The full text on this page is automatically extracted from the file linked above and may contain errors and inconsistencies.
MAR 9 - 133 0 No. 4 - 1064 THE WORKS PROGRAM -- Works Progress Adroini stration For release in afternoon newspapers Monday, W'iarch 9, 1936 More tha.n half of South Carolina's WPA cost to supply work for women an d white-collar workers. Slight! y more than half of the money for Works Progress Administration projects in South Carolina will be spent giving work to unemployed women, white collar and other professional and technical unemployed persons on educational, clerical, sanitation ·and health, and sewing and other goods projects, according to an announcement ma.de today by Harry L. Hopkins, Works Progress Administrator. A listing by types and cost of projects sho ws that of the total $9,834,319 to be sp ent as of December 31, 1935, the following will receive a slight majority of the allotment; educational, professional a nd clerical, $802,635 or 8 .2 per cent; sewing and other goods projects, $1,181,572 or 1 2 .0 per cent; ,~ sanitation and health, $1,332,449 or 13.6 per cent and miscell aneous projects, $1,824,569 or 18 .5 per cent. The balance of tho money will bo spont on highway s , roads and streets, public buildings, both governmental and educatio nal, parks and playgrounds, flood control and otber conservation, water supply and sewer systems, el ectric utilities and transportation. Note: A detailed table is attached. Digitized by Original from NORTHWESTERN UNIVERSITY NORTHWESTERN UNIVERSITY '± - .I.VO'± SOUTH CAROLI NA WR.KS PROGRESS ADMI NISTRATION Works Progress Administratio n Projects Selected for Operation Through December 31, 1935 (Subject to Revi sion ) {j Type of Work 100.0 $9,834,319 100 . 0 1 65 106 22 4 33 16.2 10.4 2. 2 0.4 3.2 2,451,172 1,905,956 142 ,804 56,764 345,648 24.9 19.4 1.4 0.6 3.5 188 133 9 46 18.5 13.l 0.9 4.5 1, 21C, 391 661,232 205 ,176 343,983 12 . 3 6. 7 2 .1 3.5 Parks and Playgrounds 30 3.0 198 , 938 2 .0 Floo d Control and Other Conservation Total Erosion control and land utilizati on I rri gati on and water conserva tion Other* 11 2 2 7 1.1 0 .2 0.7 77,906 7,218 26 , 520 44,168 0.8 0 .1 0 .3 0.4 Water Supply and Se wer System - Total Water purificati on and supply Sewe r systems Other* 52 17 25 10 5.1 1. 7 2.4 1.0 476 , 04-1 144, 000 256,001 76,040 4.8 1.4 2. 6 0.8 2 0.1 Highways, Farm to Str eets Bridges Ot her* Roads and. Streets - Total market & other s econdary roads and alleys and viaducts Public Buildings - Total Edu cational building s Federal Government bui ldings Other* p Total Cost Estimate Percent Dist. Amount 1,016 GRAND TOTAL " Number of Proj ect s Percent Dist. Number 0.2 Electric Util it ies - Total Gener ating plants and equipment Other* 1 1 0.2 0.1 0 .1 7 , 742 1,076 6 , 666 0 .1 Transportation - Total Airports and airway s Other* 7 6 1 0 .7 0.6 0 .1 270 , 904 264,411 6,493 2.8 2 .7 0 .1 Educational, Professional & Clerical - Total 246 8 Education 17 Clerical 1 25 Prof essional and technical 17 Research & Statistical surveys 48 Art, litera ry and recreat ional 31 Other* 24.2 0.8 1. 7 12.3 1. 7 4 .7 3.0 802,635 1 5 ,403 30,730 255 , 219 63 , 221 310 ,1 45 127 ,917 8 .2 0.2 0 .3 2.6 0.6 3. 2 1.3 6.4 5.7 0.7 1,181,572 1,137, 660 43,912 12 . 0 58 7 Sanitation and Heal th 133 13.1 1,332,449 13.6 Miscellaneous 117 11.5 1,8 24,569 18 .5 Goods Projects - Total Sewing Other 65 * Includes projects classifiable under more than one of the headings above. !/ Less than . 05 per cent Digitized by NORTHWESTERN UNIVERSITY !I 11.6 0.4