
6. 600
. 600
-

6. 500 |
i
■

.020
.010

-

-

.010

-

.050

-

j

-

.050
.050
.050
.05 0
.02 5
.025
.04 5
.030

1

.050
.010

!
3 .0 0
-

AND LABORERS

GENERAL LABORERS.......................
COMPOSITION ROOFERS'
HELPERS............................................
ELEVATOR CONSTRUCTORS'
HELPERS............................................ |
MARBLE SETTERS' HE LP E RS ..
TERRAZZO WORKERS'
HELPERS..........................................
GRINDERS.............. .. .....................
T I L E LAYERS' HELPERS............

4 . 4 00

4 . 55 0

4 0 .0 0

6 .0 3 0
4 .9 3 0

6.5 2 0
4 .9 3 0

40.0 0
4 0 .0 0

|
|
i

|

. 200 j
.50 0 |
.495
-

-

4 .9 3 0
5 .3 0 0
4 .9 3 0

4 .9 3 0
5 .3 0 0
4 .9 3 0

4 0.00
4 0.0 0
4 0.00

5 .4 5 0

6 .0 0 0

40.0 0

.24 0

-

3 .1 5 0

3 .0 7 8

4 0 .0 0

.200

-

1
-

.10 0

-

-

-

.25 0

-

-

-

.02 5

.32 0
-

-

-

12 6 . 0 0
-

.020
-

-

-

-

-

-

-

-

-

|
1
-

-

-

2 .3 0
-

HIGHWAY AND STREET
CONSTRUCTION

JOURNEYMEN

CARPENTERS

&

!

P IL E D R I V E R S .

.200

.05 0

HELPERS AND LABORERS

GENERAL LABORERS......................

S e e fo o tn o te s at end o f ta b le .




69

-

2 .0 0

-

2 .3 0

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h ou rly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u rs and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , July 1, 1975 and July 1, 1976)
JULY

JULY 1 ,
1975

1,

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR1

HOURS
PER
WEEK2

PENSION

INSURANCE4

DOLLARS

PERCENT

DOLLARS

OTHER5

VACATION

DOLLARS

PERCENT

PERCENT

DOLLARS

PERCENT

J A CK SO NV IL L E * FLA«
-C ONTINUE D
HIGHWAY AND STREET
CONSTRUCTION
-CONTINUED

i
I

HELPERS AND LABORERS
-CONTINUED
P IP E LAYERS....................................
ASPHALT SCREED OPERATORS.
ASPHALT RAKERS............................
ASPHALT F I N I S H E R S ....................
LABOR CREW TRUCK DRIVERS.

j
$ 3,5 60
3 .4 1 0
3 .2 5 0
3 .3 0 0
3 . 150

$ 3,479
3 .3 3 2
3 . 176
3 .2 2 5
3 .0 7 8

4 0 .0 0
4 0 .0 0
4 0.00
40.0 0
4 0.00

0 .2 0 0
.200
.200
.20 0
.200

*

-

-

-

2 . oo%!
2 .0 0 !
2 .0 0
2 .0 0 !

-

-

2 .0 0

-

I
OTHER HEAVY CONSTRUCTION
JOURNEYMEN
8 .1 0 0

o
o

8 .0 0 0

o

CARPENTERS AND P I L E D R I V ERS.....................................................

.48 0

0 .4 0 0

-

I
I 200 . 170

60. 350
~

KANSAS C I T Y *
B U IL D IN G

3 . 150
3 . 5 60
3 .4 1 0
3 .2 5 0
3 .3 0 0
3. 150

3 . 150
3 . 560
3 .4 1 0
3 .2 5 0
3 .3 0 0
3 . 150

4 0.0 0
4 0.0 0
4 0.00
4 0.0 0
4 0 .0 0
40.0 0

.20 0
.200
.200
.200
.20 0
.20 0

_
-

_

_

_

-

-

-

-

-

2 ,0 0
2 .0 0
2 .0 0
2 .0 0
2 .0 0
2 .0 0

-

2 .3 0 %
2 .3 0
2 .3 0
2 .3 0
2 .3 0

i
l
!
!

HELPERS AND LABORERS

GENERAL LABORERS......................
P IP E LA Y E R S .......................................
ASPHALT SCREED OPERATORS.
ASPHALT RAKERS............................
ASPHALT F I N I S H E R S ....................
LABOR CREW TRUCK DRIVERS.

!
!
i
|
j
I
|

.023
.023
.023
.023
.02 3
.02 3

MOo

!
i
!
!
i
|
I

2 .3 0
2.30
2 .3 0
2 .3 0
2 .3 0
2 .3 0

CONSTRUCTION
I

JOURNEYMEN
9 .0 2 0
8. 900
9 .2 2 5
9 . 22 0
9 .2 2 0

9 .6 4 8
9 .4 5 0
9 . 725
9 . 800
9 . 800

4 0.00
4 0 .0 0
4 0.00
4 0 .0 0
40.0 0

.50 0
.70 0
.55 0
.50 0
.50 0

-

.800
1 .0 0 0
.35 0
. 3 00
.3 0 0

9 .2 2 0
9 . 2 25
9 .4 7 5

9 .8 0 0
9 . 475
9 .7 2 5

4 0 .0 0
40.0 0
4 0.00

.50 0
.400
.400

-

.30 0
. 5 00
.50 0

-

9 . 5 70
7 .2 1 0
9 .8 3 0

1 0.6 20
8 .0 1 0
1 0.560

4 0.00
4 0.0 0
4 0 .0 0

.290
.29 0
.49 5

-

.310
.310
. 32 0

!

1 0.00
-

.05 0
-

-

-

.12 5
. 125

-

I
. 400
.500
. 500

8 .0 0

.60 0
. 600
-

1 .0 0 *
1 .0 0
-

1

.200
.200
.02 0

-

I
-

I

9 .7 5 0
10.000
9 .7 5 0

10.000
1 0.2 50
10.000

4 0.0 0
4 0.0 0
4 0.00

.500
.50 0
.50 0

-

1.0 0 0
1.0 0 0
1 .0 0 0

-

.75 0
. 750
.75 0

9 .7 5 0
9 .5 0 0
9 .7 5 0

10.000
9 .7 5 0
10.000

4 0.00
40.0 0
4 0.0 0

.50 0
.50 0
.50 0

-

1 .0 0 0
1 .0 0 0
1 .0 0 0

-

.75 0
*. 750
. 750

9 .5 0 0

9 .7 5 0

.500

-

1 .0 0 0

-

.750

9 .0 0 0

4 0.00

.500

-

1 .0 0 0

-

.750

9 .0 0 0
9 .2 0 0
8.70C
9 .7 6 0
9 .4 3 0
8.74C
8 .7 4 0
8 .7 4 0
9 .3 8 0
8 .5 4 0
10.250
9 .6 9 0
9 .2 5 0
9 . 300
9 .7 0 5
9 .2 2 5
9 .2 5 0

9 .2 5 0
9 .4 7 0
9 .6 0 0
1 0.320
9 .9 8 0
9 .4 9 0
9 .4 9 0
9.4 9 0
10.233
9 .6 3 0
11.150
10.640
9 . 600
9 .3 0 0
1 0.355
9 .7 2 5
9 . 600

4 0 .0 0
4 0.0 0
4 0 .0 0
4 0 .0 0
40.0 0
40.0 0
4 0.0 0
4 0 .0 0
40.0 0
4 0.0 0
4 0.00
4 0 .0 0
4 0.00
4 0.00
4 0.00
4 0 .0 0
4 0.00

.500
.570
.40 0
.56 0
.560
.56 0
.570
.60 0
.6 5 0
.70 0
.450
.50 0
.55 0
.700

-

1 .0 0 0
.51 0
.70 0
. 700
.700
1 .1 5 0
.90 0
.8 0 0
1 .0 0 0
.60 0
.5 0 0
.35 0
1 .0 0 0

-

3 .6 5 *
3 .6 5
-

3 .2 5
3 .2 5
-

. 750
.852
1 .000
. 500
.500
1.0 0 0
1.000
1 .0 0 0
. 500
1 .0 0 0
1.0 0 0
1 .0 0 0

9 .2 5 0
9 .7 6 0

9 .6 0 0
10.320

4 0.0 0
4 0.00

.70 0
~

3 .6 5

1 .0 0 0
“

3 .2 5

1 .000
.500

o
o

-

. 100
. 100
.100

1
[

8 .7 5 0

i
.100
.10 0
. 100

1
j
!
1
!

-

~

I

!

. 100

-

. 100

-

. 100
.657
. 100

-

I

S e e f o o tn o te s at end of ta b le .




!

1 .0 0 0
. 400
. 400

■e
o

ASBESTOS WORKERS......................
BOILERMAKERS...................... ..........
BRICKLAYERS ....................................
CARPENTERS.......................................
M IL LW R IG H TS ..............................
P I L E D R I V E R S , WHARF AND
BRIDG E..........................................
CEMENT F I N I S H E R S ......................
COMPO SITION............................
ELE CT R IC IAN S ( I N S I D E
HIRERS) .........................................
R E S I D E N T I A L ............................
ELEVATOR CONSTRUCTORS------ENGINEERS— POWER EQUIP­
MENT OPERATORS:
HEAVY EQUIPMENT:
CRANES (POWER OPER­
ATORS) ....................................
HOISTS (3 DRUMS)............
SHOVELS, POWER.................
MEDIUM EQUIPMENT:
BULLDOZERS............................
FO RK LIF TS (ALL TYPES)
HOISTS (S IN G LE DRUM) .
L IG H T EQUIPMENT:
F IN IS H IN G MACHINES...
O I L DRIVERS (ALL
T Y P E S ) ....................................
TRACTORS (LESS THAN
50 H P ) ....................................
G L A Z I E R S ...................... .....................
LATHERS...............................................
MARBLE SETTERS............................
TERRAZZO WORKERS.......................
P A I N T E R S ............................................
TAPERS..........................................
PAPERHANGERS...............................
P I P E F I T T E R S ....................................
SPRINKLER F I T T E R S ............
PLASTERERS.......................................
PLUMBERS............................................
REINFORCING IRON WORKERS.
ROOFERS, COM PO SITIO N ............
SHEET-METAL WORKERS...............
STONEMASONS....................................
STRUCTURAL IRON WORKERS..
ORNAMENTAL IRON WORK­
ERS...............................................
T I L E LAYERS....................................

-

70

-

-

-

-

10.00
-

.05 0

i__ :

1.50
-

.050
. 100
. 100
.050
.050
.04 0
. 160
.050

-

-

-

I
!

-

j
|
j

" i
i

1.5 0

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
v a c a t io n ,

(U nion h ou rly w age r a te s and s t r a ig h t - t im e w e e k ly h o u rs and e m p lo y e r in s u r a n c e , p e n s io n ,
b u ild in g t r a d e s , July 1, 1975 and J uly 1, 1976)

JUL Y

JULY 1 ,
1975

and o t h e r c o n t r i b u t i o n s to f un d s in the

1 97 6

1,

EMPLOYER CONTRIBUTIONS
TO FUNDS3
RATE
PER
HOUR1

RATE
PER
HOUR1

C IT Y AND JOB
C L A S S I F I C A T IO N

HOURS
PER
WEEK2

DOLLARS

—

PENSION

INSURANCE4

PERCENT

DOLLARS

PERCENT

OTHER5

VACA'TION

DOLLARS

PERCENT

PERCENT

DOLLARS

KANSAS CITY, 80*,
-CONTINUED
BU IL D IN G CONSTRUCTION
-CONTINUED
I
I

HELPERS AND LABORERS

BRICKLAYERS* TENDERS............
HOD CARRIERS ( B R I C K ) . .
B UI LD IN G LABORERS....................
ELEVATOR CONSTRUCTORS*
H E L PE RS ...........................................
MARBLE SETTERS * HE LPE RS ..
PLASTERERS* LABORERS...........
PLUMBERS' LABORERS.................
TERRAZZO WORKERS'
HELPERS..................................
BASE GRINDERS......................
T I L E LAYERS' HELPERS............

$ 8.3 90
8 . 3 90
7 .5 0 0

S8.855
8 .8 5 5
8 . 0 00

40.0 0
4 0.00
40.0 0

0 .5 0 0
.500
.45 0

6 .8 8 0
7 .4 8 0
8 . 3 90
7 .6 9 5

7 .3 9 0
8 . 00 0
8 .8 5 5
8 . 195

40.0 0
4 0.00
40.0 0
40.0 0

.49 5
.500
.450

7 . 150
7 .5 0 0
7 .4 8 0

7 .5 0 0
7 .8 5 0
8 .0 0 0

4 0.00
40.0 0
4 0.00

0 .5 0 0
. 5 00
.40 0

"

-

_
-

.32 0
-

-

. 500
. 4 00

-

-

j

~
_
-

_
-

0 .5 0 0
.50 0
.500

1 .0 0 0
. 500
.50 0

"

I
;

8 .0 0
_
-

_
1.000

0 .110
.110
.26 0

-

1.5 0
-

.02 0
. 110
.26 0

_
1 .5 0

_
-

HIGHWAY AND STREET
CONSTRUCTION
I
JOURNEYMEN

HELPERS AND LABORERS

9 .2 2 0
9 .2 2 5

9 .8 0 0
9 .6 5 5

j 4 0.0 0
4 0 .0 0

9 .7 5 0

I 10.000
i

9 .5 0 0

j

9.7 5 0

4 0.0 0

.50 0

. 400
1 .2 5 0

!

.50 0

1 .0 0 0
s

.75 0

-

.05 0

.750

-

.050

j

!

ff

_

_

1 .0 0 0

i

!i
9 .2 5 0
9 .2 5 0
i

LABORE RS ..........................................

|
.30 0
.500

I
I
!
I
|
o
o

■

!
s
!

.5 0 0
.40 0

I
■p
o

C A R P E N T E R S . . .................................
CEMENT F I N I S H E R S .............. ..
ENG INEERS--PO WER EQUIPMENT
OPERATORS:
GROUP I - D R A G L I N E S ,
SHOVELS, P ILED RIV ER S
DREDGES (STEAM,
GAS, OR DIE SEL) ,
BU LLDOZERS . .........................
GROUP I I - H O I S T S ( S I N ­
GLE DRUM), TRACTORS
(OVER 50 H P ) .................
GROUP I I I - S U B - G R A D I N G
MACHINES, SIPHONS AND
J E T S , TRACTORS (LESS
THAN 50 H P ) .........................
STRUCTURAL IRON WORKERS..

i

|
j

9 .5 0 0
9 .6 0 0

! 4 0.00
4 0.00

.500
.700

1.0 0 0
1 .0 0 0

.75 0
1 .0 0 0

I
7 .7 0 0

j

8 .2 0 0

40.0 0

.50 0

. 500

.750

.05 0
.050
|
I
|

. 150

OTHER HEAVY CONSTRUCTION

JOURNEYMEN
|

i
:
I
!

i
|
9 .8 0 0
9 .6 5 5

40.0 0
4 0.00

.50 0
.400

9 .7 5 0

1 0.000

4 0 .0 0

.50 0

9 .5 0 0

9 .7 5 0

o
o

9 .2 2 0
9 .2 2 5

I
!

|

.50 0

9 .2 5 0
9 .2 5 0

9 . 500
9 . 6 00

4 0.00
4 0.0 0

.500
.70 0

7 .7 0 0

8 .2 0 0

40.0 0

.500

.300
. 500

. 400
1 .2 5 0

i
I

o

CARPENTERS.......................................
CEMENT F I N I S H E R S ......................
ENGINEERS— POWER E Q U IP ­
MENT OPERATORS:
GROUP I - D R A G L I N E S ,
SHOVELS, P I L E D R I V ­
ERS, DREDGES (STEAM,
GAS, OR DIESEL) ,
BULLDOZERS...................
GROUP I I - H O I S T S ( S I N ­
GLE DRUM) , TRACTORS
(OVER 5 / H P ) ......................
GROUP I I I - S U B —GRADING
MACHINES, SIPHONS AND
J E T S , TRACTORS (LESS
THAN 50 H P ) .........................
STRUCTURAL IRON WORKERS..

|

i
I
i

!

-

1 .0 0 0

-

. 750

-

.05 0

1 .0 0 0

-

.750

-

.05 0

|
1 .0 0 0
1 .0 0 0

.75 0
1.0 0 0

.050
.05 0

HELPERS AND LABORERS

]______________

.50 0

-

.75 0

-

.15 0
1_________

S ee fo o tn o te s at end of ta b le .




-

71

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s tr a ig h t -t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in th e
b u ild in g t r a d e s , J u ly 1, 1975 and J uly 1, 1976)
JULY 1 ,
197 5

JU LY

1,

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR 1

HOURS
PER
WEEK2

INSURANCE4

DOLLARS
L O I 6 BEACH*

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER5

PERCENT

DOLLARS

PERCENT

C A LIF .

B U IL D IN G CQNSTBUCTION

JOURNEYMEN

$10,580
10.850
9 .5 3 0
8 .8 3 0
8 .4 6 0

$ 11,350
12.000
10.251
9 . 540
9 .4 1 0

4 0.0 0
4 0 .0 0
40.0 0
4 0.00
4 0 .0 0

0 .8 7 0
.750

10.740
11.075

11.790
1 2.000

40.0 0
4 0.0 0

1 .0 5 0
.495

9 .5 0 0

1 0.2 90

40.0 0

.95 0

9 .4 0 0

10.180

4 0.0 0

.95 0

9 .0 6 0

9 . 8 20

4 0.00

.950

-

1 .3 0 0
1.1 0 0

.

0.9 5 0
1.0 0 0
1 .8 0 0
1 .7 5 0

8 .8 4 %
-

1 .7 0 0
.32 0

|

.

.

1.000
. 500
.80 0
1 .0 0 0

10.70%
-

1.0 0
-

.

6 4 .6 5 %

0 .0 2 0
-

-

-

.
2 .33 %
-

-

-

5 .0 0

.29 7

-

I
I
2 .0 0 0

-

.50 0

-

.100

-

-

2 .0 0 0

-

.50 0

-

.10 0

-

-

2 .0 0 0

-

.50 0

-

1
.10 0 !

-

. 5 00

-

.100 1

. 500
. 500

-

.100
. 100

. 500

-

. 100

-

.
.

9 .6 2 0

10.410

4 0.0 0

.9 5 0

-

2 .0 0 0

9 .7 8 0
8 .5 2 0

1 0.580
9 .2 5 0

4 0.0 0
4 0.0 0

.95 0
.950

-

2 .0 0 0
2 .0 0 0

8 .7 9 0

9 . 530

4 0 .0 0

i|

.9 5 0

-

2 .0 0 0

9 .5 0 0
9 . 5 00

1 0.2 90
1 0.290

40.0 0
4 0 .0 0

!
|
I

.95 0
.95 0

-

2 .0 0 0
2 .0 0 0

-

.50 0
.50 0

-

9 .4 0 0

10.180

40.0 0

9 .5 0 0

10.290

9 .6 2 0

10.410

9 .1 9 0
9 .9 0 0
8 .3 7 2
1 0.500
1 0.200
9 . 529
9 .6 7 0
9 .9 2 0
10.040

9 . 9 60
10.710
9 . 522
1 0.9 00
11.400
9 .5 2 9
1 0.7 20
1 0.9 70
11.090

1
-

1
I

j
-

-

2 .0 0 0

-

.

500

-

-

2 .0 0 0

-

.

500

-

4 0.0 0

.95 0

-

2 .0 0 0

-

.50 0

-

40.0 0
40.0 0
4 0.0 0
4 0.00
4 0.00
4 0 . 00
3 5 .0 0
3 5 .0 0
3 5.00

.9 5 0
.950
.55 0
.65 0
.472
.505
.50 5
.505

-

2 .0 0 0
2 .0 0 0
.95 0
.8 0 0
.50 0
.600
. 6 00
.600

-

500
. 500
.500
. 500
. 5 00
.500

o
o

.950
.9 5 0

o

ASBESTOS WORKERS.........................
BOILERMAKERS..................................
BRICKLA YER S ....................................
CARPENTERS.......................................
CEMENT F I N I S H E R S ......................
EL E CT R IC IA NS ( I N S I D E
H I R E R S ) ..........................................
ELEVATOR C O N S T R U C T O R S .. ..
ENGINEERS— POWER E Q U IP MENT OPERATORS:
SHOVELS, BACKHOES,
DRA GLINES, CLAMSHELLS
1 * 6 ) ...............................----------TRACTORS TO 100 H . P .
( # 5 ) .............................................
A-FRAMES OR WINCH
TRUCKS ( # 3 ) .........................
MOTOR PATROL, SIN GLE
ENGINE ( # 7 ) .........................
MOTOR PATROL, M U L T I ENGINE ( # 8 ) .........................
COMPRESSORS ( # 1 ) ...............
CONCRETE MIX ERS, S K I P TYPE ( # 2 ) ...............................
TRACTORS OVER 100 H . P .
( # 6 ) ............................................
CONCRETE MIX ERS, P A V - .
S H I P LEADER OPERATORS
( 3 / 4 TO 1 1 / 2 YARDS) .
S H I P LOADERS (1 1 / 2 TO
6 1 / 2 Y A R D S ) .............................
TRACTOR LOADERS (OVER
6 1 / 2 Y A R D S ) .............................
TRENCHING MACHINES UP TO 6 F E E T .............................
CANAL TI N E R OPERATORS.
G L A Z I E R S ............................................
LATHERS...............................................
M A C H IN IS T S .......................................
MARBLE SETTERS............................
P A IN TE R S ............................................
SWING STAGE............................
13 OR MORE S T O R I E S . .
STRUCTURAL STEEL OR
BRIDGE SWING ...................
13 STORIES OR L E S S . .
MORE THAN 13 STORIES
SPRAY .....................................
13 STORIES OR L E S S . .
PAPERHANGERS ................... ..
P I P E F I T T E R S ...............................
P LA S TE R ER S. ..............................
PLUMBERS.............................................
REINFORCING IRON WORKERS.
ROOFERS, CO MPO SIT IO N ............
SHEET-METAL WORKERS...............
STONEMASONS....................................
STRUCTURAL IRON WORKERS..
TERRAZZO WORKERS.......................
T I L E LAYERS....................................

7 .9 8
-

-

10.97
-

-

.

j
j

-

13.00
‘ 5 .0 0
-

-

|

100
100

.100

1
j

.100

;

|
.10 0 j
!
i
I

.100 !

j

.

l
!
!

— |
.06 0
. 06 0 I
.06 0 ;

i

. 100 j
.42 9 1
120 !

I
.505
.505
.50 5
.505
.505
. 5 05

-

.600
.60 0
.60 0
.60 0
.600
.600

-

.
.
.
.

500
500
500
500
.5 0 0
..50 0

9 .7 9 0
10.070
10.190
9 .9 2 0
10.170
9 .9 2 0
10.950
9 .4 4 5
1 0.950
10.230
8 .7 4 0
9 .6 0 3
9 .5 3 0
10.230
9 .8 2 0
10.290

1 0.840
11.120
11.240
1 0.9 70
1 1.220
10.970
1 1.6 60
9 .8 3 5
1 1.660
1 1.0 30
9 .7 4 0
9 .6 0 3
10.251
1 1.030
10.720
1 0.4 00

35.0 0
3 5 .0 0
3 5 .0 0
35.0 0
3 5 .0 0
3 5.0 0
3 6.0 0
40.0 0
36.0 0
4 0.00
40.0 0
4 0.00
40.0 0
4 0.0 0
40.0 0
4 0 .0 0

7 .8 0 5
7 .2 0 0

8 .2 5 5
7 . 650

4 0 .0 0
4 0 .0 0

.850
.85 0

-

1.8 0 0
1 .8 0 0

-

.500
.50 0

7 .7 5 0
6 .2 2 0

8 .4 0 0
6.7 8 0

4 0.0 0
40.0 0

.49 5
1 .110

-

.32 0
1 .2 0 0

-

.500

9 .0 2 5

1 0.025

40.0 0

.850

-

1 .8 0 0

-

. 500

8 .0 8 0
7 .4 6 5
7 .7 4 5

8 .8 8 0
8 . 4 60
8 . 7 40

40.0 0
4 0 .0 0
4 0.0 0

.35 0
1 .1 1 0
1.110

-

.80 0
1 .2 0 0
1 .2 0 0

-

1.0 0 0
.500
.50 0

j

-

.83 0
1 .090
.820
.94 0
1.0 9 0
.30 0
.800

10.00
10.00
8 .8 4
~

1 .8 5 0
1.8 3 0
.80 0
1 .8 0 0
1 .8 3 0
.80 0
1.0 0 0

1 6.00
1 6.00
1 0.70
-

‘ .650
1. 150
61 . 0 0 0
1. 150
‘ .7 0 0
1 .0 0 0

-

11

7 .1 4

!
-

13.00
13.00
410.QQ
*4 .6 5
-

_

!

I

.060 !
.060
.060 l
.06 0 i
.060 1
.060 1

1
!

.200 i
.03 0
.26 0
!
.030
.30 0
. 170

~

1.5 0
1.50
2 .3 3
-

HELPERS AND LABORERS

BRICKLA YER S1 TENDERS............
B U I L D IN G LABORERS....................
ELEVATOR CONSTRUCTORS'
HELPERS...............................................
MARBLE SETTERS' HE LPE RS ..
PLASTERERS' LABORERS
(HOD C A R R I E R S ) ............................
TERRAZZO WORKERS'
HELPERS...............................................
T I L E LAYERS' HELPERS............
C E R T I F I E D .....................................

S e e f o o tn o te s at end o f ta b le .




72

_

_

_

_

.150
.150

-

.214
-

-

-

.150

-

-

.300
.300
.300

-

-

5 .0 0
-

Table 20, Wage rates, hours, and employer contributions to funds: Selected cities—Continued
(TJaion h o u r l y w a g e r a t e s an d s t r a i g h t - t i m e w e e k l y h o u r s and e m p l o y e r i n s u r a n c e ,
b u i l d i n g t r a d e s , J u l y 1, 1 9 7 5 an d J u l y l , 1 97 6)

p ension,

JULY 1,
1975

JUL Y
1

C IT Y AND JOB
C L A S S I F I C A T IO N

PER
HOUR 1

PER
H OU R 1

an d o t h e r c o n t r i b u t i o n s to fu n d s in th e

1,, 1976
EMPLOYER CONTRIBUTIONS
TO FUNDS3

PER
WEEK 2

f"
INSURANCE 4

PENSION

DOLLARS i PERCENT

LO NG

vacation ,

B E A C H * C A L IF D
-C O N T IN U E D

r
i

■

■

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER 5

PERCENT

DOLLARS I PERCENT
j

■
I

I

I

OTHER HEAVY CONSTRUCTION

i

!

|

JOURNEYMEN

!

CARPENTERS.......................................
CEMENT F I N I S H E R S ................. . .
ENGINEERS— POWER E Q U IP MENT OPERATORS:
SHOVELS, BACKHOES,
DRAG LINES, CLAMSHELLS
OVER 3 / 4 YARD................ .
TRACTORS-UP TO 100 HP.
A-FRAMES OR WINCH
TRUCKS.......................................
MOTOR PATROL BLADES—
SINGLE E NG INE ....................
MOTOR PATROL BLADES —
M U L T I - E N G I N E ......................
COMPRESSORS............................
CONCRETE M I X E R S - S L I P . .
TRACTORS-OVER 100 H P . .
CONCRETE MIX ER S-P AV ING
S HI P L E A D E R S -3 / 4 TO
1 1 / 2 YARDS.........................
S KI P LOA DE RS -1 1 / 2 TO
6 1 / 2 YARDS____ . . . . . .
TRACTOR LOADERS.................
TRENCHING MACHINES_____
CANAL T I N N E R S .......................
STRUCTURAL IRON WORKERS..

$ 8 .8 3 0
8 .4 6 0

$ 9 ,5 4 0
9 .4 1 0

4 0.00
40.0 0

_
-

1 .3 0 0
1 .1 0 0

'
i

9 .8 2 0

9 .6 2 0

1 0 . 410

9 .7 8 0
8 . 5 20
8 .7 9 C
9 .5 0 0
9 .5 0 0

10.580
9. 250
9 . 530
1 0.290
10.290

1 0.2 90
1 0.410
9 .9 6 0
10.710
11.030

.950

-

2 .0 0 0

-

4 0.00

.95 0

-

;

2 .0 0 0

-

!
!
|

4 0.0 0
4 0 .0 0
4 0.00
40.0 0
4 0.0 0

.950
.9 5 0
.95 0 i
.95 0
.95 0 !

j
i
!
|

2 .0 0 0
2 .0 0 0
2 .0 0 0
2 .0 0 0
2 .0 0 0

o
o

1 0.180

9 . 50 0
9 .6 2 0
9 . 190
9 .9 0 0
10. 2 3 0

-

0 .9 5 0
.95 0

.950 1
|
.95 0
.950 :
.950
.95 0
1.0 9 0

4 0.0 0
4 0 .0 0
4 0 .0 0
40.0 0
40.0 0

-

!
-

LO S

o

7 .6 5 0

.85 0

o
o

j

-

C A L IF .

- 100 !
.100 !
i
. 100 I

!
!
. 500 I
!I
. 500
I
.500
. 500
. 500 !
.50 0
.500 ;

|

I

_

. 100 |

:

I
i
!
!

2 .0 0 0
2 .0 0 0
2 .0 0 0
2 .0 0 0
1 .8 3 0

|
!
~
-

j

. 50 0
. 500
. 500
. 500 i
1.150

-

;

-

-

.100
. 100
. 100
. 100
. 100
. 100

-

. 100
. 100
. 100
. 100
.03 0

~

!
1

1 .8 0 0 !
1

|

. 500

!

I
. 150 i
!

-

s

I

i
!

JOURNEYMEN

!
10.580
10.850
9. 52 9
8 .8 3 0
9 . 0 30
9. 3 30

;
:
j
;

8. 960
8 .9 6 0
8. 960
8 .4 6 C
8 .5 8 C

i

10.740
11.075

j

11.350
12.000
9 .5 2 9
9.5 4 0
9.7 4 0
10.040

40.0 0
! 40.00
!1 4 0 . 0 0
4 0.00
4 0 .0 0
40.0 0

.87 0
.75 0
1 .0 3 0
1 .0 3 0
1.0 3 0

9.6 7 0
9 .6 7 0
9 . 670
9 . 510
9 .6 3 0

4 0.0 0
4 0.00
i 4 0.0 0
40.0 0
4 0.0 0

t
'

11.090
12.000

4 0.0 0
4 0 .0 0

j
j

j
|

1 .0 3 0
1 .0 3 0
1 .030
1 .1 0 0 ;
1 .100
1.0 5 0
.495

7.9 8 $
-

!
1
I

.9 5 0 !
1 .0 0 0
_

:
;
:
1
!

1 .0 8 0
1 .0 8 0
1 .0 8 01

j
j

1.0 0 0
. 5 00
. 800
. 800 !
.800
I

1 0. 9 7 %
-

-

1 .0 8 0
1 .0 8 0
1 .0 8 0
1 .7 5 0
1.7 5 0
1 .8 2 0
. 3 20

i

.80 0
.800
.800
1.0 0 0
1.000

i

I
,
!
!
i

~

i

j

j

|

“
I
5 .0 0 !

6. 700
!I

—

6 5 . 0 0 3d
~
I
|

_
.06 0
.060
.06 0

I
j
!
i!

7 .1 4 ?

.060 i
.060
.06 0
|
.020 l
.02 0

-

I
i

ii

1
!

I

J

j

j
2 .0 0 0

-

.500

4 0.00

.9 5 0

-

2 .0 0 0

-

.50 0

9 .8 2 0

40.0 0

.95 0

-

2 .0 0 0

-

10.410
10.580

40.0 0
4 0 .0 0

.950
.95 0

-

2 .0 0 0
2 .0 0 0

-

o
o

i

-

.9 5 0

-

2 .0 0 0

-

. 50 0 :
I
I
. 500 !
. 500 !
i
. 5 00

o
o

!
!

.950

.95 0

-

2 .0 0 0

-

. 500

.950
.950
.9 5 0
.55 0

-

2 .0 0 0
2 .0 0 0
2 .0 0 0
.950

-

.50 0
.50 0
.50 0
~

9 .5 0 0

1 0.290

4 0.0 0

9 .4 0 0

1 0 . 180

9 .0 6 0

9 .6 2 0

I
:
!

J

8 .5 2 0

9 .2 5 0

8 .79C

9 .5 3 0

9 . 4 00
9 .1 9 0
9 .9 0 0
8 .2 3 0

10.180
9 .9 6 0
1 0.710
9 . 522

o

9 .7 8 0

X?
o

I
1

I

!

4 0.0 0
4 0.00
40.0 0
4 0 .0 0

S e e f o o t n o t e s a t e n d of t a b l e .




!

. 500
.50 0

i
7 . 200

CONSTRUCTION

ASBESTOS WORKERS......................
BOILERMAKERS.................................
B R I C K L A Y ER S ....................................
CARPENTERS.......................................
HARDWOOD FLOOR WORKERS
MIL LW RI GH TS ............................
P IL E D R I V E R S , WHARF AND
BRIDGE..........................................
S HI NGL ER S .................................
CARPENTERS, DOCK.........................
CEMENT F I N I S H E R S .......................
COMPOSITION AND MASTIC
E LEC TR ICI AN S ( I N S I D E
W I R E R S )..........................................
ELEVATOR C O N S TR U C TO R S. .. .
ENGINEERS— POWER E Q U IP ­
MENT OPERATORS:
HEAVY EQUIPMENT:
UNIVERSAL EQUIPMENT
(SHOVELS, DRAGLINES,
CLAMSHELL OPERATORS
OVER 3 / 4 Y AR D) ,
TRACTORS (OVER 1 00
H P ) , CONCRETE MIXER
OPERATORS (PAVING) ,
S K I P LOADERS (CRAWL­
ER 1 - 1 / 2 TO 6 - 1 / 2
YAR DS ) ....................................
TRACTORS (UP TO
100 HORSE POWER), . .
MEDIUM EQUIPMENT:
A-FRAME OR WINCH
TRUCK OPERATORS............
MOTOR PATROL BLADE
OPERATORS:
S I N G L E - N O . 7 ...............
M U LTI-ENG INE-NO .8
LIG HT EQUIPMENT:
A IR COMPRESSORS...............
CONCRETE MIXERS
(S K IP T Y P E ) .............. ..
S K I P LOADERS ( 3 / 4
TO 1 - 1 / 2 Y D S . ) ...............
TRENCHING M A C H I N E S . . .
CANAL TI N E R OPERATORS
G L A Z I E R S ............................................

_

i
I

i

L A B O R E R S ....

AN G ELES*

BU IL D IN G

!
I
!

0. 020 i
!
!
i

. 500 !

2 .0 0 0

HELPERS AND LABORERS
CONSTRUCTION

j
i

_
!

!
i

j
i

o

9 .4 0 0

0. 800
1.0 0 0

-

&

9 .0 6 0

I
|

-

1 .8 0 0
1 .7 5 0

2 .0 0 0
2 .0 0 0

40.0 0
4 0.0 0
o
o

$ 10 ,29 0
1 0.180

o

9 .5 0 0
9 .4 0 0

I
|
|

73

J
I
-

. 100

-

. 100

-

. 100

. 100
. 100 !

-

j

I
!

. 100

-

-

|
|

. 100

-

1

|

.100
.100
. 100
.100

-

-

13.00

-

-

Table 20. W age rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , J u iy 1, 1975 and J uly 1, 1976)
JULY 1 ,

JULY 1,
197 5

1 97 6

EMPLOYER CONTRIBUTIONS
TO FUNDS 3
RATE
PER
HOUR 1

C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR 1

HOURS
PER
WEEK2

INSURANCE4

DOLLARS

VACATION

PENSION

PERCENT

DOLLARS

PERCENT

DOLLARS

OTHER5

PERCENT

PERCENT

DOLLARS

LOS ANGELES, C A L IF o
-CONT INUE D

1

B U IL D IN G CONSTRUCTION
-CONTINUED
JOURNEYMEN
-CONTINUED
LATHERS...............................................
$ 10 ,50 0
MAC HI NI S TS .......................................
10.200
MARBLE S E T T E R S . . .......................
9 .5 2 9
MOSAIC AND TERRAZZO WKRS.
10.520
P A I N T E R S : ..........................................
9 .6 7 0
SWING STAGE............................
9 .9 2 0
SWING STAGE OVER 13
S TO RI ES ....................................
10.040
SPRAY...............................................
9 .9 2 0
SWING S T A G E . . . . . . ...............
10.170
SWING STAGE OVER 13
S TO RI ES ....................................
10.290
STRUCTURAL STEEL AND
BRIDGE..........................................
9 .7 9 0
STRUCTURAL STEEL SWING
10.070
STRUCTURAL STEEL OVER
13 S T O R IE S ............................
10.190
DRYWALL TAPERS............................
9 .8 0 0
PAPERHANGERS.................................
9 .9 2 0
P I P E F I T T E R S ....................................
10.950
REFRIGERATION F I T T E R S .
10.750
SPRINKLER F I T T E R S ............
11.570
PLASTERERS.......................................
9 .4 4 5
PLUMBERS............................................
10.950
REINFORCING IRON WORKERS.
10.230
ROOFERS...............................................
8 .7 4 C
SHEET-METAL WORKERS...............
10.377
STONEMASONS.....................................
9 .5 2 9
STRUCTURAL-IRON WORKERS..
10.230
T I L E LAYERS .................................... j
9 .2 9 0
HELPERS

AND LABORERS

0 .6 5 0
.472
.30 0
.45 5
.45 5

1 1.090
1 0.9 70
1 1.220

35.0 0
35.0 0
35.0 0

.455
.4 5 5
.455

-

.60 0
.60 0
.60 0

1 1 .3 4 0

3 5 .0 0

.455

-

1 0.840
1 1.120

35.0 0
35.0 0

.45 5
.45 5

11.240
11.420
1 0.9 70
11.660
11.450
12.460
1 0.595
11.660
1 1.030
9 .7 4 0
10.674
9 . 529
1 1 . 03 0
10.400

3 5.00
35.0 0
3 5 .0 0
36.0 0
3 6.00
3 2.0 0
4 0.0 0
3 6.0 0
4 0.0 0
4 0 .0 0
4 0.0 0
4 0.0 0
4 0 .0 0
40.0 0

.455
.45 5
.45 5
1 .2 3 0
.56 0
.830
1 .0 3 0
.820
1 .0 4 0
1 .0 3 0
.800

7 .8 0 5
7 .2 0 0

8 .2 5 5
7 .6 5 0

40.0 0
4 0 .0 0

7 .7 5 0
6 .2 2 0
9 .0 2 5

8 .4 0 0
6 . 780
10.025

8 .0 8 0
8 . 35C
7 .4 6 5
7 .7 4 5

$ 8 . 71 C
8 .5 5 0
8 .9 3 0

10.00
-

_
10.9 7%!
-

0 .8 0 0
.500
.800
.60 0
.60 0

0 .5 0 0
6 .70 0
.500
.50 0

0 .1 5 0

6 5 .0 0 %
_

_

_
_
7.141

.300
. 110 j
.110

_
_
_
_

. 500
.5 0 0
. 500

_
_

.110
.11 0
. 110

.60 0

-

.50 0

_

.110

_

.60 0
.60 0

-

.500
.5 0 0

_

.110
.11 0

_
_

16.00
• -

.5 0 0
.500
. 500
_

_
_
_

.110
.11 0
.110

_
_
_

-

.850
.85 0

.
-

1 .8 0 0
1 .8 0 0

-

.500
.500

4 0.0 0
4 0 .0 0
4 0.0 0

.49 5
1.1 1 0
.850

-

.32 0
1 .2 0 0
1 .9 5 0

-

.5 0 0
.8 0 0

8 .8 8 0
9 . 150
8 .4 6 0
8 .7 4 0

4 0.0 0
4 0 .0 0
4 0 .0 0
4 0.0 0

.350
.35 0
1 .170
1.1 7 0

-

.80 0
.80 0
1 .2 0 0
1 .2 0 0

-

$9,2 10
9.0 5 0
9 .3 3 0

4 0 .0 0
4 0 .0 0
4 0 .0 0

0 .4 5 0
.60 0
.4 0 0

_

0 .6 5 0
1 .0 0 0
.40 0

_

-

8 .9 3 0
9 .2 5 0
9 .2 0 0

9 .3 3 0
9 .6 5 0
9 . 400

40.0 0
4 0.0 0
4 0 .0 0

.40 0
.300
.300

-

9 .4 5 0
8 .7 8 0
9 . 0 30

9 .6 5 0
9 .2 8 0
9 .5 3 0

40.0 0
4 0.0 0
4 0 .0 0

.300
.600
.600

t 9.8 8 0
9 .6 0 5

10.880
11.000

4 0.0 0
40.00

.29 0
.545

I

10.00
7 .9 8
-

_
_

-

.60 0
.60 0
.6 0 0
1 .6 0 0
.80 0
1 .8 5 0
1 .8 3 0
.80 0
2 . 100
1 .8 3 0
1 .0 0 0

i

B U IL D IN G

40.0 0
40.0 0
4 0.00
4 0.0 0
35.0 0
3 5.0 0

1 6.00
10.97
-

1 .420
61.4 00
6 .7 0 0
_
1.1 5 0
6 1.0 0 0
1.1 5 0
6 1 .0 0 0

13.00
_
_

1.5 0
.050
.200

13.00
_
61 0 . 0 0
*5 . 0 0
_

_
_
1.50

.030
.085
. 110

_
_
7 . 14

-

.030
. 170

-

_

.050
. 150

_

5 .0 0

.02 0

_

.020

1.000
1.000
.250
.25 0

_
_

.30 0
.30 0
.55 0
.55 0

_
_

6 1 .0 0 0
6 .50 0

_
-

0 .0 2 0
1 .000
.050

_

-

.400
.300
.6 0 0

-

6 .50 0
6 1 .0 0 0

-

.050
.02 0
-

-

-

.60 0
.30 0
. 300

-

61.000
-

-

-

.40 0
.35 0

]i

I

BRIC KLA YER S' TENDERS............ j
B U I L D IN G LABORERS....................
ELEVATOR CONSTRUCTORS'
HELPERS..........................................
MARBLE SETTERS' HE LP E RS ..
PLASTERERS' LABORERS............
TERRAZZO WORKERS'
HELPERS (AND FLOOR
MACHINE O P E R A T O R S ) . . . .
BASE MACHINE OPERATORS
T I L E LAYERS' HELPERS............
C E R T I F I E D HELPERS............

LO U IS V ILL E *

_
7. 98*
-

$ 10 ,90 0
1 1.400
9 .5 2 9
1 0.720
1 0.720
10.970

_
_
_

K le

CONSTRUCTION

JOURNEYMEN

ASBESTOS WORKERS.......................
BOILERMAKERS.................................
BR ICKLAYER S ....................................
CLEANERS, POINTERS,AND
CAULKERS.....................................
CARPENTERS.......................................
MI LLW RI GH TS ............................
30 FT OR MORE ABOVE
GROUND....................................
CEMENT F I N I S H E R S .......................
ON SCAFFOLD............................
EL E CT R IC IA NS ( I N S I D E
HIRERS) . . * .................... ................
ELEVATOR C O N S T R U C T O R S . . . .

S e e f o o tn o te s at end of ta b le .




74

1.0 0 %

6 .5 0 0

12 6 . 0 0

.02 0

-

2 .3 0

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
( U n i o n h o u r l y w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u i l d i n g t r a d e s , J u l y 1, 1 9 7 5 a n d J u l y 1, 1 9 7 6 )

JULY 1,

JULY

1,

1976

1975
EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
CLASSIFICAT IO N

RATE
PER
HOUR1

RATE
PER
HOUR

HOURS
PER
WEEK

PENSION

IN S U R A N C E 4

DOLLARS

PERCENT

VACATION

PERCENT

DOLLARS

DOLLARS"

OTHER5

DOLLARS

PERCENT

_ PERCENT

LOUISVILLE, KY.
-CONTINUED
BUILDING CONSTRUCTION
-C ONTINUED
JOURNEYMEN
-C ONTINUED

7 .0 6 0

7 .5 1 0

o

$ 9 .8 0 0

0. 3 5 0

-

o
o

$ 9 .2 0 0

o
©

j

o
•3-

ENGINEERS— POWER E Q U I P MENT OPERATORS:
HEAVY EQUIPMENT— S I X ERS (21 CU. FT . OR
OVE R) , CRANES, DE RR I C K S , DRAG LINES,
SHOVELS, BULLDOZERS,
HOISTS (2 DRUMS OR
MORE)..........................................
MEDIUM EQUIPMENT— M I X ERS (UNDER 21 CU.
F T . ) , COMPRESSORS ( 0 VER 6 00 CU. F T . ) ,
TRACTORS (50 HP. AND
OVER) .........................................
L IG H T EQUIPMENT— O I L ERS, PUMPS, EARTH
ROLLERS, TRACTORS
(UNDER 50 H P . ) , COMPRESSORS (UNDER 6 0 0
CU. F T . ) .................................
G L A Z I E R S ............................................
LATHERS .................
MA CH IN IS TS .................................... ..
MARBLE SETTERS............................
MOSAIC AND TERRAZZO
WORKERS.................... .. .......
P AI NTE RS , BRUSH.........................
SPRAY P A I N T WORK.. . . . .
STRUCTURAL STEEL...............
STAGE (OVER 5 STORIES)
BRIDGES OVER NAVIGABLE
WATER................................. ..
P I P E F I T T E R S .....................................
PLASTERERS.......................................
P L U M B E R S . . . . . ...................
R E S I D E N T I A L ........... ...............
REINFORCING IRON WORKERS.
ROOFERS, COM POSITIO N ............
ROOFERS, SLATE AND T I L E . .
SHEET-METAL WORKERS..............
STONEMASONS....... ..........
STRUCTURAL-IRON WORKERS..
T I L E LAYERS .............

.35 0

-

I
I
I

0 ,3 5 0

-

.35 0

-

-

-

I
!
|

-

-

0. 020

J
j

-

.020

|

6 .4 8 0
t 8. 500
9 . 190
10.000
8 .3 0 0

6 .8 9 0
8 .9 0 0
9 .9 9 0
11.200
8 .7 0 0

8 .3 0 0
7 .8 2 0
1 8.270
8 . 170
8 . 170

8 .7 0 0
8 . 2 20
8 .6 7 0
8 . 5 70
8 .5 7 0

9 .8 2 0
9 . 990
t 9 .1 0 0
9 .7 7 0
6 .3 5 0
9 .9 5 0
7. 000
7 .4 0 0
9 . 5 00
8 .9 3 0
9 .9 5 0
8 . 3 0C

1 0.220
10.440
9 .6 0 0
10.270
6 .6 8 0
10.000
7 .4 0 0
7 .8 0 0
9 . 5 00
9 .3 3 0
1 0.0 00 !
8 .7 0 0

j

40.0 0
4 0 .0 0
4 0.0 0
4 0 .0 0
4 0 .0 0

.350 I
.35 0 I
|

_

i
I
l
!

|

-

i
[
-

.3 5 0
.45 0
. 2 00

-

!
i
.40 0 |
.40 0

.40 0

4 0.0 0
40.0 0
40.0 0
4 0 .0 0
4 0 .0 0

.300{
.30 0
.30 0 i
.30 0

.40 0
.30 0
.30 0
.3 0 0
.300

4 0.00
4 0 .0 0
4 0.00
4 0.0 0 .
4 0 .0 0 I
4 0.0 0 |
4 0 .0 0
4 0.0 0
40.0 0
4 0.0 0
4 0.0 0;
40.0 0 |

.30 0
.50 0
-3 6 0
.3 6 0
.750
.50 0
.50 0
.6 0 0
.40 0
.750
.40 0

~
-

I

i
I
!
-

~

.3 0 0
.60 0
.750
.75 0
.95 0
.20 0
.2 0 0
.6 0 0
.40 0
.950
.40 0

-

j

-

| 60. 300

-

6. 500
6. 500

-

.020

-

.06 0
.34 4
.05 0

-

.05 0

5 .0 0 %

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

6. 60 0
6 .750
6 .75 0
6 .500
6 .60 0
6 .50 0
6 .500
6 .50 0

-

-

j|

-

-

. 140
21. 8 5 0
22. 0 1 0

22. 0 7 0
-

-

-

-

.44 0
.050

-

-

-

.050

'
i

I

!

"

'

I

HELPERS AND LABORERS

I
_

_

_

-

-

-

.75 0
-

.020
.02 0
.020

[

.02 0
.050
.070

!
|
|

•
.050
.05 0

1

4 0 .0 0
4 0.0 0
4 0 .0 0

.35 0
.35 0
.35 0

6 .7 2 0
7 .8 5 0
5 .5 3 0
4 .8 0 0

7 .700
8 .3 0 0
5 .7 8 0
4 .8 0 0

40.00
40.0 0
4 0 .0 0
4 0 .0 0

.54 5
.3 6 0
.50 0

7 .8 5 0
7 .8 5 0

8 .3 0 0
8 . 3 00

4 0.0 0
4 0 .0 0

-

-

-

-

-

-

7 .8 5 0
7 .8 5 0

8 .3 0 0
8 .3 0 0

4 0.0 0
4 0.00

-

-

-

-

-

-

.050
.05 0

-

7 .3 0 0
7 .5 5 0

8 .0 1 0
8 .2 6 0

40.0 0
4 0.00

_

-

-

.02 0
.020

-

--

-

.350
.75 0
.200

-

-

03

7 .2 5 0
6 . 9 00
7 . 100

- .
-

.330
.35 0
.350

-

t 7 .1 0 0
6 .7 5 0
6 .9 5 0

o
o

BRIC KLA YER S' T E N D E R S . . . . .
B U IL D IN G LABORERS....................
P IP E LAYERS' H E L PE RS ..
ELEVATOR CONSTRUCTORS'
HELPERS............................................
MARBLE SETTERS' HE L PE R S ..
PLUMBERS' LABORERS.................
ROOFERS' HELPERS ......................
TERRAZZO WORKERS'
HELPERS..........................................
BASE GRINDERS......................
FLOOR HA CH IN E S -F L AT
G R I N D E R S . ..............................
T I L E S ET TER S' H E L P E R S . . . .

-

2.3 0 %
-

-

HIGHWAY AND STREET
CONSTRUCTION

JOURNEYMEN

C AR PE NT E R S. ....................................
P I L E D R I V E R S .................................

.30 0
. 3 00

S e e fo o tn o te s at end of ta b le .




75

_

.3 0 0
.3 0 0

Table 20. W age rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s t r a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , July 1, 1975 and J u ly 1, 1976)

JULY 1
1975

JU LY

1,

1976

EMPLOYEE CONTRIBUTIONS
TO FUNDS3
CITY AND JOB
CLASSIFICATION

RATE
PER
HOUR1

RATE
PER
HOUR1

HOURS
PER
WEEK2

INSURANCE4
DOLLARS

PERCENT

PENSION
DOLLARS

VACATION

PERCENT

DOLLARS

PERCENT

OTHER5

DOLLARS

PERCENT

I

LOUISVILLE* KIo
-CONTINUED
HIGHWAY AND STREET
CONSTRUCTION
-CONTINUED
HELPERS AND LABORERS
CONSTRUCTION LABORERS;
GROUP I — GENERAL LA­
BORERS, CONCRETE AND
ASPHALT LABORERS,
CARPENTERS' TENDERS

•DRILL HELPERS.........
GROUP I I — JACK HAMMERS
CONCRETE SAWS, SAND
BLASTERS, WELD­
ERS..........................................
GROUP I I I — POWDERHEN,
BLASTERS, TUNNEL LA­
BORERS (FREE A I R ) . . . .
GROUP IV — MINERS,
DRILLERS (FREE A I R ) ,
TUNNEL BLASTERS.............

I
t $ 6 . 290

$ 6 ,7 9 0

1* 0 . 0 0

0 .3 5 0

0 .3 5 0

0.020

t 6 .5 4 0

7.01*0

4 0 .0 0

.3 5 0

.3 5 0

.020

t 6 .5 9 0

7 .0 9 0

4 0 .0 0

.3 5 0

.3 5 0

.0 20

1 7 .1 9 0

7 .6 9 0

4 0 .0 0

.3 5 0

.3 5 0

.0 2 0

7 .3 0 0
7 . 550
7 .5 5 0

8.0 1 0
8 .5 1 0
8.200

4 0 .0 0
4 0 .0 0
4 0 .0 0

300
300
300

300
300
300

OTHER HEAVY CONSTRUCTION
JOURNEYMEN
CARPENTERS...................................
MILLWRIGHTS.........................
PILED RIVERS.........................
ENGINEERS— POWER EQUIP­
MENT OPERATORS;
HEAVY EQUIPMENT— MIX­
ERS (21 CU. FT. OR
OVER), CRANES, DER­
RICKS, DRAGLINES,
SHOVELS, BULLDOZERS,
HOISTS (2 DRUMS OR
MORE).....................................
MEDIUM EQUIPMENT— MIX­
ERS (UNDER 21 CU.
F T . ) , COMPRESSORS
(OVER 600 CU. F T .),
TRACTORS (50 HP. AND
OVER).....................................
LIGHT EQUIPMENT— O IL ­
ERS, PUMPS, EARTH
ROLLERS, TRACTORS
(UNDER 50 H P .) , COM­
PRESSORS (UNDER 600
CU. F T . ) ..............................

I

|

i
9 ,0 5 0

9 .6 5 0

4 0 .0 0

350

350

7 .0 6 0

7 .5 1 0

4 0 .0 0

350

350 |

6 .4 8 0

6 .8 9 0

4 0 .0 0

350

350

t6 .2 9 0

6 .7 9 0

4 0 .0 0

350

350

t 6 .5 4 0

7 .0 4 0

4 0 .0 0

350

350

.020

t 6 .5 9 0

7 .0 9 0

4 0 .0 0

350

350

.0 2 0

t 7 . 190

7 .6 9 0

4 0 .0 0

350

350

.0 2 0

4 0 .0 0
4 0 .0 0

.4 5 0
.6 0 0

.5 0 0
1.000

HELPERS AND LABORERS
CONSTRUCTION LABORERS:
GROUP I — GENERAL LA­
BORERS, CONCRETE AND
ASPHALT LABORERS,
CARPENTERS' TENDERS
DR ILL HELPERS....................
GROUP I I — JACK HAMCONCRETE SAWS, SAND
BLASTERS, WELDERS
ERS........................................
GROUP I I I — POWDERHEN,
BLASTERS, TUNNEL LA­
BORERS (FREE AIR) . . . .
GROUP I V — MINERS,
DRILLERS (FREE A I R ) ,
TUNNEL BLASTERS.............

MEMPHIS* TERN.

BUILDING CONSTRUCTION

JOURNEYMEN
ASBESTOS WORKERS
BOILERMAKERS.____

8 .5 4 0
8 .2 0 0

9 .3 0 0
8 .8 0 0

S e e fo o tn o te s at end o f ta b le .




76

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
( U n i o n h o u r l y w a g e r a t e s and s t r a i g h t - t i m e w e e k l y h o u r s and e m p l o y e r i n s u r a n c e ,
b u i l d i n g t r a d e s , J u l y 1, 1 9 7 5 and J u l y 1, 1 97 6)

p ension,

v a cation ,

JULY

JULY 1,
.13.7 5

1,

and o t h e r c o n t r i b u t i o n s to fu n d s in th e

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

HOURS
PER
WEEK 2

RATE
PER
HOUR1

PENSION

INSURANCE4

DOLLARS

PERCENT

DOLLARS

VACATION

PERCENT

OTHER 5

PERCENT

DOLLARS

DOLLARS

PERCENT

MEMPHIS* TEH No
-C ONTINUED

B UI LD IN G CONSTRUCTION
-CONTINUED
JOURNEYMEN
-CONTINUED
$ 9 .6 0 0
9 .3 5 0
8 .8 0 0
8 .8 0 0
8 .8 0 0
8 .6 0 0
8 .8 5 0

$ 9,6 00
9 . 350
9 . 000
9 .0 0 0
9 .0 0 0
8 .6 0 0
8 .8 5 0

4 0 .0 0
4 0.00
4 0.0 0
40.0 0
4 0.00
4 0 .0 0
4 0.00

0.4 3 0
.43 0
.300
.300
.30 0
.350
.35 0

-

0. 2 00
.20 0
.30 0
. 300
.300
.4 5 0
. 4 50

8 .6 8 C
8 .4 6 0

9 . 530
9 .4 3 0

4 0.00
4 0.00

.750
.49 5

_
-

.4 0 0
. 320

8 .6 5 0

8. 650

40.0 0

.300

. 350

40.0 0

.300

.3 5 0

.30 0

.35 0

_
_
_
-

0. 250
.25 0
_
_
_

1 .0 0 X
-

-

_
_
_
_
_
_

-

1* 6 .0 0 *

0. 100
. 100
_
_
_
_

_
_
_
_
_

.02 0

2.3 0

i
I
i

|
j
8 .2 2 0

7 .5 2 0

7 .5 2 0

7 . 120
8 .5 0 0
8 . 3 00
7 .2 5 0

7 . 120
9 .0 0 0
9 . 300
7 .7 5 0

4 0 .0 0
4 0.00
4 0.0 0
40.0 0

.300
.550
.45 0
.45 0

-

7 .2 5 0
8. 100

7 .7 5 0
8 .6 0 0

4 0.00
40.0 0

.45 0
.30 0

-

o
o

8 . 2 20

o

BRICKLAYERS....................................
POINTERS AND CAULKERS.
CARPENTERS.......................................
FLOOR LAYE RS ............................
P I L E DR IV ER S ...................
CEMENT F I N I S H E R S ......................
MACHINE OPERATORS............
E LE CTR ICI AN S (I N S I D E
W IR E RS )..........................................
ELEVATOR C O N S TR U C TO R S. .. .
ENGINEERS— POWER E QU IP­
MENT OPERATORS;
CLASS A:
CRANES, DERRICKS,
DRAGLINES, TRENCHING
MACHINES (1 8 INCHES
AND OVER) P I L E D R I V ERS, HOISTS (3 DRUM)
SHOVELS, BULLDOZERS.
CLASS B:
TRENCHING MACHINES
(18 INCHES AND
S MA LL E R) , ELEVATING
OR BLADE GRADERS,
HOISTS (1 OR 2 DRUM)
MIXER S ....................................
CLASS C:
A IR COMPRESSOR (STA­
TIONARY) , PUMPS (LAR­
GER THAN 4 I N . ) ,
TRACTORS (4 0 HORSE­
POWER OR L E S S ) ...............
CLASS D:
A IR COMPRESSOR
OPERATORS.........................
G L A Z I E R S ............................................
LATHERS...............................................
MARBLE S E T T E R S . . ...................... I
MOSAIC AND TERRAZZO
WORKERS..........................................
P A I N T E R S : ... ......................................
COMMER CI AL:
BRUSH................. ..........................
SPRAY.................................... ..
S T E E L ............................................
ROLLER A PPL IC ATO R ............
I N D U S T R I A L ...............................
PAPERHANGERS.................................
P I P E F I T T E R S . .................................
PLASTERERS............................... ..
|
PLUMBERS................................... ..
REINFORCING IRON WORKERS.
ROOFERS, COMPO SITIO N ............
ROOFERS, SLATE AND T I L E . .
SHEET-METAL WORKERS...............
STONEMASONS....................................
STRUCTURAL-IRON WORKERS..
SHEETERS....................................
T I L E L A Y E R S . . ..............................

1

8 . 100
8 . 100
8 . 100
8 . 1 00
T 8 .3 5 0
8 . 1C0
t l O . 3 20
9 .0 0 0
T 9 .8 7 0
9 . 1 50
7. 900
8 . 1 50
9 .3 2 0
9 .6 0 0
9 . 150
9 .4 0 0
7 .2 5 0

8 . 600
8 .8 5 0
8 . 85 0
8 .6 0 0
8 .8 5 0
8 .6 0 0
10.070
9 . 400
9 . 870
9 . 150
8 . 7 00
8 . 950
9 .6 1 0
9 .6 0 0
9 . 150
9 .4 0 0
7 . 75 0

4 0 .0 0
4 0.00
4 0 .0 0
40.0 0
4 0.0 0
40.0 0
40.0 0
4 0.00
40.0 0
4 0 .0 0
4 0 .0 0
4 0.0 0
4 0.0 0
4 0.00
4 0.0 0
4 0.00
4 0.0 0

.30 0
.30 0
.300
.30 0
.30 0
.30 0
.55 0
.400
.35 0
.55 0
.43 0
.35 0
.35 0
.45 0

_
_
-

-

-

. 35 0
.20 0
.200

-

-

.20 0
. 300

_
-

_

.

_

. 30 0
.30 0
.300
. 30 0
.30 0
.3 0 0
. 30 0
.30 0
.60 0
.2 5 0
. 2 50
.250
.20 0
.6 0 0
.6 0 0
.2 0 0

_
-

-

-

_
-

6. 500
6. 550
6. 250
-

-

.03 0
-

_
-

.03 0

-

_
-

-

~

'

-

-

-

_
_

_
_

-

-

'

_
_

_

.030
.030
.030
.03 0
.03 0
.03 0
23 - 55 0 !
.280
.05 0
.030
.030
.410
.010
-

_

_
_
_
_
_
_
_
_
_
_
-

HELPERS AND LABORERS

6 . 5 00
6 .6 0 0
5 .5 5 0

6 .7 0 0
6 . 8 00
5 .7 5 0

5 .5 5 0

5 .7 5 0

5 .9 0 0
6 .5 0 0
5 .5 5 0

6 .6 0 0
6 .7 0 0
5 .7 5 0

4 0 .0 0
4 0.0 0
4 0 .0 0
o
o
o

BRICKLAYERS' TENDERS............
MORTAR MIXER OPERATORS
B UI LD IN G LABORERS....................
COMPOSITION ROOfERS'
HELPERS...........................................
ELEVATOR CONSTRUCTORS'
HELPERS......................... ..................
PLASTERERS' T E N D E R S . . . . . .
PLUMBERS' LABORERS.................

4 0 .0 0
40.0 0
40.0 0

.200
.20 0
.20 0

-

.200

_

.495
.200
.20 0

See fo o tn o tes at end of tab le.




77

_
-

. 2 00
.20 0
. 2 00
. 200
.3 2 0
.2 0 0
.20 0

_
12 6 . 0 0
-

.050
.05 0
.07 0
.070
.02 0
.050
.070

-

_
2 .3 0
-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion hou rly w age c a te s and s t r a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p w n sio n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in th e
b u ild in g t r a d e s , July 1, 1975 and J u ly 1, 1976)
JU LY

JULY 1 ,
_ 1 2 X 5 ____

1,

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
RATE
PER
HOUR1

BATE
PEB
HOUR1

C IT Y AND JOB
C L A S S I F I C A T IO N

PER
WEEK2

INSURANCE4

DOLLARS
M IAM I,

PERCENT

DOLLARS

PERCENT

DOLLARS

DOLLARS

PERCENT

PERCENT

FLA.

BU IL D IN G CONSTRUCTION

JOURNEYMEN

$ 9 .4 0 0
8 .2 0 C
7 . 450
Q. 7 0 0
8 .9 5 C
8 .7 0 0
6. 0 00
9 .4 5 0

$ 9 .7 0 0
8 . 800
9 .4 5 0
8 . 700
9 . 420
8 .7 0 0
6 . 500
9 . 4 50

4 0.00
4 0.00
40.0 0
4 0 .0 0
40.0 0
4 0.0 0
4 0 .0 0
4 0.00

0.450
.600
.60 0
.70 0
.550
.55 0
.70 0
.600

10.250
10.395

11.250
1 0.730

40.0 0
4 0.00

.49 5

-

9 . 500

8 .8 6 0

8 . 8 60

o
o

9 .5 0 0

.32 0

4 .5 0 %
-

3 .0 0 %
-

6 1.5 0 0 |
|
6 . 250
;
|
6 - 250 i
I
I
|

-

-

0.010
.02 0
.020
.010
.02 0

8 .5 0 %
12 6 . 0 0

o. 50%
2 .3 0

I

-

.50 0 |

40.0 0

!

.50 0

.450

-

. 450

-

-

|

-

i

-

-

|

-

6 .4 6 0
9 .4 0 0
9 .1 0 0
9 .4 5 0
9 .1 0 0

8. 7 5 C

9. 100

8 .2 5 0

8 .6 0 0

9 .2 5 0
9 .450
8 .5 0 0
8 .9 0 0
9 . 0 00
8. 7 5 0
9 .2 5 0
6 . 100

■p
o

o
o
7 .4 6 0

6 .4 6 0
8 .5 0 0
9. 100
9 . 4 50
8 .7 5 0

ct

7 .4 6 0

o
o

8 .0 1 0

o
o

!

|

!

;

4 0.0 0
40.0 0
40.0 0
4 0.0 0
4 0.00

I
I

.50 0

-

.450

-

.500

-

.45 0

-

.50 0
.550
.550
.600
.50 0

-

.450
.350 |
. 250
. 540
. 40 0

-

-

-

-

-

l
-

-

.40 0

-

. 750 j

-

-

.40 0

-

. 750

-

9. 600

4 0.00

-500!

.40 0

-

.750

-

9 .4 5 0
8 . 800
9 .200
9 . 300
6 . 300
9 .0 5 0
9 .7 5 0
6 .6 1 0

40.00
40.00
4 0.0 0
4 0.0 0
40.0 0
4 0.00
40.0 0
40.0 0

.60 0
.550
.55 0
. 5s 0
. 5 50
.55 0
. 8 30
.830

. 5 40
. 500
. 500
. 500
. 5 00
. 50 0
1 .0 0 0 i
1.0 0 0
I

-

6 .250
b . 500
6 .50 0

-

4 0.00
40.0 0
40.0 0
40.0 0
40.0 0
4 0.00
40.0 0

.830
.600!
.920 j
.75 0
.83 0 j

. 6 .250
6 .600
6 .600

-

5.6 2 6
9 .4 5 0
10.340
9 . 75 0
9 .2 7 0
1 0.020
9 . 920

|
i
J
i

!
!
:
!
I
il
I
!

_

'

.83 0
.75 0 !
I

5 .3 0 0

5 . 550

3 .9 5 0
9 .4 5 0
9 .4 5 0
9 .4 5 0

4 .2 0 0
9 . 450
9 . 750
9 . 45 0

.7 5 0 I

4 0 .0 0
4 0.0 0
40.0 0
4 0.0 0

.750!
.600 !
.75 0 !
.600

.61 0
. 540
1.0 5 0
. 5 80
.35 0
.35 0
. 5 00

j
!
I
l

. 5 00 I
I
I
. 500
.54 0 '
.580
. 540

~
-

-

-

-

_

_

[

-

-

.010
-

|
j
!
!

-

.01 0
.02 0
.02 0
.020
.020 I
.020 |
.07 0 j
.070
I
.07 0
.010
.080 i
.040
6 .500
fc . 5 0 0 !
25 . 130 j

-

-

.130

-

6 .2 5 0

-

-

-

.13 0
.010
.040
.010

-

-

6 . 250 '

!

_
-

-

-

-

!
6. 6 00
6 .5 0 0

6 .6 2 0
6 .5 2 0

4 0.00
40.0 0

7 .2 8 0

7 .5 1 0

40.0 0

7 .9 0 0

8 .2 5 0

3 .5 0 0
6 .7 8 0
6 .5 0 0
6 .6 2 0

4 . 092
6 .8 0 0
6 .5 2 °
245 . 6 20

40.0 0
4 0 .0 0
40.0 0
4 0 .0 0

7 .5 2 0

M 6 . 520

40.0 0

o
o
o

BRICKLAYERS* TENDERS............
B U I L D IN G LABORERS....................
ELEVATOR CONSTRUCTORS'
HELPERS............................................
MARBLE, T I L E AND TERRAZZO
WORKERS' HELPERS....................
P I P E F I T T E R S ' HELPERS
R E S I D E N T I A L . ...................... ..
PLASTERERS' T E N D E R S . . . . . .
PLUMBERS' LABORERS.................
ROOFERS* HELPERS......................
KETTLEMEN AND MORTAR
MEN.............................................

-

.50 0

o
o

I
I

-

_

-

.50 0

o

l
j
i
I
!

!

6 .5 0 0 |
;
6. 250
. 750 |

-

4 0.00

i
5 .0 0 0
9 . 45 0
9 .5 9 0
9. 450
9 .2 7 0
9 .5 2 0
9 .6 7 0

-

4 0.00
i

HELPERS AND LABORERS

.30 0
.30 0

-

-

-

-

-

.200
.20 0

.32 0

-

-

12 6 . 0 0 ,

.02 0

. 40 0

-

. 750

-

.830!
.950 !
1 .000 j
.300 l

.610
.45 0
.30 0
. 150

-

-

6 . 500

-

.07 0
.050
.200
-

-

I

.15 0

-

6. 50 0

-

-

-

1.000
1 .0 0 0

I
i

.495!
-

.500

.30 0

_____ L _

S e e fo o tn o te s at end of ta b le .




-

0 .6 5 0
1 .0 0 0
.54 0
.55 0
.700
.7 0 0
.5 5 0
. 54 0

j

o

ASBESTOS WORKERS......................
BOILERMAKERS................................
BRICKLAYERS. . ..............................
CA RPENTERS.....................................
MIL LW RI GH TS ............................
P IL E D R I V E R S ............................
R E S ID E N T IA L CARPENTERS
CEMENT F I N I S H E R S .......................
E LE CTR ICI AN S ( I N S I D E
H I R E R S ) . . ...................................
ELEVATOR C O N S TR UC TO RS .. ..
ENGINEERS— POWER E Q U IP ­
MENT OPERATORS
CRANES, DERRICKS,
HOISTS (2 DRUMS OR
MORE) .................... .....................
DRAG LINES , BACKHOES,
F O R K L I F T S , HOISTS (1
DRUM), F I N I S H GRADERS
BULLDOZERS, SCRAPERS,
MOTOR GRADERS,
TRENCHING MACHINES,
FRONT-END LOADERS,
WINCHES, A IR COMPRESSORS (ABOVE 125 CFM) .
ROLLERS, F I N I S H I N G
MACHINES, TRACTORS,
MIXERS, O IL E R -D R IV E R S
O I L E R S , CRAWLERS,
CRANES................. ..
G L A Z I E R S ................................ ..
L A T H E R S . ................................. ..
MARBLE SETTERS............................
MARBLE P O L I S H E R S . . . . . .
SURFACING MACHINE
OPERATORS..............................
FLOOR SURFACING (5 HP
AND UNDER) ............................
FLOOR SURFACING (OVER
5 H P ) ..........................................
MOSAIC AND TERRAZZO
WORKERS.............................. ...........
P A I N T E R S ............................................
S CA FFOLD....................................
SPRAY.................................... ..
R E S I D E N T I A L ............................
PAPERHANGERS................................
P I P E F I T T E R S ....................................
R E S I D E N T I A L ......................... ..
P IP E FITTE RS , RE S I­
DE NT IA L MECHANICAL
TRADESMEN.........................
PLASTERERS................. ....................
PLUMBERS............................................
REINFORCING IRON WORKERS.
ROOFERS, COM POSITION ...........
ROOFERS, SLATE AND T I L E . .
SHEET-METAL WORKERS...............
R E S ID E N T IA L SHEET
METAL WORKERS A ...............
R E S ID E N T IA L SHEET
METAL WORKERS B..............
STONEMASONS....................................
STRUCTURAL IRON WORKERS..
T I L E LAYERS....................................

78

-

I
2.30,
I

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w age r a :e s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , July 1, 1975 and J u ly 1, 1976)
JULY 1,
197 5

JULY

1,

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR1

HOURS
PER
WEEK2

INSURANCE4

DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER5

PERCENT

DOLLARS

PERCENT

M IA M I, FLA.
-C O M T II U E D
HIGHWAY AND STREET
CONSTRUCTION

JOURNEYMEN

o
o

8 .3 0 0

0. 5 50

o

7 .9 0 0

o
o

_

-

o

$ 7.900

o

-

o
o

P IL E D R I V E R S ....................................

.500

-

-

-

-

-

-

OTHER HEAVY CONSTRUCTION

JOURNEYMEN

_
-

_

0. 700

_

-

.95 0

-

0 .0 2 0

i
I

7 .3 1 0

7 .3 1 0

o

MILWAUKEE,

$ 8 . 30C

o

-

.50 0

-

. 95 0

-

-

I
I

7 .0 6 0

6 .6 6 0

6 .3 6 0

7 .0 6 0

6 . 66 0

6 . 360

■c
o

I
I
.500

o
o

P IL E D R I V E R S ....................................
ENGINEERS-POWER EQUIPMENT
OPERATORS:
CLASS A-C RANES, DERRI CK S , 2 DRUM H O IS T S.
.CLASS B -D R A G L IN E S ,
BACKHOES, 1 DRUM HOISTS
GRADEALLS, G R A D E R S ...
CLASS C- BULLDO ZERS,
F O R K L I F T S , WINCH
TRUCKS, FRONT END LOADERS, PUMPS (3 INCHES
OR L AR GE R)............................
CLASS D-COMPRESSORS
(ABOVE 125 CFM) ,
SCRAPERS, TRENCHERS............
CLASS E - F I N I S H I N G
MACHINES, TRACTORS, O I L ­
ERS...............................................

-

-

.50 0

9 0 .0 0

9 0.00

.500

-

-

. 950

I

-

.9 5 0

.950

I
i
-

I
i

-

-

I
I

I
i

-

-

I

B IS C .

i
I
B UI LD IN G

CONSTRUCTION

I

JOURNEYMEN
i
ASBESTOS WORKERS......................
BOILERMAKERS.................................
BRICK LAY ER S ....................................
SEWER TUNN EL, CAISSON.
TRUCK PO IN TE RS ....................
CARPENTERS.......................................
CEMENT F I N I S H E R S ......................
ELE CT R IC IAN S ( I N S I D E
W I RE RS )..........................................
ELEVATOR CONSTRUCTORS«, . . .
ENGINEERS— POWER E QU IP­
MENT OPERATORS:
HEAVY EQUIPMENT:
CRANES,DERRICKS,
SHOVELS....................................
MEDIUM EQUIPMENT:
MI XER S..........................................
TRACTORS OR BULLDOZERS
OVER 90 HO RS EPO WER ....
L IG H T EQUIPMENT:
FIREMEN ( P I L E D B I V E R
AND D E R R I C K ) ......................
PUMPS. .........................................
HO IS T S, F O R K L I F T S ,
BOATS..........................................
G L A Z I E R S . . ... ...................................
L AT HER S...............................................
MARBLE S ET TER S............................
MOSAIC AND TERRAZZO
WORKERS.......................................
P A I N T E R S ............................................
SWING S TAGE:
TO 80 F E E T .........................
80 FEET AND O V E R . . . .
SPRAY............................................
STRUCTURAL STEEL...............
DRYWALL.......................................
PAPERHANGERS.................................
P IP E F I T T E R S AND
S TE AM FI TT ERS ............................
SPRINKLER F I T T E R S ...............

10.220
8 .90C
9 .9 8 0
9 .9 8 0
9 .9 8 0
9 .3 9 0
9 .0 9 0

1 0.220
9 .9 5 0
10.290
10.290
10.290
9 . 760
9 .3 9 0

9 0.0 0
9 0.0 0
9 0.00
90.0 0
9 0.0 0
9 0.0 0
9 0.0 0

I

.950
.70 0
.97 0
.97 0
.97 0
.800
.900

_
-

i
i
1 .00 %

-

~
;
!
!
7 .0 0 %
6 .0 0

-

.090
. 160 |
. 160
. 160
.070
.070

-

.020

9.0 0 1
2 .3 1

10.580
10.520

9 0.00
9 0.00

.85 0
.995

9 .9 2 0

10.020

9 0.00

.7 0 0

-

.900

-

-

-

. 100

-

8 .8 7 0

9 .9 7 0

9 0.0 0

.700

-

.90 0

-

-

-

. 100

-

9 . 170

9 .7 7 0

9 0.00

.700

-

.90 0

-

-

-

. 100

-

8 .5 6 0
8 . 3 20

9 . 160
8 .9 2 0

9 0.00
9 0.0 0

.700
.70 0

-

.90 0
.90 0

-

-

-

. 100
.100

-

8 .7 7 0
9 . 150
8 .7 1 0
8 .9 1 0

9 .3 7 0
9.5 9 0
9. 060
8 .8 1 0

90.0 0
90.00
90.00
90.00

.70 0
.870
.750
.800

-

.900
.650
. 700
.600

-

6 .5 0 0
.910
. 5 50

-

. 100
.0 5 0
. 110

-

9 .1 7 0
8 .8 5 0

9 . 070
8 .8 5 0

90.00
90.00

.800
.500

-

.600
.600

-

.9 7 0
.50 0

-

.07 0
.020

-

9 .0 0 0
9 . 1 00
9 .2 0 0
9 .2 0 0
9 .2 0 0
8 .9 5 0

9.0 0 0
9 . 100
9 .2 0 0
9 .2 0 0
9 .2 0 0
8 . 9 50

9 0.00
9 0.0 0
9 0.0 0
9 0.0 0
9 0.00
9 0 .0 0

.500
.50 0
.500
.500
.5 0 0
.50 0

-

.60 0
.6 0 0
.60 0
.60 0
.600
.60 0

-

. 500
. 500
. 500
. 500
.500
.500

-

.020
.020
.02 0
.020
.020
.020

-

9 .7 6 0
9 .3 5 0

10.160
1 0 . 050

90.0 0
9 0 .0 0

1 .0 0 0
.60 0

-

.7 0 0
.900

”

6. 500
1.7 0 0

-

. 120

79

.20 0
.320

-

0.7 5 0 j
.550
.550
.55 0
.500 !
.50 0

10.130
9 .6 3 5

S e e fo o tn o te s at end of ta b le .




.600
1 .0 0 0
.70 0
.70 0
.7 0 0
. 700
.70 0

I

'

'

.
'

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U n ion h o u r ly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , July 1, 1975 and J u ly 1, 1976)
JU LY 1,
197 5

JULY

1976

1,

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR1

HOURS
PER
WEEK2

PENSION

INSURANCE4

DOLLARS

PERCENT

DOLLARS

PERCENT

DOLLARS

OTHER5

VACATION

PERCENT

DOLLARS

PERCENT

MILWAUKEE, V IS C .
-COBTIMUED

B U IL D IN G CONSTRUCTION
-CONTINUED
JOURNEYMEN
-CONTINUED
PLASTERERS.......................................
PLUMB ERS ..’.......................................
REINFORCING IRON WORKERS.
ROOFERS, COMPO SITION ............
DAMP AND WATERPROOF
ROOFERS....................................
KETTLEMEN.................................
MASTIC SPREADERS..............
ROOFERS, SLATE AND T I L E . .
SHEET-METAL WORKERS...............
STONEMASONS....................................
STRUCTURAL IRON WORKERS..
MACHINERY MOVERS
RIGGERS, STONE
DERRICK MEN.........................
T I L E LAYERS....................................
HELPERS

$ 8 . 8 10
9 .9 3 0
9 .6 6 0
9 . 310

$ 9 .0 6 0
10.330
1 0.060
9 .7 1 0

40.0 0
4 0.0 0
4 0.0 0
40.0 0

0 .9 0 0
.90 0
.95 0
.80 0

9 .3 1 0
9 . 31 0
9 .5 1 0
9 .4 6 0
9 .3 6 0
9 .9 8 0
9 .6 6 0

9 .7 1 0
9 .7 1 0
9 .9 1 0
9 .9 6 0
9 .4 1 0
10.240
1 0.060

4 0.0 0
4 0 .0 0
4 0.00
40.0 0
40.0 0
40.0 0
4 0.00

.80 0
.80 0
.80 0
.800
.700
.97 0
.95 0

9 .6 6 0
9 .1 9 0

1 0 . 06 0
9 .3 5 0

4 0 .0 0
4 0.00

.9 5 0
.600

-

-

I

_

0. 7 00
.9 0 0
.700
-7 0 0

i
I

_

.700
.700
.70 0
.70 0
.90 0
.70 0
.70 0

-

-

-

-

.70 0
.70 0

0. 750
6 .550
1.150
.50 0

-

.500
.500
.500
. 500
.750
.55 0
1. 150

-

1. 150
.550

-

0. 060
. 140
.07 0

_

_

.070
.070
.070
.070
. 100
. 160
-

-

“

|

AND LABORERS

i

8 .4 0 0
8. 290

8 . 4 00
8 . 290

6 .5 2 0

6 .8 0 0

.55 0

4 0.00
4 0.0 0

©

8 .2 9 0

.60 0

_

.55 0
.550

.60 0
.60 0

-

_

.80 0

o
o

8 .2 9 0

o
o
o

BRICK LAY ER S' T E N D E R S . . . . .
HOD CARRIERS AND MOR­
TAR MIX ER S............................
B U I L D IN G LABORERS....................
COMPOSITION ROOFERS'
HELPERS............................................
ELEVATOR CONSTRUCTORS*
HELPERS............................................
MARBLE SETTERS* HE LPE RS ..
PLASTERERS' LABORERS............
PLUMBERS' LABORERS
F I R S T ...............................................
SECOND..........................................
TERRAZZO WORKERS'
HELPERS.............. * ..........................
BASE MACHINE OPERATORS
FLOOR MACHINE
OPERATORS..............................
T I L E LAYERS' HELPERS............

-

i

.7 0 0

I

6 .7 4 0
8 .0 2 0
8 .5 3 0

7 . 370
8 .0 2 0
8 .5 3 0

40.0 0
4 0.00
4 0.0 0

.495
.300
.55 0

8 .5 9 0
8 .4 8 0

8 . 9 60
8 .8 5 0

4 0.0 0
4 0.0 0

.700
.700

8 .6 0 0
8 .8 2 0

8 . 60 0
8 . 82 0

4 0 .0 0
4 0.0 0

.400
.4 0 0

8 .6 0 0
8 .1 0 0

8 .6 0 0
8 . 100

40,. 0 0
4 0 .0 0

.400
.30 0

_

HIGHWAY AND STREET
CONSTRUCTION

-

. 550
. 500

_

-

-

_
“

. 60 0
.60 0

.050
_

.500
.500

_

.70 0
.7 0 0
.600
.60 0

.50 0

_

-

_
-

_
~

.07 0

6 .0 0 *
-

.02 0
-

.550
. 550
.550
. 550

i
I
|

_
2 .3 1 5

;
-

.050

_

.500
.50 0

I

.050
.05 0

-

.500

!

.320
.60 0
.600

_

I

-

-

I

I

i

_

i

|

_

_

-

.04 0
.040

-

_

_

_

-

-

_

_

~

~

;

‘

l
i
i

i

JOURNEYMEN

!

I
I

9 .7 6 0
1 0 . 190
9 .7 6 0
9 .3 4 0
9 .7 7 0

4 0.0 0
4 0.00
4 0.00
40.0 0
4 0 .0 0

.80 0
.800
.800
.90 0
.700

-

. 700
.70 0
.70 0
.700
.650

8 .8 6 0

9 . 510

40.0 0

.70 0

_

.650

8 .5 7 0

9 .2 2 0

4 0.00

.70 0

.650

. 100

8 .6 9 0

9 . 340

.7 0 0

.65 0

.100

8 .4 8 0
8 .3 6 0

9 . 130
9. 010

4 0.00
4 0 .0 0

.70 0
.70 0

-

8 .7 7 0
8 .6 1 0
9 .6 6 0

9 .4 2 0
9 .2 6 0
1 0.060

4 0.0 0
4 0.00
40.0 0

.70 0
.70 0
.95 0

-

8 .3 4 0
7 .4 6 0
7 .4 6 0

8 .3 4 0
7 .8 6 0
7 .8 6 0

4 0.0 0
4 0.0 0
40.0 0

.55 0
.650
.65 0

©

9 .3 9 0
9 .7 4 0
9 .7 6 0
9 .0 9 0
9 .1 2 0

o
o

CARPENTERS.................................
MIL LW RIGH TS ............................
P IL E D R I V E R S ............................
CEMENT F I N I S H E R S ......................
ENGINEERS-POWER EQUIPMENT
MEDIUM EQUIPMENT:
CONCRETE MIXERS...............
L IG H T EQUIPMENT:
COMPRESSORS (300 CFM
OR MORE)...............................
CONCRETE BREAKER &
TAMPER, CONCRETE
SPEADER.................................
CRUSHER OR SCREENING
PLANT, AUTOMATIC
BELT CONVEYOR.................
PUMPS, O I L E R ......................
SCREED (BITUMINOUS
PAVER) , SHOULDERING
MACHINE.................................
F I R E M E N . ................................
STRUCTURAL IRON WORKERS..

-

.650
.650

-

-

_

. 500
.500
.50 0
. 500
_

-

.010
.010
.05 0
.070
. 100

_

. 100

-

-

-

-

-

. 100
. 100

-

.650
.65 0
.70 0

-

1. 150

-

-

. 100
. 100
-

-

.60 0
.700
.70 0

-

-

_

HELPERS AND LABORERS

GENERAL LABORERS......................
ASPHALT LABORERS...............
LABORERS (STATE WORK) .

S e e fo o tn o te s at end of ta b le .




80

-

. 500
.250
.250

-

.050
.02 0
.02 0

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities—-Continued
(U nion h o u r ly w age r a te s and s tr a ig h t -t im e w e e k ly h o u rs and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , July 1, 1975 and J u ly 1, 1976)
JULY 1,
1975

JULY

1,

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

HOURS
PER
WEEK2

RATE
PER
HOUR1

INSURANCE4

DOLLARS

PENSION

DOLLARS

PERCENT

OTHER5

VACATION

PERCENT

DOLLARS

PERCENT

DOLLARS

PERCENT

MILWAUKEE, B I S C .
-CON TINU ED
OTHER HEAVY CONSTRUCTION

JOURNEYMEN

I

0. 8 0 0
.800

9 .7 6 0
9 .0 9 0

9 .7 6 0
9 .4 9 0

4 0.00
4 0.0 0

.600
.90 0

9 .1 2 0

9 .7 7 0

8 .8 6 0

9 .5 1 0

8 .5 7 0
8 . 360
8 .7 7 0

9 . 220
9 . 010
9 .4 2 0

8. 690
8 .6 1 0

0.700
.700

_

.600
.700

-

-

0, 500
.50 0

-

_

_

_

-

-

. 100

.70 0
.700

_

.650

_

_

_

. 100

-

40.0 0
40.0 0
4 0.0 0

.70 0
.70 0
.700

-

.6 5 0
.6 5 0
.65 0

-

-

-

. 100
.100
. 100;

-

9 . 340
9 .2 6 0

40.0 0
40.0 0

.7 0 0
.700

.650
.65 0

_

_

-

-

-

.100 |
. 100

8 .4 8 0
9 .6 6 0

9 .1 3 0
1 0.060

4 0 .0 0
4 0.00

.70 0
.95 0

.65 0
.70 0

_

_

_

~

1. 150

~

8 .4 5 0
7 .4 0 0

8 .8 2 0
7 .7 0 0

40.0 0
4 0.0 0

.70 0
.70 0

.65 0

_
~

_
-

i
I
I

I
. 100 !
!

~

j

i

HINNEAPOLIS-ST.
MIMNo

-

.050
. 110

.50 0 i

AND LABORERS

GENERAL LABORERS.......................j I
U T I L I T Y LABORERS.......................; |

0 ,0 1 0
.010

o
o

4 0 .0 0
4 0.00

.p
o

$9,760
1 0.190

o
o

HELPERS

$ 9 .3 9 0
9 .7 4 0

o

CARPENTERS.......................................
MIL LW RI GH TS ............................
P I L E D R I V E B S , WHARF AND
BRID GE ............................................
CEMENT F I N I S H E R S ......................
ENGINEERS— POWEB EQU IP­
MENT OPERATORS
HEAVY EQUIPMENT:
CRANES, DERRICKS,
SHOVELS.................................
MEDIUM EQUIPMENT:
M I2 ER S .......................................
L IG H T EQUIPMENT:
COMPRESSORS (300 CFM
OR MORE)...............................
PUMPS, O I L E R S ....................
SCREED (B I T U M I N O U S . . .
CONCRETE BREAKERS,
TAMPERS, S P E A D E R S .. .
FIREMEN....................................
CRUSHERS OR SCREENING
PLANTS.......................................
STRUCTURAL IRON WORKERS..

:
.50 0
.5 0 0 I

.700
.70 0

PAUL,

:
I
!

.04 0
.04 0 j

I
!

I

I

I
B U I L D IN G

CONSTRUCTION
I

8 .0 2 0
8 .9 0 0
8 .5 6 0
8 .5 6 0

9 .4 8 0
9 .4 5 0
9 .6 6 0
9 .6 6 0

4 0.00
4 0.0 0
4 0.00
4 0.00

.600
.70 0
.55 5
.555

8 .8 6 0
8 .5 6 C
8 .5 6 0

9 .9 6 0
9 .6 6 0
9 . 66 0

4 0 .0 0
4 0.00
4 0 .0 0

.555
.55 5
.55 5

8 . 860
8 .2 1 0
8 .2 1 0
8 .2 1 0
8 . 580

9 .9 6 0
9 . 210
9 .2 1 0
9 . 210
9 .6 8 0

4 0 .0 0
40.0 0
40.0 0
4 0.00
4 0 .0 0

.555
.50 0
.50 0
.50 0
.50 0

8 .8 3 0
8 .5 8 0

9 .9 3 0
9 .6 8 0

4 0 .0 0
4 0.00

.50 0
.50 0

8 .8 4 0
9 .6 8 0
8.75C

1 0.030
10.050
9 .3 5 0

40.0 0
4 0.00
4 0 .0 0

9 .6 5 0
9 .5 3 0

1 0.250
10.130

9 .4 5 0
9 .5 3 0

10.050
10.130

8 .9 0 0
9 . 180
8 .4 5 0
8 .5 0 0

-

-

-

_
-

Ij

. 3 30
.33 0
. 330

. 330
. 5 00
.5 0 0
.5 0 0
.50 0
. 5 00
.50 0
_

.495

. 320

4 0.00
40.0 0

.450
.450

-

.400
.4 0 0

4 0.00
4 0 .0 0

.450
.45 0

-

9 .5 0 0

.45 0

9.7 8 6
9 .0 5 0
9 . 100

4 0.0 0
4 0 .0 0
40.0 0

.45 0
.450
.400

S e e fo o tn o te s at end o f ta b le .




_

I

•p
o

_

_

. 650
1 .0 0 0
.3 3 0
.3 3 0

7 .0 0 *
5 .7 5
-

o
o

ASBESTOS WORKERS.......................
BOILERMAKERS.................................
BR ICKLAYER S ....................................
CEMENT BLOCK L A Y E R S . . .
BLOCKLAYERS, POINTERS,
SWING STAGE............................
S T . P A U L . . . ...............................
BLOCKLAYERS............................
POINTERS, CAULKERS,
WHEN DONE ON SWING
STAGE..........................................
CARPENTERS.......................................
MI LLW RI GH TS ............................
P IL E D R I V E B S ............................
CEMENT F I N I S H E R S ......................
COMPOSITION FLOOR
F I N I S H E R S ..............................
S T. PAUL.......................................
ELE CT R IC IA NS ( I N S I D E
W IR E R S )..........................................
S T . PAUL.......................................
ELEVATOR C O N S TR U C TO R S. .. .
ENGINEERS— POWER E Q U IP ­
MENT OPERATORS
HEAVY EQUIPMENT:
CRANES, SHOVELS,
DERRICK O P E RA TO RS ...
PUMPCRETE OPERATORS..
MEDIUM EQUIPMENT:
HO IS T S, 1-DRUM,
CONCRETE MIXERS ............
MECHANICS OR WELDERS
LIG HT EQUIPMENT:
COMPRESSORS.........................
FIREMEN, 1ST CLASS
L IC E N S E .................................
O I L E R S .......................................
G L A Z I E R S ............................................

|

I

|

JOURNEYMEN

81

_
_
-

-

_

6 1.000
6 .5 6 0
6 .5 6 0

i
-

_

-

6 .5 6 0
6 .5 6 0
6.5 6 0

-

-

6 .56 0
. 50 0
.500
.500
-

~

_

_

_

-

-

-

4 .0 0 *
4 .0 0
-

-

J
|
i

!
.050
.050

-

. 0 5 0 ii
.050
.050 i
i
.050

10.00*
7 .5 0
5 .0 0

i
i
~
_
.020

-

i
I
;
I

I . 501
4 .7 5
2.31

-

-

-

-

-

.40 0
.40 0

-

-

-

-

-

.4 0 0

_

_
_

_
_

_

_

_
_
-

-

-

“

~

.4 0 0
.40 0
.5 0 0

-

. 350

_

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
( U n i o n h o u r l y w a g e r a t e s and s t r a i g h t - t i m e w e e k l y h o u r s a nd e m p l o y e r i n s u r a n c e ,
b u i l d i n g t r a d e s , J u l y 1, 1 9 7 5 an d J u l y 1, 1 97 6)

p en sio n , v acation ,

J UL Y 1,
____197 5

C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

JULY

1,

and o t h e r c o n t r i b u t i o n s to f u n d s in t h e

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
RATE
PER
HOUR1

HOURS
PER
WEEK2

INSURANCE4

DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

OTHER5

DOLLARS

PERCENT

0 .4 0 0
.910
6. 560
.5 6 0

0 .4 5 0
.08 0
.028
. 100
.100

-

10.00%
-

-

-

DOLLARS

PERCENT

H I M M E A F O L I S -S T * P A U L ,
MINHo
-COHTIMUBD
B UI LD IN G CONSTBUCTION
-CONTINUED
JOURNEYMEN
-CONTINUED
LATHERS...............................................
S T. PAUL.......................................
M A C H IN IS TS .......................................
MARBLE SETTERS............................
S T . PAUL.................................... ..
MOSAIC AND TEHRAZZO
WORKERS..........................................
P AI NT E RS :
MI N N E A P O L IS .........................
ST . PAUL.................................
STRUCTURAL STEEL AND
SWING S T A G E - S P R A Y . . . .
S T . P A U L ...................................
PAPERHANGERS .........................................
S T. PAUL ................................................
P I P E F I T T E R S ..................... ' . ..................
SPRINKLER F I T T E R S ...............
S T. P A U L . .............................................
PLASTERERS.......................................
S T . PAUL.......................................
PLUMBERS............................................
S T. PAUL.......................................
REINFORCING IRON WORKERS.
ROOFERS, COMPOSITION............
ROOFERS, SLATE AND T I L E . .
SHEET-METAL WORKERS...............
S T. PAUL.......................................
STONEMASONS....................................
S T . PAUL.......................................
STRUCTURAL IRON WORKERS..
F I N I S H E R S .................................
T I L E LAYERS.....................................

$ 8,7 20
8 .5 1 0
8 .6 0 0
8 .7 8 5
8 .5 6 0

$ 9,0 80
8 .9 3 0
9 . 600
9 .3 1 5
9 .8 7 5

4 0 .0 0
4 0.00
40.0 0
4 0.0 0
4 0.0 0

0 .4 5 0
.500

-

-

.555
.555

-

. 330
.33 0

-

8 .9 4 0

9 .6 9 0

40.0 0

.37 0

-

. 20 0

-

*. 300

-

8 .5 8 0
8 .2 8 0

9 . 130
9 .0 5 0

40.0 0
40.0 0

.450
.450

-

.250
250

300
6. 50 0

-

.

-

6.

-

9 .0 8 0
8 .7 8 0
8 .5 8 0
8 .2 8 0
8 .0 3 0
8 .3 9 0
7 .1 5 0
8 .8 8 0
8. 8 2 0
8 .0 3 0
8 .6 7 0
8 .8 0 C
8 . 5 40
8 .5 4 0
9 .2 3 0
9 .0 1 0
8 .5 6 0
8. 5 6 0
8 .8 0 0
8 .8 0 0
8 .5 9 0

9 .6 3 0
9 .5 5 0
9 . 130
9 . 050
9 .6 4 0
9 . 48 0
7 . 950
9 . 500
9 .2 4 0
9 . 640
9 .4 7 0
1 0.3 50
9 . 060
9 . 060
9 . 980
9 .7 1 0
9 .6 6 0
9 .6 6 0
10.350
10.350
8 . 860

40.0 0
4 0 .0 0
4 0 .0 0
4 0.00
4 0.0 0
4 0.00
4 0.0 0
4 0.0 0
4 0 .0 0
4 0 .0 0
40.0 0
4 0 .0 0
4 0.00
40.0 0
4 0.00
40.0 0
40.0 0
4 0.00
4 0.0 0
4 0.0 0
40.0 0

.4 5 0
.45 0
.450
.45 0
.380
.60 0
.38 0
.450
.700
.380
.38 0
.55 0
.640
.640
.52 0
.59 0
.555
.5 5 5
.550
.550
.62 0

-

.

25 0
.2 5 0
. 250
.250
.5 0 0
.90 0
.50 0
.20 0
.250
.50 0
. 500
. 55 0
. 2 50
. 2 50
.50 0
.65 0
.3 3 0
.33 0
.55 0
.55 0
.50 0

-

*.300
*-500
*. 300
6. 500
1. 250
.50 0
1. 520
.700
.650
1 .3 5 0
1 .5 2 0

-

-

-

-

0 .3 5 0
.50 0
-

-

-

-

-

-

-

-

-

.190
.03 0

-

6. 190

-

-

.030
.190
.030 i
.030
.019
.020
. 150
.070
.030
.080
.04 0
.04 0
.08 0
. 140
.050
.050
*. 330

-

-

-

*.750
*.750
1 .0 0 0
1 .0 5 0
*. 560
*.560
*.410

-

~

-

~

HELPERS AND LABORERS
!
BR ICKLAYERS' TENDERS:
M IN N E A P O L IS .........................
S T. PAUL .................................
MORTAR MIX ER S:
M IN N EA P OL IS .........................
S T . PAU L .................................
B U IL D IN G LABORERS....................
S T. PAUL....................................
ELEVATOR CONSTRUCTORS'
HELPERS:
F I R S T 6 MONTHS......................
AFTER 6 MONTHS......................
MARBLE SETTERS' HE L PE RS ..
PLASTERERS' TENDERS...............
S T . P A U L . .................................
PLUMBERS' LABORERS
F I R S T MAN....................................
SECOND MAN.................................
TBRRAZZO WORKERS' HELP­
ERS:
1 YEAR OF S E N I O R I T Y . . .
2 YEARS OF S E N I O R I T Y . .
EASE MACHINE:
1 YEAR OF S E N I O R I T Y . .
2 YEARS OF S E N IO R I T Y .
T I L E LAYERS' HELPERS............

6 .9 5 0
6 . 90C

7 .9 5 0
7 .9 0 0

4 0.0 0
40.0 0

.450
.45 0

-

6 .9 0 0
6 .9 5 0
6 .8 0 0
6 .8 0 0

7 .9 0 0
7 . 95 0
7 .8 0 0
7 .8 0 0

4 0.00
4 0.0 0
4 0.00
40.0 0

.450
.450
.45 0
.45 0

-

.450 I
.450 i
I
.45 0
. 4 50
.45 0
.4 5 0

4 .3 7 5
6 .1 2 5
7 .1 6 0
8 .4 8 0
8 . 14G

4 .6 7 5
6 .5 4 5
7 .9 6 0
8 .8 1 0
8 .6 1 0

40.0 0
40.0 0
40.0 0
4 0.0 0
4 0.0 0

.49 5
.49 5
.620
6. 4 5 G
.45 0

-

.32 0
.32 0
.50 0

7 .2 5 0
7 .0 5 0

8 . 100
7 .9 0 0

4 0.00
4 0 .0 0

8 .4 9 0
8 .5 6 0

9 .0 3 0
9 . 100

8 .7 9 0
8 .8 9 0
7 . 160

-

-

-

.4 0 0
.40 0

-

-

-

.
.
.
.

-

-

-

400
400
400
400

-

-

-

6 .38 0
6 .6 5 0
.4 0 0

-

.40 0
.40 0

-

-

-

-

-

-

6 .3 4 0
6 .3 4 0

-

6. 100
6. 1 0 0

-

|

5 .0 0
5 .0 0
“

.020
.020
6.36 0
6.15 0
.070

2 .3 1 %
2 .3 1
-

~

.45 0

.450
.450

-

.45 0
.45 0

40.00
40.0 0

.57 0
.57 0

-

9 .3 6 0
9 .4 3 0
7 .9 6 0

4 0 .0 0
40.0 0
40.0 0

.570
.570
.62 0

-

.500

-

6.340
6 . 340
6.3 8 0

“

6. 1 0 0
6. 1 0 0
6. 3 6 0

-

8 .0 6 0
8 .5 8 0

9 .2 1 0
9 .6 8 0

4 0.00
4 0.00

.500
.50 0

-

.5 0 0
.5 0 0

-

.50 0
-

-

-

-

9 .4 0 0

10.000

4 0 .0 0

.450

.4 0 0

■

-

-

~

-

HIGHWAY AND STREET
CONSTRUCTION

JOURNEYMEN
CARPENTERS.......................................
CEMENT F I N I S H E R S .......................
ENGINEERS— POWER E QU IP­
MENT OPERATORS:
HEAVY EQUIPMENT:
SHOVELS TO 3 CU I D S ,
DREDGE OPERATORS AND
ENGINEERS, DERRICK
OPERATORS...............................

S e e f o o tn o te s at end o f ta b le .




82

-

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
( U n i o n h o u r l y w a g e r a t e s a nd s t r a i g h t - t i m e w e e k l y h o u r s and e m p l o y e r i n s u r a n c e ,
b u i l d i n g t r a d e s , J u l y 1. 1 9 7 5 a nd J u l y 1, 1 97 6)

p ension, vacation ,

JULY 1,
1975

JULY

1,

an d o t h e r c o n t r i b u t i o n s to fu n d s in th e

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR1

PER
WEEK2

INSURANCE4

DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER5

PERCENT

DOLLARS

PERCENT

!
H I I N K A P O L I S —S T . P A U L ,
H IM Io
—CONTINUED
BUILDING CONSTRUCTION
-CONTINUED
JOURNEYMEN
-CONTINUED
ENGINEERS-POWER EQUIPMENT
OPERATORS-CONTINUED
MEDIUM EQUIPMENT:
MECHANICS, W E L D E R S ...
SCRAPERS...................... ...
F I N I S H I N G GRADERS OR
MOTOR PATOR......................
L IG H T EQUIPMENT:
POMPS, COMPRESSORS,
LOADERS OF BARBER
GREENE OPERATORS............
STRUCTURAL IRON WORKERS..

$ 9 .1 8 0
9 .2 7 0

$ 9,780
9 .8 7 0

40.0 0
4 0.00

0 .4 5 0
.45 0

9. 400

10.000

4 0 .0 0

.450

8 . 50 0
8 .8 0 0

9 . 100
1 0.350

40.0 0
4 0.0 0

.45 0
.55 0

6 .7 5 0
6 . 8 00

7 .7 5 0
7 .7 5 0

4 0 .0 0
40.0 0

.450
.450

_

0 .4 0 0
.40 0

-

-

-

-

-

.4 0 0

_

_

_

_

_

.4 0 0
.55 0

-

-

-

-

-

-

HELPERS AND LABORERS

CONSTRUCTION L A B O R E R S . . . .
S T . PAUL .......................................
OTHER HEAVY CONSTRUCTION

-

.4 5 0
. 4 50

-

.5 0 0
. 50 0

0. 400
.40 0

!

i
JOURNEYMEN

CARPENTERS.......................................
CEMENT F I N I S H E R S ......................
E NG INE ER S-P OW ER E Q U IP ­
MENT OPERATORS:
HEAVY EQUIPMENT:
SHOVELS TO 3 CU YDS,
DREDGE OPERATORS AND
ENGINEERS, DERRICK
OPERATORS...............................
MEDIUM EQUIPMENT:
MECHANICS, WELDERS. . .
SCRAPERS.................................
F I N I S H I N G GRADERS OR
MOTOR PATROL....................
L IG H T EQUIPMENT:
PUMPS, COMPRESSORS,
LOADERS OR BARBER
GREENE OPERATORS............
STRUCTURAL IRON WORKERS..

8 .0 6 0
8 . 58C

9 . 210
9 . 680

40.0 0
4 0.00

.500
.50 0

i
I
-

.500
-

H A S H Y IL L E - D A V ID S O N ,

j

-

|
;
9 .4 0 0

1 0.000

40.0 0

.45 0

9 . 180
9 .2 7 0

9 .7 8 0
9 . 870

4 0.0 0
40.0 0

.45 0
.450

_

.40 0
. 4 00

_

_

_

_

_

-

~

-

-

-

-

9 .4 0 0

10.000

4 0.00

.450

_

.40 0

_

_

_

_

_

8 .5 0 0
8. 800

9 .1 0 0
10.350

4 0.00
40.0 0

.45 0
.550

-

.55 0

-

-

-

-

6. 750
6 .8 0 0

7 . 750
7 .7 5 0

40.0 0
4 0.00

.450
.45 0

.45 0
. 4 50

-

-

-

8 .7 0 0
8 .2 0 0
8 .0 0 0
8 .0 0 0
8 .4 5 0
6 .5 4 0
7 .9 0 0
7 .1 7 0

9 . 100
8 .8 0 0
8 . 200
8 .6 5 0
9 . 150
7 . 0 50
8 .6 0 0
8 .4 6 0

4 0 .0 0
40.0 0
4 0.0 0
40.0 0
4 0.0 0
40.0 0
4 0 .0 0
40.0 0

.45 0
.600
.15 0
.15 0
.25 0
.45 0
.54 5

7 .5 0 0

8 .3 0 0

4 0.0 0

.30 0

.4 0 0

.40 0

HELPERS AND LABORERS

CONSTRUCTION LABORERS_____
S T . PAUL..........................................

-

-

. 400
.400

II
I

TENMC

B U I L D IN G CONSTRUCTION

JOURNEYMEN

ASBESTOS WORKERS.......................
BOILERMAKERS.................................
BR ICKLAYERS ....................................
CARPENTERS.......................................
MIL LW RI GH TS ............................
CEMENT MASONS...............................
E L E C T R IC IA N S ..................................
ELEVATOR C O N S T R U C T O R S .. ..
ENGINEERS— POWER E Q U IP ­
MENT OPERATORS:
CENTRAL COMPRESSORS,
CRANES, DERRICKS,
DR AG LIN ES, HOISTS
(MORE THAN 1 DRUM),
P IL E D R I V B R S , SHOVELS,
TRENCH MACHINES (1 8
INCHES OR OVE R) ...............

!

j

S e e fo o tn o te s at end of ta b le .




83

_
-

.35 0
1 .0 0 0
.25 0
.10 0
.10 0
.35 0

.350

1 .0 0 X
-

6. 8 5 0
6. 25 0
-

->

1 *6.00%

0 .1 0 0
.02 0
.02 0
.020
.02 0

.020

2 .3 Q X

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
( U n i o n h o u r l y w a g e r a t e s and s t r a i g h t - t i m e w e e k l y h o u r s a n d e m p l o y e r i n s u r a n c e ,
b u i l d i n g t r a d e s , J u l y 1, 1 9 7 5 a n d J u l y 1, 1 97 6)

pen sion ,

vacation ,

JULY 1 ,

JULY 1,
197 5

and o t h e r c o n t r i b u t i o n s to f u n d s in t h e

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR1

HOURS
PER
WEEK2

f
PENSION

INSURANCE4

DOLLARS

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER5

PERCENT

DOLLARS

PERCENT

NA S B T IL LE -D A V ID S O N , T I M M .
-CONTINUED
BUILDING CONSTRUCTION
-CONTINUED
JOURNEYMEN
-CONTINUED

ENGINEERS--POWER EQUIPMENT
OPERATORS-CONTINUED
BLADE GRADERS, CONVEY­
ORS, HOIST S (1 DRUM) ,
PAVERS, TANDEM ROL­
L ER S, TRACTORS,
TRENCH MACHINE (1 8
INCHES OR S M A L L E R ) . . .
A IR COMPRESSORS (S TA ­
TIONARY) , EARTH
D R I L L S , MOTOR CRANE
DRIVERS AND O I L E R S ,
PUMPS (4 INCHES AND
LAR GE R) ....................................
A IR COMPRESSORS, O I L ­
ERS, WELDING MACHINE
OPERATORS, DECKHANDS.
G L A Z I E R S ............................................
LATHERS...............................................
M A C H IN IS TS .......................................
WELDERS.......................................
MARBLE SETTERS............................
MOSAIC AND TERRAZZO
WORKERS.......................................
P A IN TE R S ............................................
P AP ER HA NG ER S.. ...........................
PIPEFITTERS:
COMMERCIAL...............................
R E S ID E N T IA L ............................
PLASTERERS.......................................
PLUMBERS:
COMMERCIAL...............................
R E S I D E N T I A L ............................
REINFORCING IRON WORKERS.
ROOFERS, COM POSITION............
ROOFEES, SLATE AND T I L E . .
SHEET-METAL WORKERS...............
STONEMASONS . . ...........................
STRUCTURAL IRO N WORKERS..
T I L E I A Y E R S ....................................

$7,0 40

$ 7 .8 40

4 0.0 0

0 .3 0 0

0 .3 5 0

0 .0 2 0

6 .5 8 0

7 .3 8 0

4 0.00

.300

.35 0

.02 0

6 .2 1 0
7 .2 5 0
7 . 5 50
9 . 150
9 . 1 50
5 .7 5 0

7 .0 1 0
7 .6 5 0
7 .8 5 0
9 .8 0 0
9 .8 0 0
?5 . 7 5 0

40.0 0
4 0.00
4 0.00
40.0 0
40.0 0
4 0 .0 0

.30 0
.500
-

5 .7 5 0
6 .9 5 0
7 .4 5 0

75 . 75 0
7 .4 5 0
7 .9 5 0

4 0 .0 0
4 0.00
4 0 .0 0

7 .8 4 0
6 .2 5 0
7 .0 0 0

8 .8 4 0
6 .7 5 0
7 .4 0 0

4 0 .0 0
4 0 .0 0
4 0 .0 0

7 . 8 40
6 .2 5 0
8 .3 5 0
6 .3 5 0
6 .6 0 0
7 . 55 0
8. 000
8 .3 5 0
5 .7 5 0

8 . 840
6 .7 5 0
8 .9 0 0
7 .0 0 0
7 . 250
8 . 300
8 . 2 00
8 .9 0 0
75 . 7 50

5 .0 0 0
5 .0 0 0

5 .5 0 0
5 .5 0 0

-

_

_

-

-

.35 0
.5 0 0
.200
_

_

-

.40 0
.40 0

-

.450
.45 0
.400

_
-

.45 0
.450
.20 0

-

4 0 .0 0
4 0.00
4 0.0 0
4 0 .0 0
4 0.00
4 0.00
40.0 0
40.0 0
4 0.00

.450
.45 0
.50 0
.40 0
.400
.44 0

_

-

.45 0
.450
. 35 0
.25 0
.2 5 0
.31 0
.25 0
.35 0
-

4 0 .0 0
4 0 .0 0

.20 0
.20 0

-

.2 0 0
.2 0 0

.2 0 0

_

-

-

-

.50 0
-

-

_

6 ~
0 .4 0 0
.20 0
_
-

-

_

_

-

-

6. 2 5 0
6. 250
6. 250

_

_
-

-

6. 250
6. 250
6 . 150
6 .1 5 0
6 . 150
-

~

-

-

_
-

.02 0
.186
.07 0
-

-

-

-

-

:
'

i
I
!I
t
I
i

""
-

i
!
_

.050
.050
.070

-

.05 0
.050
.020

-

-

_
-

-

-

-

26. 170
.100
.02 0
-

-

-

.020
.02 0

-

.200

_

_

_

.02 0

_

.350
.20 0
.20 0
.20 0

_

_

1Z6 • 00

.020
.020
.020
.020

2 .3 0
-

.020
.020

~

-

-

-

-

HEIPERS AND LABORERS

BRICKLA YER S' TENDERS............
B U IL D IN G LABORERS....................
COMPOSITION ROOFERS'
. HELPERS..........................................
ELEVATOR CONSTRUCTORS'
HELPERS............................................
MARBLE SETTERS' HE LP E RS ..
PLASTERERS' LABORERS............
PLUMBERS' LABORERS.................
TERRA2.ZO WORKERS'
HELPERS..........................................
T I L E LAYERS' HELPERS............

M E IAIK ,

B U IL D IN G

5 .0 0 0
5 .0 1 9
5 .0 0 0
5 .0 0 0
5 .0 0 0
5 .0 0 0
5 .0 0 0

5 .5 0 0
5 .9 2 0
5 .5 0 0
5 . 500
5 . 500
5 .5 0 0
5 .5 0 0

40.0 0
4 0 .0 0
40.0 0
4 0 .0 0
40.0 0

.54 5
.200
.200
.2 0 0
.20 0
.200

4 0.0 0
4 0 .0 0

_
_

.2 0 0
.200

-

-

-

-

-

-

-

_

_
-

N .J.

CONSTRUCTION

I

JOURNEYMEN

ASBESTOS WORKERS.......................
BOILERMAKERS.................................
B RI CK LAY ER S ....................................
CARPENTERS.......................................
MI LLW RI GH TS ............................
P IL E D R I V E R S , DOCK
B U IL D E R S , HOUSE
MOVERS, AND FOUNDA­
TION WORKERS......................

9 .4 1 0
9 .4 8 0
9.750
10.130
10.380

1 0 . 36 0
10.060
10.350
10.750
11.000

4 0.00
3 5 .0 0
35.00
3 5.00
35.00

10.390

10.920

4 0.00

.92 0
-

-

7 .0 0
7 .0 0

-

1 .2 5 0

S e e fo o tn o te s at end o f ta b le .




8 .0 0 *
8 .0 0

84

-

-

.700
-

1.7 3 0

1 0.00*
2 0.00
7 .0 0
7 .0 0

-

.50 0

1 1 .0 0*
10.00
-

.11 0
-

.02 0

-

-

-

-

-

-

-

-

-

.71 0

-

.080

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
©

(U nion h ou rly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds 'in the
build in g t r a d e s , July 1, 1975 and J u ly 1, 1976)
JULY 1,
1975

JUL Y

1,

1"976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C IT Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR1

HOURS
PER
WEEK 2

I
j
I
|

IN SURANCE4

DOLLARS

PENSION

PERCENT

DOLLARS

OTHERS

VACATION

PERCENT

DOLLARS

DOLLARS

PERCENT

PERCENT

NEWARK, 8 . J .
—CONTINUED
B U IL D IN G CONSTRUCTION
-C ONTINUED
JOURNEYMEN
-CONTINUED
CEMENT F I N I S H E R S ......................
ELEC TR IC IA NS ( I N S I D E
H I R E R S ) .................................... .. .
ELEVATOR CON ST RU C TO RS .. ..
ENGINEERS— POWER EQU IP­
MENT OPERATORS:
HEAVY EQUIPMENT:
POWER SHOVELS, CRANES
POWER CRANES ON STEEL
ERE CTIO N .................................
TRENCH MACHINES, PAVING MIXERS ......................
MEDIUM EQUIPMENT:
HO IS T S, MORE THAN ONE
GENERATOR..............................
CENTRAL POWER PLANTS.
CONCRETE TOWER HOISTS
LIG HT EQUIPMENT:
AIR COMPRESSORS,
SINGLE PUMPS....................
SMALL MIX ER S ......................
CONCRETE PUMPS.................
G L A Z I E R S ................... ........................
LATHERS...............................................
M A C H IN IS TS .......................................
MOSAIC AND TERPAZZO
WORKERS.................................... .. .
P AIN TE RS ............................................
ABOVE 3 S TO RI ES ..............
P I P E F I T T E R S ....................................
SPRINKLER F I T T E R S ............
PLASTERERS.......................................
PLUMBERS............................................
REINFORCING IRON WORKERS.
ROOFERS, CO MPO SITIO N............
SHELT-METAL WORKERS..............
STONEMASONS....................................
STRUCTURAL IRON WORKERS..
T I L © LAYER S ....................................
HELPERS

$9,750

$10,350

35.00

0-920

-

0 .7 0 0

_

7 .00%
-

1 .4 9 3

-

0 .5 00

-

-

0 o 0 20

10.800
10.120

11.220
1 0.760

4 0 . 00
3 5 .0 0

11.920

12.680

4 0 . 00

-

7 .0 0

-

10.00

-

-

13.520

14.390

4 0 . 00

-

7 .0 0

-

10.00

-

-

-

8 .0 0

11.920

12.680

4 0 . 00

-

7 .0 0

-

10.00

-

-

-

8 .0 0

10.840
11.920
10.840

11.530
12.680
12.680

4 0 . GO
4 0.00
4 0 . 00

-

7.0 C
7 .0 0
7 .0 0

-

10.00
10.00
10.00

-

-

-

8 .0 0
8 .0 0
8 .0 0

1 0 . 150
9.0 9 0
11.040
t 10.250
9.4 5 0
10.850

10.800
9.6 7 0
11.75C
10.250
10.000
2910 . 85C

4 0 . CO
40.0 0
4 0 . 00
40.00
40.00
40.00

.700
.600
.500

7 .0 0
7 .0 0
7 .0 0
-

1 .0 0 0
. 2 50
-

10.00
10.00
10.00
-

9.4 5 0
8 .900
9 . 500
10.180
t 10.030
9 .7 5 0
9 . 975
10.190
10.52C
10.530
9.7 5 0
1 0 . 190
8. 400

10.030
9.4 0 0
10.000
10.490
10.703
10.350
10.625
10.820
11.070
1 1.0 0 0
10.350
10.820
8 .7 5 C

3 5 . CO
3 5.00
35.00
40.00
4 0.00
35.00
4 0.00
40.00
3 5.00
35.00
3 5 . CO
4 0 . 00
4 0.00

.760
.55 0
.550
.60 0
.920
.650
.800
.29 0
.920
.80 0

1 .5 0 0
.50 0
.500
.900
.700
1 .0 0 0
1 .0 0 0
.060
.700
2 .1 0 0

9 .0 0
23.00

7 .5 0 0

35.00

.545

7 .0 0
7 .0 0
4 .0 0
-

7 .0 0
-

!
I

8.00 7, >
-

27-

i
|
.850
-

-

.30 0
.30 0
61 . 0 0 0
. 5 00
. 8 50
-

-

-

4 .0 0
23.00
-

. 500
-

10.007» ’
28 _
j

1 .oox
-

28 “
.020

i
!

8 .0 0

-

I
. 0 50 I
.180 j
-

10.00
10.00
8 .0 0
1 0.00
-

.620 !
.070
. 0 20
.225
.020
.090
.020
.02 0
. 0 50

8 .0 0
8 .0 0
9 .0 0

-

1 .0 5
1.0 0
-

1.00
-

AND LABORERS
j

BR ICK LA Y ER S' TENDERS............
BU ILD IN G LABORERS:
/iGREEMENT A............................
AGREEMENT B............................
AGREEMENT C ............................
ELEVATOR CONSTRUCTORS'
HELPERS..........................................
MOSAIC AND TERRAZZO WORK­
ERS' HELPERS ............................
GRINDERS....................................
AGREEMENT B ............................
T I L © LAY ERS' H E L P E R S . . . . .

7 . 200
I

_

!

.60 0

„

. 0 20

_

-

.700
.600
.70 0

-

-

.700
.600
.700

-

-

-

.020
.020
.020

35.00

.545

-

1 .4 9 3

-

27_

-

28. 0 2 0

3 5.0 0
35.00
3 5 .0 0
4 0 . CO

.760
.760
.600
-

-

1 .5 0 0
1.5 0 0
.600
-

-

-

-

7 .2 0 0
7.2 0 0
7.2 0 0

7 .5 ^0
7.5 0 0
7.5 0 0

3 5 . 00
3 5 .0 0
3 5 . 00

7 .5 9 0

8 .0 7 0

77 . 96 0
78 . 110
7.2 0 0
8 .450

8 .8 4 0
8 . 990
7 .5 0 0
78 . 450

I
I

.600
I
|

-

7 .0 0

I

-

6 .0 0

-

-

-

-

.610
.610 j
.020)
-

HIGHWAY AND STREET
CONSTRUCTION

i

JOURNEYMEN

i

CARPENTERS.......................................
MI LLW RI GHT S ............................
CEMENT F I N I S H E R S .......................
ENGINEERS— POWER E QU IP ­
MENT OPERATORS:
HEAVY EQUIPMENT:
SHOVELS, CRANES,
DRAG LINES ............................
P IL E D R I V I N G MACHINES
3ACKHOFS, CONCRETE
PAVERS...................................
MEDIUM EQUIPMENT:
CAISSON H O IS T S .................
SHAFT H O IS T S ......................
EXC AVATING, CARRYALL,
LETOURNEAU............................

10.130
10.380
8 .100

10.750
11.000
8 .6 0 0

4 0 . 00
40.00
4 0.00

11.920
11.920

12.680
12.680

4 0 . 00
4 0.00

11.920
10.840
10.840
11.040

|
|

_
.60 0

-

7 .0 0
7 .0 0

_

7 .0 0
7 .0 0
-

_

_

-

-

18. 0 5 0

-

10.00
10.00

-

-

-

8 .0 0
8 .0 0

.95 0

_
-

12.680

4 0.00

-

7 .0 0

-

10.00

-

-

-

8 .0 0

1 1 .5 3 0
11.530

4 0.00
40.0 0

-

7 .0 0
7 .0 0

-

10.00
10.00

-

-

- '
-

8 .0 0
8 .0 0

11.750

4 0.00

10.00

*

“

“

8 .0 0

-

7 .0 0

■See f o o t n o t e s a t e n d o f t a b l e .




7 .0 0
7 .0 0
-

2 .0 0

85

-

•

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w age r a te s and s tr a ig h t -t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , July 1, 1975 and J uly 1, 1976)
JULY 1,
1975

J UL Y

1,

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C IT Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR1

HOURS
PER
WEEK2

INSURANCE4

DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER5

PERCENT

DOLLARS

PERCENT

NEWARK, H . J .
-CONTINUED
HIGHWAY AND STREET
CONSTRUCTION
-CONTINUED
JOURNEYMEN
“ CONTINUED
ENGINEERS-POWER EQUIPMENT
OPERATORS-CONTINUED
L IG H T EQUIPMENT:
SMALL MIXERS, PUMPS..
FRONT END L O A D E R S . . . .
CONVEYORS, 125 AND
OVER..........................................
CONCRETE PUMPS.................
STRUCTURAL IRON ERECTORS.

!
$11,040
10.150

$11,750
1 0.800

4 0.00
4 0.00

1 1 .0 4 0
10.150
1 0 . 190

11.750
10.800
10.820

40.0 0
4C. 00
4 0.00

-

7 .7 0 0

8 .2 0 0

4 0.00

0.6 0 0

7 . 150

7 .65C

40.00

.60 0

10.130
10.380

10.750
11.000

40.00
4 0.00

-

10.390
8 . 100

1 0.920
8 .6 0 0

4 0.00
40.00

1.250
.600

7 .700

8 . 200

40.00

.600

12.680
1 4.390

4 0 . 00
4 0 .0 0

-

7 .0 0
7 .0 0

-

12.680

40.00

_

7 .0 0

_

7 .0 0 %
7 .0 0

-

_

7 .0 0
7 .0 0
7 .0 0

-

_
-

-

1 0. 0 0%
10.00
10.00
10.00
23.00

-

_
-

-

_
-

10.00%

-

_
-

0 .0 2 0

8 .0 0 ?
8 .0 0
8 .0 0
8 .0 0
1 .0 0

HELPERS AND LABORERS

JACK HAMMERS, CH IPP ING
HAMMERS, PAVEMENT
BREAKERS, POWER BUGGIES
CONSTRUCTION LABORERS,
DUMPMEN, PIT MEN, FLAG­
MEN....................................................

0 . 9 50

-

.950

18. 0 50
_

_

_

18. 0 50

-

-

-

-

-

-

1 8 . 050

OTHER HEAVY CONSTRUCTION

JOURNEYMEN

11.920
13.520

I
|

10.840

12.680
11.530

4 0 . 00
4 0.00

10.150
9.0 9 0
11.040
10.190

10.800
9 .670
1 1.750
10.820

4 0 .0 0
40.00
4 0.00
40.00

7 . 150

7 .6 5 0

8.4 7 0
10.000
9 .7 5 0

8 .9 2 0
1 0.680
10.250

11.920
10.840

!

o

11.530

p

11.920

7 .0 0
7 .0 C

-

-

1 .7 3 0
. 9 50

_
-

7 .0 0
7 .0 0

7 .0 0
7 .0 0
7.0 C
7 .0 0

-

~

7 .0 0
7 .0 0

0 .7 1 0
-

-

.080

.95 0

7 .0 0

o
o

CARPENTERS.......................................
MIL LW RI GH TS ..............................
DOCK B U IL D ER S , PIER
CARPENTERS, SHORERS,
HOUSE MOVERS, P I L E
DRIVERS AND FOUNDA­
TION WORKERS. . . . . . . . . . . . . . . . . . . . . . . . . . .
CEMENT F I N I S H E R S ......................
JACKHAMMERS, CH IP PIN G
HAMMERS, PAVEMENT
BREAKERS, POWER BUGGIES
ENGINEERS — POWER EQU IP­
MENT OPERATORS:
HEAVY EQUIPMENT:
POWER SHOVELS, CRANES
POWER CRANES, 140 FT.
TRENCHING MACHINES,
TRENCHING M A C H I N E S , ..
MEDIUM EQUIPMENT:
HOISTS (1 OR 2 DRUM
WITH MORE THAN ONE
GENERATOR) . . . . . . . . . . . . . . . . . . . . . . . . . . .
CENTRAL POWER PLANTS
(STEEL ERECTION) . . . .
CONCRETE POWER HOISTS
LIGH T EQUIPMENT:
AIR COMPRESSORS,
SIN GLE PUMPS....................
SMALL MIX ERS ......................
CONCRETE PUMPS.................
STRUCTURAL IRON ERECTORS.

, 8 . 0 50

10.00
10.00
10.00

-

-

-

_

_

_

_

_

_

-

-

-

-

-

-

-

1 0.00

10.00

_
-

-

-

-

10.00
10.00

10.00
10.00
10.00
23.00

8 .0 0
8 .0 0
8 .0 0

8 .0 0

.020

8 .0 0
8 .0 0

8 .0 0
8 .0 0
8 .0 0
1 .00

HELPERS AND LABORERS

B U IL D IN G

o

MEW BEDFORD,

o
o

CONSTRUCTION LABORERS,
DUMPMEN, PIT ME N, FLAG­
MEN....................................................

.600

.950

18. 0 50

HASS.

CONSTRUCTION

JOURNEYMEN

ASBESTOS WORKERS......................
BOILERMAKERS.................................
BR IC K LA Y ER S ....................................

35.00
4 0.00
4 0.00

.760
.75 0
.800

S ee footnotes at end of tab le.




86

.930
-

-

-

.800

1 .0 0 0
10.00
-

-

-

-

-

.020
.09 0

.

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities—Continued
(uTn i o n h o u r l y w a g e r a t e s a n d s t r a i g h t - t i m e w e e k l y h o u r s a n d e m p l o y e r i n s u r a n c e ,
b u i l d i n g t r a d e s . J u l y 1, 197 5 a n d J u l y 1, 1 97 6 )

pension,

JULY 1 ,
1975

v a c a t i o n , an d o t h e r c o n t r i b u t i o n s to fu n d s in the

JU L Y

1,

197 6

EMPLOYER CO NTR IBUTIO NS
TO FUNDS3
RATE
PER
BOOR1

C IT Y AND JOB
C L A S S IF IC A T IO N

RATE
PER
HOUR1

HOURS

j

PER

WEEK2

INSURANCE

PENSION

VACATION

OTHER5

------------- 1----------------DOLLARS

{PERCENT

{DOLLARS

■t"
IBS

BEDFORD,

HASS.

-COITIIUED
B U IL D IN G CONSTRUCTION
-C O N TIN U E D
JOURNEYMEN
-CONTINUED
C A R P -N T E R S . ....................................
CEMENT F I N I S H E R S ......................
e l e c t r i c t a n s . ..............................
ELEVATOR C O N S TR U C TO R S .. ..
ENGINEERS--POWER EQUIP­
MENT OPERATORS:
GROUP A— CRANES, SHOV­
ELS, DRAGLINES, BACKHOES, H O I S T S , GRADALLS
GROUP B— GRADERS, SCRA­
PERS, BULLDOZERS, ROL­
LERS, ASPHALT PAV E RS ..
GROUP C— PUMPS, COM­
PRESSORS, WELDING MA­
CH INE S, CONCRETE SAWS,
V IBRA TO RS , SINGLE
DIAPHRAGM PUMPS.................
G L A Z I E R S .................... .......................
LATHERS............ .. ................................

MACHINISTS...... .
....
MAFBLE SETT^FS..........
MOSAIC AND TERRAZZO
WURKERS.... ...................................
PAINTERS.................................... ..
PAPERHANGERS.................................
PIPEFITTERS.............. ....................
PLASTEPERS.......................................
PLUMBERS....... .........
REINFORCING IRON WORKERS.
ROOFERS, COMPOSITION............
ROOFERS, SLATE AND TILE..
SHELT-M ETA L WORKERS......
STONEMASONS....................................
STRUCTURAL IRON WORKERS..
TILE LAYERS.......... .

$ 8,9 50
9.7 5 0
9 .3 6 0
10.105

$9,300
10.250
9 .6 0 0
1 0.665

40.0 0
40.00
40.00
40.00

0 .5 0 0
.80 0
.550 ,
. 49 5

10.360

10.610

4 0 . 00

1. 100 i

0 . 6 50
.800
.700
.320

I
i

.800

-

_
1 .0 0 ^3

-

-

j
;
4 . OOfol
6 ,0 0

0 .0 4 0
.090
.025
.020

!

.403

■p

10.490

!

1 .1 0 0

o
o

10.240

.800

-

-

.403
!
j

!

I
i
!
!
i

8.650
8 .6 8 0
9.2 5 0
9.5 0 0
9 .050

8 .860
8 .8 8 0 i
9.4 5 0
9.500
9.7 5 0

9 .050
8 . 300
8 .8 0 0
9 . 150
9 . 750
9 .1 5 0
9 . 180
8 .0 5 0
8 .050
8 .780
9.7 5 0
9 . 180
9.050

I
!
!
!
|
i
|

9 .7 5 0
8.3 0 0
8.8 0 0
9.90C |
10.250 !
9.9 0 0
9.1 8 0
8.0 5 0 ;
8.0 5 0
8 .7 8 0
10.250
9.1 8 0
9.7 5 0

i

|

4 0.00
4 0 . CO
40.00
40.00
4 0.00

1 .1 0 0
.520
.450
i
.700 !
!

4 0.00
4 0 . 00
4 0 .0 0 |
4 0.00
4 0.0 0
40,00 I
40.00 !
4C.no !
40.00 !
40.00 |
40.00 !
4 0.00
4 0 . oo;

.700
.600 I
.600 !
.760
.800
.760;
. 700
.600 :
.600;
l
.950
.800:
.700
.70 0 !

I

j

|
!
I

-

'
I
j
2.0 0 % I
!

;
!
;

“
_
_

'
j

7 .7 5 0
7.5 0 0

40.0 0
4 0 . 00

.600
.60 0

7 .6 0 0

7 .6 0 0

4 0.00

.600

7 .070
8 .3 5 0
7 .750
8.6 5 0
8.3 5 0

7 .4 6 5
8.7 1 0
7 .7 5 0
9.95C
8 .7 1 0

40.00
4 0.00
40.0 0
4 0 . 00
4 0 .0 0

.49 5
. 850
.60 0
_
.85 0

;
-

_

-

-

~

-

[
5 .0 0 ,
!
i

!
i
i
:
!

-

-

0 .2 5 0
1 .150
1.1 5 0
. 3 50
.250!
*

-

-

-

.403
. 044
.030
.402
.10 0

-

.10 0

-

-

-

l

'
:
;

-

3 .(

, 150
.090
.15 0
. 0 50
30. 3 7 0
.09 0
.050

-

I

!
!
1

.700
.70 0

_

_
;

-

-

-

-

-

-

-

-

-

-

-

!

.170l
. 17 Oj

-

1 . 1 50
.

.320
. 2 50
.700
.25 0
.250

-

-

-

-

.200

_

!

„

13. 8 0 0
.200
. 200
1 .1 6 0
.800
. 1.160
1 ,5 0 0
.200
.200
.800
.80 0
1J1 . 5 0 0
1S. 8 00

i

j

7.7 5 0
7 .5 0 0

.800
13. 8 50
. 550 !
1
13. 8 00 i

~

o
c

HIGHWAY AND STREET
CONSTRUCTION

:

|

HELPERS AND LABORERS
BRICKLAYERS' TENDERS....
BUILDING LABORERS.......
COMPOSITION ROOFERS'
HELPERS............... .
ELEVATOR CONSTRUCTORS'
HELPERS................
MARBLE SETTEES* HELPERS..
PLASTERERS* LABORERS....
TERRAZZO WORKERS'.......
TILE LAYERS' HELPERS....

;
i

-

:
i

.020
_
I
. 170|
.050}

“

-

I

|

_
-

-

-

i

JOURNEYMEN
8 .950
9.750

9 .3 0 0 1
10.250:

4 0.0 0
4 0.0 0 |

. 50C
.80 0

-

|

!

. 6 50
.800

-

.020
.15 0

!
I
10.360

4 0.00

10.610

1 .1 0 0

.800

.403

I

8.6 5 0
9 . 180

o

10.240

10.490

8.86C
9 . 180;

o
c

CARPENTERS............. . j
CEMENT FINISHERS........ 1
ENGINEERS— POWER EQUIP­
MENT OPERATORS:
G k O U P A--CRANES, POWER '
SHOVELS, DRAGLINES,
BACKHOES, SHAFT
1
HOISTS, GFADALLS..... |
GitOUP B— GRADERS, SCRA­
PERS, BULLDOZERS, ROL­
LERS, ASPHALT PAVERS..
GROUP C— PUMPS, COM­
PRESSORS, WELDING
MACHINES, CONCRETE
MIXERS...............
STRUCTURAL IRON WORKERS..

4 0.00
4O.00

1 .1 0 0

1.1 0 0
.700

.403

.800

-

13.800
1 .5 0 C

.25 0

~

I

.403|
.050

I

HELPERS AND LABORERS
j

CONSTRUCTION LABORERS....!

7.500

7 .5 0 0j

4 0 . oo!

. o o oi

S e e f o o t n o t e s at e n d of t a b l e .




87

.700

i

. 180

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected citie s — Continued
(U nion h o u r ly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u rs and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , J u ly 1, 1975 and J u ly 1, 1976)
J UL Y

JULY 1,
1975

1,

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C IT Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR1

HOURS
PER
WEEK2

DOLLARS

VACATION

PENSION

INSURANCE4

PERCENT

DOLLARS

PERCENT

DOLLARS

OTHER5

DOLLARS

PERCENT

PERCENT

BEDFORD, HASS.
- C O N T I 1 0 BD
OTHER HEAVY CONSTRUCTION
j

i

JOURNEYMEN

10.360

10.61C

10.240

10.490

8 . 650
9 . 180

8 .8 6 0
9 . 180

7.5 0 0

40.0 0
4 0.00

0.500
.80 0

-

1 .1 0 0

-

.800

1 .1 0 0

-

.800

-

-

-

40.0 0
40.00

1 .1 0 0
.700

-

-

0 .2 5 0

-

-

„ .800
131 . 5 0 0

7 .5 0 0

4 0.00

.60 0

-

.700

-

-

9.5 4 0
9.3 5 0

9 .7 4 0
9 .5 5 0

3 5 . 00
4 0.00

.650
.500

-

.960
.500

-

9 . 350
9 .3 0 0
9 .0 5 0
9 .3 0 0
9 . 350

9 . 550
9 .6 5 0
9 .40C
9.6 5 0
9 .5 5 0

40.00
36.00
3 6 . CO
3 6 . CO
4 0.00

.50 0
.650
.650
.65 0
.500

-

.500
.400
.40 0
.400
.50 0

-

10.060
9 .5 0 0

10.060
9.8 4 5

3 6 . 00
4 0.00

.800
.495

-

.400
.320

10.200
10.100
10.200

10.900
10.800
10.900

4 0. 00
40.0 0
4 0.00

.45 0
.450
.45 0

-

.700
.700
.70 0

-

-

9 .750
8.9 5 0
9.550

1 0.450
9 .3 5 0
10.200

4 0 . CO
40.0 0
4 0.0 0

.450
.45 0
.450

-

.70 0
.700
.70 0

-

-

40.0 0

.450

-

.70 0

-

.450

-

.70 0

-

.450
.500
.50 0

-

.70 0
.300
.500

.500
.500
.500
.500
.50 0
.500
.50 0
.50 0
.750
.500
.750
.550
1.050
1 .0 5 0
1 .050

-

.500
.60 0
.600
.60 0
.600
.600
.600
.600
1 .0 8 0
.500
1.080
.95 0
.50 0
.500
.500

0.650
.800

0 . 0 20
.15 0

-

.403

_

.403

-

-

.40 3
.050

-

-

.1 7 0

|
-

-

I
j

_

i

I
-

AND LABORERS

CONSTRUCTION

L A B O R E R S ....

NSW H A V I I ,

B U IL D IN G

$9,300
10.250

■P
o
o
©

HELPERS

$8,9 50
9 .750

©
©
o

CARPENTERS......................................
CEMENT F I N I S H E R S ......................
ENGINEERS— POWER E QU IP­
MENT OPERATORS:
GROUP A— CRANES, POWER
SHOVELS, DRAGLINES,
BACKHOES, SHAFT
H O IS T S, GRADALLS..............
GROUP B— GRADERS, SCRA­
PERS, BULLDOZERS,ROLLERS,
ASPHALT PAV E RS ..
GROUP C— PUMPS, COM­
PRESSORS, WELDING MA­
CH IN E S , CONCRETE
MIX ER S ..........................................
STRUCTURAL IRON WORKERS..

CO H I.

CONSTRUCTION

JOURNEYMEN

8 .9 5 0

9 .3 5 0

8.9 5 0

9 .350

9 . 500
9 .5 7 0
9 . 350

1 0.150
9 .5 7 0
9 .5 5 0

40.00
35.00
40.00

9 .3 5 0
8.5 0 0
8 .7 5 0
11.550
9.5 0 0
11.250
8 .8 5 0
9.0 0 0
9.5 0 0
9 . 350
9.5 0 0
10.400
9.0 0 0
9.2 5 0
9 . 500

9 .5 5 0
8 .8 0 0
9 .0 5 0
1 2.000
9 .8 0 0
11.550
9 . 150
9 .3 0 0
9 .6 0 0
9 .5 5 0
9.60C
10.700
9 .4 0 0
9 .6 5 0
9.6 5 0

4 0 . 00
36.00
36.00
4 0.00
36.00
3 6 . CO
36.00
36.00
3 6.00
4 0.0 0
3 6.00
4 0.00
3 5 .0 0
35.00
35.00

©
o
o

ASBESTOS WORKERS
(M EC HA N IC S)............................
B RI CK LAY ER S....................................
POINT ERS , CAULKERS AND
CLEANERS....................................
CARPENTERS.......................................
DOCK B U IL D ER S ......................
FLOOR LAYERS .........................
CEMENT FINISHERS.........................
EL E CT R IC IA NS ( I N S I D E
H I R E R S ) .........................................
ELEVATOR C O N S TR UC TO RS .. ..
ENGINEERS— POWER E QU IP­
MENT OPERATORS:
HEAVY EQUIPMENT:
CRANES, S TE E L ...................
SHOVELS....................................
DE RRICKS .................................
MEDIUM EQUIPMENT:
PITMAN MACHINES..............
COMPRESSORS.........................
BULLDOZERS............................
LIGHT EQUIPMENT:
WELLS POINTS SYSTEMS.
WELDING MACHINES,
S T E E L ....................................
SMALL CONCRETE MIXERS
(5 BAGS AND OV E R) . . . .
LATHERS...............................................
MARBLE SET TE RS ............................
MOSAIC AND TERRAZZO
WORKERS..........................................
P AI NTE RS , GENERAL....................
STRUCTURAL S TE E L ..............
BR ID G ES .......................................
HE IGH T..........................................
SPR AYING....................................
TAPERS..........................................
PAPERHANGERS.................................
P I P E F I T T E R S ....................................
PLASTERERS.......................................
PLUMBERS.............................................
REINFORCING IRON WORKERS.
ROOFERS, COM POSITIO N............
ROOFERS, T I L E ...............................
PR E-CAST SLABBERS............

-

-

“




88

-

-

-

.050
.050
.050
-

_
-

.247

316 . 5 0 5
-

-

.581
.581
.581

-

-

.581
.58 1
.581

-

-

-

.58 1

-

-

-

.581

-

-

-

-

.581
.030
-

-

-

-

-

-

-

.020
.02 0
.020
.02 0
.020
.02 0
.020
32. 5 4 9
32. 5 4 9
.021
.26 1
.261
.26 1

-

1 .0 0 $
-

-

-

-

.
6.0055

-

-

-

-

-

-

-

_________

S e e fo o tn o te s at end o f ta b le .

.60 0
-

.5 0 0
.50 0
.400
. 2 50
.25 0
.25 0

-

-

-

Table 20. W age rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s t r a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , July 1, 1 9 7 5 a n d J uly l , 1976)
J UL Y

JULY 1 ,
197 5

1,

,

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

PER
HOURl

PER
HOUR!

PER
WEEK2

INSURANCE4

DOLLARS
IBB

PENSION

PERCENT

DOLLARS

OTHER3

VACATION

PERCENT

DOLLARS

PERCENT

DOLLARS

PERCENT

m m , co n .
-C ONTINUED

B UI LD IN G CONSTRUCTION
-CONT INUE D
JOURNEYMEN
-C ONTINUED
SHFET-M ETAL WORKERS..............
STONEMASONS....................................
STRUCTURAL IRON WORKERS:
ERECTORS 6 R I G G E R S . . . .
F I N I S H E R S .................................
T ILE L A Y E R S .. . . ,

$9,0 50
9 . 350

35.00
4 0.00

$10,400
9 .5 5 0

0 .5 0 0
.500

0 .6 6 0
.500

-

_

0 .5 5 0
-

_

10.400
10.400
9 .3 5 0

1 0.700
10.700
9 .5 5 0

40.0 0
4 0.00
40.0 0

.55 0
.550
.500

-

.95 0
.950
.500

-

........
.............

7.2 5 0
7 .0 0 0

7 .7 5 0
7 .5 0 0

4 0.00
40.00

.500
.50 0

-

.450
.450

-

............................

6 .650
8 .4 0 0
7.2 5 0

6 .8 9 0
8 .6 5 0
7 .7 5 0

40.00
3 5.00
4 0.0 0

.495
.500
.50 0

8.4 0 0

8.6 5 0

3 5.00

.500

...............

HELPERS

-

.400
.40 0
-

-

0 .1 4 0

-

-

.021
.021
-

-

. 150

_
-

AND LABORERS

BR IC K LA Y ER S' TENDERS
B UIL DIN G LABORERS
ELEVATOR CONSTRUCTORS'
HELPERS
MARBLE SETTERS' HE L PE RS ..
PLASTERERS' LABORERS............
TERhAZZO WORKERS'
HELPERS..........................................
TERRAZZO MACHINE OPER­
ATORS..........................................
T I L L LAY ERS' HELPERS............

_

.320
.500
.45 0

j

.50 0

-

„
-

-

_
_

_
_
-

-

8 .6 5 0
8.4 0 0

8 .9 0 0
8 .6 5 0

35.00
35.0 0

.50 0
.500

-

.50 0
.500

-

9 .0 5 0
8.5 0 0

9 .1 5 0
8 .7 5 0

4 0.00
40.00

.650
.50 0

-

.40 0
.500

-

10.090

10.790

4 0.00

.45 0

.70 0

9.4 8 0

10.140

.450

.700

9.7 9 0
9.3 1 0

10.470
9 .9 6 0

40.00
40.00

.45 0
.450

-

.70 0
.700

-

-

8 .9 5 0
9 . 130
8 .5 3 0
8.2 1 0
10.400

9 .3 6 0
9 .7 6 C
8 .9 2 0
8 .5 8 0
1 0.700

40.0 0
4 0.00
4 0.00
4 0.00
4 0.00

.45 0
.450
.450
.450
.550

-

.700
.700
.700
.700
.95 0

-

-

7 .0 0 0

7 .5 0 0

4 0.0 0

.50 0

9 .0 5 0
8.5 0 0

9 .1 5 0
8 .7 5 0

4 0.00
4 0.00

.650
.50 0

10.090

10.790

40.0 0

.450

.70 0

9 .4 8 0

10.140

4 0.00

.450

.700

9 .7 9 0
9 . 310

10.470
9 .9 6 0

40.00
4 0.00

.450
.45 0

.150

6 .0 0

-

-

.24 7

-

. 150

_
-

-

_
_
-

HIGHWAY AND STREET
CONSTRUCTION

JOURNEYMEN

o

HELPERS

o
©

CARPENTERS . .. ..............................
CEMENT F I N I S H E R S ......................
ENGINEERS— POWER E Q U IP ­
MENT OPERATORS:
HEAVY EQUIPMENT:
SHOVELS, P IL E D R I V E R S ,
DRAG LIN ES...............................
MEDIUM EQUIPMENT:
GRADER OPERATORS............
PUHP-CRETE OPERATORS,
EUCLID LOADERS, JOY
D R I L L OPERATORS..............
BULLDOZERS............................
L IG H T EQUIPMENT:
WELLS POINT SYSTE MS. .
POWER CHIP PER S .................
PUMP OPERATORS.................
O I L E R S .......................................
STRUCTURAL IRON WORKERS..

. 250
-

.15 8
-

-

-

.581

_

-

-

.40 0

.581

_
-

-

.581
.581
.58 1
.58 1
.581
.581
.06 1

-

*

AND LABORERS

CONSTRUCTION

L A B O R E R S ....

.150

.450

OTHER HEAVY CONSTRUCTION

JOURNEYMEN

CARPENTERS.......................................
CEMENT F I N I S H E R S .......................
ENGINEERS— FOWER EQU IP­
MENT OPERATORS:
HEAVY EQUIPMENT:
SHOVELS, P IL E D R I V E R S ,
DRA GLINES...............................
MEDIUM EQUIPMENT:
GRADER OPERATORS............
PUMP-CRETE OPERATORS,
EUCLID LOADERS, JOY
D R I L L OPERATORS..............
BULLDOZERS............................
LIGH T EQUIPMENT:
WELLS POINT SYSTE MS..
POWER C H IP P ER S .................
PUMP OPERATORS.................
O I L E R S .......................................

8.9 5 0
9 .1 3 0
8 .5 3 0
8 .2 1 0

9.3 6 0
9 .7 6 0
8 .9 2 0
8.58C

i

4 0.00
4 0.00
4 0.0 0
40.00

.45 0
.450
.45 0
.45 0

S e e f o o tn o te s at end o f ta b le .




89

-

-

_
-

-

.400
.500

.70 0
• 70C
.700
.70 0
.700
.70 0

-

.25 0
-

-

.158
-

_

_

.581

_

-

-

.58 1
.581

-

_

_

-

.581

-

-

-

-

-

.581
.58 1
.581
.581

_
-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h ou rly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
build in g t r a d e s , July 1, 1975 and J u ly 1, 1976)

J UL Y

JULY 1 ,
197 5

1,

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS3
RATE
PER
HOUR1

C IT Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

HOURS .
PER
WEEK2

INSURANCE4

DOLLARS

PENSION

PERCENT

DOLLARS

OTHER5

VACATION

PERCENT

DOLLARS

PERCENT

DOLLARS

PERCENT

NEW HAVEN, CONN.
-CONTINUED
OTHER HEAVY CONSTRUCTION
-CONTINUED
JOURNEYMEN
-CONTINUED
STRUCTURAL
HELPERS

IRON WORKERS..

$10,400

$10 ,70 0

4 0.00

0 .5 5 0

0 .9 5 0

7.0 0 0

7 .5 0 0

40.00

.500

.45 0

6 .450
8 .0 0 0
9 .0 5 0

7.6 0 C
9 .0 0 0
9 .840

4 0.00
4 0.0 0
4 0.00

.450
.50 0
.250

9 .0 5 0
8 .6 7 0
9 . 140
8 .7 7 0
8 . 235

9 .8 4 0
9 .2 2 0
9 .5 6 0
9 .3 2 0
8 .9 1 5

4 0.00
40.00
4 0.00
40.0 0
40.0 0

.250
.350
.350
.350
.350

-

-

CONSTRUCTION L A B O R E R S . . . .
■Eff ORLEANS,

B U IL D IN G

0 .4 0 0

0.0 6 1

AND LABORERS

.150

LA.

CONSTRUCTION

JOURNEYMEN

ASBESTOS WORKERS......................
BOILERMAKER....................................
BR ICK LA Y ER S ....................................
CLEANERS, POINTERS,
CAULKERS...............................
CARPENTERS, GENERAL..............
MI L LW RI GH TS ............................
P IL E D R I V E P S ............................
CEMENT F I N I S H E R S ......................
E LE C TR IC IA N S ( I N S I D E
H I R E R S ) ..........................................
ELEVATOR C O N S T R U C T O R S .. ..
ENGINEERS— POWER EQU IP­
MENT OPERATORS:
hFAVY EQUIPMENT—
CRANES, DERRICKS,
DRAG LINES, SCRAPERS,
HOISTS (2 DRUMS),
BULLDOZERS (D -6 AND
L A R G E R ), MIXERS (OVER
16 S) , SHOVELS
TRENCHING MACHINES,
P I L E D R I V E R S .........................
L IG HT EQUIPMENT— A IR
COMPRESSORS, PUMPS
(OVER 3 I N . ) , MIXERS
( 1 6 S AND SMALLER) ,
F I N I S H I N G MACHINES,
BULLDOZERS (SMALLER
THAN D 6 ) .................................
OILERS ( D R I V E R S ) ..............
O I L E R S ..........................................
■GLAZIERS.............................................
LATHERS...............................................
M A C H I N I S T S .......................................
MARBLE SETT ERS............................
MOSAIC AND TERRAZZO
WORKERS..........................................
PAI NT E RS , COMMERCIAL............
STEEL OR SWING S P R AY ..
SPRAY............................................
R E S I D E N T I A L ............................
I N D U S T R I A L ..............................
PAPSRHANGERS.................................
P IP E F I T T E R S ....................................
PLASTERERS.......................................
PLUMBERS............................................
ROOFERS, COMPOSITION............
ROOFERS, SLATE AND T I L E ,
DAMP AND WATFRPROOFERS.
SHEET-METAL WORKERS..............
STONEMASONS................. ..................
STRUCTURAL-IRON WORKERS..
T I L E LAYERS ....................................
HELPERS

9 .5 2 9

9 .7 8 5

8 .4 9 0

9 .2 8 5

4 0.0 0
4 0 .0 0

.300
.49 5

8 .6 7 0

9 . 360

40.00

.25 0

7.4 2 0
6 .8 7 0
6 . 510
8.125
7 .7 8 0
7 . 190
9 .0 5 0

7 .9 9 0
7 .4 0 0
7 .0 2 0
8 .7 5 0
8 .2 3 0
7 .830
9 .8 4 0

4 0.00
4 0.00
4 0.0 0
4 0.00
40.0 0
4 0 .0 0
4 0.0 0

.25 0
.250
.250
.17 0
.20 0
.250
.250

8 .0 0 0
6 .9 7 5
7.3 5 0
7 .3 5 0
6 .9 7 5
8 .2 2 5
6.9 7 5
9.2 0 0
7 .7 5 0
9.2 0 0
7 .5 6 0

8 .600
7 .7 7 5
8 .1 5 0
8 .1 5 0
7 .7 7 5
9 .0 2 5
7 .7 5 0
9 .8 0 0
8.1 0 0
9 .8 0 0
7 .9 6 0

4 0.0 0
4 0.00
4 0.00
4 0.00
40.00
4 0.0 0
40.0 0
4 0.00
4 0.0 0
40.0 0
4 0 . 0C

.250
.27 5
.27 5
.27 5
.275
.275
.275
.450
.400
.450
.45 0

7 .5 6 0
8 .3 1 0
9 .0 5 0
8 .8 3 0
8.0 0 0

7 .9 6 0
8 .8 1 0
9.8 4 0
9 .6 1 0
8 .6 0 0

4 0.0 0
40.00
4 0.00
40.0 0
40.0 0

.45 0
.400
. 2 50
.300
.25 0

6.0 4 0
6.1 4 0

6 .8 9 0
6 .9 9 0

4 0 . 00
40.0 0

.150
.150

-

_
_

_

1 .0 0 0
1 .0 0 0
.20 0

_
_

.20 0
.300
.300
.30 0
.300

_
-

.300
.320

.80 0

_
_

_

.15 0
. 150
. 150
.15 0

1 .0 0 *
-

-

_
_
_
_
6 5 .0 0 %
6.0 0 %

„
.03 5
.03 5
_
_

_
_

_
.02 0

2 .4 0 *

.480

-

_
-

-

-

.48 0
.48 0
.480
.300
.30 0
. 150
.200

-

-

_
.300
.300
.300
.30 0
.30 0
.300
.750
.200
.750
.450

_
-

.450
.600
.20 0
.350
-

-

-

.10 0
_
-

_
_
-

_

-

. 125
.250
_

*

-

.100
.50 0
-

.15 0
.100

-

.08 0
.035

_
.
_
-

_

-

.50 0
6. 350
.5 0 0
. 100

_

_
_
_
_

-

. 140
.08 0
. 140
.450

_
_

. 450
.065
.0 3 5
.04 0
-

-

_
_
_
-

3 .00
_
-

AND LABORERS

BR IC K LA Y ER S' TENDERS............
MORTAR MIX ER S ......................

.20 0
.200

.05 0
.050
'

S e e fo o tn o te s at end o f ta b le .




90

'

'

—

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nio n h o u r ly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , Ju ly 1, 1975 and J u ly 1, 1976)
JULY

JULY 1 ,
_ . 1975______

1976

1,

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR1

HOURS
PER
WEEK?-

INSURANCE4

DOLLARS

PERCENT

DOLLARS

OTHER5

VACATION

PENSION

DOLLARS

PERCENT

PERCENT

DOLLARS

PERCENT

■ E l OI X.BA1S, L A .
- C O 1 T 1 I0 K D
B UI LD IN G CONSTRUCTION
-CONTINUED
HELPERS AND LABORERS
-CONTINUED
!
BU IL D IN G LABORERS....................
ELEVATOR CONSTRUCTORS'
HELPERS............................................
MARBLE SETTERS' HE LPE RS ..
PLASTERERS' LABORERS............
MORTAR MIXERS (MACHINE
OR H A N D ) ....................................
TEREAZZO WORKERS'
HELPERS..........................................
BASE MACHINES......................
FLOOR MACHINES....................
BUFFERS.......................................
TI Lc. LAYERS' HELPERS............

$5,910

$ 6.740

40.00

0 .1 5 0

5 .9 4 0
6.0 5 0
6 .0 3 0

6 .5 0 0
6.5 5 0
6 .8 8 0

4 0.00
4 0 . 00
4 0.00

.49 5
.250
. 150

6.1 3 0

6 . 980

4 0 .0 0

.15 0

_

6.0 5 0
6.4 5 0
6.2 0 0
6 .1 0 0
6 .0 5 0

6 .0 5 0
6 .9 5 0
6.7 0 0
6 .6 0 0
6 .5 5 0

40.00
4 0.00
4 0.00
40.00
4 0.0 0

.250
.25 0
.25 0
.250
.250

_

0 .2 0 0

0 .0 5 0

.

.320

-

.200

-

.200

.

_

-

-

.
-

-

-

-

-

-

_
-

-

-

0 .1 0 0
_

6 .0 0
_

.020
. 100
.050

2 .4 0
_

.05 0
. 100
.100
.100
. 100
.10 0

_
-

!

-

I

HIGHWAY AND STREET
CONSTRUCTION

j
. 100
.100 I
.100
.100 I
.100 I
|
I

I

I
i

I
JOURNEYMEN

CARPENTERS.......................................
CEMENT P I N I S H E R S ......................
ENGINEERS— POWER E QU IP­
MENT OPERATORS:
CRANES OVER 60 T O N S . . .
CRANES, 125 FT. BOOM..
CRANES, 175 FT. BOOM..
HEAVY DUTY OPERATORS..
MEDIUM DUTY OPERATORS.
L IG H T DUTY OPERA TORS..
MECHANIC HELPERS,
BATCH PLANT OPERATORS
O I L E R S ..........................................
FI RE MEN .......................................
OPERATING STEAM
V ALV ES ....................................
OILE RS ON CRANES USING
STEAM TO DRIVE P I L E S . .
STRUCTURAL IRON WORKERS..
HELPERS

8 . 820
6.9 0 0

9.2 2 0
8 .4 5 0

40.00
4 0.00

.350
.350

8.4 5 0
8 .450
8 .700
8.200
7.200
6.8 8 0

9 . 130
9 . 130
9.3 8 0
8 .8 8 0
7 .7 9 0
7 .4 5 0

4 0 . 00
4 0.00
40.00
40.00
4 0.00
40.00

.25 0
.25 0
.250
.250
.25 0
.25 0

_
-

.480
.480
.480
.480
.480!
.480

6 . 270
5 .9 9 0
7 . 200

6.7 8 0
6 .4 8 0
7.7 9 0

40.00
4 0.00
4 0.0 0

.250
.250
.250

-

7 .4 5 0

8.0 4 0

40.00

.25 0

6.2 4 0
8.4 7 0

6.7 3 0
9.270

4 0 . CO
4 0.00

.250
.300

4.9 0 0
5.0 0 0
5.4 5 0
5 .7 0 0

5.4 5 0
5 .550
5.730
6 .2 5 0

4 0.00
4 0 . 00
4 0.0 0
4 0 . 00

.150
. 150
.150
.150

8 .8 2 0
6.9 5 0

9 .2 2 0
8 .4 5 0

4 0.00
40.00

8 .7 3 0
8.7 3 0
8 .9 8 0
8 .4 8 0
7 .5 0 0
7.1 6 0

9 .4 3 0
9 .4 3 0
9 .6 8 0
9 .1 8 0
8 .1 2 0
7 .7 5 0

6.5 5 0
6.2 7 0
7 .480

7 .0 8 0
6 .7 8 0
8 .1 5 0

-

|

.300
.30 0 j

.15 0
_

!
I

!
i

_

j
-

-

_
_
_
-

_
_
_

_

.48 0
.480
.480

_
-

_
_
_

_
-

-

.480

_

.48 0
.350

-

-

-

-

*

.20 0
.20 0
.20 0
.200

.35 0
.350

-

.300
.30 0

-

4 0.0 0
40.0 0
4 0.00
40.00
4 0.00
4 0.00

.25 0
.25 0
.250
.250
.25 0
.250

-

.480
.48 0
.48 0
.48 0
.480
.48 0

-

40.0 0
4 0.00
40.00

.250
.25 0
.250

-

.48 0
.480
.48 0

-

_

_
-

-

-

_

j
_
'

I

„

_
-

-

AND LABORERS

CONSTRUCTION L A B O R E R S . . . .
RAKERS..........................................
FORMSETTERS............................
POWDEBMEN.................................

-

-

.05 0
.05 0
.050
.050

-

*

OTHER HEAVY CONSTRUCTION

JOURNEYMEN

7 .7 3 0

8 .4 0 0

6 . 520
8 .7 2 0

7 .0 3 0
10.170

o
o
©

CARPENTERS
CARPENTERS.......................................
CEMENT F I N I S H E R S .......................
ENGINEERS— POWER EQU IP­
MENT OPERATORS:
CRANES OVER 60 T O N S . . .
CRANES, 125 FT. BOOM..
CRANES, 175 FT. BOOM..
HEAVY DUTY OPERATORS..
MEDIUM DUTY OPERATORS.
LIGHT DOTY OPERATORS..
MECHANIC HELPERS,
BATCH PLANT OPERATORS
O I L E R S ..........................................
FIRE MEN .......................................
OPERATING STEAM
VALVES.......................................
OILERS CN CRANES USING
STEAM TO DRIVE P I L E S . .
STRUCTURAL IRON WORKERS..

40.00
4 0.00

.25 0
.25 0
.300

S e e f o o tn o te s at end of ta b le .




91

_

_

_

.48 0
.48 0
.35 0

.15 0
. 150

-

-

-

-

-

-

-

_

_
-

-

_

_

_

_

-

-

-

_
_

Table 20. W age rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , J u ly 1, 1975 and J u ly 1, 1976)
JUL Y

JULY 1 ,
1975

1,

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C L A S S I F I C A T IO N

PER
HOURi

HOURS
PER
WEEK2

PER
HOURi

1
PENSION

INSURANCE4

DOLLARS

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER5

PERCENT

DOLLARS

■EV ORLEANS, LA.
-CONTINUED

PERCENT

I

OTHER HEAVY CONS. RUCTION
-CONTINUED
!
I

HELPERS AND LABORERS

CONSTRUCTION LABORERS____
RAKERS..........................................
PORMSETTERS............................
POWD2RMEN......................... ..

$5.350
5 .5 5 0
5 .9 5 0
6.2 0 0

$ 6,050
6 .2 5 0
6 .665
7 .0 0 0

4 0.00
40.00
4 0.00
40.00

0 .150
. 150
.15 0
. 150

9 .7 0 0
710 . 5 7 0
9.9 9 0
10.390
1 0 . 390
10.390
9 .5 0 0

1 0.450
1 1.520
10.690
10.920
10.920
10.920
9.5 0 0

35.00
3 5.00
3 5 . 00
35 .0 0
35.00
40.00
35.00

1. 130
1.2 5 0
1 .2 5 0
1 .2 5 0
1.360

11.500
1 0.120

1 2.250
1 0.760

j

35.00
3 5 . 0C

.545

11.600
11.600

1 1.660
11.740

j

3 5.00
3 5.00

.93 0
.930

11.520
11.510
10.990
10.950
10.950
10.950

11.740
11.660
11.110
1 1.010
11.010
11.010

35.00
35.00
35.00
35.00
3 5.00
35.00

.930
.93 0
.93 0
.930
.93 0
.930

11.440

1 1.4 4 0

35.00

-

0.200
.200
.20 0
.20 0

-

-

-

-

-

“

-

-

12.00X
7 .0 0
-

0 .0 2 0
.07 0
.080
.080
.080
.030

-

5 .7 0

.429
28. 0 2 0

NEW YORK, N.Y.

B U IL D IN G

CONSTRUCTION

JOURNEYMEN

4 .6 0
-

.571
1 .493

7 .50X
15.00
3.40
-

0 .3 0 0
.65 0
.650
.71 0
1.7 5 0

_
-

27-

33 .

0 .5 0
-

I
I
j
!
i
i
I

-

1 .9 5 0
1.950

-

1 .9 5 0
1 .9 5 0
1 .9 5 0
1.950
1 .9 5 0
1 .9 5 0

.930

_

1 .9 5 0
1.9 5 0

»

. 7 00

-

1 . 9 50

_

.70 0

-

-

.700
.700

.02 0
.02 0

-

11.200

1 1.330

3 5.00

.930

_

10.500

1 0.590

3 5 .0 0

.930

-

_

-

_

-

.7A 0
.700
.70 0
.70 0
.70 0
.70 0

-

_

.7 0 0

_

I
j
I
!
|

.020
.02 0

-

_

.020
.020
.02 0
.020
.020
.02 0

-

.020
.020

_
_

.02 0

_

j

9 .8 9 0
1 0.360

11.240

11.780

1 1.050
10.630
10.700
11.050
11.240
11.300

1 1.580
11.130
11.270
11.580
11.780
11.900

40.00
40.0 0
4 0.00
4 0.0 0
4 0.0 0
4 0.0 0

.700
.70 0
.700
.7 0 0
.700
.70 0

-

.50 0
.500
.50 0
.500
.50 0
.50 0

-

.7 0 0
.7 0 0
.7 0 0
.70 0
.70 0
.7 0 0

11.520
10.150
8 . 810
6 .6 0 0
9 .6 0 0

1 2.070
10.630
9 .2 1 0
6 .8 8 0
10.300

40.0 0
3 5.00
35.00
35.00
3 5.00

.70 0
.700
.700
.700
.066

-

.500
.500
.500
.500
1.6 6 0

-

.700
.70 0
.70 0
. 700
.370

-

-

.14 0
.14 0
.14 0
.14 0
-

9 .4 0 0
10.100

9 .4 0 0
1 0.100

35.00
3 5.00

.94 5

-

.250
1 .9 8 5

-

.75 0

-

.07 0

-

.100
.07 0

-

1 1. 340
10.100

1 1.340
10.100

35.00
35.00

_

-

. 7 00
.70 0

9. 830
10.280

3 5.00
35.0 0

.93 0
.930

-

.700

.94 0
.945

S e e fo o tn o te s at end o f ta b le .




3 .3 8 0
1 . 7 3 0 Ii
1 .730
1 .7 3 0
1 .1 3 0

I

o
o

PORTABLE COMPRESSORS,
3 OR MORE I N BATTERY.
CONCRETE PUMPS....................
AGREEMENT B:
SCRAPERS, TOURNAPULLS,
MOTOR PATROLS, BULL­
DOZERS.......................................
TRACTORS, LOCOMOTIVES
(10 TONS AND UNDER) ,
ROAD F I N I S H I N G MA­
C HI NE S , MIXERS UNDER
2 1 E ...............................................
O I L E R S ..........................................
OILE RS (STEEL E R E C . ) . .
FI RE ME N.......................................
MAINTENANCE ENGINEERS.
STEEL ERECTION..............
OHERRYPICKERS 20 TONS
AND OVER, LOADERS 6
CU YDS AND OVER..............
PARTY C H I E F ............................
TRANSITMEN...............................
RODMEN..........................................
G L A Z I E R S ............................................
LATHEES:
WOOD:
BRONX, MANHATTAN, AND
STATEN I S L A N D ....................
BROOKLYN.................................
WOOD, WIRE AND METAL:
NASSAU-SUFFOLK.................
METAL.............................................

_

6 . 2 0X
5 .0 0
-

i

o

ASBESTOS WORKERS......................
BOILERMAKERS.................................
B RI CK LAY ER S....................................
CARPENTERS.......................................
MI LLW RI GH TS ............................
WHARP AND BRIDG E ..............
CEMENT F I N I S H E R S . ....................
E LE C TR IC IA N S ( I N S I D E
H I R E R S ) .......................................
ELEVATOR C O N S TR U C TO R S .. ..
ENGINEERS--POWER E Q U IP ­
MENT OPERATORS:
AGREEMENT A:
CRANES AND 2-DRUM
DERR ICK S .................................
DOUBLE DRUM H O I S T S . . . .
CRANES (STRUCTURAL
S T E E L ) .......................................
SHOVELS.......................................
P IL E O R I V E R S ............................
HOI ST S. .......................................
WELDING M ACHI NE S..............
COMPRESSORS............................
CONCRETE BUCKETS
(STONE D T R R I C K ) ..............
CRANES (DIGGING
B U C K E T) ....................................
CONCRETE MIXERS, POWER
HOUSES..........................................

92

1 .9 5 0
1 .9 5 0

.50 0

_
-

.200
1.9 8 5

-

.70 0

_
“

.75 0

.14 0

-

-

_

.14 0
. 140
.140
.14 0
.140
.140

-

-

-

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
( U n i o n h o u r l y w a g e r a t e s and s t r a i g h t - t i m e w e e k l y h o u r s an d e m p l o y e r i n s u r a n c e ,
b u i l d i n g t r a d e s , J u l y 1, 1 9 7 5 a nd J u l y 1, 1 97 6 )

pen sion ,

J UL Y

JULY 1,
1975

vacation,

1,

an d o t h e r c o n t r i b u t i o n s to fu n d s in th e

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR1

HOURS
PER
WEEK2

DOLLARS
MB

PERCENT

DOLLARS

OTHER5

VACATION

PENSION

INSURANCE4

PERCENT

DOLLARS

COLLARS

PERCENT

PERCENT

YORK, N . I .
-CONTINUED

BU IL D IN G CONSTRUCTION
-C ONTINUED

HELPERS

$8,200

$ 8,5 50

3 5 .0 0

0 .6 1 C

9.4 5 0
8 .0 0 0
9.7 1 0

10.030
8.7 3 0
10.600

35.00
3 5.00
3 5.0 0

.76 0
-

10.000
9.7 3 0
8 .995

10.780
10.460
10.070

3 5.0 0
35.00
35.00

.750

1 .1 0 0

_

8.700

9.5 5 0

3 5.00

8 . 550
8 .7 0 0
9 . 500
9 .7 5 0
9.710

9.2 5 0
9 .1 0 0
1 0 . 100
79 . 9 5 0
9 .9 1 0

35.00
35.00
35.00
35.00
3 5 . CO

1 .1 0 0
341 . 1 0 0
2 .6 1 0
.850
.890

1 0 . 100
9 .0 0 0
9 .7 0 0

10.100
9 .3 5 0
79 . 700

35.00
3 5.00
3 5 . 00

.945
1 .0 9 0
.500

1 .2 1 0

_

0 .7 4 0

0 .950
_

7 , 5 OSi
7 .5 0

1 .5 0 0
.571
.571

7 .5 0
8 .0 0
-

.571
..120

6 .5 0
14.00
-

.800
1.8 3 0
1 .4 4 0

_
-

1.985
2 .4 5 0
1 .4 0 0

-

6 .5 0 ? i
6 .5 0

_
-

_
. 860

_

.620

3.00?
3 .0 0

-

_
-

_

3 .0 0
-

1 .4 0 0
2 .0 2 0

4 . 0(
-

1.4 0 0

_
_
_

1 . 7 50
.79 0
1 .0 0 0

_

_

_

.90 0
1 .3 0 0
.720
1 . 0 50
.89 0

-

. 140
.14 0
1 .4 4 0
.46 9
1 .2 9 7

.75 0
1. 15C
1 .4 0 0

.070
-

_

-

. 350
-

-

1 .200
.050
-

!

_

-

_

10.600
11.670
9.7 5 0

1C.820
11.670
10.250

35.00
3 5 . 00
35.00

.550
1 .1 1 0
.500

9 . 170

10.520

3 5.00

1 .0 9 0

-

1 . 9 60

-

1 .5 0 0

-

.600

-

2 .4 5 C

-

1 .3 5 0

-

. 150

-

_

_
_

.11 0
.140
.05 0

_

-

1 .3 5 0
.78 0

-

2 .4 5 0
2 .3 5 0
2 .1 0 0

1 .3 9 5
1 .1 5 2
1 .4 9 3

-

1 .2 0 0
-

27 -

28- 0%0
8. 0 2 0

-

1.160
1.000
-

-

.95 0
. 35 0
.80 0

-

.540
-

-

_

1 .1 5 0
1.0 0 0
.500

_

.15 0
.04 0
.610
.610
.040

-

-

-

-

. 6 50
.71 0
.65 0
1 .7 5 0

.080
.08 0
.08 0
.030

-

3 .0 0
-

o
o
o
o

JOURNEYMEN
-CONTINUED
MARBLE SETTERS 6 CUTTERS.
MOSAIC AND TERRAZZO
WORKERS..........................................
P AI NTE RS ............................................
SWING STAGE............................
DECORATORS AND G RA IN E R S . ............................... ..
STRUCTURAL ST EE L ..............
P IP E F I T T E R S ....................................
PLASTERERS:
AST O RI A , BROOKLYN,
GREAT NECK, JA M A IC A ,
LONG I S L A N D .........................
BRONX, MANHATTAN,AND
RICHMOND.................................
FL U S H IN G ....................................
PLUMBERS.. ......................................
RICHMOND................................. ..
BROOKLYN............................ ..
REINFORCING IRON WORKERS
- - NYC O NL Y .................................
ROOFERS, COM POSITION............
ROOFERS, SLATE, AND T I L E . .
BROOKLYN, QUEENS,AND
LONG I S L A N D .........................
SHEET-METAL WORKERS..............
STONEMASONS....................................
STONESETTERS (NEW YORK
AND LONG I S L A N D ) ..............
STRUCTURAL IRON WORKERS;
MANHATTAN............................ .. .
BROOKLYN, QUEENS,
NASSAU,AND S U F F O L K . . .
F I N I S H E R S ....................................
T I L E LAYERS ....................................

11.40C

4 0.0 0

1 .3 5 0

_

10.000
9 .2 4 0
8 . 400

10.900
10.24 0
8 .7 5 0

4 0.00
35.00
4 0.00

1 .3 5 0
.860
.80 0

_
-

8 .8 5 0
7.7 0 0
7 .5 9 0

9 .0 0 0
7 .700
8.0 7 0

35 . 00
35.0 0
3 5.00

.68 7
.802
.545

-

7 . 830
7 .9 0 0
8.2 0 0

8 .0 3 0
8 .2 5 0
8 . 200

35.00
3 5.00
4 3.0 0

.61 0
.90 0
2 .450

. -

7 .9 0 0
7 .9 0 0
8 . 150
77 . 960
78 . 110
7 . 580

8 .7 5 0
77 . 9 0 0
8 .4 5 0
8 .8 4 0
8 .9 9 0
7.8 6 0

40. 0o
3 5.00
4 0.00
35.00
35.00
40.0 0

1 .4 0 0
.50 0
1 .3 2 0
.760
.76 0
.530

3 .0 0
-

3 .0 0
-

-

AND LABORERS

BRICKLAYERS* TENDERS............
CBNCRITE LABORERS....................
HELPERS.........................................
ELEVATOR CONSTRUCTORS'
MARBLE SETTERS' HE LPE RS ..
PLASTERERS' LABORERS...........
BR OOK LYN . .................................
QUEENS, NASSAU, AND
SUFFOLK COU NTIES’. . . . .
ROOFERS' HELPERS......................
PLUMBERS* L A B O R E R S .. ............
TERRAZZO WORKERS*....................
GRI NDERS ....................................
T I L E LAYERS' HELPERS............

_

_
-

1 .000
1 .4 3 0
1 .5 0 0
1 .5 0 0
.77 0

.010

-

-

i
|
j
j

'
HIGHWAY AND STREET
CONSTRUCTION

JOURNEYMEN
I
CARPENTERS.......................................
P I L E D S I V E R S ............................
TIMBERMEN.................................
CEMENT F I N I S H E R S ......................
ENGINEERS— POWER E QUI P­
MENT OPERATORS;
AGREEMENT A;
HEAVY E Q U I P M E N T STEEL ERECTION
(CRANES AND 2-DRUM
D E R R I C K S )............................
P I L E D R I V E R S . . . . . _____
SHOVELS................................
CRANES (DIGGING
B U C K E TS ) ............................

10.390
10.390
9 .4 5 0
9 .5 0 0

1 0.920
10.920
9.9 3 0
9 .5 0 0

40.0 0
4 0.00
4 0.00
35.00

1 .2 5 0
1 .2 5 0
1 .2 5 0
1.360

-

1 .7 3 0
1 .7 3 0
1 .7 3 0
1. 130

11.600
10.990
11.510

11.740
11.110
11.660

4 0.0 0
4 0.0 0
40.00

.930
.930
.93 0

-

1 . 9 50
1 .9 5 0
1 .9 5 0

-

.70 0
.70 0
.70 0

-

.020
.020

-

11.200

11.330

4 0.00

.930

-

1 .9 5 0

-

.70 0

-

.020

-

S e e fo o tn o te s at end of ta b le .




93

-

-

-

.02 0

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s t r a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , July 1, 1975 and J uly 1, 1976)
JULY 1,
197 5

JULY

1,, 1 97 6
EMPLOYER CONTRIBUTIONS
TO FUNDS3

C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR1

HOURS
PER
WEEK 2

INSURANCE4

PENSION

OTHER5

VACATION

DOLLARS

PERCENT

DOLLARS

PERCENT

DOLLARS

PERCENT

DOLLARS

PERCENT

0 .9 3 0
.93 0

-

1.9 5 0
1 .950

-

0 .7 0 0
.70 0

-

0 .0 2 0
.020

-

1 . 9 50

_

.70 0

_

.020

_

1 .950
1 .9 5 0
1 . 9 50

-

.70 0
.700
.700

-

.020
.02 0
.02 0

-

BEW TOBK, I . I .
-COMTIBUED
HIGHWAY AND STREET
CONSTRUCTION
-C ONTINUED
JOURNEYMEN
-CONTINUED
ENGINEERS-POWER EQUIPMENT
OPERATORS—CONTINUED
MEDIUM EQUIPMENT:
CRANES....................................
MIX ER S ....................................
POWER HOUSE (LOW
PRESS URE ).........................
L IG H T EQUIPMENT:
PORTABLE COMPRESSORS
(3 I N BA TT ER Y ) ..............
CONCRETE PUMPS..............
DOUBLE DRUM H O I S T S . .
AGREEMENT B:
SCRAPERS, TURNAPULLS,
MOTOR PATROLS...................
LOCOMOTIVES (LESS
THAN 10 TONS) , ROAJD
F I N I S H I N G MACHINES,
MIXERS UNDER 2 1 E . . . .
O I L E R S .......................................
STRUCTURAL S T E E L . . . .
MAINTENANCE ENGINEERS
STRUCTURAL S T E E L . . . .
CHERRY PICKERS (20 T
AND O V E R ), LOADERS
(OVER 6 CU. YDS. ) . . .
FI REMEN ....................................
PARTY C H I E F .........................
TRA NSI TM EN ............................
EODMEN.......................................
STRUCTURAL IRON WORKERS..
F I N I S H E R S .................................
HELPERS

$11,430
10.500

$1 1 . 5 8 D
10.590

40.00
4 0 . on

10.500

10.590

40.00

.93 0

_

10.280
10.280
10.280

10.360
1 0 . 36 D
10.360

4 0.00
40.00

.93 0
.930
.93 0

-

11.240

1 1.780

40.00

.700

11.050
10.630
10.700
11.240
11.300

11.580
1 1.130
11.270
11.780
11.900

40.00
4 0 . CO

.70 0
.700
.700
.70 0
.700

-

.500
.500
.500
.50 0
.500

-

.700
.70 0
.7 0 0
. 700
. 7 00

-

. 140
.14 0
.14 0
. 140
.140

-

11.520
11.050
8.7 6 0
7 . 790
71 0 . 0 0 0
9. 240

12.070
1 1.580
10.700
9 .1 6 0
8 .1 3 0
1 1.400
10.240

.700
.700
.700
.700
.700
1 .3 5 0
.860

-

.500
.500
.500
.500
.50 0
2.450
2.3 5 0

-

.70 0
.700
.7 0 0
.700
.700
1. 350
.78 0

-

.140
.140
. 140
.14 0
.140
.150
. 140

~

8 .7 7 0
6 .9 0 0

9 .3 2 0
7 .1 0 0

40.00

13.00%

. 7 50

-

9. 540
18 _

-

7.5 0 0
7 .3 0 0

7 .7 0 0
7 .5 0 0

40.00
40.0 0

13.00
13.00

.75 0
. 7 50

_

18 _
18 _

-

6 . 900
10.900

7 .1 0 0
10.90C

40.00

_

3 5.00

.600

. 7 50
-

10.390
10.390
9.4 5 0
9 . 500

10.92C
1 0.920
9.9 3 0
9 .5 0 0

40.00

4 0.00
4 0 . 00
3 5.00

1.250
1 .2 5 0
1 .2 5 0
1.360

10.220

40.00

4U.00
4 0.0 0
4 0 . 00

40.00
40.00
35.00
35.00

35.00
4 0.00
35.00

.500

.70 0

.14 0

AND LABORERS

CONSTRUCTION LABORERS:
AGREEMENT A ............................
AGREEMENT B ............................
CONCRETE AND CURB FORM
SETT ERS.......................................
ROLLER BOYS.........................
JACKHAMMER AND D R I L L MEN...............................................
CURbSETTERS AND FLAGGERS.

40.00

.600
-

_
-

1 0. 0 0%
10.00
10.00

1 .0 0 0
-

_
_

10.00
-

1.000

13.00
-

-

1 .7 3 0
1 .7 3 0
1 .7 3 0
1.130

-

-

_

!8 9. 5 4 0

_

_
-

OTHER HEAVY CONSTRUCTION

JOURNEYMEN

CARPENTERS.......................................
P IL E D R I V E R S ............................
II M B E R M E N ......................... ..
CEMENT F I N I S H E R S ......................
ENGINEERS— POWER EQU IP­
MENT OPERATORS:
AGREEMENT A:
HEAVY EQUIPMENT
CRANES AND 2-DRUM
DERRICKS (STEEL) . . . .
CRANES (DIGGING
B U C K E T S )...............................
MEDIUM EQUIPMENT:
CRANES.......................................
MIX ER S .......................................
POWER HOUSES (LOW
PR ESSURE)............................
L IG H T EQUIPMENT:
PORTABLE COMPRESSORS
(3 I N BA TT ER Y ) ..............
CONCRETE PUMPS)..............
DOUBLE DRUM H O I S T S . . .
SCRAPERS,TOURNAPULLS,
MOTOR PATROLS.................
LOCOMOTIVES (LESS THAN
10 T O N S ) , ROAD FIN­
ISHING MACHINFS, M I X ­
ERS UNDER 2 1 E ....................

11.600

11.740

4 0 . 00

.93 0

11.200

11.330

40.00

.930

11.430
10.500

11.58 0
10.590

40.0 0
4 0.00

.930
.930

-

1 .9 5 0
1 .950

10.500

10.590

40.00

.93 0

_

10.280
10.280
10.280

10.360
10.360
10.360

4 0.00
4 0 . 00
40.00

.93 0
.930
.93 0

-

11.240

11.780

4 0.00

.70 0

_

.500

11.050

11.580

4 0 . 00

.7 0 0

-

.500

.650
.71 0
.650
1.7 5 0

1.950

_
_

1 .9 5 0

.70 0

_
_




94

.08 0
.080
.08 0
.03 0

-

.020

_
_

.020

_

-

.020
.020

-

.700

_

.0 2 0

_

.70 0
.7 0 0
.700

-

.0 2 0
.020
.0 2 0

-

.7 0 0

-

.7 0 0
.7 0 0

1 . 9 50

_

1 .9 5 0
1 . 9 50
1 .950

-

.7 0 0

.70 0
I

S ee fo o tn o te s at end o f t a b le .

-

_

-

.140

.140

_

_

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w age r a te s and s t r a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e ,
b u ild in g t r a d e s , July 1, 1975 and J u ly 1, 1976)

p e n s io n ,

JULY 1,
1975

v a c a tio n ,

and o th e r c o n tr ib u tio n s to funds in the

JULY 1» 1976
EMPLOYER CONTRIBUTIONS
TO FUNDS'*

CITY AND JOB
CLASSIFICATION

RATE
PER
HOUR 1

RATE
PER
HOUR1

HOURS
PER
WEEK 2

INSURANCE
DOLLARS

PENSION
DOLLARS

PERCENT

VACATION

PERCENT

DOLLARS

OTHER

PERCENT

DOLLARS

PERCENT

NEW YOBK, H.I.
-COHTIHOBO
OTHER HEAVY CONSTRUCTION
-CONTINUED
JOURNEYMEN
-CONTINUED

I
|

ENGINEERS— POWER EQUIPMENT
OPERATORS:-CONTINUED
OILERS...............
STRUCTURAL STEEL....
MAINTENANCE ENGINEERS.
STRUCTURAL STEEL___
CHERRYPICKERS (20 TONS
AND OVER), LOADERS
(OVER 6 CU YDS.).....
FIREMEN........ . ....
PARTY CHIEF...........
TRANSITMEN...... .
RODMEN...............
STRUCTURAL IRON WORKERS:
AGREEMENT A............
AGREEMENT B............
FINISHERS............

$10,630
10.700
11.240
11.300

$1 1 . 130
11.270
11.780
11.900

40.00
40.CD
40.00
40. 00

0.700
.700
.700
.700

-

11.520
11.050
1C.220
8.760
7.790

12.070
11.580
10.700
9.160
8. 130

40.00
40.00
35.00
35.00
35.00

.700
.700
.700
.700
.700

-

10.000
710.000
9.240

10.90C
11.400
10.240

40. 00
40.00
35.00

1.350
1.350
.860

-

HELPERS AND LABORERS
GENEPAL LABORERS:........
AGREEMENT B:
BUILDING, CONCRETE, EX­
CAVATING AND COMMON
LABORERS............. !
DRILL RUNNERS........... !
DRILL RUNNERS’ HELPFRS
AND NIPPERS............
JACKHAMMER OPERATORS.... j
POWDER CARRIERS.........
TUNNEL WORKERS:
COMPRESSED AIR.......
FREE AIR..............
IGF LABORERS.........

6.900

7.100

40.00

8.150
77.960

8.45C
8.810

40. 00
40.00

76.640
77. 770
77.030

7. 29C
8.590
7.740

40.00
40.00
40.00

710.507
79. 867
79.012

1 1.604
10.907
9.979

37.50
37.50
37. 50

10.0051

i
j
0.700 |
.700
.700
.700

-

0.500
.500
.500
.500

-

0. 140
. 140
. 140
.140

-

.700
.700
.700
.700
.700

-

.140
.140
. 140
. 140
.140

-

1.350
1.350
.780

-

.110
.150
.140

-

|
.500 I
.500
.500
.500
.500
2.4 50
2.450
2.350 I
I
I
i
,
|

-

~

|
!
13.00%!

8

_

.750

i
1.320
.985 1
.985
.985
.985
-

j

-

-

I
-

1.4 30
1.725 I

-

-

1.725
1.725 I
1.725

-

6.00
6.00
6.00

.400
.400
.400

5.00
5.00
5.00

;

1.500 ■
-

1.500
1.500
1.500
~

10.00%
10.00
10.00

-

-

.040
.040

-

,040
.040
.0 40

-

1.020
1.020
1.020

-

NORFOLK, ¥A.

i

BUILDING CONSTRUCTION

I

!
JOURNEYMEN
7.900
9. 150
7.600
7. 400
8. 150
6. 350
6.300

8.6C0
9.750
7.990
8.000
8.950
7. 15C
7.300

40.00
40.00
40.00
40.00
40.00
40.00
40.00

.300
.700
.500
.300
.300
.300

8.000
7.320

9.000
8.020

40.00
40.00

.495

-

-

-

-

5.00
-

.320

i

_
-

-

-

-

-

-

-

-

-

-

-

-

-

-

6.00%

-

6.00
-

.010
.010
- ■*
.010
.020

-

-

-

-—
-

I
;
o

I
.325

-

.300

-

-

-

-

-

40.00

.325

-

.300

-

-

-

-

-

8.650
7.800
8.490
6.700

40.00
40.00
40.00
40.00

.325
.300

-

.300
.100
.250
.200

-

-

-

-

-

-

-

-

- ^
- '
-

.40 0
-

-

6.70C
7.250
7.750
7.600

40. 00
40.00
40.00
40.00

.500

-

.200
.300
.300
.300

-

-

-

5. 160

5. 860

6.T40

7.040

7. 550
7.250
6 .940
6.2 5 0

6. 250
6.700
7.200
7.050

-

.500
-

S ee f o o tn o te s at end o f t a b le .




.250
.900
.200
.300
.300
.300

-F
O
©

ASBESTOS WORKERS........
BOILERMAKERS............
BRICKLAYERS.............
CARPENTERS..............
MILLWRIGHTS..........
PILEDRIVERS..........
CEMENT FINISHERS........
ELECTRICIANS (INSIDE
HIRERS)..............
ELEVATOR CONSTRUCTORS....
ENGINEERS— PCWER EQUIP­
MENT OPERATORS:
AIR COMPRESSORS OVER
125 CU. FT., ONE-DRUM
HOISTS, MIXERS (165
OR SMALLER), PUMPS,
ROLLERS..............
BULLDOZERS, MIXERS
!
(LARGER THAN 165) ,
TRENCH MACHINES.....
CRANES, DERRICKS,
PILEDRIVERS, HOISTS
(2 DRUMS OR MORE) ,
MOTOR GRADERS.......
GLAZIERS................
LATHERS................ ..
MARBLE SETTERS............................
MOSAIC AND TERRAZZO
WORKERS......................................
PAINTERS.............................................
STEEL..........................................
SPRAY............................................

95

-

-

Table 20. W age rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , July 1, 1975 and J uly 1, 1976)

JULY 1,
1975

JULY 1, 1976
EMPLOYER CONTRIBUTIONS
TO FUNDS3

CITY AND JOB
CLASSIFICATION

RATE
PER
HOUR 1

RATE
PER
HOUR 1

HOURS
PEP
WEEK*

INSURANCE 4
DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER6

PERCENT

DOLLARS IPERCENT

NORFOLK, VA.
-COMTIIOED
BUILDING CONSTRUCT!ON
-CONTINUED
JOURNEYMEN
-CONTINUED
ENGINEERS— POWER EQUIPMENT
OPERATORS:-CONTINUED
SWING STAGE:
UNDER 75 FEET......
OVER 75 FEET.......
SAND BLASTING OF STEEL
HAND ROLLERS 6 FEET OR
OVER.................
PAPERHANGEPS............
PIPEFITTERS.............
PLASTERERS:
AGREEMENT A ..........
AGREEMENT B..........
PLUMBERS................
REINFORCING IRON WORKERS.
ROOFERS, COMPOSITION....
ROOFERS, SLATE AND TILE..
SHEET-METAL WORKERS.....
STONEMASONS..............
STRUCTURAL IRON WORKERS..
TILL LAYERS.... .

$7.200
8.000
7. 450

$7,750
8.550
8.000

40.00
40.00
40.00

-

-

0.300
.300
.300

-

-

-

-

-

6. 950
7.050
7.850

7.500
7.600
8.700

40.00
40.00
40. 00

_
0.400

_
-

.300
.300
.450

_
-

_
-

_
-

0.010

_
-

8.510
7.450
7.850
8.050
5.350
5.350
7.400
7.600
8.050
6.250

9. 360
9.360
8.700
9.050
5.700
5.700
8.25C
7.990
9.05 C
6.700

40. 00
40.00
40. 00
40,00
40.00
40.00
40.00
40.00
40.00
40. 00

_
.400
.500
.450
.500
.500
.500

_
-

_
.450
.500
.450
.200
.500
.200

_
-

-

_
-

_
.010
.010
.010
.010
.010
-

_
-

4.500

4.850

40.00

. 100

.150

4.500
4.650
4.650
4.400
4.500
4.650

4.850
5.000
5.000
4.750
4.850
5.000

4C.00
40.00
40.00
40.00
40.00
40. 00

.100
.100
.100
. 100
.100
. 100

. 150
.150
.150
.150
.150
.150

_

_

-

-

-

-

-

-

4. 500

4.850

40.00

. 100

.150

_

4.500
4.750

4.850
5. 100

40.00
40.00

.100
.100

-

HELPERS AND LABORERS

3.750

3.950

40.00

5. 120
4.400

5.610
4.750

40. CO
40.00

.495
.100

4. 650
4.800
4. 800
4.650

5.000
5. 15C
5.150
5.000

40.00
40.00
40.00
40.00

.100
. 100
.100
.100

7.150
7.300

7.750
7.300

40.00
40.00

.300

7.550

8.250

o

6.140

6.690

o

BRICKLAYERS’ TENDERS....
I
AIR TOOL VIBRATOR
OPERATORS...........
HOD CARRIERS......... |
MORTAR MIXERS....... . I
CONSTRUCTION LABORERS__ _
CONCRETE SAW OPERATORS
PIPELAYERS...........
MOTORIZED GEORGIA BUG­
GY OPERATORS........
NOZZLEMEN (GUNNITE) OR
LANDBLASTING.........
BURNER (WRECKING)....
COMPOSITION ROOFERS’
HELPERS................
ELEVATOR CONSTRUCTORS*
HELPERS................
PLUMBERS' LABORERS......
TERRAZZO WORKERS'
HELPERS................
BASE GRINDERS........
FLOOR GRINDERS.......
TILL LAYERS' HELPERS....

5 . 160

8.050

5.560
9.050

40.00
40.00

.325
.500

7.150
7.300

7.750
7.300

40.00
40.00

.300

-

-

_
_
-

-

.070

i
i
!

.070
.070
.070
.070
.070
.070

-

_

_

.320
.150
.150
.150
.150
.150

_

.070
_

.150
.150

_
-

-

.070
.070

-

_

_

-

-

-

_

_

_

-

-

6.00%

.070
.070
.070
.070

-

-

*

-

.020
.070

_
-

-

_
-

HIGHWAY AND STREET
CONSTRUCTION
JOURNEYMEN

o
w
o

o

CARPENTERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CEMENT FINISHERS. . . . . . . . . . . . . . . . . . . . . . . .
ENGINEERS— POWER EQUIP­
MENT OPERATORS:
HEAVY EQUIPMENT--COM­
PRESSORS (4 OR MORE) ,
CRANEMEN, HOISTS (2
DRUMS OR MORE), FIN­
ISH GRADERS . . . . . . . . . . . . . . . . . . . . . . . . . . .
MEDIUM EQUIPMENT—
BULLDOZERS, FORK­
LIFTS, MIXERS (OVER
165), PANS, TRENCHERS
LIGHT EQUIPMENT--COM­
PRESSORS (LESS THAN
4), HOISTS (1-DRUM),
MIXERS, TRACTORS
(WITHOUT ATTACHMENTS)
STRUCTURAL IRON WORKERS..
OTHER HEAVY CONSTRUCTION

.300

-

_

-

_

_

_

.325

.300

.010

.325

.300

.010

-

.300
.500

-

!
i

-

.010
.010

_

-

-

JOURNEYMEN
CAPPENTERS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CEMENT FINISHERS. . . . . . . . . . . . . . . . . . . . . . . .

.300
_____ I_J

S ee fo o tn o te s at end o f t a b le .




96

~

|

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w age r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , Ju ly 1, 1975 and J uly 1, 1976)
JULY

JULY 1,
197 5

1,,

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR 1

HOURS
PER
WEEK 1

INSURANCE4

DOLLARS

BORFOLK, ¥ A.
-COHTIBOED

PENSION

PERCENT

VACATION

PERCENT

DOLLARS

DOLLARS

OTHER 5

PERCENT

DOLLARS

PERCENT

1
1

i
i

OTHER HEAVY CONSTRUCTION
-C ONTINUED
JOURNEYMEN
-CONTINUED
ENGINEERS— POWER EQUIP­
MENT OPERATORS:
HEAVY EQUIPMENT— COM­
PRESSORS (9 OR MORE),
CRANEMEN, HOISTS (2
DRUMS OR MORE), F I N ­
ISH GRADERS.........................
MEDIUM EQUIPMENT—
BULLDOZERS, FORK­
L I F T S , MIXERS (OVER
1 6 S ) , PANS, TRENCHERS
LIG HT EQUIPMENT— COM­
PRESSORS (LESS THAN
4 ) , HOISTS (1 -D R U M ),
M IXERS, TRACTORS
(WITHOUT ATTACHMENTS)
STRUCTURAL IRON WORKERS..

!

$7.550

$8,650

4 0.00

0.3 2 5

6 .1 4 0

7 .0 4 0

4 0.00

.325

0 .3 0 0

I

0 .0 1 0

!
.300

.010
I
i
j

5 . 160
8.0 5 0

5 .8 6 0
9.0 5 0

.32 5
.50 0

40.00
40.00

“

.300
.50 0

“

;
;

”

.010
.010

■

4.5035
j
-

.650
.05 0 I
.050
.050 |
.050
.05 0
-

-

8 .0 0
6 .0 0

. 270

!
j

OMAHA,

B UI LD IN G

BEBB.

CONSTRUCTION

10.620
9 .4 3 0
9 . 160
9 . 160
9 .1 6 0
9. 28 5
9 .4 1 0
9 .8 2 0

4 0.00
4 0.00
4 0 . 00
40.00
40.00
40.00
40.00
40.00

.400
.500
.500
.500
.500
.50 0
.50 0
.500

1 0. 190
9 . 180

10.516
10.410

4 0 . 00
40.00

.580
.49 5

9.100

9.850

8 .8 5 0

9.6 0 0

8 .7 5 0

9 .5 0 0

7 .8 6 0
8.450
7 .8 0 0
10.260
7.950

8.3 6 0
9 .2 5 0
8 .3 5 0
351 0 . 0 0 0
7 .9 5 0

7 . 9 50
8 .5 0 0
9.0 5 0
9.0 5 0
9.050
8 .800
10.000
8 .7 8 0
9 . 9 00
8.4 3 0
7 . 3 30
9 .8 7 0
8 . 780

357 . 9 5 0
8 . 8O0
9.3 5 0
9.350
9 .3 5 0
9 . 150
10.280
9 .6 8 0
10.230
9 .1 8 0
8 .1 8 0
10.472
9 . 430

8.430
7 . 950

9 . 180
35 7 . 9 5 C

_
-

.51 0
.400
.400
.400
.400 |
.400 j
.400
.400
.55 0
.320

-

1 .00 %
-

.500

.400

.50 0

.400

4 0 . 00
4 0.00
4 0 . 00
40 .0 0
40.09

. 500
.550
.50 0
.366
.200

. 400
. 3 50
.400
.25 0
.400

-

4 0 . 00
40.00
4 0.00
4 0.00
4 0.00
4 0 . 00
4 0.00
4 0 . 00
4 0 . 00
40.00
4 0.00
4 0.00
40.00

. 200
.50 0
.500
.500
.50 0
.150
.50 0
.500

.400
.300
.300
.300
.300
.30 0
.750
.400
.750
.400
.200
.400

-

o

.400

o

.50 0

o
o

10.140
8 .7 8 0
8 .3 6 0
8 . 360
8 .4 8 5
8 .3 3 5
8 . 610
9.0 2 0

.75 0
.600
. 6 00
.600
.60 0
. 600
_
-

0 .5 0 %
-

I
4 0 . 0O

o

!
ASBESTOS WORKERS......................
B RIC KLA YER S .............. ....................
CARPENTERS.......................................
FLOOR LAYERS .........................
P I L E D R I V E F S ............................
HOME B UI LD ER S ........... ..
MIL LW RI GH TS .............. .............i
CEMENT F I N I S H E R S ......................
ELE CT R IC IAN S ( I N S I D E
W IR E RS )..........................................!
ELEVATOR CONSTRUCTORS____
ENGINEERS— POWER EQU IP­
MENT OPERATORS:
HEAVY EQUIPMENT:
CRANES, DERRICKS,
SHOVELS, 2-DRUM
HO I S T S ....................................
MEDIUM EQUIPMENT:
BLADE GRADERS, MOTOR
GRADE AND TRAXDOZERS
BULLDOZERS, CONCRETE
PUMPS, F O RK LI FT S ,
TRACTORS, 1-DR UM
H O I S T S . . . ......................... .. I
L IG H T EQUIPMENT:
!
AIR COMPRESSORS AND
WHEEL TRACTORS........... I
G L A Z I E R S ............................................ !
L A T H E R S . ............................................
M A C H I N I S T S . ....................................
MARBLE SETTERS. .........................
MOSAIC AND TERRAZZO
'
WORKERS..........................................
PATH TER S : ..........................................j
SPRAY............................................ !
STRUCTURAL S T E E L . . . . . . !
SWING STAGE......................... :
PAPERHANGERS................................. I
PIPE FI TTE R S....................................
PLASTERERS............................ .. . . .
PLUMBERS.... .. ...................................
REINFORCI NG I R ON WORKERS.
ROOFERS, C OM PO S I TI O N ............
S HEET- METAL WORKERS..............
STONEMASONS....................................
STRUCTURAL AND ORNAMENTAL
IRON WORKERS............................
T I L E LAYERS ....................................

i

j

JOURNEYMEN

|

!
i

!

j
|

4 0 . 00
4 0.0 0

j

_
-

.500
.200

.400
.40 0

_

j
. 350
1.0 0 0
_

i
6 .0 0 |

.750

_
6 .0 0
-

.700

_

.400
. 4 00
.40 0
. 400
.400
.66 0
.250
.66 0
.70 0
.500
-

!
.200 i
.200 !
. 200 |
|
i
“
_

|
I

. 100
.200
. 3C0
I
i
.10 0
I




97

_
-

_
. 200
_______ -___ L

S ee f o o tn o te s at end o f t a b le .

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , July 1, 1975 and J uly 1, 1976)
JULY

JUL Y 1 ,
197 5

1,

1976

EMPLOYER ITONTRIBUTIONS
TO F UNDS 3
RATE
PER
HOUR1

C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

HOURS
PER
WEEK *

DOLLARS

PERCENT

OTHER 5

VACATION

PENSION

INSURANCE 4

DOLLARS I PERCENT

PERCENT'

DOLLARS

DOLLARS>

PERCENT

OMAHA, I E B B .
-CONTINUED
I
I

BUILDING CONSTRUCTION
-CONTINUED
HELPERS

AND LABORERS

$6,815
6 .815
6 .670

$7,065
7 .0 6 5
6 .9 2 0

40.00
4 0.00
4 0.00

0.500
.500
.50 0

-

6.430
6.5 0 0
6 .9 3 5

7 . 290
8 .1 1 0
7 . 185

4 0 . 00
40.0 0
4 0 . 00

.495

_

6 .5 0 0
6 . 750
6.5 0 0

8 .1 1 0
8.2 6 0
8 .1 1 0

40.00
4 0.00
40.00

_
-

CARPENTERS.......................................
CEMENT MASONS..............................
ENGINEERS— POWER EQ U IP­
MENT OPERATORS:
OILER DRI V E RS ......................
TRACTORS (UNDER 35
H P . ) , FORM TRENCHERS,
BELT MACHINES........... ..
SPREAD OILERS (AFTER
1 Y R . ) .......................................
CONCRETE SPREADERS,
TRAXCAVATORS, ONEDRUM H O IS T S , AND
WINCH TRUCKS...................... !

8 .210
8.530

9.1 1 0
9 . 28C

40.00
40.00

7.9 8 0

8 .7 3 0

4 0.00

.50 0

HYDRO HAMMERS......................
SCRAPERS AND TURNAPULLS (OVER 35 H P . ) . .
TRENCHING MACHINES,
P I L E D R I V E R S , LOCO­
MO TI VES , SIDE BOOM
CATS, ROTARY WELL­
D R I L L I N G O PER AT OR S. ..
STRUCTURAL IRON WORKERS..

7 .2 8 0

7 .6 3 0

4 0 . 00

8 .1 5 0

8 .90C

8 . 320
8 .4 3 0

9.0 7 0
9 .1 8 0

B RI CK LAY ER S' TENDERS...........
MORTAR MI XER S ........... ..
BU IL D IN G LABORERS....................
ELEVATOR CONSTRUCTORS'
HELPERS.........................................
MARBLE SETTERS
HE LPE RS ..
PLASTERERS' LABORERS............
TERRAZZO WORKERS'
HELPERS..........................................
BASE M A C H I N E . . . . ..............
T I L E LAY E RS ' HELPERS...........

-

-

-

.500

-

!

0 .4 0 0
.40 0
.400
.320
.400

..
-

-

-

-

-

-

«

-

-

_
-

_
-

0 .2 5 0
.25 0
.250

j

I
6 .0 0
-

-

-

.270
.250

-

_
-

-

"

_
-

”

HIGHWAY AND STREET
CONSTRUCTION

JOURNEYMEN
i

.50 0
.500

6 .680

7 .0 3 0

4 0.0 0

.50 0

7 .0 6 0

7 .4 1 0

40.00

.500

7 . 760

8.5 1 0

-

.400
.400

-

.05 0
-

i
!
!!
|

.400

.400

.50 0

~

40.00

.500

40.00
40.0 0

.500
.50 0

.500

i

I

_

i
.020

.40 0

_

40.00

0 .6 0 0
-

.02 0

_

_

-

.02 0

.400

-

-

-

.020

_

.400

_

_

_

.020

-

.40 0
.400

. 0 20

.40 0

|

i

.70 0

-

. 0 20
-

-

-

HELPERS AND LABORERS

FORM SETTERS AND PRECAST
MANHOLE SETTERS....................
PIPELAYERS AND CONCRETE
SAW OPFRATORS.........................
RAKERS AND SCREFDMEN ON
ASPHALT, MCRTAR MIXERS.
FORM SETTER HELPERS..............
GENERAL LABORERS......................
LABORER-WELDERS.........................
TUNNELERS, FREE A I R ..............

7 .0 3 0

7 .0 3 0

40.00

.500

.400

6.6 5 0

6 .6 5 0

4 0.00

.50 0

.400

6.580
6 .600
6 .4 0 0
6 .570
6 . 900

6 .5 8 0
6 .6 0 0
6.4 0 0
6.5 7 0
6.9 0 0

4 0 . DO
4 0 . 00
40.0 0
4 0 . 00
40.0 0

.50 0
.50 0
.50 0
.50 0
.500

_
-

-

.200

.40 0
.400
.400
.400
.40 0

_
_

_
_

-

-

-

_

.20 0

_

.200
.200
.20 0
.200
.20 0

-

_
_
-

OTHER HEAVY CONSTRUCTION
i

JOURNEYMEN

CARPENTERS.......................................
CEMENT MASONS...............................
ENGINEERS— PCWER E QUI P­
MENT OPERATORS*.
O ILER DRI V E RS ......................
TRACTORS (UNDER 35
HP .) , FOPM TRENCHERS,
BELT MACHINES....................
SPREAD OILERS (AFTER
1 Y R . ) . . . . ............................
CONCRETE SPREADERS,
T RAXCAVATORS, ONEDRUM H O I S T S , AND
WINCH TRUCKS ......................
HYDRO HAMMERS ......................
SCRAPERS AND TURNAPULLS (OVER 35 H P . ) . .

8 .2 1 0
8 . 530

9 .1 1 0
9.28C

4 0 . CO
40.00

.500
.500

6.6 8 0

7 .0 3 0

4 0.00

.500

-

.60 0

-

-

.050

-

-

.400

-

.02 0

7.0 6 0

7.4 1 0

40.00

.500

7 .7 6 0

8 . 510

4 0.00

.500

_

.400

_

_

_

.020

7 .9 8 0
7 . 280

8 .7 3 0
7 .6 3 0

40.00
40.0 0

.500
.500

-

.400
.400

-

-

-

.02 0
.02 0

-

8 . 150

8 .9 0 0

4 0 . 00

.50 0

-

.400

.020

-

.400

I____ _________ L____________ L

. 0 20

I

S ee fo o tn o te s a t end of t a b le .




.400
.400

98

I

i

.

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s t r a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e ,
b u ild in g t r a d e s , July 1 ,1 9 7 5 and J u ly 1, 1976)
JULY 1,
197 5

p e n s io n , v a c a tio n ,

JULY

1,

and o th e r c o n tr ib u tio n s to funds in the

1 97 6

EMPLOYER CONTRIBUTIONS
TO FUNDS J
C L A S S I F I C A T IO N

PER
HOUR 1

PER
HOUR

PER
WEEK 2

1

INSURANCE 4

DOLLARS

PE RCENT

PENSION

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER 5

PERCENT

DOLLARS

PERCENT

OMAHA, NEB.
-CONTINUED
OTHER HEAVY CONSTRUCTION
-CONTINUED
JOURNEYMEN
-CONTINUED
ENGINEERS— POWER EQUIPMENT
OPERATORS:-CONTINUED
TRENCHING MACHINES,
P IL E DRIVE RS , LOCOMOT IVES , SIDE BOOM
CAT S, ROTARY WELLD R I L L I N G OPE RA TO RS ...
STRUCTURAL IRON WORKERS..
HELPERS

j
I
$8.320
8.4 3 0

* 9 .0 7 0

9 .1 8 0

40.00
4 0.00

-

0 .5 0 0
.50 0

-

0. 400
.400

-

-

“

0 .7 0 0

-

0 .020
!

AND LABORERS

7.0 3 C

.500

-

.400

-

6 .6 5 0

6 .6 5 0

4 0.00

.50 0

-

. 400

-

-

-

6 .580
6 . 600
6.4 0 0
6.5 7 0
6 .9 0 0

6 .5 8 0
6.6 0 C
6.4 0 0
6 .5 7 C
6 .9 0 0

40.00
4 0.00
4 0.00
4 0 . 00
4 0.00

.500
.500
.500
.50 0
.500

-

.400
.400
. 4C0
.40 0
.40 0

-

-

-

o

PHILADELPHIA,

7.0 3 0

o
o

FORM SETTERS AND PRECAST
MANHOLE SETTERS....................
PIPELAYERS AND CONCRETE
SAW OPERATORS.........................
RAKERS AND SCREEDM2N ON
ASPHALT, MORTAR MIXERS.
FORM SETTER HELPERS..............
GENERAL LABORERS......................
LABORER-WELDERS.........................
TUNNELERS, FREE A I R ..............

-

-

j

i
j
-

-

!
I
;
;
:
I

-

PA.

.20 0

-

.200

-

.20 0
.200
.200
.20 0
. 200

-

-

i
i

B UI LD IN G

CONSTRUCTION

I
I
I

JOURNEYMEN

ASBnSTOS WORKERS......................
BOILERMAKERS.................................
BR ICK LA Y ER S ....................................
R E S I D E N T I A L ............................
CARPENTERS.......................................
MI L LW RI GH TS ............................
WHARF AND DOCK B U I L D ­
ERS...............................................
CEMENT MASONS...............................
E L E CT R IC IA NS ( I N S I D E
W IR E R S )..........................................
R E S I D E N T I A L ............................
ELEVATOR CONSTRUCTORS_____
ENGINEERS— POWER EQU IP­
MENT OPERATORS:
HEAVY EQUIPMENT:
CRANES HANDLING STEEL
OR STONE.................................
POWER SHCVELS, DER­
R I C K S , CABLEWAYS------MEDIUM EQUIPMENT:
TOURNAPULLS, CARRYA L L S ..........................................
BULLDOZERS, TRACTORS
(D7 AND O VE R) .................
LIGH T EQUIPMENT:
WELDING MACHINES...........
COMPRESSORS, P U M P S . . .
G L A Z I E R S ............................................
L ATh ER S ...............................................
M A C H IN IS T S .......................................
MARBLE SETTERS............................
MOSAIC AND TERRAZZO WORK­
ERS.....................................................
PAI NTE RS .............................................
SWING, SPRAY, OR
ROLLER.......................................
PAPERHANGERS.................................
P I P E F I T T E R S ....................................
SPRINKLER F I T T E R S ............
PLASTERERS.......................................
PLUMBERS............................................
REINFORCING IRON WORKERS.
ROOrERS, COMPOSITION............
ROOFERS, SLATE AND T I L E . .
SHEET-METAL WORKERS..............

9 . 620
11.050
10.000
10.100
9 .5 2 0
10.020

1 0 . 170
1 1.050
10.300
1 0.450
9.770
1 0.270

4 0 . 0D
4 0.00
35.00
4 0 .0 0
4 0 . 00
4 0.00

_

.600
.65 0
1 .1 0 0
.770
1 .8 8 0
1 .8 8 0

-

-

61 . 000
6. 4 50
j

-

1 0 . 170
9.2 5 0

10.420
10.000

4 0.00
40.00

11.520
10.420
10.680

12.110
11.330
11.350

40.00
4 0.00
4 0 . CO

11.260

11.910

40.00

-

5 .5 0

-

9 .5 0

-

11.000

11.650

4 0.00

-

5 .5 0

-

9 .5 0

-

10.130

1 0.780

4 0.0 0

-

5 .5 0

-

9. 50

-

1 .8 8 0
.790
-

6 .0 0 %
6 .0 0
-

.49 5

1 .3 0 0
1 . 2 50
.320

j

.400
-

5 .0 0 %
5.00
-

I
I

**

i

_

I
I

.040
.080
.020
.200
. 200

-

6.00%

i
-

. 200
-

-

.28 2

j

~

|

10.130

10.780

4 0 . 00

-

5 .5 0

9 . 430
9 .430
9.5 8 0
9 .7 6 5
10.050
8 . 800

1 0.090
10.090
10.080
9.8 6 5
10.050
9 . 250

4 0.00
4 0.00
4 0 . 00
40.00
40.00
40.00

.450
.700
.650
6. 870

5 .5 0
5 .5 0
-

8 . 490
8 .325

8.9 2 C
9.2 9 5

4 0.00
4 0.00

8 .5 7 5
8 . 820
11.220
11.410
10.225
10.140
10.650
9 .5 0 0
10.000
11.060

9 .545
9.2 2 0
12.040
12.040
10.325
10.420
1 1.420
10.500
1 0.750
11.260

4 0.0 0
4 0.00
40.00
40.00
40.0 0
40.00
4 0 . CO
4 0.00
4 0.00
4 0.00

9 .5 0

-

1 .2 5 0
.500
6. 900

6. 870
.825

-

.82 5
.55 0
.670
.60 0
.780
.810
.79 0
1 .2 0 0
1 .0 0 0
. 8 20

-

-

-

;

See footnotes at end of table.




.600
1.0 0 0
1 .0 0 0
. 7 50
1 .300
1.300

99

-

J

-

6.9G0
.400

-

6. 500
.40 0

.40 0
.45 0
1 .4 5 0
.90 0
1 .300
1.510
. 8 20
.500
1,. 0 30

-

.400
. 8 20
-

-

-

-

-

-

6. 500
6 1.0 0 0
6 1 .000
6. 860
6. 50 0

!

!

6. 500

9 .5 0
9. 50
-

i

j

I
-

i

_
.01 0
-

~

.425
-

-

-

.050

-

-

.050
-

-

5 .0 0
-

. 190
-

.010
.080
. 190
.09 0
.130

3 .0 0 %

Table 20. W age rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , J u ly 1, 1975 and J u ly 1, 1976)
JULY 1,

JULY 1,
197 5

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS 3
RATE
PER
HOUR

C I T Y AND JOB
C L A S S I F I C A T IO N

1

RATE
PER
HOUR 1

HOURS
PER
WEEK

INSURANCE.4

DOLLARS

PENSION

PE RCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER 5

PERCENT

DOLLARS

PERCENT

-

P H I L A D E L P H I A , PA.
•C O IT IIO E D

B U IL D IN G CONSTRUCTION
-C ONTINUED
JOURNEYMEN
-CONTINUED
STONEMASONS.. ..............................
SETTERS.......................................
STRUCTURAL IRON WORKERS..
T I L E LAYERS....................................

$ 8 .200
8. 780
10.300
9.0 6 0

$ 8 .7 0 0
9 . 280
10.770
9 . 250

4 0.00
40.00
40.00
40.00

6 0.870
6. 8 7 0
.840
1 .1 0 0

-

-

6 0 .9 0 0
6. 900
1 .2 1 0
.900

-

6 ° ‘. 5 0 0
6. 500
6. 9 00
-

7 .0 5 0
7 .6 5 0
6.9 5 0

7 . 50C
7 .9 5 0
7.4 0 0

4 0 . 00
4 0 .0 0
4 0 . on

.900
.900
.900

-

.65 0
.650
.650

-

-

4.4 0 0

4 .6 4 0

4 0.00

1. 200

_

. 820

_

.495
1 .0 0 0
1 .0 0 0

_

-

-

-

-

-

-

0. 140

-

.055
.080
.055

-

HELPERS AND LABORERS

B RI CK LAY ER S' TENDERS............
BU ILD IN G LABORERS....................
R E S I D E N T I A L ............................
COMPOSITION ROOFERS'
HELPERS............................................
ELEVATOR CONSTRUCTORS'
HELPERS............................................
MARBLE SETTERS' HE LPE RS ..
TI Lfc LAYERS' HELPERS............

7 .4 8 0
7 . 215
6 .9 9 5

7 .9 4 5
7. 51C
7 .2 8 0

4 0.00
40.00
4 0.00

-

.320
1 .150
1. 150

.86 0
_

-

-

_
6 .0 0
I
j

HIGHWAY AND STREET
CONSTRUCTION

_

.190

.
-

.28 2
. 140

i

!
i

JOURNEYMEN
i
CARPENTERS.......................................
CEMENT F I N I S H E R S ...................
ENGINEERS— POWER EQ U IP­
MENT OPERATORS:
HEAVY EQUIPMENT—
CRANES.......................................
MEDIUM EQUIPMENT:
BULLDOZERS, TRACTORS
(UNDER D7) .........................
CARRYALLS, TOURNAP U L LS .......................................
L IG H T EQUIPMENT:
COMPRESSORS, P U M P S .. .
WELDING MACHINES............
STRUCTURAL IRON ERECTORS
AND F I N I S H E R S .........................
HELPERS

9.9 7 0
9.2 5 0

10.220
10.000

4 0.00
40.0 0

11.000

11.650

4 0.00

10.130

10.780

4 0 . 00

10.130

10.78C

4 0.00

9 .4 3 0
9 .4 3 0

10.090
10.09C

4 0 . GO
4 0.00

_

_

_

_

10.300

10.770

4 0.00

.84 0

-

1 .2 1 0

-

6. 900

-

-

_

7 .9 0 0

7.9 0 0

4 0 . 00

.95 0

-

.650

-

-

-

.050

-

9.9 7 0
9 . 250

10.220
10.000

40.00
40.00

1.8 8 0
.99 0

1 .3 0 0
1 .2 5 0

-

-

.080
-

_

11.000

11.650

40.00

1 .8 8 0
.99 0

-

1.3 0 0
1 . 2 50

5 . 50

_
-

.080
.4 0 0

_

9 .5 0

5 .5 0
_

_

9 .5 0

5 .5 0

_

9 .5 0

5 .5 0
5 .5 0

_
_

9 .5 0
9 .5 0

|

AND LABORERS

CONSTRUCTION L A B O R E R S . . . .

OTHER HEAVY CONSTRUCTION

JOURNEYMEN

CARPENTERS.......................................
CEMENT F I N I S H E R S ......................
ENGINEERS— FCWER EQ U IP­
MENT OPERATORS:
HEAVY E Q U IP M E N T- CRANES.......................................
MEDIUM EQUIPMENT:
BULLDOZERS, TRACTORS
(UNDER D 7 ) .........................
CARRYALLS, TOURNAP U L L S .......................................
LIG HT EQUIPMENT:
COMPRESSORS, P U M P S . . .
WELDING MACHINES............
STRUCTURAL IRON ERECTORS
AND F I N I S H E R S .........................
HELPERS

-

5 . 50%

9.50%

10.130

1 0.780

40.00

10.130

10.780

4 0.00

_

5 .5 0

9 . 430
9.4 3 0

10.090
10.090

40.00
40.0 0

_

5 .5 0
5 .5 0

10.300

10.770

40.00

.84 0

-

1 .2 1 0

7 .6 5 0

7 .9 0 0

4 0.00

.95 0

-

.65 0

5 .5 0

-

.40 0

9 .5 0
_

-

9 .5 0

_

-

.
-

_

-

6. 9 00

-

-

-

-

-

9 .5 0
9 .5 0

-

AND LABORERS

CONSTRUCTION

L AB O R E R S ....

See footnotes at end of table.




100

.05 0

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , Ju ly 1, 1975 and J u ly 1, 1976)
JULY

JUL Y 1,
197 5

1,

1 976

EMPLOYER CONTRIBUTIONS
TO FUNDS 3
C I T Y AND JOB
C L A S S I F I C A T IO N

HOURS
PER
WEEK 1

RATE
PER
HOUR 1

RATE
PER
HOUR1

DOLLARS
PH O EN IX ,

VACATION

PENSION

INSURANCE 4

PERCENT

DOLLARS

PERCENT

DOLLARS

OTHER 5

PERCENT

DOLLARS

PERCENT

ABIZ.

BU IL D IN G CONSTRUCTION

JOURNEYMEN

ASBESTOS WORKERS......................
BOILERMAKERS.................................
BRICKLA YER S ....................................
CARPENTERS:
AGREEMFNT A .........................
AGREEMENT B .........................
AGREEMENT C .........................
MIL LW RI GH TS ........... ...............
P IL E D R I V E R S :
AGREEMENT A ......................
AGREEMFNT B . ....................
AGREEMENT C ......................
FLOOR LAYERS:
AGREEMENT A . . . . . . . . . . . . . . . . . . . . .
AGREEMENT B . . . . . . . . . . . . . . . . . . . . .
AGREEMENT C . . . . . . . . . . . . . . . . . . . . .
CEMENT F I N I S H E R S . . . . . . . . . . . . . . . . . . . . .
COMPOSITION F I N I S H E R S .
E LEC TR ICIAN S ( I N S I D E
WIR E RS ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
ELEVATOR C O N S TR UC TO RS .. ..
ENGINEERS — POWER EQUIP­
MENT OPERATORS:
HEAVY EQUIPMENT:
TUGGER HOISTS (2 OR
MORE), DERRICKS . . . . . . . . . . .
UNIVERSAL EQUIPMENT,
SHOVELS, BACKHOES,
DRAG LINES , CLAM­
SH E LLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . i
TRACTOR OPERATORS,
BULLDOZER TAMPERS
AND SCRAPERS . . . . . . . . . . . . . . . . . .
MEDIUM EQUIPMENT:
i
MOTOR CRANE DRIVERS, j
LIG HT EQU IPHF NT :
|
AIR COMPRESSOR OPj
PUMP OPERATORS . . . . . . . . . . . . . !
CONCRETE MIXER OPE­
RATORS ( S K IP TYPE) . |
G LA ZI E RS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . '
LATHERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . !
MARBLE SETTERS . . . . . . . . . . . . . . . . . . . . . . . . . . '
MOSAIC AND TFRRAZZO
|
WORKERS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . j
P AI N TE R S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SPRAY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SWING STAGE . . . . . . . . . . . . . . . . . . . . . . . . . .
SPRAY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
STEEL AND B RI DG E ..............
SPRAY..........................................
PAPLEHANGERS.................................
P IP E F I T T E R S , STEAMFITTERS
REFRIGERATION F I T T E R S .
PLASTERERS.......................................i
PLUMBERS.............................................
REINFORCING IRON WORKERS.
ROOFFRS, SLATE AND T I L E . .
SHEET-METAL WORKERS. . . . . . . . . . . . .
STONEMASONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
STRUCTURAL IRON WORKERS..
ORNAMENTAL IRON WORK­
ERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
T I L E LAYERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
HELPERS

$8,840
10.850
9.7 5 0

$ 9,3 90
12.000
10.050

4 C. 00
40.00
4 0.00

0 .500
.75 0
.650

8. 835
8.8 3 5
8.835
9 . 250

9 .0 8 5
8 .8 3 5
8.8 3 5
9 .2 5 0

40.00
4 0 . CO
40.00
4 0.00

.845
.845
.845
.84 5

9 . 335
9 .0 8 5
9 .0 8 5

9 .3 3 5
9 .0 8 5
9 .0 8 5

40.00
4 0 .0 0
4 0 . 00

.84 5
.845
.845

9 .0 8 5
9 .0 8 5
9 .085
8 . 510
8 .6 6 5

9 .3 3 5
9 .085
9.0 8 5
8 .5 1 C
9 .1 5 C

4 0 . 00
4 0.00
4 0.00
4 0.00
4 0.00

.845
.845
.845
.750
.750

-

19.945
10.710

10.530
11.550

4 0.0 0
40.00

.800
.495

-

10.050

10.050

4 0 . 0O

.750

.800

.250

.040

10.050

10.050

40.00

.750

.800

.250

.04 0

.800

.250

.040

.800

. 2 50

.040

-

_
_
-

-

_

0w 950
1 .0 0 0
.900

-

61 . 0 0 0
. 500

-

-

.95 5
.955
.95 5
.955

-

6. 250
. 250
.250
6. 250

.955
.95 5
.95 5

-

6. 250
. 250
.25 0

.955
.95 5
.955
1.0 0 0
1 .0 0 0
.70 0
.320

_
-

-

1 .0 0
-

. 0 50
_

. 0 50
_

-

9 .7 1 C

4 0.00

.75 0

8 .350

8 .3 5 0

4 0.00

.7 5 0

7.5 2 0
7 .5 2 C

7 . 520
7 .5 2 0
8.3 5 0
7 . 520
8 .8 0 0
9 . 190
8 .4 4 0
9.610
8 .8 5 0
9 . 100
8 .9 8 0
9 . 570
9 .2 0 0
9.4 0 0
9.100
10.640
10.640
9.0 2 0
10.640
9 .580
7 . 100
t8.7 30
9 .7 5 0
9 .5 8 0

!

|

9 .5 8 0
8 .440

_

3 .0 0

.05 0
.05 0

_

_

_

3 .0 0

.050
_

_
_

_

1 .2 5
_

!
1
9 .7 1 0

3 .0 0 X
_
_

.05 0
-

-

61 0 . 0 0 X
6 .0 0

_

_
_

. 190

_
_

6. 2 5 0
.25 0
.25 0
6 . 500
. 500

_

0 . 120

_

i
j

i

!
|

40.00
40.00

.750
.750

8 .3 5 0
7 .5 2 0
10.400
9 . 190
9 .0 7 0

4 0.00
4 0 . 00
40.00
40.00
4 0.00

.750
.750
6 .7 0 0
.750
.650

1C.240
9 .0 9 C
9 .3 4 0
9 . 220
9.810
9.4 4 0
9 .6 4 0
9 .3 4 0
11.140
1 1.140
9 .0 2 0
1 1 . 140
10.040
8 .4 1 0
9 .2 8 C
1 C.050
10.040

40.00
4O.00
40.0 0
4 0.00
40.00
4 0 . 00
40.00
4 0.00
40.00
40.00
40.00
40.00
4 0.00
4 0.0 0
4 0.00
4 0.00
40.00

.59 0
.590
. 590
.59 0
.590
.590
.590
.75 0
.750
.75 0
.75 0
1.030
.845
.650
.650
1 .0 3 0

1 0.040
9.07C

4 0 .0 0
4 0.00

_
-

.800
.80 0

250
.25 0

.
_

.800
.800
6 .300
.40 0
.600

_

.250
. 250

_
_

_
_

_

-

1.0 0 0

-

-

.04 0
.040

_

.040
.04 0

_

_

_
_

.140
.050

. 140
.140
.140
.14 0
.140
. 140
.14 0
.120
.120
.080
.120
.750
.040
.110
. 190
.75 0

I
]

-

_

i

-

j
!
1

_

1 .0 3 0
.65 0

AND LABORERS

-

-

.380
.380
. 380
.380
.380
.380
.380
1 .3 5 0
1.350
1.0 0 0
1 .3 5 0
1 .6 5 0
.200
1 .0 5 0
.90 0
1 . 6 50

_

_

_
-

-

_
_
_
_

_

_

_
_
_

-

_

-

-

-

.750

-

6 .
6 .

-

500
5 00
8 50

-

-

6 .

-

6 .

500

-

6 .

500

_

1 .6 5 0
.600

-

-

-

_
_
_
_

_
_
_
_
-

.750
.050

-

!
|

BR ICK LA Y ER S' AND
MAoONS' TENDERS......................
BU ILD IN G LABORERS
GROUP I .......................................
GROUP I I ........................ . . . . . . . . . . .
GROUP I I I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
GROUP I V . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
GROUP V . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
GROUP V I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
GROUP V I I .................................

7 . 325

7 .3 2 5

4 0.00

.700

6 . 880
7 .010
7 . 150
7 .260
7 . 4 30
7.805
8.4 3 5

6 .8 8 0
7 .0 1 0
7.1 5 0
7 .2 6 0
7 .4 3 0
7 .8 0 5
8 .4 3 5

4 J .0 0
40.00
4 0.00
4 0 .0 0
4 0.0 0
40.0 0
4 0.0 0

.700
.700
.700
.700
.70 0
.70 0
.70 0

!
!

i

.75 0

_
-

I

i_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ !

See footnotes at end of table.




101

. 7 50
.750
.750
.750
.750
.750
.750

.25 0
_
~

250
. 250
.2 5 0
. 250
.25 0
. 250
.250

.230

.

-

■

.230
.230
.230
.230
.230
.230
.230

_
-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , Ju ly 1, 1975 and J u ly 1976)
JULY 1,
197 5

JULY

1,

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS 3
C I T Y AND JOB
C L A S S I F I C A T IO N

PER
HOUR1

RATE
PER
HOUR1

PER
WEEK 2

INSURANCE4

DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER5

PERCENT

DOLLARS

PERCENT

PH O EN IX , A B I Z .
-CONTINUED

BU IL D IN G CONSTRUCTION
-CONTINUED
HELPERS AND LABORERS
-CONTINUED
ELEVATOR CONSTRUCTORS'
HELPERS............................................
MARBLE SETTERS' HE L PE RS ..
PLASTERERS' LABORERS:
AGREEMENT A ...............................
AGREEMENT B...........
PLUMBERS' LABORERS.................
TERRAZZO WORKERS'
HELPERS:
BASE MACHINES.........................
FLOOR MACHINES...................
T I L L LAYERS' HELPERS............
PITT SBU RGH ,

B U IL D IN G

$7,500
8 .2 2 0

$ 8,0 85
8 .9 2 0

4 0 . 00
4 0.00

0.4 9 5

-

-

0 .3 2 0
-

-

.25 0

5 .6 0 0
8 .0 3 0
4 . 500

5 .6 0 C
8.0 3 0
4 .5 0 0

40.0 0
4 0 . 00
40.0 0

.750
.700
.750

-

1 .0 0 0
.750
1 .3 5 0

-

.75 0
.250
-

-

.08 0
.230
.12 0

8.8 5 0
8.550
8. 220

9 .3 0 0
9 .0 0 0
8 .5 7 0

4 0.00
4 0 . 00
40.0 0

-

**

"

.25 0

“

.16 0

”

9.7 4 0
9 .8 1 5
10.205
9 .2 3 0
8 .7 9 0
9.9 0 0
9 . 350

1 1 . 100
10.615
10.750
9 .7 3 C
9 .1 9 0
1 0.240
9 .9 3 0

40.00
40.0 0
3 7.50
4 0 . 00
4 0.00
4 0.00
4 0 . CD

_

_

-

.60 0
-

.01 0
.060
.250
-

22.00%
1 .00
b .5 0

10. 100
9 .5 5 0

10.600
9 .8 3 0

4 0.00
4 0.00

.35 0
.495

-

-

10.225
10.075

10.775
10.625

4 0.00
4 0.00

10.075

1 0.625

9 . 500
9.0 2 0
8 .855
10.050
9 . 140

-

6 .0 0 %
-

0.1 6 0

“

-

PA.

CONSTRUCTION

JOURNEYMEN

ASBnSTOS WORKERS......................
BOILERMAKERS.................................
B RI CK LAY ER S ....................................
CARPENTERS.......................................
M IL LW RI GH TS ............................
P I L E D R I V E R S ............................
CEMENT F I N I S H E R S ......................
EL E CT R IC IA NS ( I N S I D E
H I R E R S ) ..........................................
ELEVATOR C O N S TR UC TO RS .. ..
ENGINEERS--POWER E QU IP­
MENT OPERATORS:
HEAVY EQUIPMENT:
SHOVELS, CRANES..............
CARRYALL SCOOPS..............
MEDIUM EQUIPMENT:
BULLDOZERS, COMPRES­
SORS, HO IS T S ....................
LIG HT EQUIPMENT:
PUMPS, POLLERS, WELD­
ERS...............................................
G L A Z I E R S ............................................
LATHERS...............................................
M A C H IN IS T S .......................................
MARBLE SETTERS...........................
MOSAIC AND TERRAZZO WORK­
ERS..................................................
PAI NTE RS ............................................
SPRAY............................................
I N D U S T R I A L ...............................
SPRAY, I N D U S T R I A L ............
PAPERHANGERS.................................
P IP E F I T T E R S ....................................
SPRINKLER F I T T E R S ............
PLASTERERS.......................................
PLUMBERS............................................
REINFORCING IRON WORKERS.
ROOFERS, SLATE AND T I L E . .
SHEET-METAL WORKERS..............
STONEMASONS....................................
STRUCTURAL IRON WORKERS..
ORNAMENTAL IRON WORK­
ERS...............................................
FENCE ERECTORS....................
T I L L LAYER S ....................................
HELPERS

_

.60 0

-

.700

_

-

1 .0 0 0
-

8 .0 0
6 .0 0
10.00
10.00

-

-

.200
. 320

1 .00
-

.60 0
-

8 .0 0

.02 0

-

.650
.65 0

-

.800
.800

-

-

-

.02 5
.025

-

40. 0 "

.65 0

-

.800

-

-

-

.025

9 .800
9 . 39C
9.3 3 0
1 0.050
9.7 8 0

4 0.00
40.00
4 0.00
4 0.00
4 0 . 00

.65 0
.520
.700
.650
.600

-

-

-

-

.02 5

.33 0

-

.800
.620
1.200
1 .1 0 0

-

. 502
-

9.670
9 .5 0 5
10.005
9.8 0 5
10.305
9.555
9.690
10.055
9.190
9 .7 0 5
9 .545
9.760
9.5 8 0
10.050
9 . 545

10.370
9 .9 8 0
10.505
10.280
10.780
9 .9 8 0
10.540
10.055
9 .7 4 0
1 0.375
10.275
10.530
10.080
10.340
10.275

4 0 . CO
4 0 .0 0
4 0.0 0
4 0.00
4 0 . 00
4 0.00
4 0.00
4 0.00
4 0.00
4 0.00
4 0.00
4 0 . 00
40.00
3 7 . 50
40.00

.600
.600
.60 0
.600
.600
.600
.600
.600
.40 0
.700
.875
.77 0
.750
.600
.87 5

-

.85 0
.30 0
.300
.30 0
.300
.300
1 .1 0 0
.900
1.250
1 .1 0 0
1.150
1 .5 0 0
.900
1 .1 0 0
1.150

-

-

“
-

.25 0
.080
.140
.16 0
.110
.230
.500
“

-

9 .5 4 5
9 . 545
8 .4 0 0

1 0.275
10.275
8 .7 5 0

40.00
4 0 .0 0
4 0 . 00

.87 5
.875
.600

-

1 .1 5 0
1 .1 5 0
1 .1 0 0

-

-

-

“

-

-

“

.500

7 .550

8 .0 7 0

40.00

_

9 .0 0

_

7.5C

_

_

-

_

7 .8 0 0
7.550

8 .3 2 0
8 .0 7 0

4 0 . 00
4 0.00

-

9 .0 0
9 .0 0

-

7 .5 0
7 .5 0

-

-

-

-

6 . 685

6 .8 8 0

40.0 0

6 .0 0
6 .0 0
9 .0 0
6 .0 0

-

-

_

-

7 .5 0 %

7 .0 0 %

-

-

-

.090
.500

-

-

AND LABORERS

B RI CK LAY ER S' TENDERS............
* HOD CARRIERS AND MOR­
TAR M IX ER S ............................
B UI LD IN G LABORERS....................
ELEVATOR CONSTRUCTORS'
HELPERS............................................

.32 0

.495

J_I___

See footnotes at end of table.




102

—

8 .0 0

.020

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s t r a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , J u ly 1, 1975 and J u ly 1, 1976)
JULY 1 ,

JULY 1,
1 975

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS 3
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR 1

HOURS
PER
WEEK Z

INSURANCE4

PENSION

VACATION

DOLLARS

OTHER 5

DOLLARS

PERCENT

DOLLARS

PERCENT

PERCENT

DOLLARS

9 .0 0

0 .5 5 0
-

7 .5 0

-

-

-

_

_

_

_

-

-

“

7 .0 0
10.00

-

-

PERCENT

PITT SBU RGH , PA.
-COMYIMUED
B U IL D IN G CONSTRUCTION
-C ONTINUED
HELPERS AND LABORERS
-CONTINUED
BABBLE SETTEE S' HE LP E RS ..
PLASTERERS' TENDERS..............
TEPRAZZO WORKERS'
HELPERS.........................................
T I L E LAYERS' HELPERS...........

$8 .< *0 0
7 .8 0 0

$8,4 00
8 .3 2 0

4 0.00
40.00

0.450
-

8 .6 5 5
8 .0 9 0

8 .6 5 5
8 .740

4 0 . 00
40.0 0

.450
.600

8 . 850
8 .345

9.5 6 0
9 .0 2 0

40.00
40.00

9.430

9 .9 3 0

4O.00

.550
.700

-

-

-

HIGHWAY AND STREET
CONSTRUCTION

JOURNEYMEN

-

.65 0

9 .1 7 0

9 .6 7 0

4 0.00

.65 0

6 .8 1 0
-

7 .3 1 0
6 .8 6 0

40.00
40.00

.65 0
.650

6.9 1 0

7.2 6 0

-P
o

.600

8 .8 5 0
8 .3 4 5

9.5 6 0
9 .0 2 0

40.00
4 0 . 00

9.4 3 0

9 .9 3 0

.650

9 .1 7 0

9.67C

4 0 . 00

.650

6.8 1 0
-

7 . 310
6 .8 6 0

4 0.00
40.00

.650
.650

9 . 710
9 .800
9.880

9 .7 1 0
1 0.650
10.780

40.00
40.0 0
40.00

9.8 8 0
8 .7 9 0
8.7 9 0
8 .7 9 0

10.780
10.090
10.240
10.340

8.8 9 0
8.790
8 .7 9 0
8 .4 7 0
8.6 2 0
8 . 352

.600

.-600
.60 0

-

0.40$
6 .40

0 .0 3 5

.03 5

.60 0
_

-

_
-

_
~

.035
.03 5

AND LABORERS

CONSTRUCTION L A B O R E R S . . . .

o
D

HELPERS

8 .0 0
6 .0 0

-

•er
o
o
o

CARPENTERS.......................................
CEMENT F I N I S H E R S ......................
ENGINEERS— POWER E QU IP ­
MENT OPERATORS:
OPERATORS:
HEAVY EQUIPMENT— SHOV­
ELS, CRANES, DITCHERS
SHOVELS....................................
MEDIUM E Q U I P M E N T BULLDOZERS, CARRYALLS
GRADERS, SCOOPS..............
LIG HT EQUIPMENT— COM­
PRESSORS, R O L L E R S . . . .
COMPRESSORS.........................

.500

OTHER HEAVY CONSTRUCTION

JOURNEYMEN

CARPENTERS.......................................
CEMENT F I N I S H E R S . . . . ............
ENGINEERS--POWER EQ U IP ­
MENT OPERATORS:
HEAVY EQU IPME NT- -SH OV ­
ELS, CRANES, DITCHERS.
MEDIUM EQUIPMENT— BULL­
DOZERS, GRADERS, CAR­
RYA LLS , SCOOPS....................
L i t i H T EQUIPMENT— R O L L ­
ERS..................................................
COMPRESSORS............................
PORTLAND,

B UI LD IN G

8 .0 0
6 .0 0

-

-

7 .0 0
11.00

-

1 0.00

.600

-

.600
.60 0

.500
.750
.65 0

-

. 9 50
1.000
.750

40.00
4 0 . CO
4 0 . 00
40.00

.65 0
.550
.55 0
.550

_

9.3 9 0
10.290
10.090
9 .870
10.020

4 0 . CO
4 0 . 00
4 0.0 0
4 0 . 00
40.00

.550
.550
.550
.65 0
.650

10.442

40.00

.650

.40
6 .4 0

.03 5

.600

_

-

.035
_

_

_
-

.035
.035

-

-

.070
. 150

-

_

.15 0

ORE.

CONSTRUCTION

JOURNEYMEN

ASBESTOS WORKERS......................
BOILERMAKERS.................................
BRIC KLA YER S....................................
CAULKERS, POINTERS AND
CLEANERS....................................
CARPENTERS.......................................
FLOOR LAYERS.........................
MI LLW RI GH TS ............................
DOCK AND WHARF
B UILD ERS :
AGREEMENT A ......................
AGREEMENT B ......................
SH ING LER S .................................
CEMENT F I N I S H E R S ......................
COMPOSITION, M A S T I C . . .
E LE CT R IC IA NS ( I N S I D E
M I R E R S ) .........................................

_

See footnotes at end of table.




-

.750
.85 0
.850
.850

-

-

103

i
!

-

_

60 . 2 5 0
. 5 00
.250

_

-

-

-

-

.25 0
.35 0
.35 0
. 350

-

-

-

.850
. 8 50
.850
.600
.600

-

. 350
.3 5 0
.35 0
.600
.600

-

.030
.030

-

.814

-

.90 8

-

.05 0

-

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s tr a ig h t -t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , J u ly 1, 1975 and J u ly 1, 1976)
JULY 1,
1 97 5

JULY

1,

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS 3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR 1

RATE
PER
HOUR1

HOURS
PER
WEEK*

INSURANCE 4

DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER5

PERCENT

DOLLARS

I
j PERCENT

PORTLAND* ORE.
-CONTINUED
B U IL D IN G CONSTRUCTION
-CONT INUE D
JOURNEYMEN
-CONTINUED
ELEVATOR C O N S TR U C TO R S. .. .
ENGINEERS--POWER E QU IP­
MENT OPERATORS
HEAVY EQUIPMENT:
POWER SHOVELS UNDER
1 CU. YD...............................
1 CU YD. AND UNDER
3 CU YD...............................
3 CU YD. AND O V E R . . .
TRACTORS OVER 50
HORSEPOWER.........................
MEDIUM EQUIPMENT:
BLADES, POWER OVER 50
HORSEPOWFR............................
P IL E D R I V E R ENGINEERS.
LIG HT EQUIPMENT:
H O IS T S:
SINGLE DRUM.......................
2 A CT IV E DRUMS OR
MORE.......................................
CONCRETE MIXERS:
1 - 5 BAG C A P A C I T Y . . . .
5 BAG CAPACITY AND
OVER......................................
M U L T I - U N I T S OF 3
M IX ER S .................................
DE RRI CK S, L I V E BOOM..
G L A Z I E R S .............................................
LATHERS...............................................
M A C H IN IS TS ....................................... 1
MARBLE SETTERS............................
MOSAIC AND TERRAZZO
WORKERS....................................
P AI N TE R S ............................................
SPRAY............................................
HIGH WORK (OVER 50 FT)
STRUCTURAL ST EEL..............
BR IDGE ....................................
TAPERS..........................................
PAPERHANGERS.................................
P IP E F I T T E R S AND REFRIG­
ERATION F I T T E R S ....................
O I L F I T T E R S ...............................
PLASTERERS.......................................
PLUMBERS............................................
REINFOFCING IRON WORKERS.
ROOFERS, COMPOSITION............
SH ELT-METAL WORKERS..............
'STONEMASONS....................................
STRUCTURAL-IRON WORKERS..
ORNAMENTAL F I N I S H E R S . .
T I L E SETTERS.................................

HELPERS

$ 9,540

$1 1 .1 3 C

4 0 . CO

0 .5 4 5

0 .3 5 0

_

8 .0 0 *

0 .0 2 0

2 .40

9 .100

9.8 5 0

4 0 . 00

1 .0 0 0

-

1 .0 0 0

-

0 .5 0 0

-

.030

_

9.2 4 0
9 .8 8 0

9 .9 9 C
10.630

4 0 . 00
4 0 . 00

1 .0 0 C
1.000

-

-

-

1 .0 0 0
1 .0 0 0

-

. 500
.50 0

_

.03 0
. 0 30

_
_

9.0 2 0

9 .7 7 0

40.00

1.000

-

1 .0 0 0

-

.500

_

.030

-

9.2 4 0
9.2 4 0

9 .9 9 0
9.9 9 0

4 0.00
4 0.0 0

1 .0 0 0
1.0 0 0

-

1.0 0 0
1 .000

-

. 500
. 500

-

.03 0
.030

_
-

8.720

9 .4 7 0

4 0.00

1 .0 0 0

-

1 .0 0 0

-

.5*0

-

.030

_

9.1 6 0,

9 .9 1 0

40.00

1 .0 0 0

-

1 .0 0 0

-

.500

-

.03 0

_

8 .700

9 .4 5 0

40.0 0

1 .0 0 0

-

1 .0 0 0

-

.500

_

. 0 30

_

8 .8 6 0

9.6 1 0

1 .0 0 0

-

1 .0 0 0

-

. 5*0

-

4 0 . 0O

-

1 .0 0 0
1 .0 0 0
.650
.90 0
.10 0
. 7 50

-

.500
.50 0
_
61 . 0 0 0
-

-

.550
.450
.450
.45 0
. 450
.450
.400
.450

-

.2 5 0
. 400
.40 0
.40 0
.40 0
.400
.500
.4 0 0

1 .5 5 0
1 .5 5 0
.800
1.5 5 0
1 .0 0 0
.750
.510
.75 0
1.000
1 .000
.550

-

9.1 6 0
9 . 240
8 .6 5 3
8 . 200
10.860
9 . 880

9 .9 1 0
9 .9 9 0
9 . 250
9 .4 0 0
11.810
10.780

4 0 . 00
4 0.00
40.00
40.00
4 0 . CO
4 0 . CO

8 .690
8 .8 6 0
9 .1 1 3
9.860
9 .3 6 0
9. 360
8.0 6 0
9 . 110

,9 .3 4 0
, 8 . 95G
,9.2 00
,9 .9 5 0
,9.4 50
9.4 5 0
,9 .7 4 0
9 .2 0 *

40.00
40.0 0
4 0.00
40.00
4 0.0 *
4 0.00
40.00
40.00

.60 0
.450
.45 0
.450
.450
.450
.550
.450

8 .9 7 0
6 . 810
8 .6 0 0
8. 970
9.900
8 . 950
8.7 1 0
9.8 8 0
9.9 0 0
9 .9 0 O
8 .690

1 1.00J
7 .0 9 0
1G .0 5C
1 1.000
10.750
8.9 5 0
9 .6 8 0
1 0.780
10.750
10.750
9.3 4 0

4 0.00
40.0 0
40.00
4 0.00
40.00
4 0.00
4 0.00
40.00
4 0.00
40.0 *
4 0.00

1. 120
.960
.55 0
.70 0
.730
. 500
.55 0
.65 0
.730
.73 0
.600

-

7 .7 7 0
7 . 370

8 .2 7 C
7 .8 7 0

4 0.00
40.00

.750
.75 0

-

1 .0 0 0
1 .0 0 0
.410
.550

.650

-

-

-

-

-

-

6. 250

.030

_

6 .8 0
-

.030
.030
.01 0
.120
_
.150

_
_
_
_
_

_
_
_
-

_
_
_
_
_
_
_
•
_

_

. 100
.280
.280
. 280
.28 0
.28 0
.14 0
.280

61 . 0 0 0
61 . 0 0 0
6. 4 5 0
61 . 0 0 0
.250
6. 100
1 .000!
. 250
. 250
.25 0
6. 250

_
_
-

. 06C
. 190
. 120
.08 0
_

-

.020
. 150
_
_

-

-

-

j
_
3 .0 *
_

_

. 100

AND LABORERS

BR IC K LA Y ER S' TFNDERS
(HOD C A R R I E R S ) .........
BU IL D IN G LABORERS....................
COMPOSITION ROOFERS'
HELPERS ( F I R S T 8 * 0 HRS) .
ELEVATOR CONSTRUCTORS'
HELPERS ................
PROBATIONARY HE LPE RS ..
JACKHAMMER MEN ( P O W E R ) . . .
MARBLE SETTERS' HE LPE RS ..
PLASTERERS' LABORERS............
PLUMBERS' LAEORERS.................
TERRAZZO WORKERS'
H E L P E R S ,..........................................
T I L L LAY ERS' HELPERS............

6 . 230

6 .2 3 0

40.00

.500

6.6 8 0
4 .7 7 0
7 .7 2 0
7 .7 7 0
7 .7 7 0
7.4 7 0

7 .7 9 0
5.5 6 5
8 .2 2 0
8 .2 7 0
8 .2 7 0
7 .9 7 0

40.00
4 0.0 0
4 0.00
4 0 .0 0
4 0 . 00
4 0.00

.54 5
.545
.75 0
.750
.75 0
.750

7 .3 9 0
7.3 9 0

8.2 6 0
8 .2 6 0

40.0 0
4 0.00

.60 0
.600

See footnotes at end of table.




104

_
-

-

.900
.900

-

?. 65 0

.750

-

6. 1 0 0

.35 0
.35 0
.900
.900
.900
.900
.350
.350

• 6 50

_
-

-

6.
6.
6.
6.

6 50
65 0
6 50
65 0

.25 0
. 250

8 .0 0
8 .0 0
-

-

.13 0
.130
.020
.020
.13 0
.130
.130
.13 0
-

2 .4 0
2 .4 0
-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s t r a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in th e
b u ild in g t r a d e s , J u ly 1, 1975 and J u ly 1, 1976)
J UL Y 1,
1 97 5

JULY

1,

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS 3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR 1

RATE
PER
HOUR 1

HOURS
PER
WEEK £

j
INSURANCE 4

DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

!
]
PERCENT | DOLLARS
................
1

OTHER 5
1
DOLLARS

PERCENT

POBTLAND, ORB.
-C O I T I B U B D

PERCENT

I
i

!
HIGHWAY AND STREET
CONSTRUCTION

i

HELPERS AND LABORERS

CONSTRUCTION LABORERS:
GROUP I . ....................................
GROUP I I ....................................
GROUP I I I .................................
GROUP I V ....................................
PROVIDENCE,
B U IL D IN G

$7.370
7 . 720
8 .0 2 0
8 .2 7 0

$7,220
7 .5 7 0
7.8 7 0
8 . 12C

9 0.00
9 0 .0 0
9 0 . 00
9 0.00

-

0 .7 5 0
.750
.75 0
.75 0

-

0.9 0 0
.900
.900
.900

-

“
,

60.
6.
6.
6.

650
6 50
650
6 50

i
s
~
-

~
-

0 .1 3 0
.130
.130
.13 0

R .I.

CONSTRUCTION

1

!

i

;

i

;

JOURNEYMEN

ASBESTOS WORKER.........................
BOILERMAKERS.................................
BR ICK LA Y ER S ....................................
CARPENTERS.......................................
P IL E D R I V E R S AND DOCK
B U IL D E R S .................................
M IL LW RI GH TS ............................
R E S I D E N T I A L ............................
CEMENT F I N I S H E R S ......................
ELE CT R IC IA NS ( I N S I D E
W IR E R S )..........................................
ELEVATOR C O N S TR U C TO R S .. ..
ENGINEERS— POWER EQ U IP ­
MENT OPERATORS
hEAVY EQUIPMENT:
CRANES, SHOVELS,
DRAG LINES, BACKHOES..
MEDIUM EQUIPMENT:
H O I S T S , P IL E D R I V E R S ,
DE RRI CK S ..............................
L IG H T EQUIPMENT:
PUMPS, A IR COMPRES­
SORS, GAS AND ELEC­
T RI C HEATERS...................
G LA ZI E R S .............................................
LATHERS...............................................
MARBLE SETTERS............................
MOSAIC AND TERRAZZO
WORKERS..........................................
PAI NT E RS ............................................
STRUCTURAL ST EEL ..............
SPRAY............................................
PAPLRHANGERS.................................
P I P E F I T T E R S ....................................
SPRINKLER F I T T E R S ............
PLASTERERS.......................................
PLUMBERS............................................
REINFORCING IRON WORKERS.
ROOFERS, COM POSITIO N...........
ROOFERS, SLATE AND T I L E . .
SHEET-METAL WORKERS..............
STONEMASONS...................................
STRUCTURAL IRON WORKERS..
ORNAMENTAL...............................
T I L L LAYERS....................................
HELPERS

!
|
|
!
|

8. 970
10.000
9.150
8. 750

8. 920
10.680
9 .5 5 0
9 . 150

35.0 0
9 0 . C"
9 0.00
9 0.00

i
.760 i
.75 0 i
.95 0
!
.65 0

8 .750
9.000
6 .950
8 . 850

9 . 160
9 .900
7 . 270
8.8 5 0

9 0 . 00
9 0.00
9 0 . 00
9 0 . on

j
. 650
.65 0
.650
.65 0 i

9 . 100
9.390

9 . 100
9 .700

9 0.00
9 0 . CO

1
!

i
!
.930

~
-

!

. 6 50
.900

|
!
:

!
.900
.90 0
. 900
.350

-

.980 1
.995 !

!

1 .1 5 0
.320

1

!

_
;
1 0 .0 0% i
;
:
;
I
1 .0 0
-

!

!
i
1
;
j
. 2 50 i
. 2 50
.250

9 0.0 0

-

-

.030
.030
.030
-

-

.020
.299

-

!
1
|

1 0.285

-

.02 5 j
. 0 30

j

I
i
i
9 .6 2 0

!

6,. 00%

.300

1

_

_

i-o o o
.250

.95 0

-

1. 150

-

;
!

.15 0

i
9.6 2 0

10.285

90.00

.950

-

-

1. 150

!
|

i
8 . 170
8.6 8 0
9 . 250
9 .3 5 0

8 . 835
8 . 880
9.5 5 0
9 .650

9 0 .0 0
9 0 . 00
35.00
9 0 . 00

.950
.520
.600
.950

9.3 5 0
8.9 0 0
8.6 5 0
9.9 0 0
8.9 0 0
9 . 8 50
5 .5 9 0
8.700
9 .990
9 .1 8 0
9 . 200
9 .900
9.530
9.1 5 0
9 .1 8 0
9.180
9 .3 5 0

9 .6 5 0
8 .80C
9 .0 5 0
9.800
8 .8 0 0
10.350
10.060
8.700
10.160
9 . 180
9.9 0 0
10.100
9.6 3 0
9.5 5 0
9.1 8 0
9.1 8 0
9.6 5 0

90.00
9 0.00
9 0.00
9 0 . 00
90.00
9 0 . 00
9 0.00
9C.OO
9 0 .0 0
9 0 . 00
90.00
9 0.00
9 0 . 00
9 0.00
9 0 . 00
9 0.00
9 6 . 00

.950
.550
.550
.550
.55 0
.830
.6 00
.90 0
.860
.700
.950
.950
.96 0
.950
.70 0
.70 0
.95 0 i

-

-

-

1 . 1 5C
13. 8 50
.950
.650

I
!
j

j
. 6 50 i
.90 0 i
.900
.900
.90 0 ■
1 . 0 30 I
.90 0
. 9 50
1 .1 9 0
13 1 . 5 0 0 I
i
.25 0
!
.25 0 ' !
1 .1 50 |
. 6 50
13 1 . 5 0 0
13 1 . 5 0 0
!S
.65 0
!

.150
i
l
i

i

|

!
!

-

:
i
i
|
!
1
'
i

-

i
;
;
!

.25 0
.250
,25 0
. 250
. 500

j
i
!

300

-

.250
. 250

-

-

j

-

-

1
;
j
!
|

. 2 50

.

-

-

s
-

-

.150
.099
.03 0
-

!

1
!

“

_
.07 0
.050
.050
. 120
.025
.05 0
.050
-

-

_
_
1
i
j
i

i

AND LABORERS

i
B RI CK LAY ER S' TENDERS............
MORTAR MIX ER S ......................
BU ILD IN G L A B O R E R S . . . ............
COMPOSITION ROOFERS'
HELPERS
CLASS A ..........................................
CLASS B ................................................
ELEVATOR CONSTRUCTORS'
HELPERS ......................................................
MARBLE SETTERS' HE L PE RS ..
PLASTERS' LABORERS .....................
TFSSAZZO WORKERS' ........................
T I L L LAYERS' HELPERS ..............

7 .0 0 0
7 . 250
7.0 0 0

7 .5 0 0
7 .7 5 0
7.5 0 0

9 0.00
9 0.0 C
9 0.00

.600
.600 !
.600

-

8.350
7.8 0 0

9.0 5 0
8.5 5 0

9 0 . 00
9 0.00

.95 0
.950

~

6. 570
7 .7 0 0
7 .7 5 0
7.7 0 0
7 .7 0 0

6 .7 9 0
7 .8 1 0
7 .7 5 0
7.8 1 0
7.810

9 0.00
9 0.00
9 0.00
9 0.0 0
9 0 . 00

.995

-

-

-

.60 0
-

i_________ I _

See footnotes at end of table.




-

105

-

.700
.70 0
.700

.
-

_
1

_

-

-

. 2 50
.250

-

-

i

-

■

!

.320
6 1.000
.700
61 .0 0 0
61 . 0 0 0

-

-

-

!
!

6 .0 0

-

-

-

-

-

■

“

-

|
.180
.18 0 i
. 180 j

.299
.

-

-

-

150

-

-

-

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U n io n h o u r ly w a g e r a t e s a n d s t r a i g h t - t i m e w e e k ly h o u r s a n d e m p l o y e r i n s u r a n c e , p e n s i o n , v a c a t i o n , a n d o t h e r c o n tr i b u ti o n s to f u n d s in th e
b u ild in g t r a d e s , J u ly 1, 1975 a n d J u ly 1, 1976)
J UL Y 1,
197 5

JULY

1,

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS J
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR1

HOURS
PER
WEEK 2

INSURANCE 4

DOLLARS

PENSION

PE RCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER 5

PERCENT

DOLLARS

PERCENT

P B O V I D E IC E , R . I .
-CONTINUED
HIGHWAY AND STREET
CONSTRUCTION

JOURNEYMEN

CARPENTERS, P IL E D R I V E R S . .
CEMENT F I N I S H E R S ......................
ENGINEERS— POWER EQU IP­
MENT OPERATORS:
HEAVY EQUIPMENT';
CRANES, DRAGLINES,
PAVERS, SHOVFLS............
MEDIUM EQUIPMENT:
P I L E DR IV ER S, L I G H T ­
ERS, DERRICKS.................
LIGH T EQUIPMENT:
PUMPS AND A IR
COMPRESSORS, MIXERS
STONE CRUSHERS.'’. ............
STRUCTURAL IRON WORKERS..

$ 9 .1 6 0
7.6 5 0

*9 .1 6 0
8 .0 0 0

9 0 . 00
9 0 . CO

9 .9 2 0

1 0.095

9 0.00

.95 0

1.150

.150

9.9 2 0

10.095

90.00

.95 0

1 .1 5 0

.150

7 .7 7 5
9 . 180

8 .9 9 5
9.1 8 0

90.00
9 0 . CO

.95 0
.700

1 .1 5 0
13 1 . 5 0 0

7 .0 0 0

7 .5 O 0

90.00

.60 0

.70 0

9.1 6 0
7.6 5 0

9 .160
8 .0 0 0

90.0 0
9 0.0 0

.650
.500

10.320

10.395

9 0 . 00

.950

1 . 1 50

.150

10.320

1 0.395

9 0.00

.9 5 0

1.150

. 150

8 .630
9.1 8 0

8.9 0 5
9 . 180

9 0.00
90.00

.950
.70 0

-

,.1*150
13 1 . 5 0 0

-

.250

-

. 150
. 050

-

7 .0 0 0

7 .5 0 0

90.0 0

.600

-

.700

-

-

-

.180

-

10.580
10.850
9.5 3 0
8.8 3 0
8 .9 6 0
10.710
11.075

1 1.350
1 2.0 00
1 0 . 100
9 .5 9 0
9 .9 1 0
11.510
12.000

9 0.0 0
9 0.00
9 0 . Ar*
90.00
9 0.00
90.00
9 0.00

.87 0
.750
1 .0 3 C
1 .3 0 0
1. 100
.600
.995

.

1 .0 0 0
.5 0 0
6. 5 00
.800
1 .0 0 0

_
_
-

.25 0
.020

9 .5 0 0

1 0.290

9 0.00

.95 0

2 .0 0 0

.50 0

.1 0 0

j
I

9 .9 0 0

10.180

90.00

.950

2 .0 0 0

.500

. 100

i

9.0 6 0

9 .8 2 0

90.0 0

.950

0 .6 5 0
.50 0

_

0 .9 0 0
. 3 50

_

0 .2 5 0

_

.250

-

-

0 .0 3 0

.150
.050

-

HELPERS AND LABORERS

GENERAL LABORERS......................

. 180

OTHER HEAVY CONSTRUCTION

JOURNEYMEN

CARPENTERS, P I L E D R I V E R S . .
CEMENT F I N I S H E R S ......................
ENGINEERS— POWER EQUIP­
MENT OPERATORS:
HEAVY EQUIPMENT:
CRANES, SHOVEL,
DRAGLINES, P A V E R S . . .
MEDIUM EQUIPMENT:
P IL E DR IV ER S
L IG H T E R S , DE R R IC K S ..
LIG HT EQUIPMENT:
PUMPS AND A IR COM­
PRESSORS, MIXERS,
STONE CRUSHERS..............
STRUCTURAL IFON WORKERS..

_

.90 0
. 3 50

_

. 250

_

.03 0

HFLPFRS AND LABORERS

GENERAL

LABORERS......................

RIVERSIDE,

B U IL D IN G

C A L IF .

CONSTRUCTION

JOURNEYMEN

ASBESTOS WORKERS......................
BOILERMAKERS.................................
B RIC KLA YER S ....................................
CARPENTERS.......................................
CEMENT F I N I S H E R S .......................
E L E C T R IC IA N S .................................
ELEVATOR CO N S T R U C T O R S . . . .
ENGINEERS--POWER EQU IP­
MENT OPERATORS:
BACKHOE, CLAMSHELL
(OVER 3 / 9 YARD) ,
DRAG LIN ES, SHOVELS.
TRACTOR— UP TO 100
HP.............................................
A-FRAME OR WINCH
TRUCK OPERATOR............

-

-

1 .0 0 %
-

_

-

_
_

5 .0 0 %

_

_
_

_

_
_

_

_
_

.31 7

I

-

See footnotes at end of table.




. 9 50
1 .0 0 0
1 .3 5 0
1.8 0 0
1 . 7 50
1.250
.32 0

106

2 .0 0 0

-

.5 0 0

-

. 100

-

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a t e s a n d s t r a i g h t - t i m e w e e k ly h o u r s a n d e m p l o y e r i n s u r a n c e , p e n s io n , v a c a t i o n , a n d o t h e r c o n tr i b u ti o n s to fu n d s in th e
b u ild in g t r a d e s , J u ly 1, 1975 a n d J u ly 1, 1976)
J UL Y 1 ,
1975

JULY

1,

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
RATE
PER
HOUR1

C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR 1

HOURS
PER
WEEK2

INSURANCE4

DOLLARS

PERCENT

PENSION

DOLLARS

PERCENT

VACATION

DOLLARS

OTHER5

PERCENT

DOLLARS

PERCENT

RIVERSIDE, CALIF.
-CONTINUED
BUILDING CONSTRUCTION
-CONTINUED
JOURNEYMEN
-CONTINUED
ENGINEERS— POWER EQUIPMENT
OPERATORS: -CONTINUED
MOTOR PATROL BLADE
OPERATOR:
SIN GLE E N G I N E . . . .
M U L T I - E N G I N E ............
COMPRESSOR OPERATOR.
CONCRETE M I X E R - S L I P .
TRACTOR— OVER 100 HP
CONCRETE MIXER — PAV­
I N G ..........................................
S HI P LEADER OPERATOR
( 3 / 4 - 1 - 1 / 2 Y AR DS ).
S HI P 10ADFR ( 1 - 1 / 2
6 - 1 / 2 Y AR DS ) .................
TRACTOR LOADER — OVER
6 - 1 / 2 YARDS......................
TRENCHING MACHINE
OPERATOR (UP TO 6
F T ) ..........................................
CANAL L IN ER OPER­
ATOR.......................................
G LA Z IE R S ............................................
LATHERS...............................................
M A C H I N I S T S .......................................
MARbLF SETTERS............................
PAI NT E RS ............................................
PAPERHANGERS.................................
P I P L P I T T E R S . .................................
PLASTERERS.......................................
PLUMBERS............................................
REINFORCING IRON WORKERS.
ROOFERS, COMPOSITION............
ROOFERS, SLATE AND T I L E . .
SHEETHETAL WORKERS.................
STONEMASONS....................................
STRUCTURAL IRON WORKERS..
TERRAZZO WORKERS......................
T I L E LAYERS ( T I L E
S ET T E R S ) .................................

$9,620
9.7 8 0
8.5 2 0
8 .7 9 0
9.5 0 0

$10,410
10.580
9.2 5 0
9 .5 3 0
10.290

4 0.00
4 0 . A0
4 0.00
40.00
4 0 . 0A

0.9 5 0
.950
.950
. 95C
.950

-

2 .0 0 0
2.0 0 0
2 .0 0 0
2 .0 0 0
2.0 0 0

9 . 500

10.290

4 0.00

.95 0

_

2 .000

.950

_

9 .4 0 0

10.180

4 0.00

9 .5 0 0

1 0.290

40.00

.950

_

9.6 2 0

10.410

4 0 . 0A

.95 0

_

9 . 190

9 .9 6 0

4 0 . 0A

.95 0

9 .9 0 0
8 .3 7 2
10.500
10.200
9.5 2 9
9.2 7 0
9 .7 7 0
10.950
11.010
10.950
1 0.230
8 .6 5 0
8 .6 5 0
8 .0 5 0
9 .5 3 0
10.230
9 .8 2 0

10.710
9 .5 2 2
10.900
1 1.400
9 .5 2 9
10.370
10.870
1 1.660
11.858
11.660
11.030
9 . 30C
9 .3 0 0
8 .0 5 5
1 0.100
11.030
10.720

4 0.00
4 0.00
40.00
4 A . 00
4 0 . 00
4 0.00
40.00
4 0.00
40.00
40.00
4 0.00
40.00
40 ,A0
4 0.00
4C.C0
40.00
4 0.00

.95 0
.550
.650
.47 2
.84 0
.84 0
1 .09 C
.60 0
.60 0
.94 0
1 .0 3 0
1.09A
.300

9 . 250

9 .7 2 0

4 0.00

1.0 3 0

-

0. 50 0
.50 0
.5 0 0
.50 0
.500

_

.50 0

-

2 .000

.500

2.0 0 0

_

.50 0

2 .000

_

.50 0

-

_

0. 100
.100
.100
.100
. 100

-

.100

_

-

.100

_

. 100

_

_

. 100

_

_

1 .5 0
15.00
1.50
-

. 100

2 .000

.50 0

-

2.0 0 0
.950
.800
.500
1.100
1 .1 0 0
1 .830
.650
.65 0
1.500
1 .3 5 0
1 .8 3 0
.800

10.97
16.00
16.00
-

.500
.500
. 7 50
.75 0
1.150
1 .0 0 0
1.000
6. 500
1.1 5 0
. 70 0

13.00
13.00
61 0 . 0 0
-

. 100
.429
.12 0
.090
.090
.070
. 160
.160
.290
.25 0
.030
. 300

-

1 .3 5 0

-

6. 50 O

-

.250

_

. 500

_

.15 0

_

.214

_

.50 0

5 .0 0
-

.50 0

_

_
7 .9 8 %
10.00
10.00
-

13.00
65 . 0 0
-

_
7 .1 4 %
-

i
HELPERS

AND LABORERS

B R I CK LA Y ER S' TENDERS............
BU ILD IN G LABORERS
(GENERAL C O N S T . ) .................
ELEVATOR CONSTRUCTORS'
HELPERS.............................................
MARBLE SET TE ES ' HE L PE RS ..
PLASTERERS' LABORERS
(TE ND ER S).......................................
TERRAZZO WORKERS'
HELPERS.............................................
T I L E LAYERS' HELPERS............
C E R T I F I E D HELPERS............

7 .805

8 .2 5 5

40.00

.850

7 .2 0 0

7 .6 5 5

40.00

.850

7 .7 5 0
6.220

8 .4 0 0
6.7 8 0

4 0.00
40.00

.495
1. 110

-

.85 0

_

9 .5 3 0

1 0 . 180

40.00

.500

1 .8 0 0
_

_
_
-

8 .0 8 0
7 .4 6 5
7.7 4 5

8 .88C
8 .4 6 0
8.7 4 0

40.00
4 0.00
4 0.00

.35 0
1 .1 1 0
1 .1 1 0

8 . 830
8 .4 6 0

9 .4 5 0
9.4 1 0

4 0 . 0A
40.00

1 .3 0 C
1 .1 0 0

-

9 .5 0 0
9 .400

1 0.290
10.180

4 0.00
40.00

.95 0
.95 0

-

1 .8 0 0
.320
1 .2 0 0

-

1 .8 0 0

_
_

.150

I
I

.150

_

.30 0
.300
.30 0

-

I

_

-

1.000
.500
.50 0

_

1.800
1 .7 5 0

-

.80 0
1 .000

-

.020
-

-

2.000
2.0 0 0

-

.50 0
.5 0 0

-

.100
. 100

-

.500

_

.10 0

.50 0

-

.100

.80 0
1 .2 0 0
1 .2 0 0

'

l

OTHER HEAVY CONSTRUCTION

JOURNEYMFN

CARPENTERS.......................................
CEMENT F I N I S H E R S ......................
ENGINEERS-POWER EQUIPMENT
OPERATORS:
SHOVELS, BACKHOFS, DRAG­
LINES,
CLAMSHELLS
(OVER 3 / 4 Y A R D ) .................
TRACTORS (UP TO 100 HP)
A-FRAMES OR WINCH
TRUCKS.........................................
MOTOR PATRCL BLADES
( SIN GLE E N G I N E ) .................

9.0 6 0

9 .8 2 C

4 0.00

.95 0

_

9 .6 2 0

1 0.410

4 0.00

.95 0

-

See footnotes at end of table.




1 07

2.0 0 0
2.000

_
-

_
-

Table 20. W age rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s t r a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e ,
b u ild in g t r a d e s , July 1, 1975 and J u ly 1, 1976)

p e n s io n ,

JULY

JULY 1,
___ 112 5 _____

v a c a tio n ,

1,

and o th e r c o n tr ib u tio n s to funds in the

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR1

HOURS
PER
WEEK2

INSURANCE4

DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER5

PERCENT

DOLLARS

PERCENT

RIVERSIDE, C A L IF .
-CONTINUED

OTHER HEAVY CONSTRUCTION
-C ONTINUED
JOURNEYMEN
-CONTINUED

HELPERS

$ 10,580
9 .2 5 0

90.0 0
9 0 . 00

0 .95C
.950

_
-

2 .0 0 0
2.000

_
-

0 . 500
.500

_
-

0 .1 0 0
. 100

_
-

8 .790
9.500

9 .5 3 0
1 0.290

9 0.00
90.00

.95 0
.95 0

-

2 .0 0 0
2.000

-

. 50 0
. 500

-

.10 0
.100

-

9 .500

10.290

9 0.00

.9 5 0

-

2 .0 0 0

-

.500

-

. 100

-

9.9 0 0

1 0 . 180

9 0 . 00

.95 0

-

2.000

-

. 50 0

-

. 100

-

9.5 0 0

1 0.290

.95 0

-

2 .0 0 0

-

. 500

-

. 100

j
I

-

. 50C
.500
. 50 0
1.1 5 0

-

.100
. 100
. 100
.03 0

I
j

.500

-

9.6 2 0
9 . 190
9.9 0 0
10.230

1 0.910
9 .9 6 0
10.710
1 1 .0 3 C

90.00
9 0.00
90.0 0
9 0 . 00

.95 0
.95 0
.95 0
1.0 3 0

-

2.000
2.0 0 0
2 .0 0 0
1 .8 3 0

7.2 0 0

7 .6 5 0

9 0.00

.85 0

-

.800

-

11.070
10.665
7 .1 9 0
10.250
5.5 0 0

T1 1 . 0 7 0
10.665
77 . 1 9 0
10.300
5 .5 0 0

9C.OO
9 0. *0
90.00
9 0.00
9 0 .0 0

.830
.550
.55 0
.750
.750

. 900
.750
.750
.660
.660

_

_

_

-

-

-

-

.090
.090
.070
.930
.360

.
-

9 . 920
10.620
10.965
6 .9 9 0

9 .9 2 0
10.720
10.665
76 . 9 9 0

90.00
9 0 . CO
9 0.00
90.00

.750
.75 0
.550
.550

-

.660
.66 0
.75 0
. 7 50

-

-

-

.05 5
36.380
.09 0
.07 0

-

10.850
10.610

10.850
1 1.350

9 0.00
9 0.00

.700
.995

-

1.3 5 0
.32 0

8-

-

9. 020

10.210

10.960

9 0 . 0O

.55 0

“

.600

~

~

"

9. 950

10.030

10.280

9 0.00

.55 0

-

.600

-

-

-

.950

-

8.9 3 0
7 .0 5 0
9.9 0 0
10.780
9.000
11.660

9 . 185
7.1 0 0
79 . 900
10.780
9.7 5 0
11.860

9 0 . 0 r.
90.0 0
9 0.00
9 0.00
9 0 . 00
9 0.00

.550
.50 0
.82 0
-

-

.600
.550
.960
.500
-

-

-

-

9. 950
9. 90 0
. 150
.060
.030

-

11.660
8.9 5 0

11.860
8 .9 5 0

9 0.00
. 90.00

.650

-

.62 0

-

-

-

.030
.350

-

9 . 950
9 .6 5 0

9.9 5 0
9 .6 5 0

9 0.00
9 0.00

.650
.650

-

.620
. 6 20

-

-

-

.35 0
. 350

-

9 . 550
9.650
9 .9 5 0
9 .2 0 0
9 .9 9 0
10.665
7 . 190
9 .9 9 0
10.290

9.5 5 0
9 .6 5 0
9 .9 5 0
9 .2 0 0
10.990
10.665
77 . 190
10.990
10.290

90.0 0
9 0 . CO
90.00
90.00
9 0.0 0
90.00
9 0.00
9 0.00
9 0.00

.650
.650
.650
.650
.605
.550
.550
.605
.790

-

. 6 20
.62 0
. 6 20
.620
.625
.750
.750
.625
.820

-

-

.35 0
.350
.35 0
.350
1 .8 2 0
.090
.07 0
1 .8 2 0
. 170

-

_
-

AND LABORERS

CONSTRUCTION

L A B O R E R S ....

ROCHESTER,

BU IL D IN G

$9,780
8.520

c
o

( M U L T I - E N G I N E ) ....................
COMPRESSORS...............................
CONCRETE MIXERS ( S L I P
T Y P E ) ............................................
TRACTORS (OVER 100 H P ) .
CONCRETE MIXERS ( PAVI N G ) ..................................................
SHIP LEADERS ( 3 / 9 TO
1 1 / 2 Y A R D S ) .........................
SHIP LOADERS (1 1 / 2 TO
b 1 / 2 Y A R D S ) .........................
TRACTOR LOADERS (OVER
6 1 / 2 Y A R D S ) .........................
TRENCHERS (UP TO .,6 FT) .
CANAL T IN N E R S .........................
STRUCTURAL IRON WORKERS..

.150

H .I.

CONSTRUCTION

JOURNEYMEN

ASBESTOS WORKERS......................
BRICK LAY ER S....................................
R E S I D E N T I A L ............................
CARPENTERS, GENERAL..............
R E S I D E N T I A L ............................
FLOOR LAYERS, HARDWOOD
T I L E AND C A R P E T I N G . . . .
MI LLW RI GH TS ............................
CEMENT F I N I S H E R S ......................
R E S I D E N T I A L ............................
E LE C TR IC IA N S ( I N S I D E
W IR E R S )..........................................
ELEVATOR C O N S TR UC TO RS .. ..
ENGINEERS— POWER EQUIP­
MENT OPERATORS:
HEAVY EQUIPMENT—
CRANES, DERRICKS,
' P I L E D R I V E R S .........................
MEDIUM EQUIPMENT—
H O I S T S , CONCRETE
PUMPS, HIGH PRESSURE
B O I L E R S ....................................
L IG H T E Q U IP M E NT -PUMPS, COMPRESSORS,
M IX ER S .......................................
R E S I D E N T I A L ...............................
G LA ZI E R S ............................................
LATHERS...............................................
M A C H I N I S T S .......................................
MARBLE SETTERS............................
MOSAIC AND TEPRAZZO
WORKERS..........................................
P A IN TE R S ............................................
STRUCTURAL ST EEL :
TO 9 0 FE ET ............................
OVER 90 FE ET ......................
SPRAY:
REGULAR....................................
S P E C I A L ....................................
BRIDG E.......................................
PAPERHANGERS.................................
P I P E F I T T E R S ....................................
PLASTERERS.......................................
R E S I D E N T I A L ............................
PLUMBERS.............................................
REINFORCING IRON WORKERS.

_

See footnotes at end of table.




108

1.0 0 %
-

-

.550
. 550

-

0 .2 5 %
-

-

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s t r a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , July 1, 1975 and J u ly 1, 1976)
JULY

JULY 1,
197 5

1,

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

PER
HOUR1

PER
HOUR 1

PER
WEEK2

INSURANCE4

DOLLARS

PENSION

PERCEN1?

DOLLARS

OTHER5

VACATION

PERCENT

DOLLARS

PERCENT

DOLLARS

PERCENT

ROCHESTER, I . I .
-COMTIHOED
B UI LD IN G CONSTRUCTION
-C ONTINUED
JOURNEYMEN
-CONTINUED
ROOFERS, COMPOSITION...........
ROOFERS, SLATE AND T I L E . .
SHFET-METAL WORKERS..............
R E S ID E N T IA L ............................
STONEMASONS....................................
R E S I D E N T I A L ............................
STRUCTURAL IRON WORKERS..
FI N IS H E R S (ORNAMENTAL)
T I L L LAYERS ...................................
HELPERS

i T $ 1 0 , 420
10.420
f9 .8 6 0
5 .0 0 0
10.665
7 .1 9 0
10.240
10.240
11.660

$10,420
10.42C
10.340
5 .0 0 0
10.665
T7 . 1 9 0
10.290
10.290
1 1 .8 6 C

40.0 0
4 0 . 00
40.00
40.00
4 0 . CO
40.00
40.00
4 0.00
4 0 . 0^

0.6 3 0
.63 0
.700
.700
.550
.550
.74 0
.740
-

-

0 .6 30
.630
1 .0 0 0
.TOO
.750
. 7 50
.820
. 8 20
-

4 0 . CO
4C. 00

.85 0
.85 0

-

.89 0
.890

-

-

-

-

_
_

0. 250 i
.250i
.75 0
_
_

—
_
_
_
_

-

-

_
-

-

-

-

-

-

-

. 3 20
.84 0
.890

_

-

8_
-

. 8 40

_

_

0 . 0 30
.03 0
.15 0

_
_
_
_
_
_
_

.09 0
.07 0
.17 0
.17 0
. 0 30

-

AND LABORERS

BR ICK LAY ER S' TENDERS............
BUILD ING LABORERS....................
ELEVATORS CONSTRUCTORS'
HELPERS............................................
MARBLE SETTERS' HEL P ER S..
PLASTERERS' TENDERS..............
TERKAZZO WORKERS'
HELPERS..........................................
MACHINE OPERATORS
( G R I N D E R S ) .........................
T I L E LAYERS' HELPERS............

8 .000
8.00C

8.0 0 0
8.0 0 0

_

7.4 3 0
8.7 5 0
8 .0 0 0

7 .9 4 5
79.050
8 .0 0 0

4 0 . 00
4 0 . 00
4 0 . CO

8.750

79 . 0 5 0

40.00

_

4 0.00
40.00

_

_

-

-

79 . 0 5 0
79 . 0 50

8.8 5 0
8.7 5 0

.49 5
. 8 50

-

_
.

.84 0
.840

.620
.620

-

9«020
.50 0
.620

.
_

.500
.500
.500
|
I

HIGHWAY AND STREET
CONSTRUCTION

JOURNEYMEN

CARPENTERS................. .....................
P I L E D R I V E R S ............................
CEMENT F I N I S H E R S ......................
ENGINEERS— POWER EQUIP­
MENT OPERATORS:
CLASS A — BACKHOE S,
CRANES, DRAGLINES,
P I L E D R I V E R S .........................
CLASS B— CONCRETE
PUMPS, ONE-DRUM
H O I S T S , ROLLERS (A L L
ABOVE SUBGRADE)..............
CLASS C - - F 0 R K L I F T S ,
HYDRAULIC HAMMERS,
CONCRETE PAVEMENT
SPREADERS AND F I N I S H ­
ERS ...............................................
CLASS D — CONCRETE MIX ­
ERS (1 6 5 AND UNDER) ,
FORM TAMPERS, TRAC­
TORS............................................
CLASS E— O I L E R S , JU N­
IOR
ENGINEERS.................
STRUCTURAL IRON WORKERS..
F I N I S H E R S .................................
HELPERS

10. 370 I
10. 370
.04 0

8 .3 8 0
8 . 380
a . 390

8 .5 8 0
8 .2 5 0
8.8 9 0

4 0 . 00
4 0.00
40.00

.750
.75 0
. 55C

-

.66 0
.66 0
.750

9.1 5 0

9.7 0 0

4 0 . 00

.550

“

.600

9. 400

9 .5 0 C

40.00

. 550

.600

9. 40 0

8.6 5 0

9.2 0 0

4 0 . 00

.55 0

.600

9. 400

7 .9 0 0

8 .4 5 0

40.00

.550

l
. 600 j

7.6 5 0
10.240
10.240

8 .2 0 0
10.290
10.290

40.00
40.00
4 0.00

.55 0
.740
.74 0

.600
.820
. 8 20

7.3 7 0

7 .3 7 0

40.00

.850

7 . 670

7 .6 7 0

4 0.00

.850

7 .6 2 0

7 .6 2 0

40.0 0

.85 0

7. 570
9.1 2 0

7 .5 7 0
9 . 120

4 0.00
4 0.00

.850
.850

-

.89 0
.890

“

8 . 380
8.3 8 0

8 .5 8 0
8.5 8 0,

4 0.00
4 0.00

.75 0
.750

-

.660
.660

-

8 .9 5 0

-

-

-

-

I

-

9. 4 0 0
_
-

_
-

.
-

-

-

"

_

_

_

9. 400
. 170
.170

_
-

AND LABORERS

GENERAL LABORERS.............. ..
MORTAR SETTERS AND
CHANGERS.................................
ASPHALT RAKERS, WAGON
D R I L L OPERATORS, CURB
STONE SETTERS......................
PIP E LAYERS, POWER
TOOL OPERATORS ( A I R ,
E LE C T R IC , GAS,AND
D I E S E L ) ....................................
BLASTERS....................................

.890
_

.890

.55 0

.89 0

.55 0

_

.550

-

.550
.550

-

-

lo* 370
10. 43 5

-

OTHER HEAVY CONSTRUCTION

JOURNEYMEN

CARPENTERS.......................................
P IL E D R I V E R S ............................

S ee fo o tn o te s a t end of t a b le .




109

-

Table 20. W age rates, hours, and employer contributions to funds: Selected cities— Continued
(U n io n h o u r ly w a g e r a t e s a n d s t r a i g h t - t i m e w e e k ly h o u r s a n d e m p l o y e r i n s u r a n c e , p e n s io n , v a c a t i o n , a n d o t h e r c o n tr i b u ti o n s to fu n d s in th e
b u ild in g t r a d e s , J u ly 1, 1975 a n d J u ly 1, 1976)
—

JUL Y 1,
197 5

JULY

1,

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

PER
HOUR 1

PER
HOUR

PER
WEEK 2

INSURANCE 4

DOLLARS

VACATION

PENSION

PERCENT

DOLLARS

PERCENT

DOLLARS

OTHER5

PERCENT

DOLLARS

PERCENT

ROCHESTER, M . Y .
-CONTINUED
OTHER HEAVY CONSTRUCTION
-CONTINUED
JOURNEYMEN
-CONTINUED
$8.390

$8,890

9 .0 0 0

9 .3 7 0

o

9 .6 9 0

©

9 .3 0 0

4 0.00

o

CEMENT F I N I S H E R S ......................
ENGINEERS— POWER EQUIPMENT
OPERATORS;
HEAVY EQUIPMENT— CAB LEHAYS, P IL E D R I V E R S ,
CRANES, SHOVELS, CARK Y A L LS ,T Y PE s c r a p e r s . .
MEDIUM EQUIPMENT— DINKY
LOCOMOTIVES, HOISTS
(I -D RU M ) , CONCRETE
PUMPS (UNDER 8 INCHES)
HIGH PREASURE BOILERS
(15LBS AND O VE R) ..............
L IG H T EQUIPMENT— £UMPS
(UNDER 4 I N C H E S ) ..............
COMPRESSORS (3 1 5 CF
AND O VE R) , PUMPS
(4 INCHES AND O V E R ). .
MASTER MECHANICS.................
STRUCTURAL IRON WORKERS. .
F I N I S H E R S .................................

40.00

0.550

_

0 .7 5 0

_

_

_

0 .0 4 0

-

-

10. 420

-

_

.550

-

.600

-

.55 0

_

.600

_

_

_

I0. 4 20

_

.600

-

_

-

10. 4 2 0

-

-

7 .6 0 0

7 .9 0 C

4 0 . 00

.550

_

8 . 350
9 .8 5 0
10.240
10.240

8 .6 9 0
1 0.260
10.290
10.290

40.00
40.0 0
4 0.00
4 0.0 0

.550
.550
.74 0
.740

•

.600
.600
.820
.820

-

-

-

*

“

“

10. 420
.42 0
.17 0
.17 0

6.4 5 0

6 .8 0 0

4 0.00

.850

-

-

-

-

-

.550

10.220
10.550
9 .4 0 0
9 . 450
9 .3 3 0
9 . 100

10.220
1 1.550
9 .9 0 0
1 0.050
9 .7 8 0
9 .7 3 0

40.

.450
.750
.400
.40 0
.40 0
.40 0

_

.600
1.0 0 0
.400
.350
.500
.450

0 .7 5 0

_

37.5 0
40.00
4 0.00
4 0.00

-

6. 4 50
-

-

9 .6 9 0
10.045

1 0.403
1 1.010

40.00
4 0.00

10.550

10.550

8 .100
6 . 850
8 .9 0 0
9 .1 4 0
8 . 800

8 .10C
6 .8 5 0
9 .4 4 0
9.4 4 0
9 .3 0 0

8 .800
8 .3 0 0
8 . 550
8 .5 5 0
8 . 300
9 .5 0 0
9.5 0 0
8 .5 3 0
9.5 0 0
11.200
9.0 0 0
9 .0 0 0
8 .8 3 0
9.400
11.200
8.8 0 0

9 .3 0 G
9 .3 5 0
9 .6 0 0
9.6 0 0
9 .3 5 0
10.100
1 0.100
9 .08C
1 0.100
11.875
10.550
10.550
9 .6 0 0
9 .9 0 0
1 1.875
9.3 0 0

8 .2 0 0

8 .710
8 .5 1 0

-

HELPFRS AND LABORERS

LABORERS............................................
ROCKFORD,

B UI LD IN G

-

ILL .

CONSTRUCTION

JOURNEYMEN

G L A Z I E R S ..................
LAT HFR5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
MARBLE SETTERS............................
MOSAIC AND TERRAZZO
WORK 2 R S..........................................
PAI NT E RS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SWING STAGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
STRUCTURAL S TE EL . . . . . . . . . . . . . . .
PAPLPHANGERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
P IP E FITTE RS .......................................
RFFRIGERATION F I T T E R S .
PLASTERERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PLUMBERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
REINFORCING IRON WORKERS.
ROOFERS, COMPOSITION . . . . . . . . . . . .
ROOFERS, SLATE AND T I L E . .
SHEET METAL WORKERS..............
STONEMASONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
STRUCTURAL IRON WORKERS..
T I L E LAYERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

40.

o n

-

-

-

-

-

.04 0
.47 0
.030
6. 250
61 . 0 5 0
6. 220

-

8.000

-

.400
.35 0

.650

-

.85 0

-

.40 0

-

-

-

40.0 0
4 0.00
4 0.00
4 0 . 00
4 0 .0 0

.650
.65 0
.370
.40 0
.400

-

.850
.85 0
. 20 u
.350
.300

-

.. 400

-

-

-

-

-

.040
.020

-

40.00
40.00
40.00
4 0.00
40.00
40.00
4 0.00
40.00
40.00
40.0 0
4 0.00
40.0 0
40.00
40.00
4 0.00
40.00

.400
6. 4 0 0
6. 4 0 0
6. 4 0 0
6 . 40 0
.45 0
.450
.40 0
.450
.65 0
.4 0 0
.400
.40 0
.40 0
.650
.40 0

-

.02 0

-

4 0.00
40.0 0

.400
.400

See footnotes at end of table.




-

-

-

-

-

.300
-

.400
.40 0
.500
.400
.375
-

.680
.40 0
.375
.300

1 .0 0 %

-

-

-

-

6. 4 0 0
1 .0 0 0
. 400
6 . 250
6. 2 5 0
6 . 5 00

6. 5 0 0
6 . 50 0
6 . 500
-

6 . 50 0
6 . 4 50
6 . 250

6 5 .0 0 %
6 .0 0

-

.02 0

-

6.85 0
6 . 850
6 • 530
6 . 850

“

.10 0
1 .0 0 0
1.0 0 0
.160
.03 0
.100
.02 0

“

.050

-

HELPERS AND LABORERS

B RI CK LAY ER S' TENDERS . . . . . . . . . . . . .
BU IL D IN G LABORERS . . . . . . . . . . . . . . . . . . . . .

_

5.00%
-

.400
.54 5

o

MILLWRIGHTS...........
CEMENT F I N I S H E R S ......................
EL E CT R IC IA NS ( I N S I D E
H I R E R S ) .........................................
ELFtfATOR CON ST RU C TO RS .. ..
ENGINEERS — POWFR EQU IP­
MENT OPERATORS:
HEAVY — CRANES .........
L I G H T — A IR COMPRES­
SORS ..................

O ft

o
o

ASBESTOS WORKERS......................
BOILERMAKERS .............
B RIC KLA YER S ..............
CARPENTERS ...............

110

_

“

.54 0
.540

_

.050
”

.50
2 .3 1

“

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U n io n h o u r ly w a g e r a t e s a n d s t r a i g h t - t i m e w e e k ly h o u r s a n d e m p l o y e r i n s u r a n c e , p e n s io n , v a c a t i o n , a n d o t h e r c o n tr i b u ti o n s to fu n d s in th e
b u ild in g t r a d e s , J u ly 1, 1975 a n d J u ly 1, 1976)
JUL Y 1,
197 5

JULY

1,

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS 3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR 1

RATE
PER
HOUR.1

PER
WEEK 2

INSURANCE 4

DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER 5

PERCENT

DOLLARS

6 .0 0 %

0.0 2 0
.15 0
.050
.05 0

PERCENT

ROCKFOBD, I L L .
-COITINO ZD
B U IL D IN G CONSTRUCTION
-CONTINUED
HELPERS AND LABORERS
-CONTINUED
ELEVATOR CONSTRUCTORS'
HELPERS............................................
MARBLE S ET TE RS ' H E L PE RS ..
PLASTERERS' LABORERS............
PLUMBERS' LABORERS.................
TERRAZZO WORKERS'
HELPERS..........................................
WET AND DRY BASE MACHINE OPERATORS..............
T I L E LAY ERS' HELPERS............

-

-

-

-

-

-

*

0 .3 5 0
.54 0
.540

-

~

.400
.40 0

-

-

-

4 0 . 00
4 0 . CO

.400
.400

.

$7.030
6.8 0 0
8. 300
8.0 0 0

$ 7,710
7 .9 0 G
8 .8 1 0
8 .5 1 0

4 0 . 00
4 0.00
4 0.00
40.00

0. 5 45
.400
.40 0
.400

6.8 0 0

7.90C

4 0.00

.400

7 .0 5 0
6 .8 0 0

8 .0 5 0
7 .9 0 C

4 0.00
4 U. 00

9 .3 8 5
9 . 100

9.61C
9 .7 3 0

-

2 .3 1 %
_
-

-

-

.150

-

-

-

. 150
.150

-

HIGHWAY AND STREET
CONSTRUCTION

JOURNEYMEN

CARPENTERS.......................................
CEMENT F I N I S H E R S ......................
ENGINEEPS--FOWER EQU IP­
MENT OPERTORS:
HEAVY — CRANES......................
MEDIUM— SMALL TRACTOR
TY PES..........................................
L I G H T - - A I R COMPRESSORS, PUMPS.........................
O I L E R S .........................................
MINOR EQUIPMENT.................
STRUCTURAL IRON WORKERS..
HELPERS

.750
.450

6.450
6. 2 2 0

10.200

1 0.900

4 0.00

.650

-

. 8 50

"

9.6 5 0

10.350

40.00

.650

-

.85 0

-

. 4 00

-

7 .8 0 0
6 . 800
8 .9 0 0
11.200

8.5 0 0
7.5 0 0
9 .600
1 1 .8 7 5

4 0.0 0
40.00
4 0.0 0
40.00

.65 0
.65 0
.650
.650

-

-

. 4 00
.400
.400
-

-

-

.850
. 8 50
. 8 50
.375

8 .0 0 0

8 .51C

4 0.00

.400

*

.54 0

-

-

-

.050

9.3 8 5
9 . 100

9 .6 1 0
9 .7 3 0

4O.00
40.0 0

.400
.400

.750
.450

_

_

_

“

“

6. 450
6. 220

10.200

1 0.900

40.00

.65 0

.850

9.6 5 0

10.35C

7.8 0 0
6 . 800
8 .9 0 0
11.200

8.5 0 0
7 .5 0 0
9 .6 0 0
1 1.875

8.0 0 0

8 .5 1 0

8 . 910
9 .0 5 0

9 .5 3 0
9.6 0 0

8.750
9.3 6 0
9 .3 6 0
9 .3 6 0
9.3 6 0

9.4 0 0
9 .9 6 0
9 .9 6 0
9 .9 6 0
9.9 6 0

8 .740
8 .7 4 0

9 .2 8 0
9 .2 8 0

|

0 .4 0 0

-

-

. 100

-

_
-

AND LABORERS
I

LABORERS............................................
OTHER HEAVY CONSTRUCTION

JOURNEYMEN

.65 0

“

.850

“

.400

~

4 0.00
4 0.
4 0.00
4 0 . QO

.65 0
.65 0
.65 0
.65 0

• -

.850
.850
. 8 50
.375

-

.400
. 400
.400
”

-

.400

o

o
o

.400

c
o

CARPENTERS.......................................
CEMENT F I N I S H E R S ......................
ENGINEERS— POWER EQU IP­
MENT OPERATORS: ....................
MEDIUM— SMALL TRACTOR
TYPES..........................................
L IG H T — A IR COMPRES­
SORS, PUMPS.........................
O I L E R S ................. .......................
MINOR EQUIPMENT.................
STRUCTURAL IRON WORKERS..

-

_
-

-

-

-

-

. 100

-

HELPERS AND LABORERS

LABORERS............................................
ST.

B U IL D IN G

L O U IS ,

.540

.050

HO.

CONSTRUCTION

JOURNEYMEN




o

See footnotes at end of table,

4 0.00
4 0 .0 0
o
o

ASBESTOS WORKERS......................
BOILERMAKERS.................................
SEWER MANHOLES, OVER
6 F E E T .......................................
CARPENTERS......................................
R E S I D E N T I A L ............................
MIL LWR IGH TS ............................
P IL E D R I V E R S ............................
HARDWOOD FLOOR LAY ERS:
COMMERCIAL...............................
R E S ID E N T IA L .........................

.50 0
.70 0

_
~
-

4 0.00
40.0 0
40.00
4 0.00

.520
.500
.50 0
.500
.500

40.00
40.00

.730
.730

-

“

‘ I

.62 0
1 .0 0 0
.70 0
.700
.700
.700
.700
.50 0
.500

_

“
~

1 .8 2 0
.9 0 0
.5 0 0
.50 0
.500
.500
.500
.500

_

_
“

~
-

.15 0
.050
. 0 50
.050
.050
“

“
-

-

Table 20. Wage rates, hours, and employer contributions to funds:: Selected cities— Continued
,'r n io n h o u r ly w a g e r a t e s a n d s t r a i g h t - t i m e w e e k ly h o u r s a n d e m p l o y e r i n s u r a n c e , p e n s i o n , v a c a t i o n , an d o t h e r c o n t r ib u t i o n s to fu n d s in th e
b u i l d i n g t r a d e s , J u ly 1, 1 9 7 5 a n d J u ly 1, 1 9 7 6 )
JULY 1,
1975

JULY 1 ,

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS 3
RATE
PER
HOUR 1

C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR 1

PER
WEEK 1

INSURANCE 4

DOLLARS

ST.

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER 5

PERCENT

DOLLARS

PERCENT

L O U IS , HO.
-CONTINUED

B UI LD IN G CONSTRUCTION
-CON TINU ED
J OURNEYMEN-CONTINUED
CEMstlT F I N I S H E R S ......................
E LE CT R IC IA NS ( I N S I D E
W I R E F S ) .........................................
ELEVATOR C O N S TR U C TO R S. .. .
EN GiN ESR S-POWER EQUIPMENT
OPERATORS:
O k OUP 1:
CRANES, DERRICKS,
P IL E D R IV E R S ,A N D
SHOVELS.................................
GROUP 2 :
COMPRESSORS (2) ,
CONCRFTE PUMPS,
ELEVATING GRADERS,
2-DRUM HOISTS,SCOOPS
GROUP 3 :
COMPRESSOR (1) ,
CONCRETE SAWS,
1-DRUM H O IS T S .................
GROUP 4 :
CONVEYORS, O I L E R S . . . .
G L A Z I E R S .......................................................
LATHERS ..........................................................
M A C H I N I S T S .......................................
MARBLE SETTERS ..................................
MOSAIC AND TFRRAZZO
WORKERS......................................... ...
PAINT ER S, GENERAL ........................
SPRAY .......................................................
PAPr.RHANGERS .........................................
P I P E F I T T E R S ............................................
SPRINKLER F I T T E R S ..............
P LA S TE R ER S. ...........................................
PLUMBERS ................................................... ...
REINFORCING IRON WORKERS.
ROOFERS, COMPO SITION ..............
ROOFtRS, SLATE AND T I L E . .
S H ^nT -M ET AL WORKERS..................
STONEMASONS ............................................ j
STRUCTURAL IRON WORKERS.. i
T I L L LAYE RS ............................................ I
HELPERS AND LABORERS

$ 8.600

$ 9. 150

40.00

9 . 640
9 .4 6 5

1 0.300
10.050

3 7. 50
4 0.00

1.0 0 0 j
I
.550 |
.495 !

9 . 270

9 .520

4 0.00

.500

1 .0 0 0

.650

. 140

9 .2 7 0

9.5 2 0

40.00

. 500

1.000

. 6 50

.140

770

9 .0 2 0

4O .C 0

.500

8. 270
9.2 6 0
9 .5 2 5
9 .060
8 .350

8 .5 2 0
1 0.040
9 .7 7 5
9.6 1 0
8 . 826

4 0.00
4 0 .0 0
4 0 . 00
4 0.00
40.00

.500
.482
.50 0
.300
.32 5

9.6 5 0
8. 830
10.330
8.8 3 0
9.650
9 .0 1 5
8 .7 0 0
9 .7 5 5
8 . 225
8.5 0 0
8. 500
9 .640
8.7 5 0
8 .2 2 5
7.840

1 0.400
9.4 6 0
10.960
9.4 6 0
1 0.450
9 .660
9 .2 9 5
10.355
9 .0 7 5
8 .6 5 0
8 .6 5 0
1 0.290
9.4 0 0
9 .0 7 5
8 .2 8 9

4C . 0 0
4 0.00
4 0 .0 0
40. 0n
4 0 .0 0
4 0 . 00
4 0.00
3 7 . 50
4 0.00
40.00
40.00
3 7.50
4 0.0 0
40.00
4O .00

7 .9 5 0
8 .3 7 5
7.8 2 5

8.4 0 0
8 .875
8.3 2 5

6 .6 2 5
8 .6 8 0
8.5 7 0
8.750

8.

0 .9 5 0
_
-

_
. 320

1.0 0 0

_

_

.300
.30 0
.300
2.7 7 5
.500
. 4 80
.60 0
.550
.470
.47 0

-

5 .0 0 %

-

-

1 .0 0 0
1.0 3 0
.550
.500
.800

_
.30 0
. 300
.30 0
.900
.800
.800
.60 0
.700
.45 0
.45 0
-

-

_
-

.650
-

.750
.50 0
-

-

_
-

650
.3 0 0
. 300
.300

.

-

-

-

1 .7 5 0
1 .0 0 0
.500
.75 0
1.0 0 0
1.0 0 0

-

7 .0 0
-

-

.520
.55 0
.325

4 0.00
4 0.00
4 0 . 00

7.0 3 5
9 .2 8 0
9 .0 7 0
9 .0 5 0

4 0 .OO
4 0.00
4 0 . CO
4 0.00

8 .750
9.1 5 0
7.7 8 0

9. 500
9 .9 0 0
7 .7 2 2

4 0 . 00
40.00
40.00

.325

-

.400

9 .3 6 0
9.3 6 0
8.600

9.9 6 0
9.960
9 .1 5 0

4 0.00
4 0 . 00
4 0 .0 0

.500
.500
1 .0 0 0

-

.700
.700
. 9 50

9.5 0 0

1 0 . 150

4 0 .0 °

.50 0

1.0 0 0

.400

9.3 0 0

9 .9 5 0

4 0.00

.500

1.000

.40 0

9 .100

9.7 5 0

8. 500

9 . 150

-

.700
.700
.800

-

.450
. 4 50
.450

-

.900
1 .0 0 0
1.000

-

. 4 95
.45 0
.450

-

-

7 .0 0 %
6 .0 0

.65 0

1.0 0 0
_

_

6.50%
-

-

900
.75 0

.

-

_

8 .5 0 %
2 .3 0

0 .0 2 0

.140
_

8 .0 0
-

5 .0 0
_
-

8 .0 0
-

_

.140
-

-

-

-

-

.050
. 0 30
.03 0
. 0 30
.075

-

-

.01 0
.500
.050
-

I

I

_

i
I

.02 0
.15 0
.05 0

3 .00
-

10.00

-

|

i
BRICKLAYERS" TENDERS .............. !
B UIL DIN G LABORERS ........................
R E S ID E N T IA L LABORERS..
ELEVATOR CONSTRUCTORS'
HELPERS ...................................................... I
MARBLE SETTERS' HE LP E RS ..
PLASTERERS' TENDERS..............
PLUMPERS' LABORERS.................
TEP k AZZO WORKERS'
HELPERS..........................................
BASE-MACHINE OPERATORS
T I L E SETTERS' H E L P E R S . . . .

_

.320
1 .0 0 0
1 .0 0 0

-

-

_

_

_

_
-

-

.30 0
.300
.30 0
_

.30 0
.300
.50 0
.50 0
-

-

6 .0 0
-

-

_
10.00

.03 0
.130
.130

-

.02 0
.130
.130

2 .3 0
_

.050
.050

I
I

HIGHWAY AND STREET
CONSTRUCTION
JOURNEYMEN
CARPENTERS.......................................
P I L E D R I V E R S ............................
CEMENT F I N I S H E R S ......................
ENGINEERS—-PCW ER EQUIP­
MENT OPERATORS:
i
GROUP 1— CRANES, DER­
R I C K S , P IL E D R I V E R S ,
SHOVELS....................................
GROUP 2 — COMPRESSORS
(2) , CONCRETE PUMPS,
ELEVATING GRADERS,
2-DRUM HOI ST S, SCOOPS
GROUP 3 — COMPRESSORS
(1) , CONCRETE SAWS,
1-DRUM HOI ST S ....................
GROUP 4 — CONVEYORS,
O I L E R S .......................................

.

I

40.00

.500

1 .0 0 0

40.00

.50 0

1 .0 0 0

S ee fo o tn o te s at end o f t a b le .




112

-

. 500
.500
1.0 0 0

-

.050
.05 0
-

j
I

_

.4 0 0
-

.40 0

-

-

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s tr a ig h t - tim e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , J u ly 1, 1975 and J uly 1, 1976)
JULY

JU LY 1,
197 5

1,,

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS 3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR

1

RATE
PER
HOUR

HOURS
PER
WEEK 2

1

DOLLARS

VACATION

PENSION

INSURANCE 4

PERCENT

PERCENT

DOLLARS

DOLLARS

OTHER 5

PERCENT

DOLLARS

PERCENT

ST. LOUIS, MO.
-CONTINUED
HIGHWAY AND STREET
CONSTRUCTION
-CONTINUED
JOURNEYMEN
-CONTINUED
STRUCTURAL IRON WORKERS
AND F I N I S H E R S ................
RODMEN.........................................
HELPERS

!
*8 .2 2 5
8 .2 2 5

$9,075
9.0 7 5

40.00
40.00

0.5 5 0
.550

-

8 . 675

9 .4 2 5

4 0 .0 0

.450

9 . 3b0
9.3 6 0
9.3 6 0
8 . 600

9 .9 6 0
9 .9 6 0
9 .9 6 0
9 . 150

4 0 . 00
4 0.00
4 0 . 00
4 0.00

.50 0
.500
.500
1 .0 0 0

9 . 100

9 .7 0 f

4 0 . 00

.50 0

-

0 .7 5 0
.750

-

0 .0 5 0
.050

-

1.000

-

. 300

*

.030

*

.70 0
.70 0
.700
. 9 50

-

. 500
.50 0
.500
1 .0 0 0

-

.050
.050
.050

-

0.700
.70 0

-

_

-

-

AND LABORERS

L ABORERS............................................
OTHER HEAVY CONSTRUCTION

JOURNEYMEN

tiELPERS

ST .

PETERSBURG,

_

_

1 .0 0 0

.400
1
1

8 .750

9 .3 5 0

4 0 .0 0

.500

8. 550

9 . 150

40.00

.50 0

7.7 0 0

8.3 0 0

40.00

.500

8 . 225
8 .2 2 5

9 .0 7 5
9 .0 7 5

4 r' . 0 0
4 0.00

.55 0
.550

1.000

.40 0

1 .0 0 0

.40 0

i
i

!
“

-

1 .0 0 0

~

.400

.70 0
.70 0

-

.750
.75 0

~

-

-

1

-

.05 0
.05 0

-

i

AND LABORERS

LABORERS.............................................

-

!

8 . 675

9 .4 2 5

o
o

CARPENTERS......................................
MIL LWR IGH TS ............................
P IL E D R I V E R S ............................
CEMENT F I N I S H E R S ......................
ENGiNEERS — POWER EQU IP­
MENT OPERATORS:
GROUP 1 — CRANES, DRAG­
L I N E S , LAND OR FLOAT­
ING P IL E D R I V E R S ,
SHOVELS....................................
GROUP 2— BOOM TRUCKS,
F O R K LI FT S , 2-DRUM
i
H O I S T S , D R I L L I N G MA­
s
C H IN E S .......................................
GROUP 3 - - B O I L E R S , 1 DRUM HO IS T S, PUMPS,
SINGLE COMPRESSORS,
WELDING MACHINES............
GROUP 4 — CONVEYORS,
O I L E R S .......................................
STRUCTURAL IRON WORKERS
AND F I N I S H E R S .........................
RODMEN..........................................

.450
'

FLA.

1.000

. 300

.350
1 .0 0 C

6. 7 50
~

.030

i

!
BU IL D IN G

CONSTRUCTION

JOURNEYMEN

ASBr-STOS WORKERS......................
BOILERMAKERS.................................
BR ICK LAYERS:
COMMERCIAL..............................
R E S I D E N T I A L ............................
CARPENTERS.......................................
MIL LWR IGH TS ............................
P IL E D R I V E R S ............................
CEMENT F I N I S H E R S :
COMMERCIAL...............................
R E S I D E N T I A L ............................
ELE CT R IC IA NS ( I N S I D E
WIREMEN):
COMMERCIAL...............................
R E S I D E N T I A L ............................
ELEVATOR C O NS TR UC TO RS .. ..
ENGINEERS - POWER
EQUIPMENT OPERATORS:
GROUP 1 :
CRA NE S,DERRICKS,
MATERIAL HOISTS
(2 DRUM). G R A D E R S . . . .
GROUP 2 :
TUGGER H O IS T S ....................

_

8 . 510
8 .200

9 . 510
8 .8 0 0

4 0.00
40.00

.500
.60 0

8 .7 5 0
8.3 1 5
8 . 870
8.7 0 0

9 . 200
7.1 7 0
8 .7 6 5
9.4 2 0
8 .7 0 0

4 0 . 00
4O.00
4 0 . 00
40.00
40.00

" .45 0
.450
.500
.550
.550

-

8.0 0 0

8 .6 0 0
6.8 5 0

4 0.00
4 0 . 00

.45 0
.45 0

-

9.450
7 .200
8 .4 9 5

9 .9 5 0
8 .1 0 0
9 . 280

4 0.0 "
40.00
40.00

.495

.320

“

_

“

■

'
~

-

.500
.50 0
.40 0
.70 0
.70 0

-

“

“

“

.50 0
.500

-

-

-

.04 0
.040

-

12 6 . 0 0 X

.020
.020
.020

“

.02 5

~

.02 5

-

5 .0 0 X
5 .0 0

-

-

10.140

10.890

40.00

.375

.35 0

9 . 390

10.140

4 0.0 0

.37 5

.350
i

S e e f o o tn o te s at end o f t a b le .




_

113

-

-

8 .0 0 X
8 .0 0

-

-

-

-

-

-

-

~

-

.040
.04 0
.02 5
.020
.02 0

■
-

1
!
1

-

2.30X

“

Table 20. W age rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s t r a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , J u ly 1, 1975 and J uly 1, 1976)
JULY

JUL Y 1 ,
197 5

1,

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

PER
HOUR 1

PER
HOUR 1

PER
WEEK 2

DOLLARS
ST.

PERCENT

VACATION

PENSION

INSURANCE 4

DOLLARS

PERCENT

DOLLARS

OTHER,5

PERCENT

DOLLARS

PERCENT

PBTEBSBOBG, F L A .
-COITIBOBD

B U IL D IN G CONSTRUCTION
-CONT INUE D
JOURNEYMEN
-CONTINUED
ENGINEERS— POWER EQUIPMENT
OPERATORS: -CONTINUED
GROUP 3 :
MATERIAL HOISTS
(ELEVATOR) , TRENCHERS
(OVER 24 I N C H E S ) ..............
GROUP 4 :
BULLDOZERS (CRAWLERS)
GROUP 5 :
AIR COMPRESSORS
( 1 2 5 CUBI C FEET OR
O V E R )..........................................
GROUP 6 :
MATERIAL HOI ST S,
PUMPS..........................: .............
GROUP 7 :
AIR COMPRESSORS
(UNDER 125 CUBIC
F E E T ) , MIXERS,
TRENCHERS (UNDER 24
I N C H E S ) ....................................
G L A Z I E R S ............................................
LATHERS:
COMMERCIAL..............................
R E S I D E N T I A L ............................
M A C H I N I S T S .......................................
MARBLE SETTERS:
COMMERCIAL ...............................
R E S I D E N T I A L ............................
MOSAIC S TERRAZZO WORKERS
COMMERCIAL.................................
R E S I D E N T I A L ............................
PAINT ER S:
COMMERCIAL...............................
R E S I D E N T I A L ............................
PAPERHANGERS - COMMERCIAL
P I P E F I T T E R S ....................................
PLASTERERS:
COMMERCIAL...............................
R E S I D E N T I A L ...........................
PLUMBERS............................................
REINFORCING IRON WORKERS.
ROOFERS, COM POSITIO N............
ROOFERS, SLATE S T I T L E . . .
SHEET-METAL WORKERS..............
STONEMASONS:
COMMERCIAL..............................
R E S I D E N T I A L ............................
STRUCTURAL IRON WORKERS..
T I L E LAYERS:
COMMERCIAL.........................
R E S I D E N T I A L ............................

j
$8,935

$9,155

4 0.00

0.3 7 5

8 . 935

9 .6 8 5

4 0.00

.375

7.385

8.1 3 5

40.00

. 375

.350

.025

7 .1 2 5

7 .8 7 5

4 0 . 00

.37 5

.350

.025

6 .8 9 5
7.7 0 0

7 .6 4 5
7.7 0 0

4 0.0°
40.00

.375
.250

8 .2 0 5
9.4 6 3

9.4 9 0
7 .0 9 0
9 .460

4 0.00
40.0 0
40.00

8.7 5 0

9 . 200
7 .1 7 0

4 0.00
40.00

.450
.450

8 . 500
-

9.0 5 0
7 .0 5 0

40.00
4 0.00

.45 0
.450

7.3 0 0
5.240
7.8 0 0
9.0 8 0

7 .9 5 0
5 .240
8 .4 5 0
9 .8 3 0

40.0 0
4 0 . 00
4 0.00
4 0 . 00

.35 0
.35 0
.350
.450

-

7 .8 6 0
9.0 8 0
9 .0 1 0
7 . 650
7.6 5 0
8.8 1 0

8 .6 5 0
6.2 5 0
9 .8 3 0
9.85C
8 .0 5 0
8 .0 5 0
9 .3 1 0

40.0 0
4 0 . 00
4 0.00
40.00
40.00
4 0.00
4 0.00

.450
.450
.450
.550
.250
. 250
.480

-

8 . 750
9.0 1 0

9 .2 0 0
7.1 7 0
9 .8 5 C

4 0.00
4 0 .0 0
4 0 . CO

.45 0
.450
.55 0

8 .5 0 0
-

9.05C
7 .0 5 0

4 0 . 00
4 0.00

.450
.450

6 . 300
6 .1 5 0

6 .6 5 0
6.5 0 0

4 0 . 00
40.0 0

.42 5
.42 5

-

-

0 .3 5 0
_

-

.350

0.0 2 5
_

_

-

.35 0
.200

-

.200
.200
-

_
-

-

-

-

.500
.500

_

_

-

-

_

_
-

.
_

-

_

.500
.50 0

-

.025
-

-

-

. 100
. 100
_

_

-

-

.040
.04 0

_

_

.
-

.040
.04 0

-

_
-

.05 0
.05 0
.05 0
_

_
_

_

-

-

_
-

.500
.50 0
. 8 50
.400
.200
.20 0
.44 0

-

-

-

-

.500
.500
.400

-

.50 0
.50 0

-

.20 0
.200

.02 5

-

60 . 4 5 0

.400
.400
.400
.850

-

_

6. 200
6. 200
6. 200
_

.240
. 25C

_
_
-

.03 5
.09 0

_
_
_
_
_
_

~

.04 0
.040
.035

_
_

-

.040
. 04C

.02 5
.02 5

_

i
j

-

.240

. 100
.100
_

HELPERS AND LABORERS

4 . 400

4 .6 0 0

40.0 0

.25 0

5.9 5 0
5 .9 0 0
6.3 0 0

6 .5 0 0
6 .7 0 0
6.6 5 0

40.00
4 0.00
4 0.00

.495
.50 0
.425

5 .900
5 .9 0 0

6 .7 0 0
6.7 0 0

4 0 . CO
40.00

.50 0
.50 0

7 .4 0 0

.550

.700

o
o
o

_

o
o
o

B RI CK LAY ER S' TENDERS............
B UIL DIN G LABORERS....................
COMPOSITION ROOFERS'
HELPERS............................................
ELEVATOR CONSTRUCTORS'
HELPERS............................................
MARBLE SETT ERS ' HE L PE RS ..
PLASTERERS' LABORERS............
TERRAZZO WORKERS'
LABORERS.................... .....................
T I L E L AY E R S ' HEL PERS............

.550

.700

_

.20 0

-

.320
.40 0
.200

~

.400
.400

-

-

-

_

_

_

_

_

-

-

_

“ 6 .00%
-

_

_

*

-

.02 0
.750
.025
.750
.75 0

HIGHWAY AND STREET
CONSTRUCTI ON

JOURNEYMEN
P I L E D R I V E R S ....................................

.02 0

OTHER HEAVY CONSTRUCTION
JOURNEYMEN
P I L E D R I V E R S ....................................

7 .4 0 0

See footnotes at end of table.




114

J

.02 0

_

2 .30%
_

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities—Continued
(U nion h o u r ly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , Ju ly 1, 1975 and J u ly 1, 1976)

JULY 1, 1976

J ULY 1,
1975

EMPLOYER CONTRIBUTIONS
TO FUNDS 3
CITY AND JOB
CLASSIFICATION

PER
HOUR 1

PER
HOUR 1

PER
SEEK 2

DOLLARS

SAC RAHEITO,

PENSION

INSURANCE4
PERCENT

DOLLARS

OTHER 5

VACATION

PERCENT

DOLLARS

PEECENT

DOLLIES

PERCENT

C A L IF .

BUILDING CONSTRUCTION

JOURNEYMAN

ASBESTOS WORKERS........
BOILERMAKERS............
BRICKLAYERS.............
CARPENTERS..............
FLOOR LAYERS {HARDWOOD)
SHINGLERS............
MILLWRIGHTS..........
CEMENT FINISHERS........
COMPOSITION..... .
ELECTRICIANS (INSIDE
WIRER3)...............
ELEVATOR CONSTRUCTORS....
ENGINEERS-POWER EQUIPMENT
OPERATORS:
COMPRESSORS.... .......
COMPRESSORS (2 TO 6)..
QATERIAL HOISTS (1DRUM) ............ .
SMALL RUBBER TIRED
TRACTORS............
TRACTORS, DOZERS,
SCRAPERS, SHEEP FOOT,
SELF-PROP COMPACTOR
WITH DOZER AND PUSH­
CARTS...............
EUCLID, T-PULLS DW-10,
20, AND 21 AND SIM­
ILAR (WITH EARTHMOVING EQUIPMENT UP
TO AND INCLUDING 45
CY STRUCK MRC).....
TRACTORS WITH BOOM D6 OR LARGER, AND SIM­
ILAR CRANE (NOT OVER
25 TONS, HAMMERHEAD
AND GANTRY).........
POWER SHOVELS, CLAM­
SHELL, DRAGLINES,
BACKHOES, GRADEALLS:
UP TO AND INCLUDING
1 YARD............
OVER 1 YD. AND IN­
CLUDING 7 CU.YD....
UNIVERSAL LIEBBER AND
TOWER CRANES (AND
SIMILAR TYPES)......
GLAZIERS................
LATHERS.................
MOSAIC AND TERRAZZO
WORKERS...............
PAINTERS:
BRUSH................
SPRAY................
PAPERHANGERS............
PIPEFITTERS.............
PLASTERERS..............
PLUMBERS................
REINFORCING IRON WORKERS.
ROOFERS, COMPOSITION....
ROOFERS, SLATE AND TILE..
SHEET-METAL WORKERS.....
STONEMASONS.............
BLOCKLAYERS..........
STRUCTURAL AND ORNAMENTAL
IRON WORKERS...........
FENCE ERECTORS.......
TILE LAYERS...... .......

$10,900
10.850
9.800
10.700
10.850
10.850
11.200
9.460
9.710

$11,990
12.000
10.90C
11.250
11 .400
1 1.40C
11.750
10.000
10.250

40.00
40.00
40.00
40.00
4 0.00
40.00
40.00
40. 00
40.00

10.130
10.890

10.314
12.390

40.00
40.CO

.730
.495

-

.750
.320

8.580
9.460

9.050
10.020

40. 00
4 0.00

1. 120
1.120

-

2.000
2.000

-

.900
.900

9. 270

9.810

40.00

1.120

_

2.000

.

.900

.470

9. 590

10. 170

40.00

1.120

2.000

.

.900

.470

10.090

10.720

4 0.00

1.120

2.000

.900

.470

10.090

10.720

40.00

1.120

2.000

.900

.470

10.290

10.94C

40.00

1.120

2.000

.900

.470

10.570

11.250

4 0. 00

1. 120

10.730

11.420

40. 00

1.120

0.970
.750
.800
1.220
1.220
1.220
1.220
1. 150
1.150

-

_

.

0.9 50
1.000
.900
1.710
1.710
1.710
1.710
1.4 30
1.430

2.000

11.420
9.745
9.270

40.00
40.CO
40.00

1.120
.370
.520

-

2.000
1.200
1.000

9.800

10.900

40. 00

.800

_

.900

10.920
11.800
10.920
11.230
9.890
11.230
10.530
9.360
9.360
10.330
10.9O0
10.900

35. 00
35.00
35.00
40.00
40.0n
40.00
4 0.00
40.00
40.00
40.00
40.00
40.00

.990
.990
.990
1.140
.710
1. 140
1.090
.770
.770
.600
.800
.800

10.230
9. 340
9.700

10.530
9.640
11.000

40.00
40.00
40.00

1.090
1.090
.780

-

1.00%
-

2.000

_

10.730
9.745
8. 400

10.300
11.550
10.300
10.730
8.790
10.730
10.230
8.710
8.710
8.460
9.800
9.800

-

_
-

_

-

1.100
1.100
1.100
1.600
1.500
1.600
1.650
1.1 OC
1.100
1.300
.900
.900
1.650
1.650
1.000

1.070
.500
6. 900
.7 50
.750
.750
.7 50
1.500
1.500
_
-

-

0.120
_
.180
.120
.120
.120
.120
-

64.00%
8.00

.020

64. 00%
_

-

.470
.470

-

-

.900
_

.900

-

.900
.780
1.000

_

6.900

.

_
-

.800
.800
.800
2.100
61.000
2. 100
1. 100
1.000
1.000
6.900
6.900
1. 100
1.100
1. 100

.470
_




115

.470

.

i
i

.470
.420
.600

_
_

j

.180

j

.310
.140
. 310
.030
.080
.080
.170
.180
.180

_
_
_
_
_
_
_
_

.030
.030
. 195

_

i

—

_
_
_
12.00

-

'

S ee fo o tn o te s a t end o f t a b le .

_
-

TabSe 20. Wage rates, hours, and employer contributions to funds: Selected cities —Continued
(U nion h o u r ly w a g e r a t e s and s tr a ig h t -t im e w e e k ly h o u e s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , Ju ly 1, 1975 nad J u ly 1, 1976)

JULY 1, 1976

JULY 1,
1975

EMPLOYER CONTRIBUTIONS
TO FUNDS 3
CITY AND JOB
CLASSIFICATION

RATE
PER
HOUR 1

RATE
PER
HOUR 1

HOURS
PER
WEEK 2

INSURANCE 4
DOLLARS

PERC2NT

DOLLARS

OTHER5

VACATION

PENSION
PERCENT

DOLLARS

PERCENT

DOLLARS

PERCENT

SACRAMENTO, C A L I F .
—CONTINUED

BUILDING CONSTRUCTION
-CONTINUED
HELPERS AND LABORERS
BRICKLAYERS* TENDERS....
BUILDING LABORERS.......
ELEVATOR CONSTRUCTORS'
HELPERS................
PLASTERERS' LABORERS
(HOD CARRIERS).........
TEREAZZO WORKERS'
HELPERS...............
BASE MACHINE.........
FLOOR MACHINE MEN....
TILE LAYERS' HELPERS....

SAN A NTO NIO ,

0.262
.110

-

.020

-

-

. 160

-

_
-

.200
.200
.200
.280

_
-

.050
.001
.001
“

“

$7,855
8.035

40.00
40. 0n

0.800
1.000

-

1.400
1.700

-

0. 800
.900

7.620

8.670

40. 00

.495

_

.320

-

-

8. 355

9.810

4O.00

1.000

-

1.700

-

.880

.650
.650
.650
.760

_
-

.550
.550
.550

_
-

1.000
1.000
1.000
6.8 00

“

$8,000
7.535

8.660
9.060
8.660
6.610

9.460
9.860
9. 460
7.300

35. 0D
3 5.00
35. 00
40.CO

8.670
7.870
7.47-1
7.770
7.920
8. 170

9.320
8.570
7.770
8.070
8.270
8.520

40.CO
40.00
40.00
40.00
40.00
40.00

8.730
7.990

9.348
9.070

40.00
40.00

8.020

8.32C

40.00

. 350

7.170
8.760
6.990
7.050
7.300
7. 550
7.300
7.050
9.060
9.063
9.060
9.260
9.060
7.600
5. 500
5.500
8. 530
7.870
7.600

7.440
8.760
8.190
7.550
7.800
8.050
7.800
7.550
9.060
9.060
9.060
9.26C
9.06C
7.600
6.20°
6.200
8.7 30
8.570
7.600

40.00
40.00
40.00
40.00
40.00
40.00
40.00
4 0 .00
4 0. CO
40. 00
40.00
40. 00
40. CD
40.00
40.00
40.00
40.00
40.00
40.00

.350
.400
.300
.300
.300
.300
.550
.300
.400
.550

-

6.990
6,990

8. 19C
8.190

40. 00
40.00

.400

-

8.00%

TEXAS

BUILDING CONSTRUCTION
JOURNEYMEN
ASBESTOS WORKERS........
BRICKLAYERS........... . .
CARPENTERS..............
MILLWRIGHTS........ ..
CEMENT FINISHERS........ |
MACHINE OPERATORS.... |
ELECTRICIANS (INSIDE
WIRERS)...............
ELEVATOR CONSTRUCTORS....
ENGINEERS— POWER EQUIP­
MENT OPERATORS:
HEAVY EQUIPMENT— BULL­
DOZERS, SCRAPERS,
CRANES, DERRICKS,
DRAGLINFS, HOISTS (2
DRUMS OR MORE), ROLL­
ERS
(5 TONS AND
OVER), BLADE GRADERS
(SELF-PROPELLED), LO­
COMOTIVES, TRENCH MA­
CHINES, WINCH TRUCKS.
LIGHT EQUIPMENT— MIX­
ERS (LESS THAN 14 CU.
FT.), AIR COMPRESSORS
(OVER 125 CU. FT.) ,
PUMPS (2.5 IN. OR
LARGERO, WELDING MA­
CHINES, ROLLERS (UN­
DER 5 TONS) , HOISTS
(SINGLE DRUM).......
LATHERS..................
MARBLE SETTERS..........
PAINTERS, BRUSH.........
SPRAY................
SPRAY, STEEL.........
STEEL,OTHER THAN SPRAY
PAPERHANGERS............
PIPEFITTERS.............
STEAMFITTERS.........
REFRIGERATION FITTERS.
PLASTERERS..............
PLUMBERS................
REINFORCING IRON WORKERS.
ROOFERS, COMPOSITION....
ROOFERS, SLATE AND TILE..
SHEET-METAL WORKERS.....
STONEMASONS.............
STRUCTURAL IRON WORKERS..
MOSAIC AND TERRAZZO
WORKERS...............
TILE LAYERS.............

!

;

.420
.400
. 380
.380
.300
.300

-

|

.300
.545

-

j
'
I
!

.600
.300
.400
.400
.350

“
2.0°$
-

.560
. 250
.400
.400
.400
.400
“

~

-

65.00%
6.00

.02 0

"

.0 50
”

-

-

-

-

2.005
2.40

.750

-

-

-

-

-

.400

.7 50
.300
.200
.200
.200
.200
.200
.450
.4 50
.450

-

-

.450
.800
.500
.300
.800
.300
.300

' “
-

.500
.250
.450
. 450
.450
.450
.500

“
-

S ee fo o tn o te s a t end o f t a b le .

116

.170
.170
. 170 I
.050 i
.170 !
.01 0

~

~
-

-

.600
. 250
.500

-

.250
. 250

[




_

.060
.050
.01 0
-

“

“
”
~
~
~

3.00
“
-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities—Continued
(U nion h o u r ly w a g e r a te s and s t r a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , July 1, 1975 and J u ly 1, 1976)

JULY 1, 1976

JULY 1,
1975

EMPLOYER CONTRIBUTIONS
TO FUNDS3
CITY AND JOB
CLASSIFICATION

RATE
PER
HOUR 1

RATE
PER
HOUR 1

PER
WEEK 2

INSURANCE 4
DOLLARS

PENSION

PERCENT

DOLLARS

OTHER5

VACATION

PERCENT

DOLLARS

PERCENT

DOLLARS

PERCENT

SAM D I E G O , C A L I F .
-CONTINUED

BUILDING CONSTRUCTION
-CONTINUED

hELPERS AND LABORERS
BRICKLAYERS' TENDERS....
CEMENT FINISHERS'
HELPERS..............
BUILDING LABORERS.......
AIR TOOL OPERATORS....
POWER BUGGY OPERATORS.
BELL-HOLD MEN........
STEM MEN........ .
GUNITE...............
CUTTING TORCHES......
ELEVATOR CONSTRUCTORS'
HELPERS................
PLASTERERS' LABORERS....
MORTAR MIXERS........
COMPOSITION ROOFERS'
HELPERS................
TILE LAYERS' HELPERS.....
SAM DIE GO,

0.300

0.400

.300
.30C
.300
.300
.300
.300
.300
.300

.4 00
.400
.400
.400
.490
.400
.400
.400

$5.050

$5.200

40.00

C. 280

5.059
4.940
5.030
5.050
5.059
5.230
5.030
5.030

5.200
5.090
5. 180
5.200
5. 200
5. 380
5. 180
5. 180

4 0.00
40.00
40. 00
4 0.00
40. 99
40.09
40.00
40.00

.280
.280
.280
.280
.280
.280
.28C
.280

5. 590
5.310
5. 310

6.350
5.460
5. 460

40. CO
4 0.09
40. 00

.545
.280
.280

-

.3 50
.300
.300

2.500
4. 940

2.700
5.090

40. 09
4 0.00

_
.280

_
-

.300

_
-

_

-

_

0.0 30

_
j

6.00%
-

.400
.400

|

2.40%
-

.0 20
.030
.0 30

_
~

_
.0 30

_
■

1.000
.500
.500
.600
. 60G
.600
.600
.600
1.260

-

.370
.055
.055
.055
.055
.055
. 100

~

_
-

10.00
5.00

.0 20
.020

-

.400 I
i

-

_
-

.0 30
.030
.030
.030
.030
.030
.030
.C 30

-

C A L IF.

I
I

I
I

BUILDING CONSTRUCTION
JOURNEYMEN
ASBESTOS WORKERS........
BOILERMAKERS............
BRICKLAYERS........ .....
CARPENTERS..............
FLOOR LAYFRS,........
MILLWRIGHTS..........
DPYWALL HANGERS......
SUINGLERS............
CEMENT FINISHERS........
ELECTRICIANS (INSIDE
HIRERS)...............
ELEVATOR CONSTRUCTORS....
ENGINESRS-POWER EQUIPMENT
HEAVY EQUIPMENT:
UNIVERSAL EQUIPMENT
(TO 1 CU. YD) ,
TRACTORS, SINGLE
ENGINE.............
MEDIUM EQUIPMENT:
WINCH TRUCK OPERATOR.
MOTOR PATROLS- POWER
BLADE OPERATORS
(SINGLE ENGINE)....
(MULTI-ENGINE).....
LIGHT EQUIPMENT:
AIR COMPRESSORS.....
CONCRETE MIXER (SKIP
TYPE)......... . ....
GLAZIERS................
LATHERS.................
MACHINISTS (ERECTION)....
MARBLE SETTERS..........
MOSAIC AND TFRRAZZO
WORKERS...............
PAINTERS................
SPRAY................
SWING STAGE (BRUSH)...
SWING STAGE (SPRAY)...
DRYWALL TAPERS..........
PAPERHANGERS............
PIPEFITTERS.............
REFRIGERATION FITTERS.
PLASTERERS..............
PLUMBERS................
REINFORCING IRON WORKERS.
ROOFERS, COMPOSITION....
ROOFERS, SLATE AND TILE..

10.580
10.850
9.300
9. 410
9.660
9.669
10.800
9.540
8.430

11.350
12.009
10.070
10.310
10.560
10.560
11.770
10.440
8.430

40.00
40.09
40.00
49. 00
4 9.09
40. 09
40.09
40.00
40.0 9

.870
.750
.830
.560
.560
.569
.560
.56 9
.780

9.882
11.075

10.737
12.000

40.00
40.00

.495

i

_
-

.930
.3 20

-

.ICC

-

1 .00%
-

j
!
10.000

10.29C

40.00

.950

9. 560

9.820

40.00

.950

_

2.000

-

.500

-

. 190

-

10.120
10.280

10.410
10.580

40.00
40.00

.950
.950

2.000
2.000

-

.500
. 500

-

. 190
. 190

.

-

9.020

9.250

40.09

.950

_

2.000

-

. 500

-

.190

-

9.290
8.721
10.810
10.200
8. 810

9.530
9.334
10.960
11.400
10.040

40.00
40. 00
40.00
40. CO
49.00

.950
.550
.550
.472
.720

_
-

2.000
.600
.700
.500
1.000

_
-

.500
.700
.750

66.00
-

. 190
. 100
.120
-

-

8.810
9.279
9. 520
9.520
9.770
9. 840
9.779
10.950
10.950
9.710
10.950
10.230
8.890
8.890

10.040
10.370
10.620
10.620
10.870
10.720
10.879
11.66C
11.660
9.819
11.660
11.0 30
9.990

40. CO
40.00
40.00
4 9.00
40. 99
40.09
40. 00
36.00
36. CO
49. 00
36.00
40. 00
4C.09
49.00

.720
1.090
1.090
1.090
1.090
1.090
1.0*90
.007
.650
.007
1.090
.500
.500

1.009
1.100
1.100
1. 100
1.100
1.100
1.100
.012
1.500
.012
1.830
.750
.750

_
-

.750
.750
.750
.750
.750
.750
.750
.010
1.C00
.010
1.150
1.000
1.000

_
-

.090
.090
.090
.090
.090
.090
.001
. 170
.001
.030
. 100
.100

9.99C

_
-

10.00*
10.00
10.00
“

J____________

117

.190

.500

2.000

S ee f o o tn o te s at end o f t a b le .




-

.9 50
1.000
1.060
1.050
1.0 50
1.050
1.050
1.050
1.460

-

-

1 6 . GO

16.00
16.00
"

-

13.00
13.00
13.00
~

! 64 .00
I
I
I
I
-

1.50
1.50
1.50
i

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities —Continued
(U nion h o u r ly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to fund in th e
b u ild in g t r a d e s , J u ly 1, 1975 and J u ly 1, 1976)
JULY

J UL Y 1 ,
1U75

1,

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR 1

RATE
PER
HOUR 1

HOURS
PER
WEEK 2

DOLLARS

PERCENT

DOLLARS

OTHER 5

VACATION

PENSION

INSURANCE 4

PERCENT

DOLLARS

PERCENT

PERCENT

DOLLARS

SAN DIEGO, CALIF.
-CONTINUED

B U IL D IN G CONSTRUCTION
-C ONTINUED
JOURNEYMEN
-CONTINUED
SHEET-METAL WORKERS..............
STRUCTURAL-IRON WORKERS..
ORNAMENTAL F I N I S H E R S . .
FENCE E R ^ C T O ^ S . . . ............
T I L E L A Y E R S . . . . . ......................
HELPERS

$10,350
11.030
11.030
10.140
10.040

4 0.00
40.00
4 0.00
4 0 .0 0
4 0 . 00

0 .9 4 0
1 .0 9 0
1 .0 9 0
1 .0 9 0
.72 0

1 .900
1 . 8 30
1 .8 3 0
1 . 8 30
1 .0 0 0

"

0 .9 0 0
1. 150
1 .150
1. 150
.750

“
“

0 .1 7 0
.03 0
. 0 30
. 0 30

“
“

SAN FRANCISCO,

“
-

"

AND LABORERS

BR ICK LA Y ER S' TENDERS............
BUILD ING LABORERS....................
ELEVATOR CONSTRUCTORS'
HELPERS............................................
MARBLE SETTERS' HE LPE RS ..
PLASTERERS' TENDERS'!...........
TERRAZZO WORKERS'
HELPERS..........................................
BASE MACHINE.........................
T I L E LAY ERS' HELPERS...........

B U IL D IN G

$10.350
10.230
10.230
9 .3 4 0
8.8 1 0

i

7.6 9 0
6 . 630

8 .8 9 C
7 . 100

40.00
4 0.00

.60 0
.600

7 .750
7.0 4 0
9 .783

8.4 0 0
7.0 4 0
1 0 . 0 30

40.00
4 0 .0 0
4 0 . 00

.495
.400
.60 0

-

_

.500
.500

1 .6 5 0
1 .6 5 0

-

“

.32 0
.850
1.650

-

“

1 .0 0 0
1 .0 0 C
.850

”

61 . 0 0 0
61 . 0 0 0
1.000

-

1 .0 7 0
.5 0 0
1 .000

_

1 .000
6. 7 5 0
6. 7 5 0
6. 7 50
6. 7 50
6. 7 50
1 .5 0 0
1.5 0 0
1 .5 0 0
1 .5 0 0

-

1 .000
. 500

5 .0 0 %
~

.230
. 230 i

~

. 0 20

-

. 100

I
~

-

~

6 .3 4 3
6 .7 4 0
7.0 4 0

7 .020
7.3 0 0
7 .0 4 0

4 0 . 00
4 0.00
4 0.00

_
.400

10.900
1C.850
9.5 7 0

11.990
12.00C
10.670

4 0.0 0
4 0.00
35.00

.970
.750
1 .0 0 0

-

. 9 50
1 .0 0 0
.830

9 . 570
t9 .9 5 0
110. 100
t l 0 .4 5 0
t l O . 100
t i o . 100
9 .460
9 .710
9.7 1 0
9 . 460

10.670
10.500
10.650
11 . 0 0 0
10.650
1 0.650
10.000
10.250
10.250
10.000

35.00
36.00
3 6.00
36.00
3 6 . 00
3 6.0 0
40.00
4 0 .0 0
4 0.00
40.00

1 .0 0 0
1. 220
1 .2 2 0
1 .2 2 0
1 .2 2 °
1 .2 2 0
1. 150
1 .1 5 0
1. 150
1.150

-

.830
1 .7 1 0
1 .710
1.710
1 .7 1 0
1 .7 1 0
1.430
1.430
1 .4 3 0
1 . 4 30

10.220
10.890

10.780
1 2.390

35.00
40.00

.82 5
.49 5

-

.823
.32 0

.490
-

8 .0 0

8 .5 8 0
9 . 460

9.0 5 0
10.020

4 0 .0 0
40. 0"

1 .1 2 0
1. 120

-

2 .0 0 0
2 .0 0 0

.900
.90 0

9 .2 7 0

9.8 1 0

4 0 . 00

1. 120

-

9 .590

10.170

4 0 . 00

1. 12C

_

10.090

10.720

40.00

1.120

2.0 0 0

.90 0

. 240

10.090

10.720

4 0.00

1. 120

2 .0 0 0

.900

.24 0

10.290

10.940

40.00

1 .1 2 0

2.0 0 0

.900

.

.240

10.570

1 1.250

40.0 0

1 .1 2 0

.90 0

_

.24 0

C A LIF .

CONSTRUCTION
I

JOURNEYMEN
ASBESTOS WORKERS......................
BOILERMAKERS.................................
BR ICKLAYER S ....................................
TUCK P OIN TE RS , CLEAN­
ERS ............................................
CARPENTERS.......................................
FLOOR LAYERS.........................
MIL LWR IGH TS ............................
S HI NGL ER S .................................
POWER SAW OPE RA TO RS ...
CEMENT F I N I S H E R S ......................
CO MP O SIT IO N............................
SWINGING SCAFFOLD............
POWER MACHINE......................
ELE CT R IC IAN S ( I N S I D E
WIRFRS AND FIXTURE
HANGERS).......................................
ELEVATOR C O NS TR UC TO RS .. ..
ENGINEERS-POWER EQUIPMENT
OPERATORS:
COMPRESSORS...............................
COMPRESSORS (OVER 2 ) . .
MAT ERIAL HOISTS
( 1 - D R U M ) .................................
SMALL RUBEER-TIRED
TRACTORS.................................
TRACTORS, DOZERS,
SCRAPERS, SH EEPSFOOT,
SELF-PROPFLLED COM­
PACTORS WITH DOZERS,
AND PUSH CARTS.................
E U C L I D S , T - P U L L S , DW1 0, 2 0 , AND 21 AND
S I M I L A R (WITH EARTHMOVING EQUIPMENT UP
TO AND I NCL UDI NG 45
C U . Y D . STRUCK MCR)■ • •
TRACTORS (WITH BOOM)
D - 6 OR LARGER AND
S I M I L A R ....................................
CRANES (NOT OVER 2 5
T O N S ), HAMMERHEAD AND
GANTRY.......................................
POWER SHOVELS, CLAM­
S HE LL S , DRAGLINES,
BACKHOES, GRADEALLS:
UP TO AND INCL UD­
ING 1 YARD.................
OVER *1 YARD AND
INC LU DING 7 CU.YD
UNIVERSAL LIEBHERN AND
TOWER CRANES (AND
S I M I L A R T Y P E S ) ....................

_

.25 0
.060
.06 0
.060
.060
.060
~
”

"
“
~

_

.
_

.24 0
.240

.
“

2 .000

-

.900

-

.240

-

2 .000

-

;900

-

.240

-

.

2 .0 0 0

.

.240

.900

2 .0 0 0

10.570

11.250

4 0 .0 0

1 .1 2 0

11.420

4 0.00

1 .1 2 0

-

2.000

-

.900

-

.240

10.730

11.420

40.00

1.120

-

2 .0 0 0

-

.900

-

.240

118

“

1 .0 4 0
. 0 20

.

10.730

S ee fo o tn o te s a t end o f t a b le .




I

-

-

.060
.250

_

_

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , J u ly 1, 1975 and J u ly 1, 1976)
J UL Y 1 ,
197 5

JUL Y

1,,

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS5
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR 1

RATE
PER
HOUR 1

HOURS
PEE
WEEK *

INSURANCE 4

DOLLARS

PENSION

DOLLARS

PERCENT

VACATION

PERCENT

DOLLARS

OTHER 5

PERCENT

DOLLARS | PERCENT

SAN FRANCISCO, C A L I F .
-CONTINUED

I

BUILDING CONSTRUCTION
-CONTINUED
I

JOURNEYMEN
-CONTINUED
G LA Z IE R S ............................................
LATHERS...............................................
M A C H I N I S T S ......................................
MARBLE SETT ERS.............. .............
P AI NT E RS ............................................
PAPERHANGERS.................................
P IP E F I T T E R S ....................................
REFRIGERATION F I T T E R S .
SPRINKLER F I T T E R S ............
PLASTERERS.......................................
PLUMBERS......................... .. ................
RODdEN ( R E I N F O R C IN G )............
ROOFERS, COMPO SITIO N ............
ROOFERS, SLATE & T I L E . . . .
SHFET-METAL WORKERS..............
STONEMASONS....................................
STRUCTURAL IRON WORKERS..
ORNAMENTAL F I N I S H E R S . .
FENCE MEN.................................
TERRAZZO WORKERS......................
T I L L LAYERS....................................

I
I
$ 9,4 80
10.070
10.200
9 .7 5 0
10.150
1 0. 150
11.015
11.015
11.410
8.600
11.015
10.230
9.560
9 . 560
10.780
9.5 7 0
10.230
10.230
9.3 4 0
10.320
9 .700

$ 10 .100
11.070
11.400
10.640
10.770
10.770
11.750
11.750
11.610
8.7 8 0
1 1 .7 5 0
11.030
10.230
10.230
12.500
10.670
1 1.030
1 1 . 0 30
10.140
10.320
11.000

4 0.00
36.0 0
4 0.00
35.00
3 5 . 00
3 5.0 0
35 . 00
3 5.0 0
4 0 . 00
3 6.00
35.00
4 0.00
36.0 0
36.00
37.5 0
35 . 00
40.0 0
4 0 . 00
4 0 . 00
35.00
40.00

0 .9 2 0
.56 0
.749
1 .0 0 0
.990
.990
1 .8 7 5
1.87 5
.600
.90 0
1 .8 7 5
1 .0 9 0
.500
.50 0
.66 0
1.0 0 0
1.0 9 0
1 .0 9 0
1.090
1.0 0 0
.780

-

|

HELPERS AND LABORERS

BU IL D IN G

AHA,

_
*

61. 130
1 .000
1.0 3 0
.40 0
.400
.54 0
.540
61 . 0 0 0
6. 7 50
.54 0
1.1 5 0
.95 0
.950
1. 300
1.0 0 0
1 .1 5 0
1 .1 5 0
1 .150
1 .0 0 0
1.100

_
-

-

-

0 .3 8 0
.030
|
.060
.40 0
.40 0
2.2 9 5
2.4 4 5
51 . 0 0 0
371 . 1 0 0
2 .2 9 5
.07 0
.140
.140
.48 0
. 250
.070
.070
.070
.250
.19 5

1 .0 0 0

_

.150

-

-

.900
.90 0

.100
.10 0

-

. 100

-

.020

-

-

-

I
|
!

i

BR ICKLAYERS' TENDERS............
BU ILD IN G LABORERS:
GROUP I I I .................................
GROUP I I - C O NC R ET E .. .
GROUP I - PNEUMATIC
TOOL TUNNEL M I N E R . . . .
ELEVATOR CONSTRUCTORS’
HELPERS...............................................
MARBLE SETTERS' HE L PE RS ..
PLASTERERS' LABORERS............
TERRAZZO WORKERS'
HELPERS..........................................
BASE MACHINE.........................
POL IS HE R S .................................
WFT MACHINE MEN.................
T I L L LAYERS’ HELPERS............
SANTA

1 . 3 50
1 .1 0 0
.500
. 8 30
1 .1 0 0
1 .1 0 0
1 .5 0 0
1 .5 0 0
.90 0
1 .9 0 0
1 .5 0 0
1 .8 3 0
1. 100
1 .100
1.740
.830
1 . 8 30
1 .8 3 0
1 .8 3 0
. 8 30
1 .0 0 0

8 .750

9 . 150

3 6. 0O

.800

7 .5 3 5
7.6 3 5

8.045
8 . 145

40.00
40.00

1.0 0 0
1 .0 0 0

1 .2 0 0

_

-

1 .7 0 0
1 .7 0 0

-

7 . 785

8 .2 9 5

4 0.00

1 .000

-

1 .7 0 0

-

.900

7.6 2 0
7.2 2 0
8.8 0 0

8 .6 7 0
7.2 2 0
9.8 0 0

40.0 0
40.0 0
36.00

.495
.655
.800

-

.320
.25 0
1.200

-

1.470
1 . 2 50

8 .6 6 0
9.0 6 0
8.6 6 0
8 .6 6 0
8 .230

9.4 6 0
9 .8 6 0
9.4 6 0
9 .4 6 0
8 .5 5 0

3 5 . 00
3 5.00
35.00
3 5.00
4 0.00

.65 0
.65 0
.650
.650
.690

.550
.550
.550
.550
.510

-

10.580
10.850

11.350
12.000

40.0 0
4 0 . 00

.870
.75 0

9 .5 3 0
8 .8 3 0

10.251
9 .5 4 0

4 0.00
40.0 0

1.3 0 0

8 .4 6 0
11.400
11.075

9 .4 1 0
11.500
12.000

4 0 .0 0
35.00
40.00

1 .1 0 0
.450
.495

9 . 500
9 .4 0 0
9.0 6 0

10.290
10.180
9 .8 2 0

4 0.00
40.00
4 0.00

9 . 620
9.780
8 .5 2 0

1 0.410
1 0.580
9 .2 5 0

8 .7 9 0
9 . 500
9.5 0 0

9 .530
10.290
10.290

-

-

~

-

-

-

-

1.0 0 0
1 .0 0 0
1.0 0 0
1 .0 0 0
.68 4

8 • 00%

-

-

. 150

-

-

.200
.200
.200
.200

-

-

-

-

-

-

“

“

C A L IF .

CONSTRUCTION

JOURNEYMEN

10.290

9.6 2 0
9 . 190
9 .900

10.410
9.9 6 0
1 0.710

_

-

1.0 0 0
.5 0 0

1 .0 0 0
-

5 .0 0

.020
.317

-

-

. 100
.100
.100

-

.5 0 0
.5 0 0
.500

-

. 100
. 100
. 100

.500
.5 0 0
.500

-

.100
. 100
. 100

-

2 .0 0 0

-

.5 0 0

-

.100

-

2.0 0 0
2 .0 0 0
2 .000

-

. 500

.50 0

-

~

-

. 500

-

.100
. 100
. 100

.95 0
.95 0
.950

-

2.000
2.0 0 0
2.000

-

.500
.5 0 0
.5 0 0

40.00
4 0.00
4C. 00

.950
.950
.95 0

-

2 .0 0 0
2 .0 0 C
2 .0 0 0

.
-

4 0.00
4 0 .0 0
4 0.00

.95 0
.950
.95 0

-

2 .0 0 0
2 .0 0 0
2 .0 0 0

-

.950

-

.950
.950
.950

-

119

-

.020

1.00
-

4 0.00
40.00
4 0.0 0

-

_

64 . 6 5
-

1 .7 5 0
1 .3 5 0
.320

8 .8 4 *
-

_
-

.800

-

S ee fo o tn o te s at end o f t a b le .




. 9 50
1.0 0 0

1 0. 6 9 %
-

o
o

9 .5 0 0

_

-

1.8 0 0

o

ASBESTOS WORKERS......................
BOILERMAKERS.................................
BRICKLAYERS (BRICK AND
B L O C K ) ............................................
CARPENTERS.......................................
CEMENT FI N I S H E R S
(CEMENT MASONS)....................
E L E C T R IC IA N S .................................
ELEVATOR C O NS TR UC TO RS .. ..
ENGINEERS— POWER E QU IP­
MENT OPERATORS:
SHOVELS, BACKHOES,
DRAGLINES, CLAMSHELLS
(OVER 3 / 4 Y A R D ) ..............
TRACTORS—UP TO 100 HP.
A-PRAMES....................................
MOTOR PATROL BLADES:
SINGLE EN GINE....................
M U L T I - E N G I N E ......................
COMPRESSORS............................
CONCRETE MIXERS ( S L I P
T Y P E ) ..........................................
TRACTORS-OVER 100 H P . .
CONCRETE MIXERS .................
SHIP LOADERS ( 1 1 / 2 TO
6 1 / 2 Y AR DS ).......................
TRACTOR LOADERS (OVER
6 1 / 2 YARDS) . . . . . . . . . . . . . . . . . . . . . . . .
TRENCHERS.................................
CANAL T I N N E R S . . . . . . . . . . . . . . . . . . . . . . . .

2 .33%
-

I
I
!

_

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s t r a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , Ju ly 1, 1975 and J uly 1, 1976)
JU LY 1,
1975

JU LY

1,

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR 1

RATE
PER
HOUR 1

PER
WEEK 2

INSURANCE 4

DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER 5

PERCENT

DOLLARS

PERCENT

SANTA ANA, CALIF.
-CONTINUED
BUILDING CONSTRUCTION ‘
-CONTINUED

i

JOURNEYMEN
-C ONTINUED
G L A Z I E R S ............................................
LATHERS...............................................
M A C H I N I S T S .......................................
MARBLE SETTERS:
AGREEMENT A ...............................
AGREEMENT B ..............................
MOSAIC AND TERRAZZO
WORKERS. . ....................................
P A I N T F R S ............................................
PAPERHANGERS......................... ..
P I P E F I T T E R S ....................................
PLASTERERS.......................................
PLUMBERS......................... ..................
ROOFERS, CO MPO SITIO N ............
ROOFERS, SLATE S T I L E . . . .
REINFORCING IRON WORKERS.
SHEET METAL WORKERS..............
STONEMASONS....................................
STRUCTURAL IRON WORKERS..
T I L E LAYERS ....................................

$8.372
10.500
10.200

$ 9,5 22
10.90C
11.400

4 0 . 00
40.0 0
4 0 . 00

0 . 550
.650
.472

9 .530
9 . 529

10.251
9 .5 2 9

40.0 0
40.0 0

-

9.8 2 0
9.2 7 0
9 .7 7 0
9 . 527
9.445
9 . 527
8 .740
8 .7 4 0
10.230
9 .6 0 3
9.5 3 0
10.230
10.290

10.720
1 0.370
10.870
1 0 . 145
1 0.485
1 0.145
9 .7 4 0
9 .7 4 0
11.030
9 .6 0 3
10.251
1 1 . 0 30
10.400

4 0 . 0D
4 0 .0 0
4 0.00
40.00
40 . 0 0
40.0 0
4 0.00
40.00
4 0.00
4u .0 0
4 0.00
40.00
40.0 0

. 3 00
.84 0
.84 0
.83 0
.820
.820
1 .0 9 0
.94 0
1 .0 9 0
.80 0

_
-

0 .9 5 0
.80 0
.50 0
-

8 . 8 4%
7 .9 8
1 0.00
10.00
8 .8 4
-

.800
1 .1 0 0
1.1 O 0
1.8 5 0
.950
. 9 50
1 . 8 30
1.8 0 0
1.8 3 0
1.0 0 0

_

10.69%
10.97
1 6 . CO
16.00
10.69
-

0 .5 0 0
-

13.00%
-

0 . 4 29
.120
-

-

64 . 6 5
*5 .0 0

-

6. 7 0 0
.750
.750
.650
61 . 0 0 0
61 . 0 0 0
1 .1 5 0
1.1 5 0
61 . 0 0 C

61 3 . 0 0
61 3 • 00
10.00
4 .6 5
-

.30 0
.20 0
.08 5
.08 5
.030
.030
.170

!

2 .3 3 %
7 .1 4
1 .5 0
1 .5 0
2 .3 3
-

j
HELPERS

AND LABORERS

8 .2 5 5
7.6 5 0

7 . 805
7 .200

4 0 . 00
4 0.0 0

.850
.85 0

-

-

.5 0 0
.500

.320
1 .2 0 0

-

.500

1 .8 0 0
.80 0
1 .2 0 0
1 . 2 00

”

.5 0 0
1 .0 0 0
. 500
.500

-

1 .3 0 0

1 .8 0 0
1 .8 0 0

7 . 750
6 .2 2 0

8 .40C
6 . 780

4 0.0 0
40.00

.495
1 .1 1 0

-

9.025
8.0 8 0
7 .465
7 . 745

10.025
8 .8 8 0
8 .4 6 0
8 .7 4 0

4 0.00
4 0 . 0C
4 0.00
4 0.0 0

.85 0
.35 0
1 .1 1 0
1 .1 1 0

-

18.330

19.830

o
o
c
03

BRICKLAYERS TENDERS..............
BUILD ING LABORERS....................
ELEVATOR CONSTRUCTORS'
HELPERS............................................
MARBLE SET TE ES ' HE L PE RS ..
PLASTERERS' LABORERS
(HOD CA R R I E H S ) .........................
TERRAZZO HELPERS......................
T I L E LAYERS' HELPERS............
C E R T I F I E D HELPERS...........

2.250

-

3.8 0 0

9.060
9 . 900
8 .5 2 0

9 .8 2 0
10.710
9 .2 5 0

40.00
4 0.0 0
40.00

.95 0
.95 0
.950

_
-

2 .0 0 0
2 .0 0 0
2 .0 0 0

8.7 9 0
9 .500

9 .5 3 0
1 0.290

4 0.00
40.00

.950
.950

-

2 .0 0 0
2 .0 0 0

-

9 .6 2 0
9.7 8 0

10.410
10.580

40.00
40.00

.950
.95 0

-

9 .4 0 0

10.180

4 0.0 0

.95 0

9 . 400
9 .5 0 0

10.180
10.290

40.00
4 0.0 0

9 .6 2 0
9 . 190
8 .4 6 0
10.230

1 0.410
9 .9 6 0
9 .4 1 0
11.030

4 0.0 0
4 0.00
4 0.00
4 0.00

.150
. 150

-

5 .0 0
-

.21 4
-

-

_
-

.15 0
.300
.30 0
.300

-

-

~

OTHER HEAVY CONSTRUCTION

JOURNEYMEN

ENGINEERS--POWER E QU IP ­
MENT OPERATORS:
SHOVELS, BACKHOES,
DR AG LIN ES, CLAMSHELLS
OVER 3 / 9 YARD......................
A-FRAMES OR WINCH
TRUCKS.......................................
CANAL T I N E R S .........................
COMPRESSORS............................
CONCRETE MIXERS:
S L I P T Y P E .........................
P A V I N G .................................
MOTOR PATROL BLADES:
SIN GL E EN GIN E ..............
M U L T I - E N G I N E .................
S HI P L E A D E R S -3 / 4 TO 1
1 / 2 YARDS...............................
TRACTORS:
UP TO 100 HP.................
OVER 100 HP....................
TRACTOR LOADERS-OVER
6 1 / 2 YARDS.........................
TRENCHING M A C H I N E S . . . .
CEMENT F I N I S H E R S ......................
STRUCTURAL IRON WORKERS..

-

.120

-

.50 0
.50 0
. 500

-

.100
. 100
.10 0

-

.50 0
.50 0

-

.100
.10 0

-

-

2 .0 0 0
2.0 0 0

-

.500
.50 0

-

.10 0

_

_

2 .000

_

.50 0

.95 0
.950

-

2.0 0 0
2.000

-

.500
.50 0

-

. 100
.10 0

.
_

.95 0
.95 0
1 .0 0 0
1 .0 9 0

-

2 .0 0 0
2 .0 0 0
1 .7 5 0
1.8 3 0

-

.50 0
.50 0
1 .000
1.1 5 0

-

.100
.10 0

•
_

.5 0 0

-

-

_
-

-

.100
.10 0

-

.030

*

HELPERS

AND LABORERS

CONSTRUCTION L A B O R E R S . . . .

7.650

7.2 0 0

4 0.00

.85 0

.

S ee f o o tn o te s at end o f t a b le .




1 .8 0 0

-

.

120

-

-

.150

_

~

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , J u ly 1, 19"5 and J u ly 1, 1976)
JUL Y 1,
197 5

JULY

1,

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
RATE
PER
HOUR

C IT Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR 1

1

HOURS
PER
WEEK 2

INSURANCE 4 '

DOLLARS

SALT LAKE C I T Y ,

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER 5

PERCENT

DOLLARS

PERCENT

!
I

UTAH

|
B UI LD ING

;

CONSTRUCTION

JOURNEYMEN
|
$9,179
1 0 . 15C
9 .6 2 0
9 .0 0 0
9 . 500
1 1.380
8 .7 6 0

4 0.00
4 0 . CO
40.00
40.00
4 0.00
3 6.00
4 0.00

7 . 630

8.8 8 5

4 0.00

9 . 400
8 .2 3 0

9 .870
9.1 5 5

40.00
4 0.00

0.520
.75 0
.450
.50 0
.50 0
.500
.500

-

1 .0 2 0
1 .0 0 0
.420
.60 0
.60 0
.600
.600

-

0 .500
.35 0
. 25C
. 250
. 250
.25 0

.50 0

-

.600

-

. 250

.450
.495 i

-

.500
.320

o
o
an

$ 8,420
8 .400
8 .9 2 0
8 .2 6 0
8. 510
9.5 8 0
7 . 505

-

-

-

0 .8 2 0
. 150
.030
-

-

-

I
:

6 .0 0 %
6 .0 0
;

9.4 7 0

1 0.220

9 .030

9.7 8 0

■3-

40.00

8 . 870

9.6 2 0

40.00

1.500

.750

-

-

.020

2 .3 1 %

!

I

o
o
o

ASBESTOS WORKERS......................
BOILERMAKERS.................................
BRICKLAYERS ...........................
CARPENTERS.......................................
MILLWR IGH TS ............................
P I L E D P I V E R S ............................
CEMENT F I N I S H E R S ......................
COMPOSITION FLOOR LAY­
ERS AND F I N I S H I N G
MACHINE O P E R A T O R S . .. .
E LEC TR ICIAN S ( I N S I D E
H I R E R S ) ..........................................
ELEVATOR CONSTRUCTOES. . . .
ENGINEERS-POWER EQUIPMENT
OPERATORS:
HEAVY EQUIPMENT:
GROUP 1 1 :
KOEHRING S CO OPF RS .. .
GROUP 1 0 :
D E R R I C K . ..............................
GROUP 9 :
TOWER C R A N E . . . , ............
GROUP 8 :
TRACTOR WITH FRONTEND LOADERS, 2 TO
5 CUBIC YARDS..............
MEDIUM EQUIPMENT:
GROUP 4 :
H O I S T , 1 DRUM....................
GROUP 7 :
H O I S T , 2 DRUMS.............. ..
GROUP 6 :
MIXER MOBILES....................
TRACTOR, RUBBER TIRED
LIGH T EQUIPMENT:
GROUP 5 :
AIR COMPRESSORS,
2 OR MORE......................
GROUP 3 :
AIR COMPRESSORS............
CONCRETE MIXERS
(S K I P T Y P E ) ....................
GROUP
2:
MATERIAL LOADERS_____
G L A L IE R S ............................................
LATHERS...............................................
MARBLE SETTERS............................
MOSAIC AND TERRAZZO
WORKERS..........................................
P AI NTE RS .............................................
SPRAY............................................
SWING STAGE............................
PAPERHANGERS.................................
P I P E F I T T E R S ....................................
PIPE WELDERS.........................
REFRIGERATION F I T T E R S .
ST EAM F IT T ER S .........................
PLUMBERS............................................
PLASTERERS.......................................
REINFORCING RODMEN.................
ROOFERS, COM POSITIO N............
ROOFERS, SLATE AND T I L E . .
SHEET-METAL WORKERS..............
STRUCTURAL-IRON WORKERS..
ORNAMENTAL F I N I S H E R S . .
FENCE ERECTORS....................
SHEETERS....................................
T I L E SETTERS.................................

. 8 50

_

.200

.750

-

1 .5 0 0

-

. 850

-

. 200

.750

-

1 .5 0 0

-

. 850

-

.20 0

-

1 .5 0 0

-

. 8 50

-

.200

-

l
1

!
8.7 5 0

9.5 0 0

!
40.00 !

.750

-

|
7.6 2 0

8 .3 7 0

40.00

.75 0

-

1.500

-

. 850

-

.200

-

8 . 340

9.0 9 0

4 0 . CO

.75 0

-

1 .5 0 0

-

.85 0

-

.200

-

8 .1 9 0
8 . 190

8 .9 4 0
8.94C

4 0 . 00
4 0.00

.75 0
.750

-

1 .5 0 0
1 .5 0 0

-

.85 0
.850

-

.200
.200

-

7 .7 3 0

8 .48C

4 0 . 00

.7 5 0

-

1 .5 0 0

-

.85 0

-

.200

-

7.440

8 .1 9 0

4 0 . 00

.75 0

-

1 .5 0 0

-

.85 0

-

.200

-

7 .4 4 0

8 .1 9 0

40.00

.75 0

-

1 .5 0 0

7.0 9 0
7.860
7 .9 8 0
7 .600

7 .8 4 0
8 . 340
7 .9 8 0
8 .4 0 0

4 0.0 0
4 0 . 00
4 0.0 0
40.00

.750
.510
.45 0
. 170

-

1 .5 0 0
.200
. 500
.20 0

7 .6 0 0
7.2 2 0
7 .5 2 0
7 . 520
7 .4 7 0
9 . 150
8 .9 0 0
8. 550
8.9 0 0
8.9 0 0
7 . 585
9 . 150
8 .0 0 0
8 .0 0 0
7.4 0 0
9.1 5 0
9 .150
9 . 150
9 .1 5 0
7 .6 0 0

8 .400
7 .6 5 0
7 .9 5 0
7.9 5 0
7 .9 0 0
9.6 0 0
9 .1 5 0
8.8 0 0
9 .1 5 0
9 . 150
8 .86C
9 . 800
8 .300
8.5 9 0
9 .0 1 0
9.8 0 0
9.80C
9.800
9 .8 0 0
8.4 0 0

4 0 . 00
4 0.00
40.00
4 3.00
40.00
4 0 . 00
4 0.00
40.00
40.0 0
4 0 . 00
40.0 0
4 0 . 00
4 0.00
4 0.00
4 0.00
4 0 . CO
40.00
40.0 0
40.00
40.00

. 170
.510
.510
.510
.510
.510
.51 0
.510
.510
. 51C
.50 0
.550
.570
.570
.50 0
.55 0
.55 0
.550
.550
.170

-

.200
.300
.30 0
.300
.30 0
1.000
.750
.750
.750
. 7 50
.600
1.0 0 0
.350
.350
.540
1 .0 0 0
1 .0 0 0
1 .0 0 0
1.0 0 0
.200

7 .200
6 .4 5 5
6 .4 5 5

7 .900
6 .8 0 0
6 .8 0 0

4 0 . 00
40.0 0
4 0.00

. 350
.35 0
.350

-

5 .7 6 0

6 .4 1 0

40.00

.495

_

~

.85 0

-

.200

. 850
.63 0
.35 0

_

.200
.340
. 100
.130

.350
.50 0
.50 0
.50 0
. 500
.25 0
. 250
.250
. 250
.2 5 0 !
i
i
.47 0
. 350

-

-

.130
.030
.030
.030
.030
. 0 50
.110
. 130
.110
. 1 10
,
!

“

l

.002
”
.500
.00 2
.00 2
.002
.002
.130

_

i
:
~

HELPERS AND LABORFRS

BRICKLAYFRS* TENDERS............
BU ILD IN G LABORERS....................
CONCRETE LABORERS............
ELEVATOR CONSTRUCTORS'
HELPERS............................................

_

_
-

.30 0
.300
.300

See f o o tn o te s at end o f t a b le .

121

_

6 .0 0

.320
'




.350
.35 0
.350

"

'

-

_

.040
.04 0

-

.020

2 .3 1

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s tr a ig h t_ tim e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , Ju ly 1, 1975 and J uly 1, 1976)
JULY 1 ,
197 5

JULY

1,

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C L A S S I F I C A T IO N

PER
HOUR 1

PER
HOUR 1

PER
WEEK a

INSURANCE 4

PENSION

VACATION

OTHER 5

7
DOLLARS

PERCENT

DOLLARS

PERCENT

DOLLARS

PERCENT

DOLLARS

_

0 .0 9 0
.090

PERCENT

SALT LAKE CITY, UTAH
-COITIIOED
B U IL D IN G CONSTRUCTION
-C ONT INUE D

|

!

|
HELPERS AND LABORERS
-CONTINUED
I
PLASTERERS’ LABORERS............
PLUMBERS' LABORERS.................
TERRAZZO WORKERS* HELPER.

$7,200
6 .9 5 5
6 .9 5 5

$7,7 00
6 .8 C C
6 .8 0 0

90.00
90.00
9 0.0 0

0.3 0 0
.350
.35 0

-

0.3 5 0
. 3 50
.350

.600
.600

-

C. 300
.30 0
. 300

-

~

. 250
.250

-

-

HIGHWAY AND STREET
CONSTRUCTION
:
JOURNEYMEN

HELPERS

8.2 6 0
8 .030

9.000
8.7 6 0

9 0.0 0
9 0 . 00

.500
.50 0

-

!

LAB O R E R S ....

_

-

|
I

9 .5 0 0

90.00

.750

1 .5 0 0

.85 0

8.390

9.090

.75 0

1 .5 0 0

. 8 50

.10 0

8.750
9 . 150

9.500
9 .8 0 0

90.00
9 0.0 0

.75 0
.550

-

1.5 0 0
1 .0 0 0

.8 5 0
-

-

.100
.020

-

6 . 955

6 .8 0 0

9 0.00

.350

-

.30 0

-

.09 0

-

-

.030
-

_

o
o

8. 750

'!

AND LABORERS

CONSTRUCTION

. 0 30

■po

CARPENTERS......................... . . . . . .
CEMENT F I N I S H E R S ......................
ENGINEERS--POWER E QUI P­
MENT OPERATORS:
HEAVY EQUIPMENT (GROUP
6 ) — KOEHRING SCOOPERS
(UP TO 5 CU. Y D S . ) . . . .
MEDIUM EQUIPMENT
(GROUP 7 ) — TPACTORS..
L IG H T EQUIPMENT (GROUP
8 ) — TRUCK CRANES..............
STRUCTURAL IRON WORKERS..

. 3 50
!

I

i
j

!
I,

. 100

I
!

!

OTHER HEAVY CONSTRUCTION
i
JOURNEYMEN

9 .0 0 0
8 .7 6 0

8.7 5 0

9 .5 0 C

8 .3 9 0

9 .0 9 0

8 .7 5 0
9 . 150

9.5 0 0
9 .8 0 0

9 0.0 0
9 0 . 00

i

.50 0
.500

c
o

8 .2 6 0
8.0 3 0

o

CARPENTERS................. .....................
CEMENT F I N I S H E R S ......................
ENGINEERS— POWER E Q U IP ­
MENT OPERATORS:
HEAVY EQUIPMENT (GROUP
8) — KOEHRING SCOOPERS
(UP TO 5 CU. Y D S . ) . . . .
MEDIUM EQUIPMENT
(GROUP 7 ) — TRACTORS. .
L IG H T EQUIPMENT (GROUP
8 ) — TRUCK CRANES..............
STRUCTURAL IRON WORKERS..

i

.750

9 0 . CO

.750

9 0 . 00
9 0.00

-

.600
.600

. 250
.250

-

1 .5 0 0
_
_

.750
.550

.850

1 .5 0 0

. 100

.

.850

.

1.5 0 0
1 .000

I
I

.10 0

.8 5 0

. 100
.020

*“

j

'

HELPERS

AND LABORERS

6 .9 5 5

6 .8 0 C

o
o
o

CONSTRUCTION L A B O R E R S . . . .

.350

-

.350

-

.300

-

.09 0

-

.05 0
.050
.050
.050

-

. 100

-

SCRA1TOI, PA.

B UI LD IN G

CONSTRUCTION
|

JOURNEYMEN

ASBESTOS WORKERS......................
BR ICKLAYER S ....................................
CARPENTERS.......................................
MIL LW RI GH TS ............................
CEMENT F I N I S H E R S ......................
ELE CT R IC IA NS ( I N S I D E
W IR E R S )..........................................

8 .300
9 .6 5 0
8.9 0 0
9 . 980
9.5 5 0

9 .1 5 0
10.150
9 .5 5 0
10.130
10.500

9 0.00
35.00
90.00
90.0 0
9 0.0 0

.65 0
.65 0
.510
.510

9.1 5 0

9 .7 5 0

9 0.0 0

.500

-

-

-

-

.600
.50 0
.50 0
.500
-

.50 0

.500

-

-

-

-

1 .0 0 %

-

-

-

.5 0 0
.

S e e f o o tn o te s a t end o f t a b le .




122

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s tr a ig h t -t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , Ju ly 1, 1975 and July 1, 1976)
JULY 1 ,

JUL Y 1,
1975

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS

3

RATE
PER
HOUR

CITY AND JOB
CLASSIFICATION

RATE
PER
HOUR

1

1

INSURANCE
DOLLARS

i

4
DOLLARS

PERCENT

PERCENT

DOLLARS

i

PERCENT

DOLLARS

SCRANTON, PA.
-CONTINUED

I
;

i
!
BU ILD IN G CONSTRUCTION
-CONTINUED

Ij
[
j
$9,380

9 0 . 00

S10.00C

-

0 .5 4 5

-

1 .0 0 %

0.5 0 0

10.650

1 1.2 50

j
!
!

9 0.0 0

5.5 0 %

I
I
i

-

10.370

9 0 . 00

9 .0 0 0
8.8 0 0
9 . 590
9 .000

9.600
9 . 150
10.090
9.5 0 0

90 .0 0
9C . 0 0
9 0.00
35 .0 0

9.000
7 . 100
8.1 0 0
8 . 1C 0
8 . 600
7 .6 0 0
1C.000
9 .7 0 0
9.9 9 0
10.950
9 .060

9 .5 0 0
8.1 0 0
9 .1 0 O
9 . 100
9.6 0 0
8 .60C
10.750
10.581
10.790
11.150
9 .8 1 0

35 .0 0
9 0.00
9 0.00
9 0 . 00
NO. 00
9 0. 00
9 0.00
90.00
9 0.00
9 0 . QC
9 0.00

5 .5 0

-

.400

5 .5 0
.600
.100
.500

-

-

-

-

-

-

-

-

-

"

.50 0

I

-

-

.40 0
.840
.420

!
j

i

-

9 .5 0
-

-

-

-

-

I

-

i

-

|

.050
.246
. 0 50

I
|

-

!
i

!
_

i

!

-

-

-

-

i
-

-

-

-

1

I

-

!

-

j

-

!
-

;

I

;

. 100
.05 0

I
i

_

~

l
j

"

-

-

.050

-

-

-

-

-

l

9.0 6 0
9 .5 5 0
9 . 650
10.550
9 .0 0 0

AND LABORERS

!

j
i
I

BR ICK LA Y FR S ' T E N D E R S . . . . .
BU ILD IN G LABORERS . . . . . . . . . . .
COMPOSITION ROOFERS'
HELPERS.. . . . . . . . . . . . . . . . . . . . . .
ELEVATOR CONSTRUCTORS'
HELPERS . . . . . . . . . . . . . . . . . . . . . . .
MARBLE SETTERS' HEL PER S..
PLASTERERS' S MASONS'
TENDERS............................................
PLUMBERS' LABORFRS.................
TERRAZZO HELPERS......................
T I L E LAYERS' HELPERS...........

9 .8 1 0
10.080
1 0 . 15C
11.250
9 .5 0 C

90.00
4 0.00
35.00
40.00
40.00

i
i
I

7 .9 5 0
7 . 550

.420
.500
.65 0
.840

|
;

I
I

|

i

.47 0
.50 0
.50 0
1 .2 1 0
.500

-

-

0.50C

-

-

I
i

-

!

-

-

i

-

-

.09 0
.050
.050

i
!

3 .

<
-

!

!
i

8.6 F 0
8 . 200

4P . o n
4 0.00

|

_

.480
.48 0

_

.50 0
.500

-

_
_

_

I

_

.050
.05 0

j

I

8.8 3 0
6.566
8 .530

I

9 .5 8 0

4 0. 00

. 4 20

-

.470

7.920
8 . 5 30

4 0 . 00
4 0.00

.54 5

-

.50 0

-

_

1.00
_

-

_

|
I

_

_

!

5 .0 0

_

7 .9 5 0
7 .7 0 0
8. 630
8.530

|

8 .6 0 C
8 .3 5 0
8 .6 3 0
8 .5 3 0

4 0.00
40.00
4 0. 00
40 .0 0

.48 0
. 480
-

-

;

_
_
_

.500
.500

|

"

-

|

I

-

!
i
I
,

_
_

_
_

-

!

HIGHWAY AND STREET
CONSTRUCTION

_

-

-

!

_

I

.05 0
.050

-

s
i

-

2

. :

!

!

~

|

-

i
I

!

j

JOURNEYMEN

!
J

I

J
i
!

_

!

8 .7 2 0

8.1 7 0

!

!
I

i
j

40.o o

;

_

.350

!

.400

.
I

j

i

10.650

1 1 . 25C

|

4 0.00

-

5 .5 0

-

9 . 50

-

9 .7 7 0

10.370

I
i

40.00

-

5 .5 0

-

9.5 0

-

5 .5 0
-

-

9 .5 0

1 .2 1 0

_

I

-

.05 0

-

.050

-

;
!
|

-

!
9 .0 0 0
10.550

OTHER HEAVY CONSTRUCTION

9 .6 0 0
1 1 .2 5 C

|

4 0.00
40.00

.

840

. . . . . . . . . . . . . . . . . . . . .

-

-

.

-

8 . 7 20

-

!

j
8 .1 7 0

-

.050
.050

I

i

|

i

JOURNEYMEN

40.00

.

350

See f o o tn o te s at end o f t a b le .




!

-

-

-

.750
1 .2 1 0
.470

!

.05 0

-

-

I
I
!
I

;

;

-

|

9 .5 0

-

. 500
1 .0 0 0
1 .0 0 0
1 .0 0 0
1 .0 0 0
1 .0 0 0
.750

-

i

•

0 .0 5 0

!
j

9.770

2 ..

J

9.5 0

-

-

5 .0 0 % |

I
j

I

CARPENTERS .

;

j

ELEVATOR CONSTRUCTION
MECHANICS....................................
ENGINEERS— POWER E Q U IP H l NT OPERATORS:
hEAVY E QU IP M E NT -CRANES, DERRICKS,
POWFR SHOVELS....................
MEDIUM EQUIPMENT—
TURVAPULLS, CARRYALLS, BULLDOZERS,
TRACTORS.................................
L IG HT EQUIPMENT — WELD"
ING
MACHINES, COMPRESSORS, PUMPS..............
GLAZIERS ( O U T S I D E ) .................
LATHERS...............................................
MARLLF SETTERS . . . . . . . . . . . . . . . .
MOSAIC AND TERRAZZO
WORKERS. . . ................................
P AI NT E RS ......................................... .
oWI NG . . . . . . . . . . . . . . . . . . . . . . . .
STEEL. . . . . . . . . . . . . . . . . . . . . . . . .
SPRAY . . . . . . . . . . . . . . . . . . . .
PA PEFHA NGERS . . . . . . . . . . . . . . . . . .
P IP E F IT T E R S . . . . . . . . . . . . . . . . . . . .
PLASTERERS . . . . . . . . . . . . . . . . . . . . . . I
PLUMBERS............................................ |
REINFORCING IRON WORKERS. !
ROOFERS, COMPOSITION . . . . . . |
ROOFERS, SH IN G LE , SLATE, i
j
AND T I L E . . . . . . . . . . . . . . . . . . . . .
SHELT-METAL WORKERS. . . . . . . .
STONEMASONS . . . . . . . . . . . . . . . . . . . .
STRUCTURAL IRON WORKERS..
T I L E LAYERS . . . . . . . . . . . . . . .

CARPENTERS.......................................
ENGINEERS —
PCWER EQ U IP ­
MENT OPERATORS
HEAVY EQUIPMENT
CRANES, DERRICK S,
S H O V E L S ...............................
MEDIUM EQUIPMENT
BULLDOZERS, CARRYA LL S , TRACTORS,
TURNAPULLS . . . . . . . . . . . . . .
LIG HT EQUIPMENT
COMPRESSORS, PUMPS,
WELDING M A C H I N E S . . . .
STRUCTURAL IRON WORKERS..

!
I

s

JOURNEYMEN
-CONTINUED

HFLPERS

PERCE]

123

.40 0

-

-

-

i
i
i

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , July 1, 1975 and J u ly 1, 1976)
JULY 1,
1 97 5

JULY

1,

197 6

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR1

RATE
PER
HOUR1

HOURS
PER
WEEK *

INSURANCE4

DOLLARS

PENSION

PE RCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER 5

PERCENT

DOLLARS

PERCENT

SCRAHTON, PA.
-COMTINOBD

OTHER HEAVY CONSTRUCTION
-C ONTINUED
JOURNEYMEN
-CONTINUED
e n g i n e e p s — fower

eq u ip ­
OPERATORS:
HEAVY EQUIPMENT —
CRANES, DERRICKS
SHOVELS....................................
MEDIUM EQUIPMENT—
TURNAPULLS, CARRYA LL S , BULLDOZERS,
TRACTORS.................................
L IG H T EQUIPMENT — WELD­
ING MACHINES, COMPRES­
SORS , PUMPS......................
STRUCTURAL IRON WORKERS..
ment

o

9.7 7 0

1 0 . 37C

9 .0 0 0
10.550

9 .6 0 0
11.250

4 0.00
4 0.00

o
o

$11.250

b-

c

$10,650

5 .5 0 %

9.50%

5 .5 0

9 .5 0

0 .0 5 0

.050

9 .5 0

5 .5 0
0 .8 4 0

1 .2 1 0

.05 0
.05 0

~

|
S EA TT L E ,

B U IL D IN G

BASH.

j

CONSTRUCTION

JOURNEYMEN

10.060
9.8 0 0
9 .870

1 0.910
10.650
10.270

4 0.00
40. 0"
4 0 . 00

.44 0
.75 0
.550

-

9. 87C

10.270

4 0 .0 "

.550

_

. 6 50

-

.70 0
.700
.700
.700
.700

8. 900
8 .900
9 . 100
9 .0 3 0
9.400

9 .5 5 0
9 .5 1 0
9.7 1 0
9 . 6 8C
1 0 . 0 10

4r.oo
4 0.0 0
4 0 . 00
4 0. " 0
4 0 . 00

.500
.50 0
.50 0
.500
.50 0

9.0 5 0
9 .0 2 0
9.2 7 0

9.660
9 .9 7 0
10.220

4 0 . 00
4 0 . 00
4 " .00

.500
.550
.550

11.327
11.215

4 0.00
40.00

.350
.54 5

9 .680
9 .5 2 5

!

10.280
10.100

11.080
1 0.900

4 0 . 00
4 0 .0 0

.75 0
.750

9.8 8 0

10.680

40.00

.750

10.000

10.800

.75 0

9.9 1 0
10.230
10.280

10.710
1 1.030
11.080

40. 0"
4 0.00
4 0 . 00

.75 0
.750
.750

-

_
-

.700
1 .0 0 0
1 .0 0 0
.40 0
.350

-

61 . 0 0 0
, . 500
6. 250

-

6. 250

_

*.200
200
.20 0
.200
.20 0

-

_

6. 200
-

-

_

1 .0 0
-

_
_
_
-

.900
.900

-

.900

_

-

-

j
'

_
_
-

l
i
,
!
!1

_
*6 .0 0 %
2 ,5 0

.900
.90 0
.900

9 .8 8 0

10.830

40.00

.75 0

.90 0

10.380

4 0 . 00

.75 0

.900

10.030
9 .9 6 0
8.5 9 0
8 . 640
9 .8 7 0

10.830
10.760
9.5 9 0
9 . 340
10.270

4 0 . 00
40.00
4 0 . CO
4 0.00
40.00

.75 0
.75 0
. 300
.55 0
.550

.900
.90 0
.650
.500
.65 0

9.680
8.9 1 0
9 . 160
9 .1 6 0
8 .9 1 0

9 .9 7 0
8.9 1 0
9 .1 6 0
9 . 160
8 .9 1 0

4 0 .0 0
4 0.00
4 0.0 0
4 0 . 00
4 0.0 0

.550
.440
.440
.440
. 4UQ

124

-

_
-

-

-

_

j

.900

9 .580

See fo o tn o te s at end o f t a b le .




_

.950
1 .0 0 0
.65 0

. 100
.020
. 180

-

.18 0

_

.02 0
6. 040
6. 0 4 0
.020
6. 040

-

*.040
. 0 20
.02 0

-

_

_

_

_

.020

8 .0 0 ?

1
i
1
i

o
o
o

ASBESTOS WORKERS......................
BOILERMAKERS.................................
B RIC KLA YER S ....................................
CLEANERS, POINTERS, AND
CAULKERS....................................
CARPENTERS, GENERAL:
AGREEMENT A ...................... ..
AGREEMENT B ......................
bOOMMEN......................................
FLODR LAYERS,SHINGLERS
MIL LW RI GH TS ............................
P IL E D R I V E R S , BRIDGE
AND DOCK.................................
CEMENT F I N I S H E R S ......................
COMPO SITIO N ............................
ELE CT R IC IAN S ( I N S I D E
WIRER5) ..........................................
ELEVATOR C O N S TR U C TO R S .. ..
ENGINEERS-POWER EQUIPMENT
OPERATORS:
HEAVY EQUIPMENT:
SHOVELS AND CRANES,
CRAWLER AND TRUCK
T Y PE .................... .......................
BULLDOZERS............................
CARRYALL TYPE
SCRAPER (SINGLE) . . . .
MEDIUM EQUIPMENT:
H O I S T S ....................................
MIXER S, CONCRETE:
2 9 0 YARDS AND UNDER
OVER 200 YARDS............
P IL E D R I V E R S ......................
L IG H T EQUIPMENT:
POR KLIFTS OR LUMBER
STACKERS (ON
CONSTRUCTION JOB
S I T E ) ....................................
COMPRESSORS,
E XC AVA TI NG ......................
CARRYALL TYPE
SCRAPERS (DOUBLE) . .
HEAVY DUTY MACHINERY
G L A Z I F R S .............................................
LATHERS...............................................
MARBLE SETTERS .............. ............
MOSAIC AND TERRAZZO
WORKERS..........................................
P AI N TE R S ............................................
STRUCTURAL ST EEL..............
SPRAY.............................................
PAPEF.HANGERS.................................

I
!

.650
.700
.700
.700
.700

. 190
.19 0

-

. 190

_

. 190

_
-

-

_
_

_
_

-

.55 4
1 .000
6. 250

-

. 190
.190
. 190

_
-

. 190

_
-

6. 30 0
-

_
-

-

.190
. 190
.190
.315
. 100
.18 0

_
-

_
_
-

_
.060
.060
.06 0
.06 0

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities— Continued
(U nion h o u r ly w a g e r a te s and s tr a ig h t -t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , Ju ly 1, 1975 and J u ly 1, 1976)
JULY 1,
197 5

JULY 1 ,

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR

RATE
PER
HOUR 1

HOURS
PER
WEEK

INSURANCE 4

DOLLARS

PENSION

PERCENT

DOLLARS

OTHER5

VACATION

PERCENT

DOLLARS

PERCENT

PERCENT

DOLLARS

SEATTLE, WASH.
-CONTINUED
|

B U IL D IN G CONSTRUCTION
-C ONTINUED
JOURNEYMEN
-CONTINUED
P IP E F I T T E R S ....................................
PLASTERERS.......................................
PLUMBERS............................................
REFRIGERATION F I T T E R S . . . .
REINFORCING IRON WORKERS.
ROOFERS, COMPOSITION:
STEEP.........................................
F L A T ............................................
ROOFERS, SLATE AND T I L E . .
SH Sl,T-M ET A L WORKERS..............
STONEMASONS....................................
STRUCTURAL IRON WORKERS..
T I L E LAYERS ....................................
HELPERS

$11,260
8 . 500
11.260
10.010
9 .9 0 0

$11,260
8.9 0 0
11.260
11.260
10.750

90.0 0
90.00
90.00
9 0 .0 "
9O.00

0 .6 5 0
.55 0
.650
.65 0
.730

8 .8 0 0
8 . 800
9.0 5 0
10.360
9.8 7 0
9.9 0 0
9.6 8 0

9.60C,
9 .9 5 0
9 .6 0 C
1 1 . 150
10.27C
1 C. 75C
9.9 7 0

9 0.0 0
9 0.00
9 C. 00
9 0 . 00
9 0 .0 0
90.00
9 0.00

.60 0
.60 0
.60 0
.560
.55 0
.73 0
.550

7 . 960
7 .6 6 0

8 .6 6 0
8 .3 6 0

90. 0"
9 0.00

.850
.85 0

7 .8 5 0
8 .9 7 0
8 .6 6 0
8 .9 7 0
8 .9 7 0

90.0 0
9 0 . CO
90.00
90.00
9O.00

_

_

1 .1 2 0
1 .0 0 0
1 .1 2 0
1.1 2 0
1 .0 0 0

-

-

-

_
-

0 .0 7 0
.120
.070
.07 0
-

_
_
-

_
.59 0
.180
-

_
.
_
_
_

-

6. 150
6. 150
6. 150
61 . G 9 0
6. 25 0
6. 2 50
6. 300

-

. 170

-

-

.
-

-

.90 0
.900
.900
.900
.65 0
V.000
.65 0

-

1.0 0 0
61 . 0 0 0
1 .0 0 0
1 .0 0 0
6. 25 0

-

1
!

AND LABORERS
i

BRIC KLA YER S' TENDERS............
BUILDING LABORERS....................
ELEVATOR CONSTRUCTORS'
HELPERS............................................
MARBLE SETTERS' HE L PE RS ..
PLASTERERS' LABORERS............
TERRAZZO HELPERS......................
T I L L LAYERS' HELPERS...........
HIGHWAY AND STREET
CONSTRUCTION

HELPERS

_
_
_

!

6 .6 7 0
7 .820
7 . 960
7 .820
7 . 820

_

.595
.550
.85 0
.550
.55 0

-

. 9 50
. 9 50

-

.350
.950
-

*

-

-

-

.06 0
.060

1

2.5 0
-

.30 0
.3C P
. 300

-

-

-

. 0 20
. 180
.06 0
.160
. 160

-

i
;

|
!

_
8 .0 0
-

|
I

AND LABORERS

GENERAL LABORERS......................

7.6 6 0

8 .3 6 0

9 0 .0 0

.850

-

I

|

. 9 50

-

-

!

.060

-

I
SPOKANE,

B UI LD IN G

BASH.

1

CCNSTRUCTION

JOURNEYMEN

ASBESTOS WORKERS......................
BOILERMAKERS.................................
BRICKLA YER S ....................................
CLEANERS, POINTERS AND
CAULKERS....................................
CARPENTERS.......................................
MIL LW RI GH TS ............................
*■1L E D R I V E F S ............................
CEMENT F I N I S H E R S ......................
E LE CTR ICI AN S ( I N S I D E
W IR E R S )..........................................
ELEVATOR C O N S T R U C T O R S .. ..
ENGINEERS-POWER EQUIPMENT
OPERATORS :
HEAVY EQUIPMENT:
CRANES (UNDER 65 T ) . . .
DERRICKS (UNDER 65 T)
HOISTS (2 OR MORE
DRUMS)....................................
MEDIUM EQUIPMENT:
HI X w R MOBILES, PUMPCR2TES, L I N K BELTS
OF S I M I L A R .........................
LIGHT EQUIPMENT:
COMPRESSORS (1 O N L Y ) .
PUMPS..........................................
G LA ZI E R S ............................................
LATHERS...............................................
MARdLF MASONS..............................
MOSAIC AND TERRAZZO
WORKERS..........................................

8. 900
9 .800
9 .6 9 0

9 .5 0 0
1 0.6 5^
10.110

9 0.00
9 0 .0 0
9 0 . 0O

.99 0
.750
.55 0

-

9 .6 9 0
9 .090
9 .5 9 0
9 . 190
8 .680

10.110
9 .9 9 0
9 .9 9 0
9 .6 9 0
9.1 9 0

90.00
9 0.00
9 0.00
90.00
9 0 .0 0

. 550
.600
.600
.600
.500

-

.700
.550
.550
.550
. 7 50

9 . 166
9 .2 0 0

9.7 5 2
10.510

9 0.00
9 0.00

.930
.995

-

.900
.32 0

_
-

-

-

250
250
250
250

-

-

1 .0 0 %
-

_

61 .2 5 0
. 500
~

6.
6.
6.
6.

_
.

-

-

68 . 00%
8 .0 0

-

9.2 0 0

9 .8 5 0

90.0 0

.800

8 .9 0 0

9.5 5 C

9 0.00

.800

-

.900

!
i
|

.050

-

.050
.05 5
.055
.055
6. 250

-

-

.020

-

8.9 0 0

9 .5 5 0

90.0 0

.80 0

-

.90 0

-

8.9 0 0
8.0 5 0
7 .9 5 5
9.5 8 0
9 .6 9 0

9 .5 5 0
8.7 0 0
8 .7 9 0
10.350
10.11C

9 0.00
90.00
90.00
90.00
9 0.00

.800
.800
.350
.500
.550

-

.900
.900
.100
.70 0

-

9.5 0 0

9.95C

9 0 . 00

.550

.700

125

-

.900
-

i
I
I
i

.020

"

.90 0

-

-

1

S ee fo o tn o te s a t end o f ta b le .




1 .0 2 0
1 .0 0 0
.70 0

j
-

.020

-

.02 0

-

-

.020
.020
. 310

-

-

.050
.250

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities—Continued
(U nion h o u r ly w a g e r a te s ana s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s . Ju ly 1, 1975 and J u ly 1, 1976
JULY 1,
1975

JULY 1 ,

1 9 76

EMPLOYER CONTRIBUTIONS
TO FUNDS3
CLASSIFICATION

PER
HOUR 1

PER
HOUR 1

PER
WEEK 2

INSURANCE 4
DOLLARS

PENSION

PERCENT

DOLLARS

OTHER5

VACATION

PER CEN T

DOLLARS

PERCENT

DOLLARS

PER CEN T

SPOKANE, WASH.
-CONTINUED
BUILDING CONSTRUCTION
-CONTINUED
JOURNEYMEN
-CONTINUED
PAINTERS................. .. ........................
SPRAY............................................
STRUCTURAL STEEL..............
DRYWALL T A P E R S . . . . . . . .
PAPERHANGERS.............. ..................
PIPEFITTERS....................................
REFRIGERATION FITTERS.
PLASTERERS.......................................
PLUMBERS............................................
REINFORCING IRON WORKERS.
ROOFERS, COMPOSITION............
ROOFERS, SLATE AND T I L E . .
SHEET-METAL WORKERS..............
STONEMASONS....................................
STRUCTURAL AND ORNAMENTAL
IRON WORKERS...............................
FINISHERS................... ..
TILE LAYERS....................................

$8,770
9.020
9 . 170
9.023
8.770

$9,420
9.670
9.670
9.670
9.420
11.600
11.600
10.530
11.600
10.750
8 . 440
8.440
10.600

0.4O0
.4 0 0
.4 0 0
.400
.400
.650
.65 0
.500
.650
.730
.600
.600
.570
.5 5 0

10.110

40.00
4 0 . 00
4 0 . on
4 0 . 00
40.00
40.00
40.00
40.00
4 0 . 00
40.00
40.00
40.00
40.00
40.00

9.900
9 . 900
9.500

10.750
10.750
9.950

40.00
40.00
40.00

.730
.730
.5 5 0

7.950
7.500

8.550
8 . 1 O0

40.00
40.00

7.500

8 . 1 O0

6.440

7.360

10.020
10.020

9.680
10.020

9.900
7.790
7.790
10.160
9.690

-

-

-

_

0. 700
.7 0 0
.700
.7 0 0
.700
1.1 0 0
1.100

1 .1 0 0
1.000

.500
.5 0 0
.800
.700

-

1.0 0 0

-

-

6. 25 0
6. 5 0 0
6. 5 00
6. 7 5 0
-

-

_
-

6. 250
6. 250

.
-

-

1.0 0 0
1 .0 0 0

-

0.070
.070
.070
.0 7 0
.0 7 0
.110
.11 0

-

.11 0

-

-

1 .0 0 0
1 .0 0 0

-

.700

.650
.650

-

.700
.7 0 0

-

-

-

40 . 0 0

.650

_

.700

_

.

_

40.03

.495

-

. 320

-

-

8 .0 0

_
_
-

-

-

.555
.050

-

_
3.00*
_

-

-

6. 25 0

-

. 0 20
.020

-

HELPERS AND LABORERS
BRICKLAYERS' TENDERS............
BUILDING LABORERS....................
CONCRETE AND GRADE
CREW...............................
ELEVATOR CONSTRUCTORS'
HELPERS...............................
STAM FO R D ,

'
I

.020
.020

-

. 100

_
-

CO N N.

i
I
BUILDING CCNSTRUCTION
JOURNEYMEN
ASBESTOS WORKERS................
BRICKLAYERS.........................
CAFPFNTE RS ......................... .
CEMENT FINISHERS ................
ENGINEERS--POWER EQUIP­
MENT OPERATORS:
DERRICKS, PILEDRIVERS,
STIFF LEG AND GUY DER­
RICKS, HOISTS (2 DRUMS
OR OVER) ....................................
TOWER CRANES, DRAG­
LINES, GRADALLS, FRONT
END LOADERS (OVER 7
CU. Y D .) ....................................
MAINTENANCE ENGINEERS..
WELDERS, FRONT END
LOADERS ( 3 - 7 CU. YD .) ,
MUCKING MACHINES,
PUMPCRETES, WELL DIG­
GERS, CONVEYORS.................
COMPRESSOR BATTERY
OPERATORS.................................
ASPHALT SPREADERS..............
EULLDOZERS, GRADERS,
SCRAPER PANS, CARRYALLS...............................................
CONCRETE MIXERS, FRONT
END LOADERS (UNDER 3
CU. Y D . ) , POWERSTO NF
SPREADERS.................................
AIR AND STEAM VALVE
OPERATORS.................................
COMPRESSORS, GENERA­
TORS, WELDING MACHINES
STEAM JENNIES, FORK­
LIFTS UNDER 4 F E E T . . . .
ROLLERS..........................................
MECHANICAL HEATERS............

9 . 540
9.500
9.250
9.500

9.740
9.500
9.250
9. 500

35.00
3 5 . 00
4 0 . 00
35.00

.6 5 0
.530
.650
. 530

10.200

10.900

40.00

.4 5 0

10.100
10.000

10.800
10.700

40.00
40.00

.450
.450

9.750

10.450

40.00

.450

9.250
9.600

9.700
10.250

40.00
40.00

.450
.4 5 0

9.550

10.200

40.00

.450

9 . 500

10.150

40.00

.450

9.050

9.450

40.00

.450

_

.700

_

_

_

.570

8.950

9.350

40.00

.450

_

.700

_

-

_

.570

_

9 . 400
9.300
8.800

10.050
9.950
9.200

40.00
4 0 .00
4 0 . 00

.4 5 0
.450
.450

_

.7 0 0
.700
.7 0 0

_

_

_

_

-

-

-

.570
.5 7 0
.5 7 0

S ee f o o tn o te s a t e n d o f t a b l e .




1 20

-

.960
.250
.400
.2 5 0

-

.600
.100

-

.350
. 100

_

.700

-

.7 0 0
.700

.570

-

-

-

_
-

_
-

_

.570
.570

.700
_

-

.700
.700

-

.570

-

.700

I
;

_

.570
.570

-

.5 7 0

.570

.700

-

_

!

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities—Continued
(U n io n h o u r ly w a g e r a t e s a n d s t r a i g h t - t i m e w e e k ly h o u r s a n d e m p l o y e r i n s u r a n c e , p e n s io n , v a c a t i o n , a n d o t h e r c o n tr i b u ti o n s to fu n d s in th e
b u ild in g t r a d e s , J u ly 1, 1975 a n d J u ly 1, 1976)
JULY

JU LY 1 ,
1975

1,

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3

CITY AND JOB
CLASSIFICATION

RATE
PER
HOUR 1

RATE
PER
HOUR 1

HOURS
PER
WEEK 2

INSURANCE 4
DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER 5

PERCENT

DOLLARS

PERCENT

STAMFORD, CONN.
-CONTINUED
BUILDING CONSTRUCTION
-CONTINUED
JOURNEYMEN
-CONTINUED
ENGINEERS— POWER EQUIPMENT
OPERATORSCONTINUED
DINKY MACHINES, POWER
PAVEMENT BREAKERS............
FIREMEN— HIGH PRESSURE.
OILERS............................................
GLAZIERS................................. ..
LATHERS...............................................
PAINTERS............................................
PAPERHANGERS.................................
PIPEFITTERS....................................
PLASTERERS.......................................
PLUMBERS............................................
REINFORCING IRON WORKERS.
ROOFERS, COMPOSITION............
ROOFERS, SLATE AND T I L E . .
SHEET’ METAL WORKERS..............
STONEMASONS....................................
STRUCTURAL IRON WORKERS..

$9,150
8 . 600
8 .200

O. 530
9.010
7 . 580
8.080
10.050
9 . 500
10.050
10.900
9.000
9 . 250
10.790
9 . 500
10.900

$ 9,800
9.000
8.5 5 0
9.53C
9.010
8.500
10.3O0
9.500
10.300
10.700
9.900
9.650
10.790
9.500
10.700

9 O .0 0
9 0.00
90.00
9 0 . 00
35.00
3 5 . 00
35.00
3 7 . 5C
35.00
3 7 . 50
90.00
35.00
3 5. 00
37.50
35.00
90.00

0.950
.9 5 0
.9 5 0
.9 5 0
.350
.5 0 0
.500
.750
.530
.7 5 0
.550
1.05C
1.050
.720
.5 3 0
.550

“

7.750
7.500

90.00
9 0.00

.500
.500

-

8 .0 0 0

-

0.700
.700
.7 0 0
.9 7 0
.200

.500
.500
.5 0 0
.250
.500
.950
.500
.500
.550
.250
.950

-

-

-

-

-

-

0 . 7 50
. 100

-

-

-

I

.900
.250
. 250
. 3 00
. 100
.900

0.570
.570
.5 7 0
. 390
.0 3 0
-

-

9.00%

.020
-

-

9.00
-

.020
.021

.261
. 261
.390
-

-

-

-

.021

HELPERS AND LABORERS
BRICKLAYERS' TENDERS............
BUILDING LABORERS...................
COMPOSITION ROOFERS'
HELPERS............................................
PLASTERERS' LABORERS............

7 . 250
7.000

_

.950
.950

-

7 . 250
7.250

7.750
7.75C

9 0.00
90.00

.500
.500

-

. 9 50
.950

-

8.950
8.680

9.9O0
8.65C

90.00
9 0 . 00

.650
.530

-

.900
.2 5 0

-

10.220

10.930

9 O .0 0

.950

-

-

_

_

-

"

. 150
. 150
.150
.1 5 0

_
-

HIGHWAY AND STREET
CONSTRUCTION
JOURNEYMEN
CARPENTERS.......................................
CEMENT FINISHERS......................
ENGINEERS— POWER EQUIP­
MENT OPERATORS:
ERECTING AND HANDLING
STRUCTURAL STEEL,
FRONT END LOADERS (7
CU. YD. OP OVER)..............
PILEDRIVERS, DRAG­
LINES, GRADEALLS,POWER I
SHOVELS AND C R A N E S . .. .
SIDE BOOMS, EUCLID
LOADERS, PUMPCRETES.. .
COMPRESSOR BATT ERIE S...
ASPHALT SPREADERS..............
FRONT END LOADERS 3 YDS
OR OVER, GRADERS..............
WELL POINTS SYSTEM............
ASPHALT ROLLERS, BULL­
DOZERS, CARRYALLS............
FRONT END LOADERS UNDER
3 YDS, ROLLERS, POWER
CHIPPERS, FORK LIFT S...
FIREMEN, HIGH PRESSUPE.
PUMPS, CO M PRE SSO RS.....
BATCH AND EULK CEMENT
PLANTS..........................................
OILERS............................................
STRUCTURAL IRON WORKERS..

.10 0

!
i
i

.10 0

.700

10.090

10.790

9 0 . 00

.9 5 0

.700

9.790
9. 260
9.610

10.970
9.690
10.28C

90.00
90.00
90.00

.950
.9 5 0
.950

.700
.700
.700

9.980
8 . 95 0

10.190
9.350

90.00
90.00

.950
.9 5 0

9.310

9.960

9 0 . *0

.950

9 . 130
8.620
8 . 530

9.760
9.020
8.920

9 n . 00
90.00
90.00

.950
.9 5 0
.9 5 0

8.700
10.900

9.300
8.580
10.700

9 0 . on
90.00
90.00

.950
.9 5 0
.5 5 0

7.0C0

7.50C

90.00

.500

.950

8 . 9 50
8.680

9.900
8.650

90.00
90.00

.650
.530

.900
.250

8 .2 1 0

. 100

_

.300
.300
_
-

-

-

.700
.700

-

_
-

.3 0 0
.300
.3 0 0

_
-

_
-

_
-

~

.300
.300

-

.700

_

.

_

.300

-

.7 0 0
.7 0 0
.700

-

-

-

.300
.300
.3 0 0

-

_
-

.700
.700
.950

_
~
-

.3 0 0
.300
.080

_
-

-

_
-

_
-

.900

HELPERS AND LABORERS

LABORERS..................................

.1 5 0

OTHER HEAVY CONSTRUCTION
JOURNEYMEN
CARPENTERS.......................................
CEMENT FINISHERS......................

S ee f o o tn o te s a t e n d o f t a b l e .




127

-

.100
. 100

.208

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities—Continued
(U n io n h o u r ly w a g e r a t e s a n d s t r a i g h t - t i m e w e e k ly h o u r s a n d e m p l o y e r i n s u r a n c e , p e n s io n , v a c a t i o n , a n d o t h e r c o n tr i b u ti o n s to fu n d s in th e
b u ild in g t r a d e s , J u ly 1, 1975 a n d J u ly 1, 1976)
JULY

1,

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS 3
CITY AND J0 3
CLASSIFICATION

RATE
PER
HOUR 1

RATE
PER
HOUR 1

HOURS
PER
WEEK 2

INSURANCE 4
DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER 5

PERCENT

DOLLARS

PERCENT

STAHFOBD, CONN.
-COHTIHOBD
OTHER HEAVY CONSTRUCTION
-CONTINUED
JOURNEYMEN
-CONTINUED
ENGINEERS— PCWER EQUIP­
MENT OPERATORS:
ERECTING AND HANDLING
STRUCTURAL STEEL,
FRONT END LOADERS (7
CU. YD. OP OVER)..............
PILE DRIVERS, DRAG­
LINES, GRADALLS, POWER
SHOVELS AND C R A N E S . .. .
SIDE 9 00 MS, EUCLID
LOADERS, PUMPCRETES.. .
COMPRESSOR BA TT ER IE S.. .
ASPHALT SPREADERS..............
FRONT END LOADERS 3 YDS
OP OVER, GRADERS,............
WELL POINT OPERATORS...
ASPHALT ROLLERS, BULL­
DOZERS, CARRYALLS............
FRONT END LOADERS UNDER
3 YDS, ROLLERS, POWER
CHIPPERS, FORK LIF TS ...
FIREMEN, HIGH PRESSURE.
PUMPS, COMPRESSORS............
BATCH AND BULK CEMENT
PLANTS..........................................
OILERS............................................
STRUCTURAL IRON WORKERS..

$10,930

40. 0O

10.090

10.790

40.00

.450

.700

.300

9 . 790
9.260
9.610

10.470
9.690
10.280

40.00
40.00
40.00

.4 5 0
.450
.450

-

.700
.700
.700

_

.300
.300
. 300

_
_

9.480
8 . 950

10.14"
9.350

40.00
40.00

.4 5 0
.450

-

.700
.700

_

.3 0 0
. 300

_

9 . 310

9.960

40.00

.450

9.130
8.620
8.530

9.760
9 . 0 20
8.920

4 0 . CO
40.00
4 0 . 00

.4 5 0
.450
.4 5 0

8.700
1C.400

9.300
8.580
10.700

40.00
40.00
4 0 . 0"

.4 5 0
.4 5 0
.5 5 0

7.OQ0

7.500

40.00

.500

$10,220

8.2 1 0

0.4 5 0

0.700

0 . 300

_

-

.700

-

_
-

-

. 300

.700
.700
.7 0 0

-

.700
.7 0 0
. 9 50

-

_
_

_
_

_
0. 4 00

-

I

.300
.300 I
.3 0 0

_

i
j

.3 0 0
.300

_

.101

-

-

HELPERS AND LABORERS
j|
CONSTRUCTION LA BO RE RS....

.450

.150

TOLEDO, OHIO

i
i
i

BUILDING CONSTRUCTION
JOURNEYMEN

GROUP E:
B A C K F I L L E R S , CONCRETE
SPREADING...............................
GROUP F :
O I L E R , PUMPS......................
G L A Z I E R S ............................................
SWING STAGE............................
LATHERS...............................................
MARBLE SETTERS............................
MOSAIC S TERRAZZO WORKERS

1 1 . 185

10.180
11.900
11.735

40.00
4 0 .00
4 0 . 00

.5 0 0
.500
.650

11.185
10.600
10.600
10.600
11.550

11.735
1 1.55C
11.550
11.550
11.570

4 0 . 00
40.00
4 0 . 00
40.0"
40.00

.650
.650
.650
.650
.5 0 0

1 0 .9 5C
10.640

1 2 . 150
11.270

4 0 . 00
40.00

.500
.495

10.490

11.390

©
o
o

ASBESTOS WORKERS......................
BOILERMAKERS.................................
BRICKLAYERS....................................
POINTERS, CLEANERS, AND
CAULKERS....................................
CARPENTERS.......................................
MILLWRIGHTS............................
PILEDRIVERS............................
CEMENT FINISHERS......................
ELECTRICIANS (INSIDE
HIRERS)..........................................
ELEVATOR CONSTRUCTORS....
ENGINEERS-POWER EQUIPMENT
OPERATORS
GROUP A:
HEAVY EQUIPMENT,
CRANES, ETC.........................
GROUP B:
MEDIUM EQUIPMENT,
BULLDOZERS, ETC............
GROUP C:
LIGHT EQUIPMENT..............
GROUP D:
WELDER OPERATORS,
COMPRESSORS, MIXERS.

9 . 230

.460

1 .0 0 0

11.100

_
-

_
-

.600
.8 0 0
.800
.500
.5 0 0
.5 0 0
_

.550
.3 2 0

_
_

_
-

-

61 . 0 0 0

_
_

_
_

6. 500
6. 50 0 |
6. 5 0 0 !
i;ooo j

1. 00%

-

!

_
_
_
„

6 . 00%

.060
. 120

_

. 120
.040
.0 4 0
.040

_

_

_

6. 110

.02 0 (

2 .31%

I
i
.090

10.330

11.23C

40.00

.460

1 .0 0 0

.0 9 0

9.980

10.880

40.00

.4 6 0

1 .0 0 0

.090

9.170

10.070

4 0 . 00

.460

1 .0 0 0

.090

4 0.00

.460

1 .0 0 0

.090

4 0.0 0
4 0 . 00
4 0.0 0
4 0.00
4 0 . 00
4 0.00

.46 0
.50 0
.500
.65 0
.65 0
.650

1 .0 0 0
.850
.850
.100
.80 0
.400

.090
.040
.04 0
.030
.12 0 !
.05 0 |

8 .8 4 0
7 .7 8 0
9 .0 2 5
9.2 7 5
10.950
11.185
10.170

9 .7 4 0 .
8 .2 8 0
10.475
10.725
11.900
11.735
11.120

S ee f o o tn o te s a t e n d o f t a b l e .




1 .0 0 0
-

128

_
-

.
-

~

_

.01 0
.010
-

_
.250

-

_
-

1
_
_
-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities—Continued
(U nion h o u r ly w a g e r a te s and s t r a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in th e
b u ild in g t r a d e s , J u ly 1, 1975 and J u ly 1, 1976)
JULY 1,

JULY 1 ,
1975

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C ITY AND JOB
CLASSIFICATION

RATE
PER
HOUR J

RATE
PER
HOUR 1

HOURS
PER
WEEK 2

PENSION

INSURANCE 4
DOLLARS

PERCENT

DOLLARS

VACATION

PERCENT

OTHER 5

DOLLARS | PERCENT

PERCENT

DOLLARS

TOLEDO, OHIO
—COVTIIUBD
BUILDING CONSTRUCTION
-CONTINUED
JOURNEYMEN
-CONTINUED
PAINTERS, BRUSH, GENERAL.
SPRAY........................................
SWING
BRUSH.....................................
SPRAY.....................................
PAPERHANGERS..............................
PIPE FITTER S................................
REPRIGERATION FITTERS.
PLASTERERS...................................
PLUMBERS........................................
REINFORCING IRON WORKERS.
ROOFERS, COMPOSITION..........
R E SIDENTIAL.........................
ROOFERS, SLATE AND T I L E . .
SHELT-METAL WORKERS.............
STONEMASONS................................
STRUCTURAL-IRON WORKERS..
FINISH ER S..............................
TILx, LAYERS................................

-

$8. 990
9 .5 9 0

* 9 .6 9 0
1 0 .1 9 0

9 0 .0 0
9 0 .0 0

0 .6 5 0
.6 5 0

9 .2 9 0
9 .8 9 0
8 .9 9 0
9 .9 7 5
9 .9 7 5
10 .7 5 0
9 .9 7 5
1 0 .3 9 0
1 0 .9 9 0
1 0 .9 9 0
1 0 .9 9 0
1 0 .0 7 5
1 1 .1 8 5
1 0 .3 9 0
1 0.39 0
1 0 .1 7 0

9 .9 9 0
1 0 .9 9 0
9 .6 9 0
1 0 .7 3 0
1 0 .7 3 0
1 1 .9 5 0
1 0 .7 3 0
1 1 .0 0 0
1 1 .0 9 0
1 1 .0 9 0
1 1 .0 9 0
1 0 .8 2 5
1 1 .7 3 5
1 1 .0 0 0
1 1 .0 0 0
1 1 .1 2 0

9 0 .0 0
9 0 . 9^
9 0 .0 0
9 0 .0 0
9 0 .0 0
9 0 .0 0
9 0 .0 0
9 0 .0 0
9 0 .0 0
90 .00
9 0 .0 0
9 0 .0 0
9 C .00
9 0 .0 0
9 0. 00
9 0 .0 0

.6 5 0
.6 5 0
.6 5 0
1 .6 0 0
1 .6 0 0
.6 5 0
1 .6 0 0
.6 5 0
.6 5 0
.6 5 0
.6 5 0
.6 5 0
.6 5 0
.6 5 0
.6 5 0
.6 5 0

-

9. 290
9 .3 6 0
9 . 160

10.29C
1 0 .3 1 0
10. 110

9 0 . OO
9 0 .0 0
90. 00

.5 5 0
.5 5 0
.5 5 0

7 .9 9 8
9 .2 0 0
9 . 180
9 . 180

7. 890
10.1C 0
1C.13C
1 0 .1 3 0

90. no
9 0 .0 0
9 0 .0 0
9 0 . 00

9 .2 0 0
9 . 500
9 .2 0 0

1 0 .1 0 0
1 0 .9 0 0
1 0 .1 0 0

10.6O 0
1 0 .6 0 0
9 .2 1 0

-

0.700
.7 0 0

_
-

b0 . 850
•>. 850

_
-

_
-

|
;

_

6. 850
6. 8 50
6. 850
1 .3 0 0
1. 300
6.7 5 0
1 .3 0 0
6. 830
6.5 0 0
6. 500
6. 500
61.C 00
6. 8 3C
6. 830
.2 5 0

-

;
!
_ ■i

-

.7 0 0
.7 0 0
.7 0 0
.8 5 0
.8 5 0
.8 5 0
1 .0 6 0
.8 5 0
.8 5 0
.8 50
1 .0 0 0
.8 0 0
1 .0 6 0
1 .0 6 0
.9 0 0

-

_
-

.9 0 0
.9 0 0
.9 0 0

_
-

6.5 0 0
6. 500
6. 500

.9 9 5
.6 5 0
.5 5 0
.5 5 0

-

-

-

.3 2 0
.9 0 0
.9 0 0
.9 0 0

6.50C
<>.5 00
6. 500

90. 00
9 0 .0 0
9 0 . on

.6 5 0
.6 5 0
.6 5 0

-

.9 0 0
.9 0 0
.9 0 0

1 1 .5 5 0
1 1 .5 5 0
1 0 .9 6 0

9 0 . on
9 0 .0 0
9 0 .0 0

.6 5 0
.6 5 0
.5 0 0

.. •
-

.5 0 0
.5 0 0
-

-

9 .6 9 0

1 0 .9 9 0

9 0 .0 0

.9 6 0

-

.8 0 0

-

9 .5 2 0

1 0 .3 7 0

9 0 .0 0

.9 6 0

-

.8 0 0

-

8 . 980
1 0 .3 9 0

9 .3 3 0
1 1 .0 0 0

9 0 . on
9 0 .0 0

.9 6 0
.6 5 0

-

.8 0 0
1 .0 6 0

-

7 . 550

8 .1 5 0

9 0 .0 0

.5 5 0

-

.9 0 0

-

-

-

10.6 0 0
1 0 .6 0 0
1 0 .6 0 0
9 . 210

1 1 .5 5 0
1 1 .5 5 0
1 1 .5 5 0
1 0 .9 6 0

9 0 .0 0
9 0 .0 0
9 0 .0 0
9 0 .0 0

.6 5 0
.6 5 0
.6 5 0
.5 0 0

-

.5 0 0
.5 0 0
.5 0 0

_
-

6. 500
6.5 0 0
6. 500

_
-

-

-

-

-

0 .1 6 0 i
. 160
.0 5 0
.1 6 0
.0 9 0
.0 5 0
.1 2 0
.0 9 0
.0 9 0
.0 5 0

-

-

-

HELPERS AND LABORERS
BRICKLAYERS' TENDERS..........
MORTAF MIXERS....................
BUILDING LABORERS.................
ELEVATOR CONSTRUCTORS'
HELPERS........................................
MARBLE SETTERS* HELPERS..
PLASTERERS' TENDERS.............
MIXERS.....................................
TERBAZZO WORKERS'
HELPERS.....................................
BASE GRINDERS....................
T IL E LAYERS' HELPERS..........

-

-

-

6 .0 0 1
-

.0 9 0 I
.0 9 0 i
.0 9 0
.0 2 0
.0 9 0
. 100
. 100

2 .3 1
-

6. 500
6. 500
6. 500

-

.0 9 0
.0 9 0
.0 9 0

-

6. 500
6. 500
-

_
-

.0 9 0
.0 9 0
6. 110

-

-

-

.0 9 0

-

-

-

.0 9 0

-

-

.0 9 0
.0 9 0 i
I
I

HIGHWAY AND STREET
CONSTRUCTION
JOURNEYMEN
CARPENTERS.................................. '
PILEDRIVERS.........................
CEMENT FIN ISH ER S....................
ENGINEERS— POWER EQUIP­
MENT OPERATORS:
HEAVY EQ U IPM EN TCRANES (ALL TYPES),
POWER SHOVELS, DER­
RICKS......................................
MEDIUM EQUIPMENT— POW­
ER GRADERS, POWER
SCOOPS, BULLDOZERS...
LIGHT EQUIPMENT— PORT­
ABLE COMPRESSORS,
PUMPS (9 IN . AND
OVER), ASPHALT ROLL­
ERS ........................................
STRUCTURAL IRON WORKERS..

.8 3 0

HELPERS AND LABORERS
GENERAL LABORERS....................

i
.0 5 0 !
I

OTHER HEAVY CONSTRUCTION
JOURNEYMEN
CARPENTERS...................................
MILLWRIGHTS............................
PILEDRIVERS............................
CEMENT FIN ISH ER S....................

'
S ee f o o tn o te s at end o f t a b le .




1 29

.0 9 0
.0 9 0
.0 9 0
6. 110

-

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities—Continued
(U n io n h o u r ly w a g e r a t e s a n d s t r a i g h t - t i m e w e e k ly h o u r s a n d e m p l o y e r i n s u r a n c e , p e n s io n , v a c a t i o n , a n d o t h e r c o n tr i b u ti o n s to fu n d s in th e
b u ild in g t r a d e s , J u ly 1, 1975 a n d J u ly 1, 1976)

JULY 1 ,

JULY 1,
1975

19 7 6

EMPLOYER CONTRIBUTIONS
TO FUNDS 3
CITY AND JOB
CLASSIFICATION

RATE
PER
HOUR 1

RATE
PER
HOUR

HOURS
PER
WEEK

PENSION

INSURANCE 4
DOLLARS

PE RCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER 5

PERCENT

DOLLARS

PERCENT

TOLEDO, OHIO
-COMTINUED
OTHER HEAVY CONSTRUCTION
-CONTINUED
JOURNEYMEN
-CONTINUED
ENGINEERS— POWER EQUIP­
MENT OPERATORS:
HEAVY EQUIPMENT—
CRANES (ALL TYPES) ,
POWER SHOVELS, DER­
RICKS..........................................
MEDIUM EQUIPMENT— POW­
ER GRADERS, POWER
SCOOPS, BULLDOZERS...
LIGHT EQUIPMENT— PORT­
ABLE COMPRESSORS,
PUMPS (4 IN. AND
OVER), ASPHLAf ROLL­
ERS ............................................
STRUCTURAL IRON WORKERS..

$9,640

$10.49*"*

40.00

0.460

0.800

9.520

10.370

40.00

.4 6 0

.800

0.0 9 0
.090
I
I
I

40.00
4 0 . CO

.460
.6 5 0

8.150

40.00

.550

-

.400

9.450
9.400
9.850
9.550
9 . 7 50
9.990
9 . 650

10.21C

.490
.700
.7 0 0
.650
.6 5 0
.6 5 0
.6 8 5

-

1 .000

10.460
10.040

40.00
4 0 . 00
40.00
40.00
40.00
40.00
40.00

1 0 . 100

10.250

1C.50C
10.38C

4 0 . 00
4 0 . CO

.650
.495

10.350

11.080

40.00

.550

10.100

10.830
10.830

4 0 . 0U
40.00

.5 5 0
.550

9 . 330

8 . 480
10.390

11.000

7 . 550

.800
1 . 0 60

-

60 . 830

-

.090
.040

-

-

.050

-

HELPERS AND LABORERS
GENERAL LABORERS......................

WASHIIGTOH, D. C.

BUILDING CONSTRUCTION
JOURNEYMEN
ASBESTOS WORKERS......................
BOILERMAKERS.................................
BRICKLAYERS....................................
CARPENTERS.......................................
PILE DRIVERS.........................
MILLWRIGHTS............................
CEMENT FINISHERS......................
ELECTRICIANS (INSIDE
WIRERS).........................................
ELEVATOR CONSTRUCTORS....
ENGINEERS-POWER EQUIPMENT
OPERATORS:
HEAVY EQUIPMENT:
CRANES, SHOVELS, AND
PILE DRIVERS......................
MEDIUM EQUIPMENT:
HOISTS, SINGLE OR
DOUBLE DRUM......................
TRENCHING MACHINES...
LIGHT EQUIPMENT:
COMPRESSORS,......................
PUMPS..........................................
BULLDOZERS............................
GLAZIERS............................................
LATHERS...............................................
MACHINISTS.......................................
MOSAIC AND TERRAZZO
WORKERS.........................................
MARBLE SETTERS............................
PAINTERS............................................
SPRAY.............................................
BRIDGE, STRUCTURALSTEEL, SWING S T A G E .. . .
PAPEPHANGERS.................................
DRYWALL TAPERS............................
PIPEFITTERS....................................
REFRIGERATION FITTERS.
SPRINKLER FITTERS............
PLASTERERS.......................................
PLUMBERS.............................................
REINFORCING IRON WORKERS.

9.690
9.520
9 . 520
9.500
8.980
8.730
9 . 250
9 . 230
10.350
9.440
9.440
9.940
9.440
9 . 440
9.050
9.050
10.600
9.020
9.150
9 . 350

10.200

10.600
10.000
10.210

_
-

-

10.000

.550
.550
.5 5 0
.5 6 0
.500
.5 5 0

-

9.930
10.85C
9.840
9.840

4 0 . 00
40.00
40.00
40.00

.5 0 0
.6 0 0
.7 1 0
.710

-

10.340
9.840
9.84C
9.800
9.800
11.450
9.080
9.800
10.550

40.00
4 0 . 00
40.00
40.00
40.00
40.00
40.00
4 0 . 00
40.00

.710
.710
.7 1 0
.650
.650
.600
.450
.7 3 0
.550

130

.02 0

. 50C
.5 3 0
.530
.530
.500

-

-

.8 0 0
.320

1.0055
-

_
-

.550
.550

-

-

.550
.550
.550
.450
.500
-

_
-

_
-

4.60

_

_

6. 5 0 0
-

~

.10 0

-

6 .Q 0 X

.02 1

-

-

. 5 50

40.00
40.00
4 0 . 00
40.00
4 0 . 00
40.00

9.91C
9.910
10.230
9.780
9.510

S ee f o o tn o te s a t e n d o f t a b l e .




.600

_
_
-

.400
.450
.690
.690
.690
.690
.690
.750
.7 5 0
.900
.250
.700
.850

_
-

-

.005
.385

.050
I

-

_
6. 4 0 0
.400
6. 280

i

-

.010
.010
.010
.01 0
.010

.030
.030
.0 8 0
.030
.0 3 0

_
.
_
-

Table 20, Wage rates, hours, and employer contributions to funds: Selected cities—Continued
(U nion h o u r ly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , Ju ly 1, 1975 and J u ly 1, 1976)
JULY 1,
19 75

JULY 1 ,

1976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
CITY AND JOB
CLASSIFICATION

RATE
PER
HOUR 1

RATE
PER
HOUR 1

HOURS
PER
WEEK 2

INSURANCE 4
DOLLARS

PENSION

PERCENT

DOLLARS

VACATION

PERCENT

DOLLARS

OTHER 5

PERCENT

DOLLARS

PERCENT

WASHINGTON, D . C .
'‘ CONTINUED

BUILDING CONSTRUCTION
- CONTINUED
JOURNEYMEN
-CONTINUED
ROOFERS, COMPOSITION............
ROOFERS, SLATE AND T I L E . .
SHEET-METAL WORKERS..............
STONEMASONS....................................
STRUCTURAL-IRON WORKERS..
TILE LAYERS................................. ..

$8,210
8.770
9.260
10.350
1 0 .0 0 0
9.230

$ 9,010
9.570
10.060
10.850
10.40C
9.930

7 . 230
5.050

40.00
4 0 . CO
40.00
40.00
40.00
40.00

0.470
.4 7 0
.740
.600
.870
.500

-

8.070
5.C50

40.00
4 0 . 00

.500
. 280

_

.400
-

5.930

6 . 4 30

40.00

.4 7 0

_

.250

6.840
7.970
8 . 020
7.680

7.280
8 .6 0 0
8.760
7.76C

40.00

-

.320
.400
.400
.400

-

_

4 0 . 00

.495
.500
. 50C
.350

8.050
8.050

8.600
8.600

40.00
4 0 . 0O

.500
.5 0 0

.400
.400

”

9.550
6.750

1 0 .0 0 0
6.750

4 0 . 00
40.00

.6 5 0
.2 2 0

.530
.300

-

10.350

11.08C

40.00

.5 5 0

10.350
9.690

10.830
10.830

40.00
4C.00

.550
.5 5 0

9. 300
9 . 520
1 0 .0 0 0

10.230
9.910
10.400

40.00
40.00
4 0 . 00

.5 5 0
.550
.870

6.930
6 . 100

7.760
6.400

40.00
40.00

.3 5 0
.500

9 . 550
6.750

1 0.000

6.750

40.00
40.00

.22 0

10.350

1 1.080

40.00

.550

10.350
9.690

10.830
10.830

4 0 . 00
40.00

.550
.550

9 . 300
9.520
1 0 .0 0 0

10.230
9.910
10.400

40.00
40.00
40.00

.550
.550
.870

0.250
.2 5 0
.8 4 0
.450
.800
.400

_

0. 4 40
6. 500
-

-

_

-

_

*

_
0 .0 2 0
.0 5 0
. 0 50
-

_
_
_
-

-

_

.050

_

_

_

_

HELPERS AND LABORERS
BUILDING LABORERS....................
RESIDENTIAL LABORERS..
COMPOSITION ROOFERS'
HELPERS............ ..
ELEVATOR CONSTRUCTORS'
HELPERS............................................
MARBLE SETTERS* HELPERS..
PLASTERERS' LABORERS............
PLUMBERS' LABORERS.................
TERRAZZO WORKERS'
HELPERS..........................................
TILE LAYERS' HELPERS............

4 0 .0 0

40.00

_

_

_

6 . OCX
-

]

.0 2 1
_
. 0 50

_

"

-

HIGHWAY AND STREET
CONSTRUCTION
JOURNEYMEN
CARPENTERS.......................................
CEMENT MASONS...............................
ENGINEERS— PCWER EQUIP­
MENT OPERATORS:
HEAVY EQUIPMENT:
CRANES, PILEDRIVERS,
SHO VELS.................................
MEDIUM EQUIPMENT:
HOISTS (SINGLE OR
DOUBLE DRUM)....................
TRENCHERS...............................
LIGHT EQUIPMENT:
BULLDOZERS............................
COMPRESSORS, PU M P S. ..
STRUCTURAL IRON WORKERS..

-

-

-

-

-

-

-

-

-

-

-

_
-

-

.550

-

_
-

.550
.550
.550
.5 5 0
.8 0 0

-

.050

-

.030
.0 5 0

-

HELPERS AND LABORERS
LABORERS:
AGREEMENT A .................................
AGREEMENT B ..............................

.400
.4 0 0 -

-

-

OTHER HEAVY CONSTRUCTION
JOURNEYMEN
CARPENTERS.......................................
CEMENT MASONS...............................
ENGINEERS-POWER EQUIPMENT
OPERATORS:
HEAVY EQUIPMENT:
CRANES, PILFDRIVER S ,
SHOVELS....................................
MEDIUM EQUIPMENT:
HOISTS (SINGLE OR
DOUBLE DRUM)....................
TRENCHERS...............................
LIGHT EQUIPMENT:
BULLDOZERS............................
COMPRESSORS, PU MPS ...
STRUCTURAL IRON WORKERS..

.6 5 0

S ee f o o tn o te s a t e n d o f t a b l e .




131

.5 3 0
-

.300

-

-

-

-

-

.550

_
-

.5 5 0
.550
.550
.550
.800

_
”

-

-

-

-

_

.

_

_

-

-

~

.0 5 0

~

Table 20. Wage rates, hours, and employer contributions to funds: Selected cities—Continued
(U nion h o u r ly w a g e r a te s and s tr a ig h t - t im e w e e k ly h o u r s and e m p lo y e r in s u r a n c e , p e n s io n , v a c a tio n , and o th e r c o n tr ib u tio n s to funds in the
b u ild in g t r a d e s , July 1, 1975 and J u ly 1, 1976)
JULY 1 ,

JULY 1,
197 5

1 976

EMPLOYER CONTRIBUTIONS
TO FUNDS3
C I T Y AND JOB
C L A S S I F I C A T IO N

RATE
PER
HOUR 1

RATE
PER
HOUR 1

HOURS
PER
WEEK 2

INSURANCE 4

DOLLARS

PERCENT

DOLLARS

OTHER 5

VACATION

PENSION

PERCENT

DOLLARS

PERCENT

DOLLARS

PERCENT

WASHINGTON, D.C.
-CONTINUED

OTHER HEAVY C0NSTR0CTI0N
-C ONTINUED

HELPERS AND LABORFRS

LABOREFS:
AGREEMENT A...............................
AGREEMENT B ..............................

$6,930
7 .7 1 0

$ 7,760
8 .0 7 0

140.00
140. 00

0.3 5 0
.50 0

8.2 0 0
8 . 680
8 .5 0 0

9.0 5 0
9 .3 3 0
9 .1 5 0

4 0.00
4 0.00
4 0.00

.460
.50 0
.50 0

-

.125
.25 0
-

9 .1 2 0

9 .4 0 0

4 0.0 0

.600

_

.25 0

8 .7 5 0

9 .5 0 0

4 0.0 0

.500

0 .0 3 0
.050

0 .4 0 0
.400

IICHITA, KANSAS

B UI LD IN G

CONSTRUCTION

JOURNEYMEN

ASBESTOS WORKERS......................
BRICKLA YER S ....................................
CARPENTERS.......................................
ELE CT R IC IAN S ’ ( I N S I D E
H I R E R S ) ..........................................
ENGINEFRS— POWER E QU IP ­
MENT OPERATORS:
GROUP I — BOILERS ( 2 ) ,
CRANES, 'DOZERS, SCRAP­
ERS , HOISTS (2-DRUM)
GROUP I I — A-FRAMES,
BOILERS (1) , FORK
L I F T S , HCISTS ( 1 DRUM), POWER BROOMS..
GROUP I I I — FARM TRAC­
TORS WITH ATTACHMENTS
GROUP I I I — FARM TRAC­
TORS WITHOUT ATTACH­
MENTS..........................................
GROUP I V — O I L E R S : ............
MOTOR CRANES....................
G L A Z I E R S ............................................
LATHERS................................................
PAINT ER S:
BRUSH.............................................
SPRAY............................................
PLASTERERS.......................................
PLUMBERS............................................
ROOFERS, COMPOSITION............
SHEET METAL WORKERS..............
STRUCTURAL IRON WORKERS..

HFLPERS

B UILD ING

8.3 5 0

9 . 100

4 0 . 00

.500

7.550

8 . 300

40.00

.500

7 . 300
7.2 5 0
7 . 500
8 .0 6 0
8.5 6 0

8 .0 5 0
7 .7 5 0
8 .0 0 0
8.6 2 0
8 .9 0 0

40.0 0
4 0.00
4 0.00
40.0 0
40.00

.50 0
.500
.500
.400
-

8 .2 2 0
8 .8 2 0
8 .500
9 .0 3 0
7 . 600
9.3 5 1
9 . 180

8.W 70
9.0 7 0
8.5 0 0
10.230
8 .2 0 0
10.125
9 .8 8 0

4 0.00
4 0 . 00
40.0 0
40.00
40.0 0
40.00
4 0.0 0

.100
.10 0
.6 4 0
.280
.700
—

6 .2 0 0

6.700

4 0.00

.500

9.1 8 0

9.8 8 0

40.00

9 .1 8 0

9.8 8 0

4 0 .0 0

0 .8 5 0
.250
-

-

-

_

1 .0 0 %

1 .0 0 0

-

_
-

4

1.000

1 .0 0 0
1.0 0 0
1.000
.420
. 150
.300
.300
.800
.200
.400
.250

6 .0 0

.500

1.0 0 0

_

-

-

-

-

.50 0
.500
.50 0
.
.500
_
* .550
. 5 30

_

-

1 .0 0 %

.100

.50 0
.50 0

.075
-

. 100
_

-

10.00%
-

-

.100

.10 0
.10 0
. 100
.020
.

_
_
_
.
.010

_
_
4 .0 0 %
_

_
_
_
3 .0 0

AND LABORERS

LABORERS....................

.250

.18 0

HIGHWAY AND STREET
CONSTRUCTION

JOURNEYMEN

STRUCTURAL IRON WORKERS..

.53 0

.250

OTHER HEAVY CONSTRUCTION

JOURNEYMEN

STRUCTURAL IRON

WORKERS..

.

S s e f o o tn o te s o n f o llo w in g p a g e .




132

.250

.

.53 0

.

.

.

F o o tn o te s to ta b le 20—
1 B a s ic (m in im u m ) r a te s , e x c lu d in g h o lid a y , v a c a tio n , o r o th e r
b e n e fit p a y m e n ts m a d e o r r e g u la r ly c r e d it e d to the e m p lo y e e . W age
r a te s show n r e p r e s e n t r a te s a v a ila b le and p a y a b le on July 1 of the
s u r v e y y e a r and do not in c lu d e in c r e a s e s m a d e la t e r that a r e r e t r o ­
a c tiv e to July 1 or b e f o r e .
2 H ours a r e th e s a m e fo r both y e a r s u n le s s o t h e r w is e in d ic a te d .
3 Show n in c e n ts p e r h o u r o r a s a p e r c e n t o f r a te ; in a c tu a l
p r a c t ic e , h o w e v e r , s o m e e m p lo y e r p a y m e n ts a r e c a lc u la te d on the
b a s i s o f t o ta l h o u r s o r g r o s s p a y r o ll.
T h e s e v a r ia t io n s in m eth o d
of c o m p u ta tio n a r e not in d ic a te d in the a b o v e ta b u la tio n .
4 In c lu d e s l if e in s u r a n c e , h o s p ita liz a t io n , and o th e r ty p e s of h e a lth
and w e lfa r e b e n e fits ; e x c lu d e s p a y m e n ts in to h o lid a y , v a c a tio n , and u n ­
e m p lo y m e n t funds w h en s u c h p r o g r a m s h a v e b e e n n e g o tia te d .
5 In c lu d e s a ll oth e r n o n le g a lly r e q u ir e d e m p lo y e r c o n tr ib u tio n s ,
e x c e p t th o s e fo r a p p r e n tic e s h ip fund p a y m e n ts , a s in d ic a te d in in d iv id u a l
a g r e em e n ts,
6 P a r t of n e g o tia te d r a te; not in c lu d e d in b a s e r a te . A m ount m a y
be in c lu d e d in c o m p u ta tio n of o v e r tim e and o th e r p r e m iu m r a t e s .
7 N ew r a te in n e g o tia tio n on s u r v e y d a te .
8 U n d er 5 y e a r s of s e r v ic e ; 2% p lu s s u p p le m e n ta l v a c a tio n of 4%
of a c tu a l h o u r s w o r k e d . F iv e y e a r s of s e r v i c e and o v e r ; 4% p lu s s u p ­
p le m e n ta l v a c a tio n of 4% of a c tu a l h o u r s w o r k e d .
9 A g r e e m e n t a ls o p r o v id e s fo r 6 p a id h o lid a y s ,
10 A g r e e m e n t a ls o p r o v id e s fo r 2 p a id h o lid a y s .
11 A g r e e m e n t a ls o p r o v id e s fo r 5 p a id h o lid a y s .
12 A fte r 6 m on th s of s e r v i c e ,
2 p e r c e n t of h o u r ly r a te fo r a ll
h o u r s w ork ed ; a fte r 5 y e a r s of s e r v i c e , 4 p e r c e n t of h o u r ly r a te fo r
a ll h o u r s w o r k e d . An a d d itio n a l am o u n t eq u a l to o n e - h a lf p e r c e n t of
the h o u r ly r a te s h a ll a c c r u e to the e m p lo y e e on the e ff e c tiv e d a te of
the s e c o n d and th ir d r a te c h a n g e , and one p e r c e n t on the d ate of the
fo u r th r a te ch an ge u n til th is a m o u n t r e a c h e s 2 p e r c e n t.
13 I n c lu d e s s u p p le m e n ta l a nnu ity fund.
14 $ 1 of th is am ount is a d e d u c tio n f r o m e m p lo y e e 's n e t w a g e s
not in c lu d e d in b a s ic ra te show n .
15 In c lu d e s SUB; s e p a r a te data not a v a ila b le .
16 P e r c e n ta g e b a s e d on the n e g o tia te d r a te of $ 1 2 . 4 9 .
17 A g r e e m e n t a l s o p r o v id e s fo r 7 p a id h o lid a y s .
18 A g r e e m e n t a l s o p r o v id e s fo r 8 p a id h o lid a y s .
19 0. 050 un ion a d m in is tr a tio n fund co n trib u tio n is not in c lu d e d in
b a s e r a te show n .




133

20 In c lu d e s a 1 2 - c e n t c o n trib u tio n to C a r p e n te r s D is t r ic t C ou ncil
W orking D u es F un d. P a r t of n e g o tia te d r a te not in c lu d e d in b a s e r a te
show n .
21 In c lu d e s a 7 5 -c.en t c o n trib u tio n to s a v in g s fund. P a r t of n e g o ­
tia te d r a te; not in c lu d e d in b a s e r a te sh o w n .
22 I n c lu d e s a 2 - c e n t c o n trib u tio n to h o lid a y s . P a r t of n e g o tia te d
ra te; not in c lu d e d in b a s e r a te sh o w n .
23. In c lu d e s a 5 0 - c e n t c o n trib u tio n to s a v in g fund. P a r t of n e g o ­
tia te d ra te; not in c lu d e d in b a s e r a te sh o w n .
24 R e d u ce d w a g e r a te n e g o tia te d s in c e p r e v io u s y e a r .
25 I n c lu d e s a 3 -ce n t c o n trib u tio n to the b u ild in g fund. P a r t of n e ­
g o tia te d r a te not in c lu d e d in b a s e r a te show n .
26 In c lu d e s a 1 5 - c e n t co n trib u tio n to h o lid a y s . P a r t of n e g o tia te d
ra te; not in c lu d e d in b a s e r a te sh o w n .
27 E m p lo y e e s r e c e iv e p r o r a te d v a c a tio n tim e and pa y b a s e d on
y e a r s of s e r v i c e and n u m b er of d a y s w o rk ed in the c o n tr a c t y e a r a s
fo llo w s : 6 m o n th s o r m o r e but l e s s than 5 y e a r s ; m a x im u m of 2 w e e k s ;
5 y e a r s and o v e r ; m a x im u m of 3 w e e k s .
28 A g r e e m e n t a l s o p r o v id e s fo r 11 p a id h o lid a y s .
29 D ata in e ff e c t b e f o r e J u ly 1, 1976.
30 T h ir t y -f iv e c e n ts of th is am o u n t is d ed u c te d f r o m e m p lo y e e 's
n e t w a g e s fo r a H o lid a y Fund; not in c lu d e d in b a s e r a te sh o w n .
31 S ix p e r c e n t i s d e d u c te d fr o m e m p lo y e e 's n e t w a g e s fo r a S a v ­
in g s fund; not in c lu d e d in b a s e r a te sh o w n .
32 T h ir t y -e ig h t c e n ts is d e d u c te d fr o m e m p lo y e e 's n e t w a g e s fr o m
I n v e s tm e n t S a v in g s Fund; n ot in c lu d e d in b a s e r a te sh o w n .
33 In a d d itio n , e m p lo y e r p a y s e m p lo y e e s ' s h a r e of S o c ia l S e c u r ity
b e n e f it s . A g r e e m e n t a ls o p r o v id e s fo r 9 p a id h o lid a y s .
34 I n s u r a n c e in c lu d e s H ea lth and W e lfa r e and P e n s io n ; s e p a r a te
data not a v a ila b le .
35 C o n tr a c t e x p ir e d 6 / 3 0 / 7 6 ,
36 A g r e e m e n t a ls o p r o v id e s fo r one p a id h o lid a y .
37 0 . 750 H o lid a y C o n trib u tio n n o t in c lu d e d in b a s e r a te show n .
t R e v is io n o f data p r e v io u s ly r e p o r te d .
NO TE: D a s h e s (-) in d ic a te no data, o r no data r e p o r te d . W hen
r e fe r r in g to a r a te p e r h ou r fo r a p r e v io u s y e a r ,
in d ic a te d e ith e r
a ch a n g e in p r o g r e s s io n , or a new job o r union not p r e v io u s ly r e ­
p o r te d .

Appendix:

Scope and Method of Study
In order to provide appropriate regional representation,
each region was considered separately when city weights
were assigned.
Average wage rates, designed to show current levels,
were based on building trades wage rates in each city as of
July 1, 1976. The wage rates were weighted by the number
of union members at the rate in the area. These averages
were not designed for precise year-to-year comparisons be­
cause of fluctuations in membership in the job classifica­
tions studied. Average cents-per-hour and percent changes
from July 1, 1975, to July 1, 1976, however, were based on
comparable quotations for the various job classifications in
both periods, weighted by the membership reported for the
current (1976) survey. The index series, designed for trend
purposes, was constructed similarly.
Wage and hour information is presented in table 20 for
workers in street and highway and other heavy construction
(including railroads, tunnels, subways, elevated highways,
viaducts, dams, bridges, reservoirs, hydroelectric projects,
pipelines, transmission and telephone lines, radio towers,
etc.). These rates were not used to calculate averages or
indexes in this publication.

Union wage rates and hours reported in this bulletin
were agreed on through collective bargaining between trade
unions and employers and are defined as (1) the basic (min­
imum) rates (excluding holiday, vacation, or other benefit
payments made regularly or credited to the worker each
pay period) and (2) the maximum number of weekly hours
at straight-time rates. Wage rates exceeding the negotiated
minimum, which may be paid for special qualifications or
other reasons, are excluded. Thus, rates shown do not rep­
resent total hourly earnings of building trades workers.
Information presented for the building trades is based on
union rates in effect on July 1, 1976, covering approxi­
mately 623,000 journeymen and 139,000 helpers and la­
borers in the 66 cities surveyed. Data were obtained by
local union officials by mail questionnaire; in some in­
stances, Bureau economists visited local union officials to
obtain the desired information.
The survey was designed to reflect union wage rates in
building construction in all cities of 100,000 inhabitants or
more (1970 Census of Population). All cities that had
500,000 inhabitants or more were included, as were most
cities with 250,000 to 500,000 inhabitants. Data for some
cities were weighted to compensate for cities not surveyed.




U.S. GOVERNMENT PRINTING OFFICE : 1977

134

0-241-016

Bureau of Labor Statistics
Regional Offices

Region IV
1371 Peachtree Street, NE.
Atlanta, Ga. 30309
Phone: (404) 881-4418

Regions VII and VIII*
911 Walnut Street
Kansas City, Mo. 64106
Phone: (816) 374-2481

Region II
Suite 3400
1515 Broadway
New York, N Y. 10036
Phone: (212) 399-5405

Region V
9th Floor
Federal Office Building
230 S. Dearborn Street
Chicago, III. 60604
Phone:(312)353-1880

Regions IX and X**
450 Golden Gate Avenue
Box 36017
San Francisco, Calif. 94102
Phone: (415) 556-4678

Region III
3535 Market Street
P.O. Box 13309
Philadelphia, Pa. 19101
Phone: (215) 596-1154

Region VI
Second Floor
555 Griffin Square Building
Dallas, Tex. 75202
Phone:(214)749-3516

Region I
1603 JFK Federal Building
Government Center
Boston, Mass. 02203
Phone: (617) 223-6761




‘ Regions VII and VIII are serviced
by Kansas City
“ Regions IX and X are serviced
by San Francisco

U. S. D e p a r tm e n t o f L a b o r

P o s ta g e a n d F e e s P a id

B u re a u o f L a b o r S ta tis tic s

U .S . D e p a r tm e n t o f L a b o r

W a s h in g to n , D .C . 2 0 2 1 2
T h ir d C la s s M a il
O ffic ia l B u s in e s s
Penalty for private use, $300




L a b -4 4 1