CORPS OF ENGINEERS—CIVIL WORKS CORPS OF ENGINEERS—CIVIL The following appropriations shall be expended under the direction of the Secretary of the Army and the supervision of the Chief of Engineers for authorized civil functions of the Department of the Army pertaining to rivers and harbors, flood øcontrol, shore protection¿ and storm damage reduction, aquatic ecosystem restoration, and related purposes. f Federal Funds General and special funds: øOFFICE OF ASSISTANT SECRETARY OF THE ARMY (CIVIL WORKS)¿ øFor expenses necessary for the Office of Assistant Secretary of the Army (Civil Works), as authorized by 10 U.S.C. 3016(b)(3), $4,000,000.¿ (Energy and Water Development Appropriations Act, 2006.) Program and Financing (in millions of dollars) 2005 actual Identification code 96–3132–0–1–054 2006 est. 2007 est. 00.01 Obligations by program activity: Direct program activity .................................................. 4 4 ................... 10.00 Total new obligations ................................................ 4 4 ................... 22.00 23.95 Budgetary resources available for obligation: New budget authority (gross) ........................................ Total new obligations .................................................... 4 ¥4 4 ................... ¥4 ................... New budget authority (gross), detail: Discretionary: 40.00 Appropriation ............................................................. 4 4 ................... Change in obligated balances: Obligated balance, start of year ................................... ................... Total new obligations .................................................... 4 Total outlays (gross) ...................................................... ¥3 1 1 4 ................... ¥4 ................... 72.40 73.10 73.20 74.40 Obligated balance, end of year ................................ 1 1 1 86.90 Outlays (gross), detail: Outlays from new discretionary authority ..................... 3 4 ................... 89.00 90.00 Net budget authority and outlays: Budget authority ............................................................ Outlays ........................................................................... 4 3 4 ................... 4 ................... Object Classification (in millions of dollars) 2005 actual Identification code 96–3132–0–1–054 2006 est. 2007 est. 99.0 Reimbursable obligations: Reimbursable obligations ... 4 4 ................... 99.9 Total new obligations ................................................ 4 4 ................... cprice-sewell on PROD1PC66 with BUDGET PAG f CONSTRUCTION PROGRAM [Budget authority in millions of dollars] 2005 actual 2006 est. 2007 est. Direct program: General fund ....................................................................... 1,510 1,988 1,383 Supplementals .................................................................... 63 101 .................... Rescission ........................................................................... –14 –22 .................... Flood Control and Coastal Emergencies Transfer ............. –35 40 .................... Transfer to Bureau of Indian Affairs ................................. .................... .................... .................... Harbor Maintenance Trust Fund ........................................ 10 9 .................... Inland Waterways Trust Fund ............................................ 137 182 172 VerDate Aug 31 2005 12:14 Jan 26, 2006 Jkt 206762 PO 00000 Frm 00001 Fmt 3616 Rivers and harbors contributed funds (mandatory) .......... 286 323 323 Total direct program ................................................. Reimbursable program ........................................................... 1,957 866 2,621 648 1,878 650 Total program ......................................................................... 2,823 3,269 2,528 CONSTRUCTION For expenses necessary for the construction of river and harbor, flood øcontrol, shore protection¿ and storm damage reduction, aquatic ecosystem restoration, and related projects authorized by law; for conducting detailed studies, and plans and specifications, of such projects (including those involving participation by States, local governments, or private groups) authorized or made eligible for selection by law (but such detailed studies, and plans and specifications, shall not constitute a commitment of the Government to construction); ø$2,372,000,000¿ $1,555,000,000, to remain available until expended; øof which such sums as are necessary to cover the Federal share of construction costs for facilities under the Dredged Material Disposal Facilities program shall be derived from the Harbor Maintenance Trust Fund as authorized by Public Law 104–303; and¿ of which $35,000,000 is to enable the Corps to implement, in conjunction with the National Park Service, the modifications authorized by section 104 of the Everglades National Park Protection and Expansion Act of 1989; and of which such sums as are necessary øpursuant to Public Law 99–662 shall be derived from the Inland Waterways Trust Fund,¿ to cover one-half of the costs of construction and ørehabilitation¿ replacement of inland waterways projects shall be derived from the Inland Waterways Trust Fundø, (including the rehabilitation costs for Lock and Dam 11, Mississippi River, Iowa; Lock and Dam 19, Mississippi River, Iowa; Lock and Dam 24, Mississippi River, Illinois and Missouri; Lock 27, Mississippi River, Illinois; and Lock and Dam 3, Mississippi River, Minnesota) shall be derived from the Inland Waterways Trust Fund; and of which $12,000,000 shall be exclusively for projects and activities authorized under section 107 of the River and Harbor Act of 1960; and of which $500,000 shall be exclusively for projects and activities authorized under section 111 of the River and Harbor Act of 1968; and of which $7,000,000 shall be exclusively for projects and activities authorized under section 103 of the River and Harbor Act of 1962; and of which $40,000,000 shall be exclusively available for projects and activities authorized under section 205 of the Flood Control Act of 1948; and of which $15,000,000 shall be exclusively for projects and activities authorized under section 14 of the Flood Control Act of 1946; and of which $300,000 shall be exclusively for projects and activities authorized under section 208 of the Flood Control Act of 1954; and of which $30,000,000 shall be exclusively for projects and activities authorized under section 1135 of the Water Resources Development Act of 1986; and of which $30,000,000 shall be exclusively for projects and activities authorized under section 206 of the Water Resources Development Act of 1996; and of which $5,000,000 shall be exclusively for projects and activities authorized under sections 204 and 207 of the Water Resources Development Act of 1992 and section 933 of the Water Resources Development Act of 1986: Provided, That the Chief of Engineers is directed to use $11,250,000 of the funds appropriated herein for the Dallas Floodway Extension, Texas, project, including the Cadillac Heights feature, generally in accordance with the Chief of Engineers report dated December 7, 1999: Provided further, That the Chief of Engineers is directed to use $1,500,000 of the funds provided herein for the Hawaii Water Management Project: Provided further, That the Chief of Engineers is directed to use $13,000,000 of the funds appropriated herein for the navigation project at Kaumalapau Harbor, Hawaii: Provided further, That the Chief of Engineers is directed to use $4,000,000 of the funds provided herein for the Dam Safety and Seepage/Stability Correction Program for seepage control features and repairs to the tainter gates at Waterbury Dam, Vermont: Provided further, That $600,000 of the funds provided herein for the Dam Safety and Seepage/Stability Correction Program shall be available for Dover Dam, Ohio: Provided further, That the Chief of Engineers is directed to Sfmt 3616 E:\BUDGET\COE.XXX COE 991 992 CORPS OF ENGINEERS—CIVIL—Continued Federal Funds—Continued THE BUDGET FOR FISCAL YEAR 2007 General and special funds—Continued CONSTRUCTION—Continued use $9,500,000 of the funds appropriated herein for planning, engineering, design or construction of the Grundy, Buchanan County, and Dickenson County, Virginia, elements of the Levisa and Tug Forks of the Big Sandy River and Upper Cumberland River Project: Provided further, That the Chief of Engineers is directed to use $5,600,000 of the funds appropriated herein for planning, engineering, design or construction of the Lower Mingo County, Upper Mingo County, Wayne County, McDowell County, West Virginia, elements of the Levisa and Tug Forks of the Big Sandy River and Upper Cumberland River Project: Provided further, That the Chief of Engineers is directed to continue the Dickenson County Detailed Project Report as generally defined in Plan 4 of the Huntington District Engineer’s Draft Supplement to the section 202 General Plan for Flood Damage Reduction dated April 1997, including all Russell Fork tributary streams within the County and special considerations as may be appropriate to address the unique relocations and resettlement needs for the flood prone communities within the County: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $16,000,000 of the funds appropriated herein for the Clover Fork, City of Cumberland, Town of Martin, Pike County (including Levisa Fork and Tug Fork Tributaries), Bell County, Harlan County in accordance with the Draft Detailed Project Report dated January 2002, Floyd County, Martin County, Johnson County, and Knox County, Kentucky, detailed project report, elements of the Levisa and Tug Forks of the Big Sandy River and Upper Cumberland River: Provided further, That the Chief of Engineers is directed to proceed with work on the permanent bridge to replace Folsom Bridge Dam Road, Folsom, California, as authorized by the Energy and Water Development Appropriations Act, 2004 (Public Law 108–137), and, of the $15,000,000 available for the American River Watershed (Folsom Dam Mini-Raise), California, project, $10,000,000 of those funds be directed for the permanent bridge, with all remaining devoted to the Mini-Raise: Provided further, That $300,000 is provided for the Chief of Engineers to conduct a General Reevaluation Study on the Mount St. Helens project to determine if ecosystem restoration actions are prudent in the Cowlitz and Toutle watersheds for species that have been listed as being of economic importance and threatened or endangered: Provided further, That $35,000,000 shall be available for projects and activities authorized under 16 U.S.C. 410–r–8: Provided further, That the Secretary is directed to use $2,000,000 of the funds appropriated herein to provide a grant to the City of Caliente, Nevada, for the City to expend for the purpose of purchasing construction equipment to be used by the City in constructing local flood control measures¿. (Energy and Water Development Appropriations Act, 2006.) øFor additional amounts for ‘‘Construction’’ to rehabilitate and repair Corps projects related to the consequences of hurricanes in the Gulf of Mexico and Atlantic Ocean in 2005, $101,417,000, to remain available until expended: Provided, That the amount provided under this heading is designated as an emergency requirement pursuant to section 402 of H. Con. Res. 95 (109th Congress), the concurrent resolution on the budget for fiscal year 2006.¿ (Emergency Supplemental Appropriations Act to Address Hurricanes in the Gulf of Mexico and Pandemic Influenza, 2006.) Program and Financing (in millions of dollars) 2005 actual cprice-sewell on PROD1PC66 with BUDGET PAG Identification code 96–3122–0–1–301 Obligations by program activity: 00.04 Projects specifically authorized by Congress ................ 00.05 Projects not specifically authorized by Congress .......... 00.09 Locks and dams ............................................................ 00.12 Projects specifically authorized by Congress ................ 00.13 Projects not specifically authorized by Congress .......... 00.16 Projects specifically authorized by Congress ................ 00.17 Projects not specifically authorized by Congress .......... 00.18 Emergency streambank and shoreline protection ......... 00.22 Reservoirs ....................................................................... 00.25 Multiple-purpose power projects ................................... 00.27 Navigation ...................................................................... 00.28 Flood control .................................................................. 00.29 Multiple-purpose power projects ................................... 00.33 Employees’ compensation .............................................. 00.34 Environmental projects .................................................. 00.35 Project modification for environmental restoration ....... 00.36 Aquatic plant control ..................................................... VerDate Aug 31 2005 12:14 Jan 26, 2006 Jkt 206762 263 15 153 122 15 464 29 12 15 21 20 16 35 19 402 26 4 PO 00000 2006 est. 2007 est. 336 13 208 85 12 584 40 10 16 6 21 119 50 17 587 30 4 227 7 129 91 5 390 27 8 8 24 27 15 56 18 312 21 3 Frm 00002 Fmt 3616 00.37 00.39 Aquatic ecosystems ....................................................... Beneficial uses of dredged material ............................. 26 6 43 2 4 3 01.00 09.00 Direct program subtotal ............................................ Reimbursable program .................................................. 1,663 728 2,183 434 1,375 434 10.00 Total new obligations ................................................ 2,391 2,617 1,809 21.40 22.00 Budgetary resources available for obligation: Unobligated balance carried forward, start of year New budget authority (gross) ........................................ 811 2,537 957 2,946 1,286 2,033 23.90 23.95 Total budgetary resources available for obligation Total new obligations .................................................... 3,348 ¥2,391 3,903 ¥2,617 3,319 ¥1,809 24.40 Unobligated balance carried forward, end of year 957 1,286 1,510 New budget authority (gross), detail: Discretionary: 40.00 Appropriation ............................................................. 1,720 2,280 1,383 40.33 Appropriation permanently reduced (P.L. 109–148) ................... ¥22 ................... 40.35 Appropriation permanently reduced .......................... ¥14 ................... ................... 41.00 Transferred to other accounts ................................... ¥40 ¥322 ................... 42.00 Transferred from other accounts .............................. 5 362 ................... 43.00 68.00 68.10 Appropriation (total discretionary) ........................ Spending authority from offsetting collections: Discretionary: Offsetting collections (Cash) ................................ Change in uncollected customer payments from Federal sources (unexpired) ............................. 68.90 1,671 2,298 1,383 767 648 650 99 ................... ................... Spending authority from offsetting collections (total discretionary) ..................................... 866 648 650 70.00 Total new budget authority (gross) .......................... 2,537 2,946 2,033 72.40 73.10 73.20 74.00 Change in obligated balances: Obligated balance, start of year ................................... Total new obligations .................................................... Total outlays (gross) ...................................................... Change in uncollected customer payments from Federal sources (unexpired) ............................................ ¥328 2,391 ¥2,324 ¥360 2,617 ¥2,718 ¥461 1,809 ¥2,367 74.40 Obligated balance, end of year ................................ ¥360 ¥461 ¥1,019 86.90 86.93 Outlays (gross), detail: Outlays from new discretionary authority ..................... Outlays from discretionary balances ............................. 1,824 500 1,799 919 1,220 1,147 87.00 Total outlays (gross) ................................................. 2,324 2,718 2,367 Offsets: Against gross budget authority and outlays: Offsetting collections (cash) from: 88.00 Federal sources ..................................................... 88.40 Non-Federal sources ............................................. ¥185 ¥582 ¥130 ¥518 ¥130 ¥520 88.90 ¥767 ¥648 ¥650 88.95 89.00 90.00 Total, offsetting collections (cash) .................. Against gross budget authority only: Change in uncollected customer payments from Federal sources (unexpired) .................................. Net budget authority and outlays: Budget authority ............................................................ Outlays ........................................................................... ¥99 ................... ................... ¥99 ................... ................... 1,671 1,557 2,298 2,070 1,383 1,717 This appropriation funds construction, replacement, and related activities for water resources projects whose principal purpose is to provide commercial navigation, flood and storm damage reduction, or aquatic ecosystem restoration benefits to the Nation. The Budget shows all activity financed through the Inland Waterways Trust Fund as occurring in that account. The budget for the construction account allocates funds based on the following seven performance-based guidelines, which improve the overall performance of the construction program by redirecting funds to high-performing projects and limiting new construction starts. 1. Project rankings within mission areas. All ongoing, specifically authorized construction projects, including projects funded in the Mississippi River and Tributaries account, will be assigned based upon their primary purpose to one of the Sfmt 3616 E:\BUDGET\COE.XXX COE CORPS OF ENGINEERS—CIVIL—Continued Federal Funds—Continued cprice-sewell on PROD1PC66 with BUDGET PAG CORPS OF ENGINEERS—CIVIL WORKS main mission areas of the Corps (flood and storm damage reduction; commercial navigation; aquatic ecosystem restoration) or to hydropower. Projects, except aquatic ecosystem restoration projects, will be ranked by their remaining benefits divided by their remaining costs (RBRC), calculated at a seven percent real discount rate. Aquatic ecosystem restoration projects will be ranked by the extent to which they costeffectively contribute to the restoration of a nationally or regionally significant aquatic ecosystem that has become degraded as a result of a civil works project, or to a restoration effort for which the Corps is otherwise uniquely well-suited (e.g., because the solution requires complex alterations to the hydrology and hydraulics of a river system). 2. Project completions. Each project with an RBRC of 3.0 or greater that can be completed in the budget year with a final increment of funding will receive the balance of funding needed to complete construction and related administrative activities. Likewise, each aquatic ecosystem restoration project that cost-effectively contributes to the restoration of a nationally or regionally significant aquatic ecosystem that has become degraded as a result of a civil works project, or to a restoration effort for which the Corps is otherwise uniquely well-suited, and that can be completed in the budget year with a final increment of funding will receive the balance of funding needed to complete construction and related administrative activities. 3. Projects with very high economic and environmental returns. The projects with the highest RBRCs (or that are the most cost-effective in contributing to the restoration of a nationally or regionally significant aquatic ecosystem that has become degraded as a result of a Corps project, for aquatic ecosystem restoration) will receive not less than 80 percent of the maximum level of funding that the Corps can spend efficiently in each fiscal year. 4. Projects with a low priority. All ongoing flood and storm damage reduction, commercial navigation, and hydropower construction projects that have RBRCs below 3.0, except for flood and storm damage reduction projects that are funded in the budget to address significant risk to human safety, will be considered for deferral. All ongoing aquatic ecosystem restoration projects that do not cost-effectively contribute to the restoration of a nationally or regionally significant aquatic ecosystem that has become degraded as a result of a civil works project, and do not cost-effectively address a problem for which the Corps is otherwise uniquely well-suited, and are less than 50 percent complete will be considered for deferral. Where a project considered for deferral was previously budgeted, the budget will include funding to cover the cost of terminating or completing each ongoing contract, whichever is less for. Budget year and future year savings from project suspensions (after covering the cost of terminating or completing ongoing contracts) will be used to accelerate the projects with the highest net economic and environmental returns. 5. New starts and resumptions. The budget will provide funds to start up new construction projects, and to resume work on ongoing construction projects on which the Corps has not performed any physical work under a construction contract during the past three consecutive fiscal years, only if the project would be ranked in the top 20 percent of the ongoing construction projects in its mission area that year. The term ‘‘physical work under a construction contract’’ does not include activities related to project planning, engineering and design, relocation, or the acquisition of lands, easements, or rights-of-way. For non-structural flood damage reduction projects, construction begins in the first fiscal year in which the Corps acquires lands, easements, or rights-of-way primarily to relocate structures, or performs physical work under a construction contract for non-structural project-related measures. For aquatic ecosystem restoration projects, conVerDate Aug 31 2005 12:14 Jan 26, 2006 Jkt 206762 PO 00000 Frm 00003 Fmt 3616 993 struction begins in the first fiscal year in which the Corps acquires lands, easements, or rights-of-way primarily to facilitate the restoration of degraded aquatic ecosystems including wetlands, riparian areas, and adjacent floodplains, or performs physical work under a construction contract to modify existing project facilities primarily to restore the aquatic ecosystem. For all other water resources projects, construction begins in the first fiscal year in which the Corps performs physical work under a construction contract. 6. Other cases. All other ongoing construction projects will receive not more than the amount needed to meet earnings permitted under ongoing multi-year contracts and related costs, except for flood and storm damage reduction projects that are funded in the budget to address significant risk to human safety, which will receive at least the funding needed to pay contractor earnings and related costs. Dam safety assurance, seepage control, and static instability correction projects that are funded in the budget for construction will receive the maximum level of funding that the Corps can spend efficiently in each fiscal year. Projects that are funded in the budget for construction will receive the amount needed to ensure that they comply with treaties and with biological opinions pursuant to the Endangered Species Act, and meet authorized mitigation requirements. 7. Ten percent rule. Up to a total of 10 percent of the funding available for construction may be allocated to ongoing construction projects regardless of the guidelines above. However, this may not be used to start up or resume any project. The Budget proposes that the Administration and the Congress apply these guidelines to the Corps construction account and to the construction activities in the Mississippi River and Tributaries account. This appropriation includes $64 million for the Comprehensive Everglades Restoration Plan (CERP), which represents 4 percent of the total amount in the 2007 Budget for this account and 1 percent of the total amount in the 2007 Budget for the Corps of Engineers civil works program. Funding the CERP at this level would not have a significant impact on the overall Corps of Engineers civil works program in 2007. Future levels of funding for construction of CERP projects will depend on the availability of funds, and the impact of such future funding on the overall Corps of Engineers civil works program cannot be determined at this time. The budget for the Department of the Interior (DOI) includes an additional $8 million for the CERP. This Corps account and the DOI budget include $100 million and $61 million, respectively, for other Everglades work. Therefore, the budget for the two agencies includes a total of $233 million for Everglades restoration work for 2007, of which $72 million is for work under the CERP and $161 million is for non-CERP work. This appropriation also funds continuing authorities programs (the planning, design, and construction of projects that do not require specific legislation). The 2007 Budget includes funding for flood control (Section 205), emergency streambank and shoreline protection (Section 14), beach erosion control (Section 103), snagging and clearing (Section 208), aquatic ecosystem restoration (Section 206), and project modifications for improvement of the environment (Section 1135). Object Classification (in millions of dollars) 2005 actual Identification code 96–3122–0–1–301 2006 est. 2007 est. 11.1 11.3 11.5 11.7 Direct obligations: Personnel compensation: Full-time permanent ............................................. Other than full-time permanent ........................... Other personnel compensation ............................. Military personnel ................................................. 166 6 5 6 245 7 5 6 245 7 5 6 11.9 Total personnel compensation ......................... 183 263 263 Sfmt 3643 E:\BUDGET\COE.XXX COE 994 CORPS OF ENGINEERS—CIVIL—Continued Federal Funds—Continued THE BUDGET FOR FISCAL YEAR 2007 General and special funds—Continued CONSTRUCTION—Continued Object Classification (in millions of dollars)—Continued 2005 actual Identification code 96–3122–0–1–301 12.1 12.2 12.2 21.0 23.1 23.3 24.0 25.1 25.2 25.3 2006 est. 2007 est. 42 3 2 12 16 7 7 115 669 61 4 3 12 16 8 8 125 757 61 4 3 12 16 8 8 125 259 25.5 26.0 31.0 32.0 Civilian personnel benefits ....................................... Accrued retirement .................................................... Other personnel ......................................................... Travel and transportation of persons ....................... Rental payments to GSA ........................................... Communications, utilities, and miscellaneous ......... Printing and reproduction ......................................... Advisory and assistance services ............................. Other services ............................................................ Purchase of goods and services from Government accounts ................................................................ Research and development contracts ....................... Supplies and materials ............................................. Equipment ................................................................. Land and structures .................................................. 60 9 12 16 510 106 10 12 17 781 66 10 12 17 511 99.0 99.0 Direct obligations .................................................. Reimbursable obligations .............................................. 1,663 728 2,183 434 1,375 434 99.9 Total new obligations ................................................ 2,391 2,617 1,809 Personnel Summary 2005 actual Identification code 96–3122–0–1–301 Direct: Civilian full-time equivalent employment ..................... Reimbursable: 2001 Civilian full-time equivalent employment ..................... 1001 2006 est. 2007 est. 2,642 3,151 2,791 1,609 1,609 1,609 f OPERATION AND MAINTENANCE PROGRAM (Budget authority in millions of dollars) 2005 actual 2006 est. 2007 est. Direct program: General fund (non-homeland security) .............................. 1,151 1,214 1,444 General fund (homeland security) ..................................... 89 72 43 Supplemental ...................................................................... 355 328 .................... Rescission ........................................................................... –16 –13 .................... Special recreation user fees .............................................. 42 38 38 Disposal facilities user fees .............................................. .................... 1 1 Harbor Maintenance Trust Fund ........................................ 677 658 707 Inland Waterways Trust Fund ............................................ .................... .................... 25 Bonneville Power Administration transfer (mandatory) ..... 73 0 0 Rivers and harbors contributed funds (mandatory) .......... 34 35 35 Total direct program ...................................................... 2,405 2,333 2,293 Reimbursable program Total program ......................................................................... 142 2,547 26 2,359 26 2,319 cprice-sewell on PROD1PC66 with BUDGET PAG OPERATION AND MAINTENANCE For expenses necessary for the operation, maintenance, and care of existing river and harbor, flood and storm damage reduction, aquatic ecosystem restoration, and related projects authorized by law, including the rehabilitation of such projects where the extent of the work is not large enough to be considered a replacement, the construction of facilities, projects, or features (including islands and wetlands) to use materials dredged during Federal navigation maintenance activities; and the mitigation of impacts on shorelines resulting from Federal navigation operation and maintenance activities; for the benefit of federally listed species to address the effects of civil works projects owned or operated by the Corps; for providing security for infrastructure owned and operated by, or on behalf of, the øUnited States Army¿ Corps øof Engineers (the ‘‘Corps’’)¿, including administrative buildings and facilities, and laboratoriesø, and the Washington Aqueduct¿; for the maintenance of harbor channels provided by a State, municipality, or other public agency that serve essential navigation needs of general commerce, where authorized by law; and for surveys and charting of northern and northwestern lakes and connecting waters, clearing and straightening channels, and removal of obstructions to navigation, ø$1,989,000,000¿ $2,258,000,000, to remain available until expended, of which such sums as are necessary VerDate Aug 31 2005 12:14 Jan 26, 2006 Jkt 206762 PO 00000 Frm 00004 Fmt 3616 to cover the Federal share of øoperation¿ eligible operations and maintenance øcosts for coastal harbors and channels, and inland harbors¿ shall be derived from the Harbor Maintenance Trust Fundø, pursuant to Public Law 99–662 may be derived from that fund, as amended¿; of which such sums as are necessary to cover one-half of the costs of inland waterway project rehabilitations shall be derived from the Inland Waterways Trust Fund; of which such sums as become available from the special account for the Corps established by the Land and Water Conservation Act of 1965, as amended (16 U.S.C. 460l–6a(i)), ømay be derived from that account¿ shall be used for resource protection, research, interpretation, and maintenance activities related to resource protection in øthe¿ areas operated by the Corps at which outdoor recreation is available; and of which such sums as become available under section 217 of the Water Resources Development Act of 1996, Public Law 104–303, shall be used to cover the cost of operation and maintenance of the dredged material disposal facilities for which fees have been collectedø: Provided, That utilizing funds appropriated herein, for the Intracoastal Waterway, Delaware River to Chesapeake Bay, Delaware and Maryland, the Chief of Engineers, is directed to reimburse the State of Delaware for normal operation and maintenance costs incurred by the State of Delaware for the SR1 Bridge from station 58∂00 to station 293∂00 between October 1, 2005, and September 30, 2006: Provided further, That the Chief of Engineers is authorized to undertake, at full Federal expense, a detailed evaluation of the Albuquerque levees for purposes of determining structural integrity, impacts of vegetative growth, and performance under current hydrological conditions: Provided further, That using $275,000 provided herein, the Chief of Engineers is authorized to remove the sunken vessel State of Pennsylvania from the Christina River in Delaware¿. (Energy and Water Development Appropriations Act, 2006.) øFor an additional amount for ‘‘Operation and Maintenance’’ to dredge navigation channels and repair other Corps projects related to the consequences of hurricanes in the Gulf of Mexico and Atlantic Ocean in 2005, $327,517,000, to remain available until expended: Provided, That $75,000,000 of this amount shall be used for authorized operation and maintenance activities along the Mississippi RiverGulf Outlet channel: Provided further, That the amount provided under this heading is designated as an emergency requirement pursuant to section 402 of H. Con. Res. 95 (109th Congress), the concurrent resolution on the budget for fiscal year 2006.¿ (Emergency Supplemental Appropriations Act to Address Hurricanes in the Gulf of Mexico and Pandemic Influenza, 2006.) Program and Financing (in millions of dollars) 2005 actual Identification code 96–3123–0–1–301 Obligations by program activity: Channels and harbors ................................................... Locks and dams ............................................................ Reservoirs ....................................................................... Channel improvements, inspections, and miscellaneous maintenance ................................................... 00.09 Multiple-purpose power projects ................................... 00.01 00.02 00.05 00.06 2006 est. 2007 est. 137 410 378 124 410 328 95 350 330 41 463 30 425 35 450 Total operation and maintenance projects ............... Protection of navigation ................................................ National emergency preparedness ................................. Special programs to improve operation and maintenance ......................................................................... 1,429 44 3 1,317 30 4 1,260 30 4 26 20 20 01.91 Total miscellaneous items ........................................ 73 54 54 01.92 09.00 Total direct program ................................................. Reimbursable program activity ..................................... 1,502 115 1,371 25 1,314 25 10.00 Total new obligations ................................................ 1,617 1,396 1,339 21.40 22.00 Budgetary resources available for obligation: Unobligated balance carried forward, start of year New budget authority (gross) ........................................ 43 1,836 262 1,666 532 1,552 23.90 23.95 Total budgetary resources available for obligation Total new obligations .................................................... 1,879 ¥1,617 1,928 ¥1,396 2,084 ¥1,339 24.40 Unobligated balance carried forward, end of year 262 532 745 New budget authority (gross), detail: Discretionary: 40.00 Appropriation ............................................................. 1,595 40.00 Appropriation (Homeland Security) ........................... ................... 1,543 72 1,445 43 00.91 01.01 01.02 01.05 Sfmt 3643 E:\BUDGET\COE.XXX COE CORPS OF ENGINEERS—CIVIL—Continued Federal Funds—Continued CORPS OF ENGINEERS—CIVIL WORKS 40.33 40.35 41.00 42.00 43.00 68.00 68.10 68.90 Appropriation permanently reduced (P.L. 109–148) ................... ¥13 ................... Appropriation permanently reduced .......................... ¥16 ................... ................... Transferred to other accounts ................................... ................... ¥74 ................... Transferred from other accounts .............................. 42 112 38 Appropriation (total discretionary) ........................ Spending authority from offsetting collections: Discretionary: Offsetting collections (cash) ................................ Change in uncollected customer payments from Federal sources (unexpired) ............................. 69.62 Spending authority from offsetting collections (total discretionary) ..................................... Mandatory: Transferred from other accounts .......................... 70.00 Total new budget authority (gross) .......................... 72.40 73.10 73.20 74.00 Change in obligated balances: Obligated balance, start of year ................................... Total new obligations .................................................... Total outlays (gross) ...................................................... Change in uncollected customer payments from Federal sources (unexpired) ............................................ 74.40 Obligated balance, end of year ................................ 86.90 86.93 86.97 Outlays (gross), detail: Outlays from new discretionary authority ..................... Outlays from discretionary balances ............................. Outlays from new mandatory authority ......................... 87.00 Total outlays (gross) ................................................. 1,621 1,640 1,526 138 26 26 4 ................... ................... 142 26 26 73 ................... ................... 1,836 1,666 1,552 294 1,617 ¥1,598 309 1,396 ¥1,765 ¥60 1,339 ¥1,691 ¥4 ................... ................... 309 ¥60 ¥412 1,261 1,472 1,364 336 293 327 1 ................... ................... 1,598 1,765 1,691 Offsets: Against gross budget authority and outlays: Offsetting collections (cash) from: 88.00 Other Federal sources (Cash) ............................... 88.40 Non-Federal sources, ............................................ ¥104 ¥33 ¥25 ¥1 ¥25 ¥1 88.90 ¥137 ¥26 ¥26 88.95 88.96 89.00 90.00 Total, offsetting collections (cash) .................. Against gross budget authority only: Change in uncollected customer payments from Federal sources (unexpired) .................................. Portion of offsetting collections (cash) credited to expired accounts ................................................... Net budget authority and outlays: Budget authority ............................................................ Outlays ........................................................................... ¥4 ................... ................... ¥1 ................... ................... 1,694 1,460 1,640 1,739 1,526 1,665 (in millions of dollars) Enacted/requested: 2005 actual 2006 est. 2007 est. Budget Authority ..................................................................... 1,694 1,640 1,526 Outlays .................................................................................... 1,461 1,739 1,665 Legislative proposal, subject to PAYGO: Budget Authority ..................................................................... .................... .................... 9 Outlays .................................................................................... .................... .................... .................... cprice-sewell on PROD1PC66 with BUDGET PAG 1,694 1,461 1,640 1,739 1,535 1,665 This appropriation funds operation, maintenance, and related activities at the water resources projects that the Corps of Engineers operates and maintains. Work to be accomplished consists of dredging, repair, and operation of structures and other facilities, as authorized in the various River and Harbor, Flood Control, and Water Resources Development Acts. Related activities include aquatic plant control, monitoring of completed projects where appropriate, removal of sunken vessels, and the collection of domestic waterborne commerce statistics. The Budget shows all activity financed through the Harbor Maintenance Trust Fund and the Inland Waterways Trust Fund as occurring within those accounts. To improve accountability and oversight, reflect the full cost of operating and maintaining existing projects, and support an integrated investment strategy, the Budget begins to fund the following activities in the operation and maintenance acVerDate Aug 31 2005 12:14 Jan 26, 2006 Jkt 206762 count: rehabilitation of infrastructure, where the extent of the work is not large enough to be considered a replacement; Endangered Species Act compliance, where the Corps is implementating a reasonable and prudent alternative set forth in a biological opinion in order to be able to continue operating an existing project without jeopardizing the existence of listed species; the construction of facilities, projects or features (including islands and wetlands) to use materials dredged during Federal navigation maintenance activities; and the mitigation of impacts on shorelines resulting from Federal navigation operation and maintenance activities. This account funds all of the costs associated with protecting Corps of Engineers facilities from potential security threats. This appropriation also funds the national emergency preparedness program under Executive Order 11490. This appropriation does not provide any funding for the operation and maintenance of the Comprehensive Everglades Restoration Plan (CERP) in 2007; therefore, funding the CERP at this level would not have a significant impact on the overall Corps of Engineers civil works program. Because no CERP projects have been completed, the work scheduled for CERP over the next couple of years will not involve the operation or maintenance of projects. Future levels of funding for operation and maintenance will depend on the pace of project construction and availability of funds. The impact of such future funding on the overall Corps of Engineers civil works program cannot be determined at this time. Object Classification (in millions of dollars) Summary of Budget Authority and Outlays Total: Budget Authority ..................................................................... Outlays .................................................................................... 995 PO 00000 Frm 00005 Fmt 3616 2005 actual Identification code 96–3123–0–1–301 11.1 11.3 11.5 11.7 Direct obligations: Personnel compensation: Full-time permanent ............................................. Other than full-time permanent ........................... Other personnel compensation ............................. Military personnel ................................................. 11.9 12.1 13.0 21.0 22.0 23.1 23.2 23.3 2006 est. 2007 est. 413 24 8 1 453 25 29 1 459 25 30 1 446 107 4 8 2 5 1 508 116 4 6 2 5 1 515 117 4 6 2 5 1 15 2 2 390 15 2 2 285 15 2 2 200 25.4 25.7 26.0 31.0 32.0 Total personnel compensation ......................... Civilian personnel benefits ....................................... Benefits for former personnel ................................... Travel and transportation of persons ....................... Transportation of things ........................................... Rental payments to GSA ........................................... Rental payments to others ........................................ Communications, utilities, and miscellaneous charges ................................................................. Printing and reproduction ......................................... Advisory and assistance services ............................. Other services ............................................................ Other purchases of goods and services from Government accounts ................................................. Operation and maintenance of facilities .................. Operation and maintenance of equipment ............... Supplies and materials ............................................. Equipment ................................................................. Land and structures .................................................. 240 40 5 20 20 195 185 40 5 20 20 155 205 40 5 20 20 155 99.0 99.0 Direct obligations .................................................. Reimbursable obligations .............................................. 1,502 115 1,371 25 1,314 25 99.9 Total new obligations ................................................ 1,617 1,396 1,339 24.0 25.1 25.2 25.3 Personnel Summary 2005 actual Identification code 96–3123–0–1–301 1001 Direct: Civilian full-time equivalent employment ..................... Sfmt 3643 E:\BUDGET\COE.XXX COE 8,908 2006 est. 9,260 2007 est. 9,160 996 CORPS OF ENGINEERS—CIVIL—Continued Federal Funds—Continued THE BUDGET FOR FISCAL YEAR 2007 General and special funds—Continued OPERATION AND tion projects to upgrade Corps recreation facilities at little or no cost to the Federal government using new planning, management and financing arrangements with State and local government park authorities, local communities, or the private sector. Under the Construction, Operation and Maintenance, and Mississippi River and Tributaries accounts, the budget provides a total of $267 million for recreation activities in 2007. MAINTENANCE (Legislative proposal, subject to PAYGO) Program and Financing (in millions of dollars) 2005 actual Identification code 96–3123–4–1–301 2006 est. 2007 est. 00.01 Obligations by program activity: Direct program activity .................................................. ................... ................... 9 10.00 Total new obligations (object class 25.2) ................ ................... ................... 9 Budgetary resources available for obligation: 22.00 New budget authority (gross) ........................................ ................... ................... 23.95 Total new obligations .................................................... ................... ................... 9 ¥9 f SPECIAL RECREATION USER FEE (Legislative Proposal, Subject to PAYGO) Program and Financing (in millions of dollars) New budget authority (gross), detail: Mandatory: 62.00 Transferred from other accounts .............................. ................... ................... Change in obligated balances: 73.10 Total new obligations .................................................... ................... ................... 9 74.40 9 Obligated balance, end of year ................................ ................... ................... Net budget authority and outlays: 89.00 Budget authority ............................................................ ................... ................... 9 90.00 Outlays ........................................................................... ................... ................... ................... f Appropriation (total mandatory) ........................... ................... ................... ................... 89.00 90.00 Net budget authority and outlays: Budget authority ............................................................ ................... ................... ................... Outlays ........................................................................... ................... ................... ................... [Budget authority in millions of dollars] 2006 est. 49 2007 est. 51 51 Balance, start of year .................................................... 49 51 Receipts: 02.20 Special recreation use fees, Corps of Engineers .......... 44 37 02.21 Special recreation use fees, Corps of Engineers— legislative proposal subject to PAYGO ...................... ................... ................... 02.22 User fees, Fund for non-Federal use of disposal facilities ............................................................................. ................... 1 51 02.99 38 47 Total: Balances and collections .................................... 93 89 Appropriations: 05.00 Special recreation user fee ............................................ ¥42 ¥38 05.01 Special recreation user fee—legislative proposal subject to PAYGO ............................................................ ................... ................... 98 01.99 Total receipts and collections ................................... 44 04.00 37 9 1 ¥9 Total appropriations .................................................. ¥42 ¥38 ¥47 07.99 Balance, end of year ..................................................... 51 51 51 Program and Financing (in millions of dollars) 2005 actual cprice-sewell on PROD1PC66 with BUDGET PAG New budget authority (gross), detail: Discretionary: 40.20 Appropriation (special fund) ..................................... 41.00 Transferred to other accounts ................................... 42 ¥42 2006 est. 38 ¥38 2007 est. 38 ¥38 43.00 Appropriation (total discretionary) ........................ ................... ................... ................... 89.00 90.00 Net budget authority and outlays: Budget authority ............................................................ ................... ................... ................... Outlays ........................................................................... ................... ................... ................... The budget re-proposes a Corps recreation facility modernization initiative based on a model now employed by other Federal recreation providers including the National Park Service and the Forest Service. The Corps would finance a portion of the cost of maintaining and upgrading recreation facilities through the collection of additional user fees. The Corps also would undertake a limited number of demonstraVerDate Aug 31 2005 12:14 Jan 26, 2006 Jkt 206762 PO 00000 Frm 00006 Direct program: General fund ....................................................................... Supplemental ...................................................................... Rescission ........................................................................... Flood control and coastal emergencies transfer ............... Rivers and harbors contributed funds (mandatory) .......... 2005 actual 349 6 –3 –24 47 400 154 –4 24 47 278 — — 0 47 Total direct program ...................................................... Reimbursable program ........................................................... 375 10 621 1 325 1 Total program ......................................................................... 385 622 326 2006 est. 2007 est. øFLOOD CONTROL,¿ MISSISSIPPI RIVER AND TRIBUTARIESø, ARKANSAS, ILLINOIS, KENTUCKY, LOUISIANA, MISSISSIPPI, MISSOURI, AND TENNESSEE¿ ¥38 05.99 Identification code 96–5383–0–2–301 9 ¥9 MISSISSIPPI RIVER AND TRIBUTARIES PROGRAM 2005 actual Balance, start of year .................................................... 2007 est. 62.50 Special and Trust Fund Receipts (in millions of dollars) 01.00 2006 est. New budget authority (gross), detail: Mandatory: 60.20 Appropriation (special fund) ..................................... ................... ................... 61.00 Transferred to other accounts ................................... ................... ................... SPECIAL RECREATION USER FEE Identification code 96–5383–0–2–301 2005 actual Identification code 96–5383–4–2–301 9 Fmt 3616 For expenses necessary for the øflood damage reduction¿ program for the Mississippi River alluvial valley below Cape Girardeau, Missouri, as authorized by law, ø$400,000,000¿ $278,000,000, to remain available until expended, of which such sums as are necessary to cover the Federal share of operation and maintenance costs for inland harbors shall be derived from the Harbor Maintenance Trust Fundø: Provided, That the Chief of Engineers is directed to use $20,000,000 of the funds provided herein for design and real estate activities and pump supply elements for the Yazoo Basin, Yazoo Backwater Pumping Plant, Mississippi: Provided further, That the Secretary of the Army, acting through the Chief of Engineers is directed to use $9,000,000 appropriated herein for construction of water withdrawal features of the Grand Prairie, Arkansas, project, of which such sums as are necessary to cover the Federal share of operation and maintenance costs for inland harbors shall be derived from the Harbor Maintenance Trust Fund¿. (Energy and Water Development Appropriations Act, 2006.) øFor an additional amount for ‘‘Flood Control, Mississippi River and Tributaries, Arkansas, Illinois, Kentucky, Louisiana, Mississippi, Missouri, and Tennessee’’ to cover the additional costs of mat laying and other repairs to the Mississippi River channel and associated levee repairs related to the consequences of hurricanes in the Gulf of Mexico in 2005, $153,750,000, to remain available until expended: Provided, That the amount provided under this heading is designated as an emergency requirement pursuant to section 402 of H. Con. Res. 95 (109th Congress), the concurrent resolution on the budget for fiscal year 2006.¿ (Emergency Supplemental Appropriations Act to Address Hurricanes in the Gulf of Mexico and Pandemic Influenza, 2006.) Sfmt 3616 E:\BUDGET\COE.XXX COE CORPS OF ENGINEERS—CIVIL—Continued Federal Funds—Continued CORPS OF ENGINEERS—CIVIL WORKS Program and Financing (in millions of dollars) 2005 actual Identification code 96–3112–0–1–301 2006 est. 2007 est. 00.01 00.03 00.05 09.11 Obligations by program activity: General investigations ................................................... Construction ................................................................... Maintenance ................................................................... Reimbursable program .................................................. 7 153 154 34 9 211 180 2 6 128 143 1 10.00 Total new obligations ................................................ 348 402 278 21.40 22.00 Budgetary resources available for obligation: Unobligated balance carried forward, start of year New budget authority (gross) ........................................ 19 338 9 575 182 279 23.90 23.95 Total budgetary resources available for obligation Total new obligations .................................................... 357 ¥348 584 ¥402 461 ¥278 24.40 Unobligated balance carried forward, end of year 9 182 183 New budget authority (gross), detail: Discretionary: 40.00 Appropriation ............................................................. 331 554 278 40.33 Appropriation permanently reduced (P.L. 109–148) ................... ¥4 ................... 40.35 Appropriation permanently reduced .......................... ¥3 ................... ................... 42.00 Transferred from other accounts .............................. ................... 24 ................... 43.00 68.00 68.10 68.61 328 574 278 22 1 1 12 ................... ................... ¥24 ................... ................... 68.90 Spending authority from offsetting collections (total discretionary) ..................................... 10 1 1 70.00 Total new budget authority (gross) .......................... 338 575 279 72.40 73.10 73.20 74.00 Change in obligated balances: Obligated balance, start of year ................................... Total new obligations .................................................... Total outlays (gross) ...................................................... Change in uncollected customer payments from Federal sources (unexpired) ............................................ 28 348 ¥332 32 402 ¥435 ¥1 278 ¥355 ¥12 ................... ................... 74.40 Obligated balance, end of year ................................ 32 ¥1 ¥78 86.90 86.93 Outlays (gross), detail: Outlays from new discretionary authority ..................... Outlays from discretionary balances ............................. 259 73 433 2 210 145 87.00 Total outlays (gross) ................................................. 332 435 355 Offsets: Against gross budget authority and outlays: Offsetting collections (cash) from: 88.00 Federal sources ..................................................... 88.40 Non-Federal sources ............................................. ¥21 ¥1 ¥1 ¥1 ................... ................... 88.90 ¥22 88.95 89.00 90.00 cprice-sewell on PROD1PC66 with BUDGET PAG Appropriation (total discretionary) ........................ Spending authority from offsetting collections: Discretionary: Offsetting collections (cash) ................................ Change in uncollected customer payments from Federal sources (unexpired) ............................. Transferred to other accounts .............................. Total, offsetting collections (cash) .................. Against gross budget authority only: Change in uncollected customer payments from Federal sources (unexpired) .................................. Net budget authority and outlays: Budget authority ............................................................ Outlays ........................................................................... ¥1 ¥1 ¥12 ................... ................... 304 310 574 434 278 354 This appropriation funds planning, construction, and operation and maintenance activities associated with projects to reduce flood damage in the lower Mississippi River alluvial valley below Cape Girardeau, Missouri. Object Classification (in millions of dollars) 2005 actual Identification code 96–3112–0–1–301 11.1 11.3 11.5 Direct obligations: Personnel compensation: Full-time permanent ............................................. Other than full-time permanent ........................... Other personnel compensation ............................. VerDate Aug 31 2005 12:14 Jan 26, 2006 Jkt 206762 74 3 9 PO 00000 2006 est. 2007 est. 82 3 9 90 3 9 Frm 00007 Fmt 3616 997 11.9 12.1 13.0 21.0 23.1 23.3 24.0 25.1 25.2 25.3 25.4 26.0 31.0 32.0 Total personnel compensation ......................... Civilian personnel benefits ....................................... Benefits for former personnel ................................... Travel and transportation of persons ....................... Rental payments to GSA ........................................... Communications, utilities, and miscellaneous ......... Printing and reproduction ......................................... Advisory and assistance services ............................. Other services ............................................................ Purchase goods & svcs. fm Government .................. Operation and maintenance of facilities .................. Supplies and materials ............................................. Equipment ................................................................. Land and structures .................................................. 86 19 1 5 3 3 2 13 133 5 2 4 2 36 94 21 2 5 3 6 10 15 181 5 2 4 2 50 102 23 2 3 3 5 2 3 17 81 2 6 2 26 99.0 99.0 Direct obligations .................................................. Reimbursable obligations .............................................. 314 34 400 2 277 1 99.9 Total new obligations ................................................ 348 402 278 Personnel Summary 2005 actual Identification code 96–3112–0–1–301 Direct: 1001 Civilian full-time equivalent employment ..................... 1,410 2006 est. 1,500 2007 est. 1,600 f FLOOD CONTROL AND COASTAL EMERGENCIES For expenses necessary to prepare for flood, hurricane, and other natural disasters and support emergency operations, repairs, and other activities in response to flood and hurricane emergencies, as authorized by law, $81,000,000, to remain available until expended. øFor an additional amount for ‘‘Flood Control and Coastal Emergencies’’, as authorized by section 5 of the Flood Control Act of August 18, 1941, as amended (33 U.S.C. 701n), for emergency response to and recovery from coastal storm damages and flooding related to the consequences of hurricanes in the Gulf of Mexico and Atlantic Ocean in 2005, $2,277,965,000, to remain available until expended: Provided, That in using the funds appropriated for construction related to Hurricane Katrina in the areas covered by the disaster declaration made by the President under the Robert T. Stafford Disaster Relief and Emergency Assistance Act, Public Law 93–288, 88 Stat. 143, as amended (42 U.S.C. 5121 et seq.), the Secretary of the Army, acting through the Chief of Engineers, is directed to restore the flood damage reduction and hurricane and storm damage reduction projects, and related works, to provide the level of protection for which they were designed, at full Federal expense: Provided further, That $75,000,000 of this amount shall be used to accelerate completion of unconstructed portions of authorized projects in the State of Mississippi along the Mississippi Gulf Coast at full Federal expense: Provided further, That $544,460,000 of this amount shall be used to accelerate completion of unconstructed portions of authorized hurricane, storm damage reduction and flood control projects in the greater New Orleans and south Louisiana area at full Federal expense: Provided further, That $70,000,000 of this amount shall be available to prepare for flood, hurricane and other natural disasters and support emergency operations, repair and other activities in response to flood and hurricane emergencies as authorized by law: Provided further, That the amount provided under this heading is designated as an emergency requirement pursuant to section 402 of H. Con. Res. 95 (109th Congress), the concurrent resolution on the budget for fiscal year 2006.¿ (Emergency Supplemental Appropriations Act to Address Hurricanes in the Gulf of Mexico and Pandemic Influenza, 2006.) Program and Financing (in millions of dollars) 2005 actual Identification code 96–3125–0–1–301 2006 est. 2007 est. Obligations by program activity: Direct program: 00.01 Disaster preparedness ............................................... 00.02 Emergency operations ............................................... 00.03 Rehabilitation ............................................................ 00.04 Advance measures .................................................... 09.00 Reimbursable program activity ..................................... 21 58 83 5 1,538 28 42 75 2 1,616 31 45 78 6 1,616 10.00 1,705 1,763 1,776 Sfmt 3643 Total new obligations ................................................ E:\BUDGET\COE.XXX COE 998 CORPS OF ENGINEERS—CIVIL—Continued Federal Funds—Continued THE BUDGET FOR FISCAL YEAR 2007 General and special funds—Continued FLOOD CONTROL AND Object Classification (in millions of dollars) COASTAL EMERGENCIES—Continued Program and Financing (in millions of dollars)—Continued 2005 actual Identification code 96–3125–0–1–301 2006 est. 2007 est. 11.1 11.3 11.5 76 2 1 1 11 5 5 5 27 2 5 5 1 5 5 31.0 32.0 Total personnel compensation ......................... Civilian personnel benefits ....................................... Travel and transportation of persons ....................... Rental payments to GSA ........................................... Communications, utilities, and miscellaneous charges ................................................................. Other purchases of goods and services from Government accounts ................................................. Equipment ................................................................. Land and structures .................................................. 79 1 6 98 6 12 98 6 12 99.0 99.0 Direct obligations .................................................. Reimbursable obligations .............................................. 167 1,538 147 1,616 160 1,616 99.9 Total new obligations ................................................ 1,705 1,763 1,776 3,224 2,240 3,701 105 23.90 23.95 Total budgetary resources available for obligation Total new obligations .................................................... 4,929 ¥1,705 5,464 ¥1,763 3,806 ¥1,776 11.9 12.1 21.0 23.1 23.3 24.40 Unobligated balance carried forward, end of year 3,224 3,701 2,030 25.3 43.00 383 2,214 81 959 26 24 68.00 68.10 68.62 68.90 70.00 2,278 81 ¥468 ................... 404 ................... 2007 est. 7 1 19 364 4,565 348 ¥5 40 2006 est. 8 1 2 Budgetary resources available for obligation: Unobligated balance carried forward, start of year New budget authority (gross) ........................................ New budget authority (gross), detail: Discretionary: 40.00 Appropriation ............................................................. 41.00 Transferred to other accounts ................................... 42.00 Transferred from other accounts .............................. Direct obligations: Personnel compensation: Full-time permanent ............................................. Other than full-time permanent ........................... Other personnel compensation ............................. 57 1 18 21.40 22.00 Appropriation (total discretionary) ........................ Spending authority from offsetting collections: Discretionary: Offsetting collections (cash) ................................ Change in uncollected customer payments from Federal sources (unexpired) ............................. Transferred from other accounts .......................... 2005 actual Identification code 96–3125–0–1–301 Personnel Summary 3,199 ................... ................... 24 ................... ................... Spending authority from offsetting collections (total discretionary) ..................................... 4,182 26 24 Total new budget authority (gross) .......................... 4,565 2,240 105 2005 actual Identification code 96–3125–0–1–301 Direct: 1001 Civilian full-time equivalent employment ..................... 884 2006 est. 140 2007 est. 140 f INVESTIGATIONS PROGRAM [Budget authority in millions of dollars] 72.40 73.10 73.20 74.00 74.40 Obligated balance, end of year ................................ ¥389 1,705 ¥1,109 ¥2,992 1,763 ¥1,761 ¥2,990 1,776 ¥620 ¥3,199 ................... ................... ¥2,992 ¥2,990 ¥1,834 Outlays (gross), detail: 86.90 Outlays from new discretionary authority ..................... 86.93 Outlays from discretionary balances ............................. 87 1,022 1,674 87 53 567 87.00 1,109 1,761 620 Total outlays (gross) ................................................. Offsets: Against gross budget authority and outlays: Offsetting collections (cash) from: 88.00 Federal sources ..................................................... 88.40 Non-Federal sources ............................................. ¥178 ¥26 ¥24 ¥781 ................... ................... 88.90 ¥959 88.95 89.00 90.00 cprice-sewell on PROD1PC66 with BUDGET PAG Change in obligated balances: Obligated balance, start of year ................................... Total new obligations .................................................... Total outlays (gross) ...................................................... Change in uncollected customer payments from Federal sources (unexpired) ............................................ Total, offsetting collections (cash) .................. Against gross budget authority only: Change in uncollected customer payments from Federal sources (unexpired) .................................. Net budget authority and outlays: Budget authority ............................................................ Outlays ........................................................................... ¥26 ¥24 ¥3,199 ................... ................... 407 151 2,214 1,735 81 596 This appropriation provides the funds needed for the planning, training, exercises, and other measures that ensure the readiness of the Corps of Engineers to respond to floods, hurricanes, and other natural disasters, and to support emergency operations in response to flood and hurricane disasters, including advance measures, flood fighting, emergency operations, providing potable water on an emergency basis, and the repair of certain flood and storm damage reduction projects. The Budget provides funding for ongoing preparedness activities, as well as additional funding to help meet emergency needs during the year without disrupting activities in other program areas. VerDate Aug 31 2005 12:14 Jan 26, 2006 Jkt 206762 PO 00000 Frm 00008 Fmt 3616 Direct program: General fund ....................................................................... Rescission ........................................................................... Supplemental ...................................................................... Rivers and harbors contributed funds (mandatory) .......... 2005 actual 145 –1 — 28 164 –2 37 29 94 — — 29 Total direct program ...................................................... Reimbursable program ........................................................... 172 39 228 9 123 9 Total program ......................................................................... 211 237 132 2006 est. 2007 est. INVESTIGATIONS For expenses necessary for the collection and study of basic information pertaining to river and harbor, flood øcontrol, shore protection¿ and storm damage reduction, aquatic ecosystem restoration, and related projects, restudy of authorized projects, miscellaneous investigations, and, when authorized by law, surveys and detailed studies and plans and specifications of projects prior to construction, ø$164,000,000¿ $94,000,000, to remain available until expended, of which $25,000 shall be transferred to the Council on Environmental Quality for the Coastal America Initiative: Provided, That, ønotwithstanding any other provision of law, within the funds provided under this heading, $1,000,000 shall be available for planning assistance to the state of Ohio for Stark County watershed basin study: Provided further, That¿ using ø$8,000,000¿ $20,000,000 of the funds provided herein, the Secretary of the Army, acting through the Chief of Engineers, is directed to øconduct a comprehensive hurricane protection study at full Federal expense to develop and present a full range of flood, coastal and hurricane protection measures exclusive of normal policy considerations for south Louisiana and the Secretary shall submit a feasibility report for short-term protection within 6 months of enactment of this Act, interim protection within 12 months of enactment of this Act and long-term comprehensive protection within 24 months of enactment of this Act: Provided further, That the Secretary shall consider providing protection for a storm surge equivalent to a Category 5 hurricane within the project area and may submit reports on component areas of the larger protection program for authorization as soon as practicable: Provided further, That the analysis shall be conducted in close coordination with the State of Louisiana and its appropriate agencies¿ inventory all Federal and non-Federal flood and storm damage reduction projects; develop and test a methodology to assess the structural and operational integrity of such projects and the associated risks; and establish and maintain a database of such projects, which shall include information on the structural Sfmt 3616 E:\BUDGET\COE.XXX COE CORPS OF ENGINEERS—CIVIL—Continued Federal Funds—Continued CORPS OF ENGINEERS—CIVIL WORKS and operational integrity of the projects and the parties responsible for operation and maintenance of the projects included therein. (Energy and Water Development Appropriations Act, 2006.) øFor an additional amount for ‘‘Investigations’’ to expedite studies of flood and storm damage reduction related to the consequences of hurricanes in the Gulf of Mexico and Atlantic Ocean in 2005, $37,300,000, to remain available until expended: Provided, That using $10,000,000 of the funds provided, the Secretary shall conduct an analysis and design for comprehensive improvements or modifications to existing improvements in the coastal area of Mississippi in the interest of hurricane and storm damage reduction, prevention of saltwater intrusion, preservation of fish and wildlife, prevention of erosion, and other related water resources purposes at full Federal expense: Provided further, That the Secretary shall recommend a costeffective project, but shall not perform an incremental benefit-cost analysis to identify the recommended project, and shall not make project recommendations based upon maximizing net national economic development benefits: Provided further, That interim recommendations for near term improvements shall be provided within 6 months of enactment of this Act with final recommendations within 24 months of enactment: Provided further, That none of the $12,000,000 provided herein for the Louisiana Hurricane Protection Study shall be available for expenditure until the State of Louisiana establishes a single state or quasi-state entity to act as local sponsor for construction, operation and maintenance of all of the hurricane, storm damage reduction and flood control projects in the greater New Orleans and southeast Louisiana area: Provided further, That the amount provided under this heading is designated as an emergency requirement pursuant to section 402 of H. Con. Res. 95 (109th Congress), the concurrent resolution on the budget for fiscal year 2006.¿ øSEC. 5009. Public Law 109–103 is amended under the heading ‘‘Corps of Engineers—Civil, Investigations’’, by striking ‘‘Provided further, That using $8,000,000’’ and all that follows to the end of the paragraph, and inserting in lieu thereof, ‘‘Provided further, That using $8,000,000 of the funds provided herein, the Secretary of the Army, acting through the Chief of Engineers, is directed to conduct a comprehensive hurricane protection analysis and design at full federal expense to develop and present a full range of flood control, coastal restoration, and hurricane protection measures exclusive of normal policy considerations for South Louisiana and the Secretary shall submit a preliminary technical report for comprehensive Category 5 protection within 6 months of enactment of this Act and a final technical report for Category 5 protection within 24 months of enactment of this Act: Provided further, That the Secretary shall consider providing protection for a storm surge equivalent to a Category 5 hurricane within the project area and may submit reports on component areas of the larger protection program for authorization as soon as practicable: Provided further, That the analysis shall be conducted in close coordination with the State of Louisiana and its appropriate agencies.’’¿ (Emergency Supplemental Appropriations Act to Address Hurricanes in the Gulf of Mexico and Pandemic Influenza, 2006.) Program and Financing (in millions of dollars) 2005 actual Identification code 96–3121–0–1–301 Obligations by program activity: Navigation, flood damage prevention, and shoreline protection studies ...................................................... 00.02 Comprehensive basin studies ........................................ 00.03 Special studies .............................................................. 00.04 Review of authorized projects ....................................... 00.05 Cooperation with other Federal agencies and nonFederal interests ........................................................ 00.07 Preconstruction engineering and design ....................... 00.08 Flood plain management services ................................. 00.09 Other programs .............................................................. 00.10 Research and development ........................................... 09.11 Reimbursable program activity ..................................... 2006 est. 2007 est. 24.40 Unobligated balance carried forward, end of year 43.00 68.00 68.10 Appropriation (total discretionary) ........................ Spending authority from offsetting collections: Discretionary: Offsetting collections (cash) ................................ Change in uncollected customer payments from Federal sources (unexpired) ............................. cprice-sewell on PROD1PC66 with BUDGET PAG 28 3 32 2 37 4 41 1 37 4 40 1 7 25 6 13 20 37 10 31 6 7 27 20 11 31 6 7 21 20 Total new obligations ................................................ 173 184 178 21.40 22.00 Budgetary resources available for obligation: Unobligated balance carried forward, start of year New budget authority (gross) ........................................ 41 183 51 208 75 103 VerDate Aug 31 2005 12:14 Jan 26, 2006 Jkt 206762 144 199 94 37 9 9 2 ................... ................... 68.90 Spending authority from offsetting collections (total discretionary) ..................................... 39 9 9 70.00 Total new budget authority (gross) .......................... 183 208 103 72.40 73.10 73.20 74.00 Change in obligated balances: Obligated balance, start of year ................................... Total new obligations .................................................... Total outlays (gross) ...................................................... Change in uncollected customer payments from Federal sources (unexpired) ............................................ ¥8 173 ¥171 ¥8 184 ¥185 ¥9 178 ¥145 74.40 Obligated balance, end of year ................................ ¥8 ¥9 24 86.90 86.93 Outlays (gross), detail: Outlays from new discretionary authority ..................... Outlays from discretionary balances ............................. 140 31 124 61 61 84 87.00 Total outlays (gross) ................................................. 171 185 145 ¥2 ................... ................... Offsets: Against gross budget authority and outlays: Offsetting collections (cash) from: 88.00 Federal sources ..................................................... 88.40 Non-Federal sources ............................................. ¥18 ¥9 ¥9 ¥19 ................... ................... 88.90 ¥37 88.95 89.00 90.00 Total, offsetting collections (cash) .................. Against gross budget authority only: Change in uncollected customer payments from Federal sources (unexpired) .................................. Net budget authority and outlays: Budget authority ............................................................ Outlays ........................................................................... ¥9 ¥9 ¥2 ................... ................... 144 134 199 176 94 136 This appropriation funds studies to determine the need, the engineering feasibility, the economic return, and the environmental and social suitability of solutions to water and related land resource problems; and funds preconstruction engineering and design, data collection, interagency coordination, and research. Because the Corps of Engineers civil works program already has a large backlog of ongoing construction work, the budget limits funding for the study and design of additional projects. Object Classification (in millions of dollars) 10.00 Total budgetary resources available for obligation Total new obligations .................................................... 75 ................... New budget authority (gross), detail: Discretionary: 40.00 Appropriation ............................................................. 145 201 94 40.33 Appropriation permanently reduced (P.L. 109–148) ................... ¥2 ................... 40.35 Appropriation permanently reduced .......................... ¥1 ................... ................... 41.00 Transferred to other accounts ................................... ................... ¥8 ................... 42.00 Transferred from other accounts .............................. ................... 8 ................... 00.01 23.90 23.95 51 999 224 ¥173 PO 00000 259 ¥184 178 ¥178 Frm 00009 Fmt 3616 2005 actual Identification code 96–3121–0–1–301 11.1 11.3 11.5 Direct obligations: Personnel compensation: Full-time permanent ............................................. Other than full-time permanent ........................... Other personnel compensation ............................. 11.9 12.1 13.0 21.0 23.1 23.3 24.0 25.2 25.3 25.5 26.0 31.0 Sfmt 3643 Total personnel compensation ......................... Civilian personnel benefits ....................................... Benefits for former personnel ................................... Travel and transportation of persons ....................... Rental payments to GSA ........................................... Communications, utilities, and miscellaneous ......... Printing and reproduction ......................................... Other services ............................................................ Purchase of goods and services from Government accounts ................................................................ Research and development contracts ....................... Supplies and materials ............................................. Equipment ................................................................. E:\BUDGET\COE.XXX COE 2006 est. 2007 est. 57 2 1 71 2 1 69 2 1 60 14 1 2 2 1 1 29 74 18 1 1 1 1 1 37 72 17 1 1 1 1 1 37 17 6 2 2 21 7 1 1 21 2 2 2 1000 CORPS OF ENGINEERS—CIVIL—Continued Federal Funds—Continued THE BUDGET FOR FISCAL YEAR 2007 General and special funds—Continued 89.00 90.00 INVESTIGATIONS—Continued Net budget authority and outlays: Budget authority ............................................................ Outlays ........................................................................... 144 142 158 157 173 172 Object Classification (in millions of dollars)—Continued 2005 actual Identification code 96–3121–0–1–301 2006 est. 2007 est. 99.0 99.0 Direct obligations .................................................. Reimbursable obligations .............................................. 137 36 164 20 158 20 99.9 Total new obligations ................................................ 173 184 178 Personnel Summary 2005 actual Identification code 96–3121–0–1–301 Direct: 1001 Civilian full-time equivalent employment ..................... 2006 est. 851 2007 est. 1,000 This appropriation provides funds to administer laws pertaining to regulation of activities affecting U.S. waters including wetlands, in accordance with the Rivers and Harbors Appropriation Act of 1899, the Clean Water Act, and the Marine Protection, Research and Sanctuaries Act of 1972. The requested funds are needed to review and process permit applications, ensure compliance on permitted sites, protect important aquatic resources, and support watershed planning efforts in sensitive environmental areas in cooperation with States and local communities. Object Classification (in millions of dollars) 960 f For expenses necessary for administration of laws pertaining to regulation of navigable waters and wetlands, ø$160,000,000¿ $173,000,000, to remain available until expended. (Energy and Water Development Appropriations Act, 2006.) Program and Financing (in millions of dollars) 2005 actual 2006 est. 2007 est. 2007 est. 11.1 11.3 11.5 75 2 2 85 3 1 86 3 1 11.9 12.1 21.0 22.0 23.1 23.3 24.0 25.1 25.2 25.3 25.7 26.0 31.0 32.0 Total personnel compensation ......................... Civilian personnel benefits ....................................... Travel and transportation of persons ....................... Transportation of things ........................................... Rental payments to GSA ........................................... Communications, utilities, and miscellaneous ......... Printing and reproduction ......................................... Advisory and assistance services ............................. Other services ............................................................ Purchase goods & svcs. fm Government accts. Operation and maintenance of equipment ............... Supplies and materials ............................................. Equipment ................................................................. Land and structures .................................................. 79 18 3 2 2 1 1 2 8 19 3 1 1 2 89 21 3 2 2 1 1 1 3 20 2 1 1 1 90 21 5 4 4 4 4 4 10 20 4 4 4 4 00.03 00.05 00.06 00.07 Obligations by program activity: Permit evaluation ........................................................... Enforcement and compliance ........................................ Studies ........................................................................... Administrative appeals .................................................. 119 21 1 1 122 23 2 1 132 32 10 8 01.92 09.00 Total direct obligations ............................................. Reimbursable program .................................................. 142 2 148 1 182 1 10.00 Total new obligations ................................................ 144 149 183 99.0 99.0 Direct obligations .................................................. Reimbursable obligations .............................................. 142 2 148 1 182 1 21.40 22.00 Budgetary resources available for obligation: Unobligated balance carried forward, start of year New budget authority (gross) ........................................ 3 147 6 159 16 174 99.9 Total new obligations ................................................ 144 149 183 23.90 23.95 Total budgetary resources available for obligation Total new obligations .................................................... 150 ¥144 165 ¥149 190 ¥183 24.40 Unobligated balance carried forward, end of year 6 16 7 Personnel Summary 1001 43.00 Appropriation (total discretionary) ........................ Discretionary: Spending authority from offsetting collections: Offsetting collections (cash) ..................................... 144 158 173 3 1 1 Total new budget authority (gross) .......................... 147 159 174 Change in obligated balances: 72.40 Obligated balance, start of year ................................... 73.10 Total new obligations .................................................... 73.20 Total outlays (gross) ...................................................... 3 144 ¥145 2 149 ¥158 ¥7 183 ¥173 68.00 70.00 74.40 Obligated balance, end of year ................................ 2 ¥7 3 86.90 86.93 Outlays (gross), detail: Outlays from new discretionary authority ..................... Outlays from discretionary balances ............................. 138 7 151 7 165 8 87.00 Total outlays (gross) ................................................. 145 158 173 Offsets: Against gross budget authority and outlays: Offsetting collections (cash) from: 88.00 Federal sources ..................................................... 88.40 Non-Federal sources ............................................. ¥1 ¥1 ¥1 ¥2 ................... ................... 88.90 ¥3 Total, offsetting collections (cash) .................. VerDate Aug 31 2005 12:14 Jan 26, 2006 Jkt 206762 PO 00000 ¥1 Frm 00010 ¥1 Fmt 3616 2005 actual Identification code 96–3126–0–1–301 Direct: Civilian full-time equivalent employment ..................... New budget authority (gross), detail: Discretionary: 40.00 Appropriation ............................................................. 145 160 173 40.33 Appropriation permanently reduced (P.L. 109–148) ................... ¥2 ................... 40.35 Appropriation permanently reduced .......................... ¥1 ................... ................... cprice-sewell on PROD1PC66 with BUDGET PAG 2006 est. Direct obligations: Personnel compensation: Full-time permanent ............................................. Other than full-time permanent ........................... Other personnel compensation ............................. REGULATORY PROGRAM Identification code 96–3126–0–1–301 2005 actual Identification code 96–3126–0–1–301 1,383 2006 est. 2007 est. 1,400 1,400 f FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM For expenses necessary to clean up contamination from sites in the United States resulting from work performed as part of the Nation’s early atomic energy program, ø$140,000,000¿ $130,000,000, to remain available until expended. (Energy and Water Development Appropriations Act, 2006.) Program and Financing (in millions of dollars) 2005 actual Identification code 96–3130–0–1–053 2006 est. 2007 est. 00.01 09.01 Obligations by program activity: Direct program activity .................................................. Reimbursable program .................................................. 10.00 Total new obligations ................................................ 161 140 130 21.40 22.00 Budgetary resources available for obligation: Unobligated balance carried forward, start of year New budget authority (gross) ........................................ 2 165 6 139 5 130 23.90 23.95 Total budgetary resources available for obligation Total new obligations .................................................... 167 ¥161 145 ¥140 135 ¥130 24.40 Unobligated balance carried forward, end of year 6 5 5 New budget authority (gross), detail: Discretionary: 40.00 Appropriation ............................................................. 165 140 130 Sfmt 3643 E:\BUDGET\COE.XXX COE 160 140 130 1 ................... ................... CORPS OF ENGINEERS—CIVIL—Continued Federal Funds—Continued CORPS OF ENGINEERS—CIVIL WORKS 40.33 40.35 43.00 68.00 68.10 68.90 Appropriation permanently reduced (P.L. 109–148) ................... ¥1 ................... Appropriation permanently reduced .......................... ¥1 ................... ................... Appropriation (total discretionary) ........................ Spending authority from offsetting collections: Discretionary: Offsetting collections (cash) ................................ Change in uncollected customer payments from Federal sources (unexpired) ............................. ¥1 ................... ................... Spending authority from offsetting collections (total discretionary) ..................................... 1 ................... ................... 70.00 Total new budget authority (gross) .......................... 72.40 73.10 73.20 74.00 Change in obligated balances: Obligated balance, start of year ................................... Total new obligations .................................................... Total outlays (gross) ...................................................... Change in uncollected customer payments from Federal sources (unexpired) ............................................ 74.40 164 139 130 2 ................... ................... 165 139 130 29 161 ¥155 36 140 ¥118 58 130 ¥141 1 ................... ................... Obligated balance, end of year ................................ 36 58 47 Outlays (gross), detail: 86.90 Outlays from new discretionary authority ..................... 86.93 Outlays from discretionary balances ............................. 99 56 83 35 78 63 155 118 141 87.00 Total outlays (gross) ................................................. Offsets: Against gross budget authority and outlays: 88.00 Offsetting collections (cash) from: Federal sources Against gross budget authority only: 88.95 Change in uncollected customer payments from Federal sources (unexpired) .................................. 89.00 90.00 ¥2 ................... ................... 1 ................... ................... Net budget authority and outlays: Budget authority ............................................................ Outlays ........................................................................... 164 152 139 118 130 141 This appropriation funds the cleanup of certain low-level radioactive materials and mixed wastes, located mostly at sites contaminated as a result of the Nation’s early efforts to develop atomic weapons. of the Office of the Chief of Engineers or the civil works executive direction and management activities of the ødivision¿ offices of the Division Engineersø: Provided further, That the Secretary is directed to use $4,500,000 of the funds appropriated herein to conduct, at full Federal expense and in close cooperation with state and local governments, comprehensive analyses that examine multi-jurisdictional use and management of water resources on a watershed or regional scale¿. (Energy and Water Development Appropriations Act, 2006.) øFor an additional amount for ‘‘General Expenses’’ for increased efforts by the Mississippi Valley Division to oversee emergency response and recovery activities related to the consequences of hurricanes in the Gulf of Mexico in 2005, $1,600,000, to remain available until expended: Provided, That the amount provided under this heading is designated as an emergency requirement pursuant to section 402 of H. Con. Res. 95 (109th Congress), the concurrent resolution on the budget for fiscal year 2006.¿ (Emergency Supplemental Appropriations Act to Address Hurricanes in the Gulf of Mexico and Pandemic Influenza, 2006.) Program and Financing (in millions of dollars) Identification code 96–3130–0–1–053 32.0 Direct obligations: Personnel compensation: Full-time permanent ........ Civilian personnel benefits ....................................... Other services ............................................................ Other purchases of goods and services from Government accounts ................................................. Land and structures .................................................. 99.0 99.0 Direct obligations .................................................. Reimbursable obligations .............................................. 99.9 Total new obligations ................................................ 11.1 12.1 25.2 25.3 2006 est. 2007 est. Total new obligations ................................................ 174 162 164 21.40 22.00 Budgetary resources available for obligation: Unobligated balance carried forward, start of year New budget authority (gross) ........................................ 4 181 11 154 3 164 23.90 23.95 Total budgetary resources available for obligation Total new obligations .................................................... 185 ¥174 165 ¥162 167 ¥164 24.40 Unobligated balance carried forward, end of year 11 3 3 40.00 40.33 40.35 9 2 100 43.00 25 15 15 10 13 6 68.00 68.10 140 2005 actual 1001 Direct: Civilian full-time equivalent employment ..................... 122 2006 est. 130 2007 est. 130 Spending authority from offsetting collections (total discretionary) ..................................... 70.00 Total new budget authority (gross) .......................... 72.40 73.10 73.20 74.00 Change in obligated balances: Obligated balance, start of year ................................... Total new obligations .................................................... Total outlays (gross) ...................................................... Change in uncollected customer payments from Federal sources (unexpired) ............................................ 74.40 Obligated balance, end of year ................................ 86.90 86.93 Outlays (gross), detail: Outlays from new discretionary authority ..................... Outlays from discretionary balances ............................. 87.00 Total outlays (gross) ................................................. cprice-sewell on PROD1PC66 with BUDGET PAG øGENERAL¿ EXPENSES For expenses necessary for the Office of the Assistant Secretary of the Army (Civil Works) and for general administration and related civil works functions in the headquarters of the United States Army Corps of Engineers, the offices of the Division Engineers, the Humphreys Engineer Center Support Activity, the Institute for Water Resources, the United States Army Engineer Research and Development Center, and the United States Army Corps of Engineers Finance Center, ø$154,000,000¿ $164,000,000, to remain available until expended: Provided, That no part of any other appropriation provided in title I of this Act shall be available to fund the civil works activities 12:14 Jan 26, 2006 Jkt 206762 PO 00000 Frm 00011 Appropriation (total discretionary) ........................ Spending authority from offsetting collections: Discretionary: Offsetting collections (cash) ................................ Change in uncollected customer payments from Federal sources (unexpired) ............................. 166 154 164 18 ................... ................... ¥3 ................... ................... 15 ................... ................... 130 f VerDate Aug 31 2005 New budget authority (gross), detail: Discretionary: Appropriation ............................................................. 167 156 164 Appropriation permanently reduced (P.L. 109–148) ................... ¥2 ................... Appropriation permanently reduced .......................... ¥1 ................... ................... 68.90 Personnel Summary Identification code 96–3130–0–1–053 2007 est. 10.00 9 2 104 161 2006 est. Obligations by program activity: Executive direction and management: 00.01 Office, Chief of Engineers ......................................... 56 60 57 00.02 Division offices .......................................................... 69 67 68 00.03 Assistant Secretary of the Army (Civil Works) .......... ................... ................... 6 00.09 Humphreys Engineer Center support activity ................ 17 17 17 00.11 Institute for Water Resources ........................................ 4 4 4 00.12 USACE finance center .................................................... 1 1 1 00.13 GE program accounts .................................................... 10 13 11 09.00 Reimbursable program .................................................. 17 ................... ................... 9 2 109 160 140 130 1 ................... ................... 2005 actual Identification code 96–3124–0–1–301 Object Classification (in millions of dollars) 2005 actual 1001 Fmt 3616 Offsets: Against gross budget authority and outlays: 88.00 Offsetting collections (cash) from: Federal sources Against gross budget authority only: 88.95 Change in uncollected customer payments from Federal sources (unexpired) .................................. Sfmt 3643 E:\BUDGET\COE.XXX COE 181 154 164 31 174 ¥180 28 162 ¥124 66 164 ¥161 3 ................... ................... 28 66 69 148 124 32 ................... 131 30 180 161 124 ¥18 ................... ................... 3 ................... ................... 1002 CORPS OF ENGINEERS—CIVIL—Continued Federal Funds—Continued THE BUDGET FOR FISCAL YEAR 2007 General and special funds—Continued PAYMENT øGENERAL¿ EXPENSES—Continued TO SOUTH DAKOTA TERRESTRIAL WILDLIFE HABITAT RESTORATION TRUST FUND Program and Financing (in millions of dollars) Program and Financing (in millions of dollars)—Continued 2005 actual Identification code 96–3129–0–1–306 2005 actual Identification code 96–3124–0–1–301 Net budget authority and outlays: 89.00 Budget authority ............................................................ 90.00 Outlays ........................................................................... 2006 est. 154 124 Object Classification (in millions of dollars) 2005 actual cprice-sewell on PROD1PC66 with BUDGET PAG 2006 est. 2007 est. 11.1 11.3 11.5 11.7 Direct obligations: Personnel compensation: Full-time permanent ............................................. Other than full-time permanent ........................... Other personnel compensation ............................. Military personnel ................................................. 93 1 1 4 93 2 1 4 95 2 1 5 11.9 12.1 12.2 13.0 21.0 23.1 23.2 23.3 24.0 25.2 25.3 26.0 31.0 Total personnel compensation ......................... Civilian personnel benefits ....................................... Accrued retirement .................................................... Benefits for former personnel ................................... Travel and transportation of persons ....................... Rental payments to GSA ........................................... Rental payments to others ........................................ Communications, utilities, and miscellaneous ......... Printing and reproduction ......................................... Other services ............................................................ Purchase goods & svcs. fm Government accts. Supplies and materials ............................................. Equipment ................................................................. 99 17 2 1 6 6 1 5 2 9 5 2 2 100 18 3 1 6 6 1 5 2 10 6 2 2 103 18 3 1 6 6 1 5 2 9 6 2 2 99.0 99.0 Direct obligations .................................................. Reimbursable obligations .............................................. 99.9 Total new obligations ................................................ 157 162 164 17 ................... ................... 174 162 164 Personnel Summary 2005 actual Identification code 96–3124–0–1–301 1001 Direct: Civilian full-time equivalent employment ..................... VerDate Aug 31 2005 12:14 Jan 26, 2006 Jkt 206762 10 10 10 10.00 Total new obligations (object class 25.2) ................ 10 10 10 22.00 23.95 Budgetary resources available for obligation: New budget authority (gross) ........................................ Total new obligations .................................................... 10 ¥10 10 ¥10 10 ¥10 New budget authority (gross), detail: Mandatory: 60.00 Appropriation ............................................................. 10 10 10 73.10 73.20 Change in obligated balances: Total new obligations .................................................... Total outlays (gross) ...................................................... 10 ¥10 10 ¥10 10 ¥10 86.97 Outlays (gross), detail: Outlays from new mandatory authority ......................... 10 10 10 89.00 90.00 Net budget authority and outlays: Budget authority ............................................................ Outlays ........................................................................... 10 10 10 10 10 10 164 161 This appropriation funds the policy oversight, the executive direction and management, the centralized operations, and the administration of the Office of the Assistant Secretary of the Army (Civil Works) and of the Corps of Engineers at the following offices and facilities: Office of the Assistant Secretary of the Army (Civil Works).—This office provides policy direction and oversight, principally for the civil works program. Headquarters, U.S. Army Corps of Engineers.—This office provides executive direction and management for the entire civil works program. Offices of the Division Engineers.—Eight division offices supervise work in 38 district offices. Humphreys Engineer Center Support Activity.—This support center provides administrative services (such as personnel, logistics, information management, and finance and accounting) for the Office of the Chief of Engineers and other separate field operating activities. Institute for Water Resources.—This institute performs studies and analyses and develops planning techniques for the management and development of water resources. United States Army Corps of Engineers Finance Center.— This center provides centralized support for all Corps finance and accounting activities. U.S. Army Engineer Research and Development Center.— This center manages all research and development for the civil works program. The Office of the Assistant Secretary formerly was funded in a separate account. Identification code 96–3124–0–1–301 999 PO 00000 2006 est. 2007 est. Obligations by program activity: Payment to SD Terrestrial Wildlife Habitat Restoration Trust Fund ................................................................. 00.01 166 161 2006 est. 2007 est. 2007 est. 997 997 Frm 00012 Fmt 3616 This fund makes payments to the South Dakota Terrestrial Wildlife Habitat Restoration Trust Fund, established by the Water Resources Act of 1999 (P.L. 106–53). f WASHINGTON AQUEDUCT Program and Financing (in millions of dollars) 2005 actual Identification code 96–3128–0–1–301 New budget authority (gross), detail: Spending authority from offsetting collections: Mandatory: 69.00 Offsetting collections (cash) ................................ 69.47 Portion applied to repay debt ............................... 69.90 1 ¥1 2006 est. 1 ¥1 2007 est. 1 ¥1 Spending authority from offsetting collections (total mandatory) ......................................... ................... ................... ................... Offsets: Against gross budget authority and outlays: 88.40 Offsetting collections (cash) from: Non-Federal sources .................................................................. ¥1 ¥1 ¥1 Net budget authority and outlays: Budget authority ............................................................ Outlays ........................................................................... ¥1 ¥1 ¥1 ¥1 ¥1 ¥1 89.00 90.00 Summary of Budget Authority and Outlays (in millions of dollars) Enacted/requested: 2005 actual 2006 est. 2007 est. Budget Authority ..................................................................... –1 –1 –1 Outlays .................................................................................... –1 –1 –1 Legislative proposal, subject to PAYGO: Budget Authority ..................................................................... .................... .................... 68 Outlays .................................................................................... .................... .................... .................... Total: Budget Authority ..................................................................... Outlays .................................................................................... –1 –1 –1 –1 67 –1 The Washington Aqueduct (Aqueduct) supplies drinking water to customers in three jurisdictions: the District of Columbia, Arlington County, Virginia, and the city of Falls Church, Virginia. Although the Aqueduct is owned and operated by the Army Corps of Engineers, the customers finance the operation, maintenance and major capital improvement Sfmt 3616 E:\BUDGET\COE.XXX COE CORPS OF ENGINEERS—CIVIL—Continued Federal Funds—Continued CORPS OF ENGINEERS—CIVIL WORKS of Aqueduct facilities. Under current law, the Aqueduct’s customers are required to pay in advance the full cost of making capital improvements at the Aqueduct. WASHINGTON AQUEDUCT 2005 actual 2006 est. Obligations by program activity: Reimbursable program .................................................. ................... ................... 100 10.00 Total new obligations (object class 32.0) ................ ................... ................... 100 Budgetary resources available for obligation: 22.00 New budget authority (gross) ........................................ ................... ................... 23.95 Total new obligations .................................................... ................... ................... New budget authority (gross), detail: Mandatory: 66.10 Contract authority ..................................................... ................... ................... Spending authority from offsetting collections: Mandatory: 69.00 Offsetting collections (cash) ................................ ................... ................... 69.49 Portion applied to liquidate contract authority ................... ................... 100 ¥100 100 21.40 22.00 2007 est. 9 9 9 9 14 18 18 Budgetary resources available for obligation: Unobligated balance carried forward, start of year ................... New budget authority (gross) ........................................ 15 1 18 1 18 Total new obligations ................................................ 23.90 23.95 Total budgetary resources available for obligation Total new obligations .................................................... 15 ¥14 19 ¥18 19 ¥18 24.40 Unobligated balance carried forward, end of year 1 1 1 New budget authority (gross), detail: Mandatory: 60.20 Appropriation (special fund) ..................................... 15 18 18 72.40 73.10 73.20 Change in obligated balances: Obligated balance, start of year ................................... Total new obligations .................................................... Total outlays (gross) ...................................................... 3 14 ¥15 1 18 ¥18 1 18 ¥18 1 1 1 32 ¥32 Spending authority from offsetting collections (total mandatory) ......................................... ................... ................... ................... 70.00 Total new budget authority (gross) .......................... ................... ................... 100 74.40 Obligated balance, end of year ................................ 73.10 73.20 Change in obligated balances: Total new obligations .................................................... ................... ................... Total outlays (gross) ...................................................... ................... ................... 100 ¥32 86.97 86.98 Outlays (gross), detail: Outlays from new mandatory authority ......................... Outlays from mandatory balances ................................ 74.40 Obligated balance, end of year ................................ ................... ................... 68 87.00 Total outlays (gross) ................................................. 15 18 18 86.97 Outlays (gross), detail: Outlays from new mandatory authority ......................... ................... ................... 32 89.00 90.00 Net budget authority and outlays: Budget authority ............................................................ Outlays ........................................................................... 15 16 18 18 18 18 Offsets: Against gross budget authority and outlays: 88.40 Offsetting collections (cash) from: Non-Federal sources .................................................................. ................... ................... 89.00 90.00 ¥32 Net budget authority and outlays: Budget authority ............................................................ ................... ................... 68 Outlays ........................................................................... ................... ................... ................... The Administration plans to submit legislation to allow the Corps to undertake capital improvements to comply with the National Pollutant Discharge Elimination System permit that has been issued for the Aqueduct in advance of receiving cash payments from the customers. The customers would deposit the funds in advance in an interest bearing account, and the funds would be transferred to the Corps as disbursements are made. PERMANENT APPROPRIATIONS Special and Trust Fund Receipts (in millions of dollars) 2005 actual Identification code 96–9921–0–2–999 01.00 2006 est. 2007 est. Balance, start of year .................................................... 18 17 17 Balance, start of year .................................................... Receipts: 02.20 Receipts from leases of lands acquired for flood control, navigation, and allied purposes .................. 02.60 Licenses under Federal Power Act, improvements of navigable waters, maintenance and operation of dams, etc. ................................................................. 18 17 17 9 9 9 5 9 10 02.99 Total receipts and collections ................................... 14 18 19 Total: Balances and collections .................................... Appropriations: 05.00 Permanent appropriations ............................................. 32 35 36 ¥15 ¥18 17 01.99 cprice-sewell on PROD1PC66 with BUDGET PAG 2006 est. 6 8 10.00 2007 est. 09.01 69.90 2005 actual Identification code 96–9921–0–2–999 00.02 Program and Financing (in millions of dollars) Identification code 96–3128–4–1–301 Program and Financing (in millions of dollars) Obligations by program activity: Maintenance and operation of dams and other improvements of navigable waters ............................... 00.03 Payments to States ........................................................ (Legislative proposal, subject to PAYGO) 1003 04.00 07.99 Balance, end of year ..................................................... VerDate Aug 31 2005 12:14 Jan 26, 2006 Jkt 206762 PO 00000 9 18 18 6 ................... ................... This account covers the following three permanent appropriations: Hydraulic mining debris reservoir.—The Corps uses fees collected from Pacific Gas and Electric Company to help maintain the Englebright Dam, Yuba River, CA, mine debris restraining works and associated hydropower generation facilities. (33 U.S.C. 683) Maintenance and operation of dams and other improvements of navigable waters.—The Corps uses its share of certain fees levied by the Federal Energy Regulatory Commission (on the private use of Federal property, including facilities and land; private construction and operation of water management and appurtenant facilities; and private benefit from headwater improvement by others) for construction, operation, and maintenance of Federal water management facilities. (16 U.S.C. 810(a)) Payments to States.—In lieu of taxes, the Corps pays to States three-fourths of the rent received from the lease of Federal lands acquired for flood control, navigation, and allied purposes. (33 U.S.C. 701c–3) Object Classification (in millions of dollars) 2005 actual Identification code 96–9921–0–2–999 2006 est. 2007 est. 11.1 13.0 25.2 41.0 Direct obligations: Personnel compensation: Full-time permanent ........ Benefits for former personnel ................................... Other services ............................................................ Grants, subsidies, and contributions ........................ 1 1 4 4 1 1 5 7 1 1 5 7 ¥18 99.0 99.5 Direct obligations .................................................. Below reporting threshold .............................................. 10 4 14 4 14 4 17 18 99.9 Total new obligations ................................................ 14 18 18 Frm 00013 Fmt 3616 Sfmt 3643 E:\BUDGET\COE.XXX COE 1004 CORPS OF ENGINEERS—CIVIL—Continued Federal Funds—Continued THE BUDGET FOR FISCAL YEAR 2007 General and special funds—Continued chargeable to the civil works program. In addition, payments are made into the fund when other agencies or entities use plant and equipment acquired by the fund. PERMANENT APPROPRIATIONS—Continued Personnel Summary Object Classification (in millions of dollars) 2005 actual Identification code 96–9921–0–2–999 1001 2006 est. 2007 est. 15 23 23 f Intragovernmental funds: REVOLVING FUND Program and Financing (in millions of dollars) 2005 actual Identification code 96–4902–0–4–301 09.01 09.02 09.03 09.04 09.09 09.20 09.21 09.22 09.23 09.24 09.25 Obligations by program activity: Plant and equipment services ....................................... Warehousing (GPRA) ...................................................... Shop and facility services ............................................. General administrative services .................................... 2005 actual Identification code 96–4902–0–4–301 Direct: Civilian full-time equivalent employment ..................... 661 11 2,284 1,452 2006 est. 2007 est. 721 10 2,261 1,669 764 10 2,284 1,836 Total operating expenses .......................................... 4,408 4,661 Land and structures ...................................................... 4 19 Dredges .......................................................................... 2 28 Other floating plant ....................................................... 10 16 Land-based equipment .................................................. 2 3 Tools, office furniture, and equipment .......................... 4 5 Airplance ........................................................................ ................... ................... 4,894 6 8 5 14 5 3 09.29 Total capital investment ........................................... 22 71 41 10.00 Total new obligations ................................................ 4,430 4,732 4,935 21.0 22.0 23.1 23.2 23.3 24.0 25.1 25.2 25.3 27 2 14 2 31 18 2 4,120 27 2 15 2 34 17 1 4,283 25.7 26.0 31.0 32.0 42.0 44.0 250 11 150 39 17 1 1 275 12 164 42 19 2 2 295 13 175 46 21 2 2 99.9 Total new obligations ................................................ 4,430 4,732 4,935 f HARBOR MAINTENANCE TRUST FUND Special and Trust Fund Receipts (in millions of dollars) 2005 actual Identification code 96–8863–0–7–301 23.90 23.95 Total budgetary resources available for obligation Total new obligations .................................................... 24.40 Unobligated balance carried forward, end of year New budget authority (gross), detail: Spending authority from offsetting collections: Mandatory: 69.00 Offsetting collections (cash) ................................ 69.10 Change in uncollected customer payments from Federal sources (unexpired) ............................. 69.90 72.40 73.10 73.20 74.00 74.40 Spending authority from offsetting collections (total mandatory) ......................................... Change in obligated balances: Obligated balance, start of year ................................... Total new obligations .................................................... Total outlays (gross) ...................................................... Change in uncollected customer payments from Federal sources (unexpired) ............................................ Obligated balance, end of year ................................ cprice-sewell on PROD1PC66 with BUDGET PAG Outlays (gross), detail: 86.97 Outlays from new mandatory authority ......................... Offsets: Against gross budget authority and outlays: 88.00 Offsetting collections (cash) from: Federal sources Against gross budget authority only: 88.95 Change in uncollected customer payments from Federal sources (unexpired) .................................. 88.96 Portion of offsetting collections (cash) credited to expired accounts ................................................... 4,467 ¥4,430 37 ................... 4,695 4,965 2,695 3,277 Balance, start of year .................................................... Receipts: 02.00 Earnings on investments, Harbor maintenance trust fund ........................................................................... 02.60 User fees, Harbor maintenance trust fund ................... 2,299 2,695 3,277 54 1,048 142 1,133 175 1,228 Total receipts and collections ................................... 1,102 1,275 1,403 Total: Balances and collections .................................... Appropriations: 05.00 Salaries and expenses, Customs and Border Protection 05.01 Operations and maintenance ........................................ 05.02 Harbor maintenance trust fund ..................................... 05.03 Harbor maintenance trust fund ..................................... 3,401 3,970 4,680 ¥3 ¥16 ¥10 ¥677 ¥3 ¥3 ¥16 ¥8 ¥9 ................... ¥665 ¥707 05.99 Total appropriations .................................................. ¥706 ¥693 ¥718 07.99 Balance, end of year ..................................................... 2,695 3,277 3,962 4,965 ¥4,935 02.99 37 ................... 30 04.00 4,695 4,965 7 ................... ................... 4,463 4,695 4,965 899 4,430 ¥4,394 928 4,732 ¥4,695 965 4,935 ¥4,965 Program and Financing (in millions of dollars) ¥7 ................... ................... 928 4,394 ¥4,457 965 4,695 ¥4,695 Jkt 206762 ¥4,965 ¥7 ................... ................... 1 ................... ................... PO 00000 Frm 00014 00.01 00.02 Obligations by program activity: Direct program activity .................................................. 687 Dredged material disposal facilities ............................. ................... 2006 est. 2007 est. 658 9 698 9 10.00 Total new obligations ................................................ 687 667 707 22.00 23.95 Budgetary resources available for obligation: New budget authority (gross) ........................................ Total new obligations .................................................... 687 ¥687 667 ¥667 707 ¥707 4,965 This revolving fund provides for the acquisition, operation, and maintenance of plant and equipment used by the civil works program; and for temporary financing of services 12:14 Jan 26, 2006 2005 actual Identification code 96–8863–0–7–301 935 Net budget authority and outlays: 89.00 Budget authority ............................................................ ................... ................... ................... 90.00 Outlays ........................................................................... ¥63 ................... ................... VerDate Aug 31 2005 2007 est. 2,299 4,732 ¥4,732 4,456 2006 est. Balance, start of year .................................................... 01.99 4 4,463 2007 est. 24 1 12 1 29 17 1 3,876 01.00 Budgetary resources available for obligation: 21.40 Unobligated balance carried forward, start of year 22.00 New budget authority (gross) ........................................ 2006 est. Travel and transportation of persons ............................ Transportation of things ................................................ Rental payments to GSA ................................................ Rental payments to others ............................................ Communications, utilities, and miscellaneous charges Printing and reproduction .............................................. Advisory and assistance services .................................. Other services ................................................................ Other purchases of goods and services from Government accounts ........................................................... Operation and maintenance of equipment ................... Supplies and materials ................................................. Equipment ...................................................................... Land and structures ...................................................... Insurance claims and indemnities ................................ Refunds .......................................................................... Fmt 3616 New budget authority (gross), detail: Discretionary: 40.26 Appropriation (Construction) ..................................... 10 40.26 Appropriation (Operations & maintenance) .............. 677 40.33 Appropriation permanently reduced (P.L. 109–148) ................... 9 ................... 665 707 ¥7 ................... 43.00 Appropriation (total discretionary) ........................ 687 667 707 73.10 73.20 Change in obligated balances: Total new obligations .................................................... Total outlays (gross) ...................................................... 687 ¥687 667 ¥667 707 ¥707 86.90 86.93 Outlays (gross), detail: Outlays from new discretionary authority ..................... Outlays from discretionary balances ............................. Sfmt 3643 E:\BUDGET\COE.XXX COE 674 667 707 13 ................... ................... CORPS OF ENGINEERS—CIVIL—Continued Trust Funds CORPS OF ENGINEERS—CIVIL WORKS 87.00 Total outlays (gross) ................................................. 687 667 707 89.00 90.00 Net budget authority and outlays: Budget authority ............................................................ Outlays ........................................................................... 687 687 667 667 707 707 Direct: 1001 Civilian full-time equivalent employment ..................... 2,237 2,621 1,833 Trust Funds 2,621 1,833 1,833 Memorandum (non-add) entries: Total investments, start of year: Federal securities: Par value ................................................................... 92.02 Total investments, end of year: Federal securities: Par value ................................................................... 1005 Personnel Summary 2005 actual Identification code 96–8863–0–7–301 3,000 2006 est. 3,000 2007 est. 3,000 f 92.01 INLAND WATERWAYS TRUST FUND Special and Trust Fund Receipts (in millions of dollars) The Harbor Maintenance Trust Fund is authorized under the Harbor Maintenance Revenue Act of 1986 (P.L. 99–662, Title XIV), as amended. Revenue is derived from receipts from a 0.125 percent ad valorem tax imposed upon commercial users of specified U.S. ports, Saint Lawrence Seaway tolls, and investment interest. The budget shows all activity related to the Harbor Maintenance Trust Fund as occurring within this account, rather than in the Operation and Maintenance account. The Harbor Maintenance Revenue Act authorized expenditures from this fund to finance up to 100 percent of Corps of Engineers harbor operation and maintenance costs, including the operation and maintenance of Great Lakes navigation projects. The fund fully finances the operation and maintenance of the Saint Lawrence Seaway Development Corporation. Section 201 of Public Law 104–303 authorized the Federal share of the costs for the construction of dredged material disposal facilities that are necessary for the operation and maintenance of any coastal or inland harbor, the dredging and disposal of contaminated sediments that are in or affect the maintenance of Federal navigation channels, the mitigation of impacts resulting from Federal navigation operation and maintenance activities, and the operation and maintenance of dredged material disposal facilities to be derived from the fund. The North American Free Trade Agreement Implementation Act (P.L. 103–182, section 683) authorized payment from the fund of administrative expenses incurred by the Department of the Treasury, the Corps of Engineers, and the Department of Commerce related to administration of the harbor maintenance tax, but not to exceed $5,000,000 for any fiscal year. A 1995 decision by the United States Court of International Trade, United States Shoe Corp. v. United States (Case No. 94–11–00668), found the harbor maintenance tax unconstitutional under the export clause of the Constitution (Article I, section 9, clause 5), and enjoined the Customs Service from collecting the tax on exports. The Supreme Court affirmed that decision on March 31, 1998. Object Classification (in millions of dollars) 2005 actual cprice-sewell on PROD1PC66 with BUDGET PAG Identification code 96–8863–0–7–301 11.1 12.1 21.0 22.0 23.1 23.2 23.3 25.1 25.2 25.3 2006 est. 2007 est. 82 20 20 20 20 8 18 12 200 192 47 10 10 10 5 15 5 100 195 48 10 10 10 5 15 5 128 25.4 25.7 26.0 31.0 32.0 Personnel compensation: Full-time permanent ............. Civilian personnel benefits ............................................ Travel and transportation of persons ............................ Transportation of things ................................................ Rental payments to GSA ................................................ Rental payments to others ............................................ Communications, utilities, and miscellaneous charges Advisory and assistance services .................................. Other services ................................................................ Other purchases of goods and services from Government accounts ........................................................... Operation and maintenance of facilities ...................... Operation and maintenance of equipment ................... Supplies and materials ................................................. Equipment ...................................................................... Land and structures ...................................................... 110 15 5 15 15 127 103 15 5 15 15 120 110 12 5 15 15 124 99.9 Total new obligations ................................................ 687 667 707 Frm 00015 Fmt 3616 VerDate Aug 31 2005 12:14 Jan 26, 2006 Jkt 206762 PO 00000 2005 actual Identification code 20–8861–0–7–301 01.00 2006 est. 2007 est. Balance, start of year .................................................... 350 323 233 Balance, start of year .................................................... Receipts: 02.00 Interest and profits on investments in public debt securities, Inland waterways trust fund ................... 02.60 Transfer from general fund, Inland waterways revenue act taxes .................................................................... 350 323 233 19 13 12 91 81 77 02.99 110 94 89 Total: Balances and collections .................................... 460 417 Appropriations: 05.00 Inland waterways trust fund ......................................... ¥137 ¥184 05.01 Inland waterways trust fund ......................................... ................... ................... 322 01.99 Total receipts and collections ................................... 04.00 ¥172 ¥25 05.99 Total appropriations .................................................. ¥137 ¥184 ¥197 07.99 Balance, end of year ..................................................... 323 233 125 Program and Financing (in millions of dollars) 2005 actual Identification code 20–8861–0–7–301 2006 est. 2007 est. 00.01 Obligations by program activity: Direct program activity .................................................. 136 183 172 10.00 Total new obligations ................................................ 136 183 172 21.40 22.00 Budgetary resources available for obligation: Unobligated balance carried forward, start of year ................... New budget authority (gross) ........................................ 137 23.90 23.95 Total budgetary resources available for obligation Total new obligations .................................................... 24.40 Unobligated balance carried forward, end of year 137 ¥136 1 ................... 182 197 183 ¥183 197 ¥172 1 ................... 25 New budget authority (gross), detail: Discretionary: 40.26 Appropriation (Construction) ..................................... 137 184 172 40.26 Appropriation (Operation & Maintenance) ................ ................... ................... 25 40.33 Appropriation permanently reduced (P.L. 109–148) ................... ¥2 ................... 43.00 Appropriation (total discretionary) ........................ 137 182 197 72.40 73.10 73.20 Change in obligated balances: Obligated balance, start of year ................................... Total new obligations .................................................... Total outlays (gross) ...................................................... 10 136 ¥127 19 183 ¥156 46 172 ¥194 74.40 Obligated balance, end of year ................................ 19 46 24 Outlays (gross), detail: Outlays from new discretionary authority ..................... ................... Outlays from discretionary balances ............................. 127 155 1 167 27 86.90 86.93 87.00 Total outlays (gross) ................................................. 127 156 194 89.00 90.00 Net budget authority and outlays: Budget authority ............................................................ Outlays ........................................................................... 137 127 182 156 197 194 352 336 230 336 230 230 Memorandum (non-add) entries: Total investments, start of year: Federal securities: Par value ................................................................... 92.02 Total investments, end of year: Federal securities: Par value ................................................................... 92.01 Sfmt 3643 E:\BUDGET\COE.XXX COE 1006 CORPS OF ENGINEERS—CIVIL—Continued Trust Funds—Continued THE BUDGET FOR FISCAL YEAR 2007 00.08 INLAND WATERWAYS TRUST FUND—Continued The Inland Waterways Trust Fund is authorized under the Inland Waterways Revenue Act of 1978 (P.L. 95–502), as amended by the Water Resources Development Act of 1986 (P.L. 99–662). Revenue is derived from taxes imposed on fuel for vessels engaged in commercial waterway transportation, plus investment interest. The budget shows all activity related to the Inland Waterways Trust Fund as occurring within this account, rather than in the Construction and Operation and Maintenance accounts. The fund is used to pay one half of the costs associated with the construction and rehabilitation of Federal inland waterways projects. 4 4 4 00.09 Where not required for an authorized Federal project Coastal Wetlands Restoration: Where required for an authorized Federal Project 7 7 7 10.00 Total new obligations ................................................ 402 441 441 21.40 22.00 Budgetary resources available for obligation: Unobligated balance carried forward, start of year New budget authority (gross) ........................................ 260 410 268 445 272 445 23.90 23.95 Total budgetary resources available for obligation Total new obligations .................................................... 670 ¥402 713 ¥441 717 ¥441 24.40 Unobligated balance carried forward, end of year 268 272 276 New budget authority (gross), detail: Mandatory: 60.26 Appropriation (trust fund) ......................................... 410 445 445 72.40 73.10 73.20 Change in obligated balances: Obligated balance, start of year ................................... Total new obligations .................................................... Total outlays (gross) ...................................................... 148 402 ¥350 200 441 ¥445 196 441 ¥445 74.40 Obligated balance, end of year ................................ 200 196 192 86.97 86.98 Outlays (gross), detail: Outlays from new mandatory authority ......................... Outlays from mandatory balances ................................ 4 346 4 441 4 441 87.00 Total outlays (gross) ................................................. 350 445 445 89.00 90.00 Net budget authority and outlays: Budget authority ............................................................ Outlays ........................................................................... 410 350 445 445 445 445 Object Classification (in millions of dollars) 2005 actual Identification code 20–8861–0–7–301 11.1 12.1 21.0 23.1 23.3 24.0 25.1 25.2 25.3 2006 est. 2007 est. 8 3 2 2 2 2 10 74 9 3 3 3 3 3 13 91 16 3 3 3 3 3 13 91 25.5 26.0 31.0 32.0 Personnel compensation: Full-time permanent ............. Civilian personnel benefits ............................................ Travel and transportation of persons ............................ Rental payments to GSA ................................................ Communications, utilities, and miscellaneous charges Printing and reproduction .............................................. Advisory and assistance services .................................. Other services ................................................................ Other purchases of goods and services from Government accounts ........................................................... Research and development contracts ........................... Supplies and materials ................................................. Equipment ...................................................................... Land and structures ...................................................... 5 1 2 2 23 10 2 3 3 37 5 2 3 3 24 99.9 Total new obligations ................................................ 136 183 172 Personnel Summary 2005 actual Identification code 20–8861–0–7–301 1001 Direct: Civilian full-time equivalent employment ..................... 2006 est. 137 2007 est. 150 Funds are contributed by non-Federal interests for use on improvements of rivers and harbors. This includes cost-sharing contributions for the study, design, construction, and operation and maintenance of authorized Federal projects, as well as contributions of 100 percent of the costs of other work. Object Classification (in millions of dollars) 150 2005 actual Identification code 96–8862–0–7–301 f RIVERS AND 11.1 11.3 11.5 HARBORS CONTRIBUTED FUNDS Personnel compensation: Full-time permanent .................................................. Other than full-time permanent ............................... Other personnel compensation .................................. 2006 est. 2007 est. 28 1 1 32 1 1 32 1 1 Special and Trust Fund Receipts (in millions of dollars) 2005 actual Identification code 96–8862–0–7–301 01.00 2006 est. 2007 est. Balance, start of year .................................................... ................... ................... ................... 01.99 Balance, start of year .................................................... ................... ................... ................... Receipts: 02.20 Contributions, Rivers and harbors, other than port and harbor user fees ................................................ 410 445 445 04.00 Total: Balances and collections .................................... Appropriations: 05.00 Rivers and harbors contributed funds .......................... 07.99 410 445 445 ¥410 ¥445 ¥445 Balance, end of year ..................................................... ................... ................... ................... 11.9 12.1 21.0 23.1 23.3 25.1 25.2 25.3 30 8 1 1 1 1 47 34 8 1 1 1 1 49 34 8 1 1 1 1 49 25.4 26.0 32.0 Total personnel compensation .............................. Civilian personnel benefits ............................................ Travel and transportation of persons ............................ Rental payments to GSA ................................................ Communications, utilities, and miscellaneous charges Advisory and assistance services .................................. Other services ................................................................ Other purchases of goods and services from Government accounts ........................................................... Operation and maintenance of facilities ...................... Supplies and materials ................................................. Land and structures ...................................................... 25 1 45 242 25 1 45 275 25 1 45 275 99.9 Total new obligations ................................................ 402 441 441 Personnel Summary Program and Financing (in millions of dollars) 2005 actual cprice-sewell on PROD1PC66 with BUDGET PAG Identification code 96–8862–0–7–301 Obligations by program activity: General investigations: 00.01 Where required for an authorized Federal project 00.02 Where not required for an authorized Federal project ................................................................... Construction General: 00.03 Where required for an authorized Federal project 00.04 Where not required for an authorized Federal project Operations and Maintenance: 00.05 Where required for an authorized Federal project 00.06 Where not required for an authorized Federal project Flood Control, Mississippi River & Tributaries: 00.07 Where required for an authorized Federal project VerDate Aug 31 2005 12:14 Jan 26, 2006 Jkt 206762 2006 est. 2005 actual Identification code 96–8862–0–7–301 2007 est. 1001 Direct: Civilian full-time equivalent employment ..................... 485 22 22 22 f 6 7 7 COASTAL WETLANDS RESTORATION TRUST FUND 273 13 310 13 310 13 32 2 33 2 33 2 43 43 43 Frm 00016 Fmt 3616 PO 00000 2006 est. 500 2007 est. 500 [Budget authority in millions of dollars] 2005 actual Corps of Engineers ...................................................................... 7 Environmental Protection Agency ................................................ –1 Fish & Wildlife Service ................................................................ .................... National Marine Fisheries Service ............................................... 16 Natural Resources Conservation Service .................................... 2 Sfmt 3647 E:\BUDGET\COE.XXX COE 2006 est. 2 12 12 1 20 2007 est. 13 10 11 20 16 GENERAL PROVISIONS CORPS OF ENGINEERS—CIVIL WORKS 1007 Undistributed balance ................................................................. Subtotal .............................................................................. 34 58 16 63 5 75 SOUTH DAKOTA TERRESTRIAL WILDLIFE HABITAT RESTORATION TRUST FUND Rivers and harbors contributed funds (mandatory) ................... 7 7 7 Special and Trust Fund Receipts (in millions of dollars) Total program .............................................................................. 65 70 82 f 01.00 Program and Financing (in millions of dollars) 2005 actual 2006 est. 2007 est. Obligations by program activity: 00.01 Direct program activity .................................................. 24 65 65 10.00 Total new obligations ................................................ 24 65 65 21.40 22.00 Budgetary resources available for obligation: Unobligated balance carried forward, start of year New budget authority (gross) ........................................ 89 58 123 63 121 75 23.90 23.95 Total budgetary resources available for obligation Total new obligations .................................................... 147 ¥24 186 ¥65 196 ¥65 Unobligated balance carried forward, end of year 123 121 2007 est. 45 57 71 Balance, start of year .................................................... Receipts: 02.00 Payment from the general fund, South Dakota terrestrial wildlife habitat restoration trust fund .............. 02.01 Earnings on investments, South Dakota terrestrial wildlife habitat restoration trust fund ...................... 45 57 71 10 10 10 2 4 5 02.99 Total receipts and collections ................................... 12 14 15 Total: Balances and collections .................................... Appropriations: 05.00 South Dakota terrestrial wildlife habitat restoration trust fund .................................................................. 05.01 South Dakota terrestrial wildlife habitat restoration trust fund .................................................................. 57 71 86 ¥10 ¥10 ¥10 10 10 10 04.00 05.99 07.99 24.40 2006 est. Balance, start of year .................................................... 01.99 COASTAL WETLANDS RESTORATION TRUST FUND Identification code 96–8333–0–7–301 2005 actual Identification code 96–8217–0–7–306 Total appropriations .................................................. ................... ................... ................... Balance, end of year ..................................................... 57 71 86 131 Program and Financing (in millions of dollars) New budget authority (gross), detail: Mandatory: 62.00 Transferred from other accounts .............................. 58 63 75 72.40 73.10 73.20 Change in obligated balances: Obligated balance, start of year ................................... Total new obligations .................................................... Total outlays (gross) ...................................................... 265 24 ¥42 247 65 ¥63 249 65 ¥75 74.40 Obligated balance, end of year ................................ 247 249 239 62.50 Appropriation (total mandatory) ........................... ................... ................... ................... Outlays (gross), detail: Outlays from new mandatory authority ......................... ................... Outlays from mandatory balances ................................ 42 43 20 55 20 89.00 90.00 Net budget authority and outlays: Budget authority ............................................................ ................... ................... ................... Outlays ........................................................................... ................... ................... ................... 63 75 86.97 86.98 87.00 Total outlays (gross) ................................................. 42 2005 actual Identification code 96–8217–0–7–306 New budget authority (gross), detail: Mandatory: 60.26 Appropriation (trust fund) ......................................... 60.45 Portion precluded from obligation ............................ 10 ¥10 Memorandum (non-add) entries: Total investments, start of year: Federal securities: Par value ................................................................... 92.02 Total investments, end of year: Federal securities: Par value ................................................................... 2006 est. 10 ¥10 2007 est. 10 ¥10 92.01 Net budget authority and outlays: 89.00 Budget authority ............................................................ 90.00 Outlays ........................................................................... 58 42 63 63 75 75 The Coastal Wetlands Planning, Protection and Restoration Act (P.L. 101–646, Title III, as amended) directs the Secretary of the Interior to distribute to the Coastal Wetlands Restoration Trust Fund a portion of the amounts appropriated each fiscal year from the Sport Fish Restoration Account. The Louisiana Coastal Wetlands Conservation and Restoration Task Force, an interagency task force (consisting of the Corps of Engineers, Environmental Protection Agency, Fish and Wildlife Service, Natural Resources Conservation Service, National Marine Fisheries Service and the State of Louisiana) uses these funds to plan, set priorities, and carry out projects for the creation, protection, and restoration of coastal wetlands in the State of Louisiana. Object Classification (in millions of dollars) 2005 actual cprice-sewell on PROD1PC66 with BUDGET PAG Identification code 96–8333–0–7–301 2006 est. 2007 est. 11.1 25.2 25.3 Personnel compensation: Full-time permanent ............. Other services ................................................................ Other purchases of goods and services from Government accounts ........................................................... 2 4 3 9 3 9 18 53 53 99.9 Total new obligations ................................................ 24 65 65 Personnel Summary 2005 actual Identification code 96–8333–0–7–301 1001 Direct: Civilian full-time equivalent employment ..................... VerDate Aug 31 2005 12:14 Jan 26, 2006 Jkt 206762 29 PO 00000 2006 est. 2007 est. 40 40 Frm 00017 Fmt 3616 64 76 80 76 80 80 This fund, authorized in the Water Resources Development Act of 1999 (P.L. 106–53), supports wildlife habitat restoration efforts undertaken by the State of South Dakota. The establishment of this fund satisfies the Federal obligation under the Fish and Wildlife Coordination Act (16 U.S.C. 1661 et seq.) to mitigate for the loss of habitat due to flooding from the Oahe and Big Bend projects, which were part of the Pick-Sloan Missouri River Basin program. f ADMINISTRATIVE PROVISION Appropriations in this title shall be available for official reception and representation expenses (not to exceed $5,000); and during the current fiscal year the Revolving Fund, Corps of Engineers, shall be available for purchase (not to exceed 100 for replacement only) and hire of passenger motor vehicles. (Energy and Water Development Appropriations Act, 2006.) f GENERAL PROVISIONS CORPS OF ENGINEERS—CIVIL SEC. 101. (a) None of the funds provided in title I of this Actø, or provided by previous appropriations Acts to the agencies or entities funded in title I of this Act that remain available for obligation or expenditure in fiscal year 2006,¿ shall be available for obligation or expenditure through a reprogramming of funds that— (1) creates or initiates a new program, project, or activity; (2) eliminates a program, project or activity; Sfmt 3616 E:\BUDGET\COE.XXX COE 1008 GENERAL PROVISIONS—Continued cprice-sewell on PROD1PC66 with BUDGET PAG CORPS OF THE BUDGET FOR FISCAL YEAR 2007 ENGINEERS—CIVIL—Continued (3) increases funds øor personnel¿ for any program, project or activity for which funds have been denied or restricted by this Act; (4) øproposes to use¿ uses funds directed for a specific activity øby either the House or the Senate Committees on Appropriations¿ for a different purpose, unless prior notice is transmitted to the House and Senate Comittees on Appropriations; (5) augments an existing øprograms, projects¿ program, project, or øactivities¿ activity in excess of $2,000,000 or 50 percent, whichever is less, unless prior øapproval is received from¿ notice is transmitted to the House and Senate Committees on Appropriations; or (6) reduces an existing øprograms, projects¿ program, project, or øactivities¿ activity in excess of $2,000,000 or 50 percent, whichever is less, unless prior øapproval is received from¿ notice is transmitted to the House and Senate Committees on Appropriationsø; or (7) creates, reorganizes, or restructures a branch, division, office, bureau, board, commission, agency, administration, or department different from the budget justifications submitted to the Committees on Appropriations or the table accompanying the Statement of Managers accompanying this Act, whichever is more detailed, unless prior approval is received from the House and Senate Committees on Appropriations¿. (b) Subsection (a)(1) shall not apply to any project or activity authorized under section 205 of the Flood Control Act of 1948; section 14 of the Flood Control Act of 1946; section 208 of the Flood Control Act of 1954; section 107 of the River and Harbor Act of 1960; section 103 of the River and Harbor Act of 1962; section 111 of the River and Harbor Act of 1968; section 1135 of the Water Resources Development Act of 1986; section 206 of the Water Resources Development Act of 1996; sections 204 and 207 of the Water Resources Development Act of 1992 or section 933 of the Water Resources Development Act of 1986. (c) øNot later than 60 days after the date of enactment of this Act, the Corps of Engineers shall submit a report to the Committees on Appropriations of the Senate and the House of Representatives to establish the baseline for application of reprogramming and transfer authorities for the current fiscal year: Provided, That the report shall include— (1) a table for each appropriation with a separate column to display the President’s budget request, adjustments made by Congress, adjustments due to enacted rescissions, if appropriate, and the fiscal year enacted level; (2) a delineation in the table for each appropriation both by object class and program, project and activity as detailed in the budget appendix for the respective appropriations; and (3) an identification of items of special congressional interest: Provided further, That the amount appropriated for salaries and expenses of the Corps of Engineers shall be reduced by $100,000 per day for each day after the required date that the report has not been submitted to the Congress. (d)¿ None of the funds received by the Corps as a non-Federal share øfor project¿ of the costs øby any agency funded in title I of this Act¿ of a civil works project shall be available for reprogramming. SEC. 102. øBeginning in fiscal year 2006 and thereafter, agreements proposed for execution by the Assistant Secretary of the Army for Civil Works or the United States Army Corps of Engineers after the date of the enactment of this Act pursuant to section 4 of the River and Harbor Act of 1915, Public Law 64–291; section 11 of the River and Harbor Act of 1925, Public Law 68–585; the Civil Functions Appropriations Act, 1936, Public Law 75–208; section 215 of the Flood Control Act of 1968, as amended, Public Law 90–483; sections 104, 203, and 204 of the Water Resources Development Act of 1986, as amended, Public Law 99–662; section 206 of the Water Resources Development Act of 1992, as amended, Public Law 102– 580; section 211 of the Water Resources Development Act of 1996, Public Law 104–303; and any other specific project authority, shall be limited to total credits and reimbursements for all applicable projects not to exceed $100,000,000 in each fiscal year.¿ The Secretary of the Army is authorized to implement measures throughout the watershed of the Missouri River and its tributaries for the survival and recovery of the interior least tern, the piping plover, and the pallid sturgeon. VerDate Aug 31 2005 12:14 Jan 26, 2006 Jkt 206762 PO 00000 Frm 00018 Fmt 3616 øSEC. 103. In order to protect and preserve the integrity of the water supply against further degradation, none of the funds made available under this Act and any other Act hereafter may be used by the Army Corps of Engineers to support activities related to any proposed new landfill in the Muskingum Watershed if such landfill— (1) has not received a permit to construct from the State agency with responsibility for solid waste management in the watershed; (2) has not received waste for disposal during 2005; and (3) is not contiguous or adjacent to a portion of a landfill that has received waste for disposal in 2005 and each landfill is owned by the same person or entity.¿ øSEC. 104. None of the funds appropriated in this or any other Act shall be used to demonstrate or implement any plans divesting or transferring any Civil Works missions, functions, or responsibilities of the United States Army Corps of Engineers to other government agencies without specific direction in a subsequent Act of Congress.¿ øSEC. 105. ST. GEORGES BRIDGE, DELAWARE.—None of the funds made available in this Act may be used to carry out any activity relating to closure or removal of the St. Georges Bridge across the Intracoastal Waterway, Delaware River to Chesapeake Bay, Delaware and Maryland, including a hearing or any other activity relating to preparation of an environmental impact statement concerning the closure or removal.¿ SEC. ø106¿ 103. Notwithstanding any other provision of law, the requirements regarding the use of continuing contracts under the authority of section 206 of the Water Resources Development Act of 1999 (33 U.S.C. 2331) shall not apply øonly to projects funded under the Operation and Maintenance account and the Operation and Maintenance subaccount of the Flood Control, Mississippi River and Tributaries account¿ to any water resource project. øSEC. 107. Within 75 days of the date of the Chief of Engineers Report on a water resource matter, the Assistant Secretary of the Army (Civil Works) shall submit the report to the appropriate authorizing and appropriating committees of the Congress.¿ SEC. ø108¿ 104. None of the funds made available in title I of this Act may be used to award any continuing contract or to make modifications to any existing continuing contract that commits an amount for a project in excess of the amount appropriated for such project pursuant to this Act: Provided, That the amounts appropriated in this Act may be modified pursuant to the authorities provided in section 101 of this Act or through the application of unobligated balances for such project. øSEC. 109. Within 90 days of the date of enactment of this Act, the Assistant Secretary of the Army (Civil Works) shall transmit to Congress his report on any water resources matter on which the Chief of Engineers has reported.¿ øSEC. 110. Section 123 of Public Law 108–137 (117 Stat. 1837) is amended by striking ‘‘in accordance with the Baltimore Metropolitan Water Resources-Gwynns Falls Watershed Feasibility Report’’ and all that follows and inserting the following language in lieu thereof: ‘‘in accordance with the Baltimore Metropolitan Water Resources Gwynns Falls Watershed Study—Draft Feasibility Report and Integrated Environmental Assessment prepared by the Corps of Engineers and the City of Baltimore, Maryland, dated April 2004. The non-Federal sponsor shall receive credit toward its share of project costs for work carried out by the non-Federal sponsor prior to execution of a project cooperation agreement, if the Secretary determines that the work is integral to the project. The non-Federal sponsor may also receive credit for any work performed by the non-Federal sponsor pursuant to a project cooperation agreement. The non-Federal sponsor shall be reimbursed for any work performed by the nonFederal sponsor that is in excess of the non-Federal share of project costs.’’.¿ øSEC. 111. None of the funds in this Act may be expended by the Secretary of the Army to construct the Port Jersey element of the New York and New Jersey Harbor or to reimburse the local sponsor for the construction of the Port Jersey element until commitments for construction of container handling facilities are obtained from the non-Federal sponsor for a second user along the Port Jersey element.¿ øSEC. 112. MARMET LOCK, KANAWHA RIVER, WEST VIRGINIA. Section 101(a)(31) of the Water Resources Development Act of 1996 (110 Stat. 3666), is amended by striking ‘‘$229,581,000’’ and inserting ‘‘$358,000,000’’.¿ øSEC. 113. Truckee Meadows Flood Control Project, Nevada.—The non-Federal funds expended for purchase of lands, easements and rights-of-way, implementation of project monitoring and assessment, and construction and implementation of recreation, ecosystem restoraSfmt 3616 E:\BUDGET\COE.XXX COE GENERAL PROVISIONS—Continued cprice-sewell on PROD1PC66 with BUDGET PAG CORPS OF ENGINEERS—CIVIL WORKS tion, and water quality improvement features, including the provision of 6700 acre-feet of water rights no later than the effective date of the Truckee River Operating Agreement for re-vegetation, reestablishment and maintenance of riverine and riparian habitat of the Lower Truckee River and Pyramid Lake, whether expended prior to or after the signing of the Project Cooperation Agreement (PCA), shall be fully credited to the non-Federal sponsor’s share of costs for the project: Provided, That for the purposes of benefit-cost ratio calculations in the General Reevaluation Report (GRR), the Truckee Meadows Nevada Flood Control Project shall be defined as a single unit and non-separable.¿ øSEC. 114. WATER REALLOCATION, LAKE CUMBERLAND, KENTUCKY. (a) IN GENERAL.—Subject to subsection (b), none of the funds made available by this Act may be used to carry out any water reallocation project or component under the Wolf Creek Project, Lake Cumberland, Kentucky, authorized under the Act of June 28, 1938 (52 Stat. 1215, chapter 795) and the Act of July 24, 1946 (60 Stat. 636, chapter 595). (b) EXISTING REALLOCATIONS.—Subsection (a) shall not apply to any water reallocation for Lake Cumberland, Kentucky, that is carried out subject to an agreement or payment schedule in effect on the date of enactment of this Act.¿ øSEC. 115. Section 529(b)(3) of Public Law 106–541 is amended by striking ‘‘$10,000,000’’ and inserting ‘‘$20,000,000’’ in lieu thereof.¿ øSEC. 116. YAZOO BASIN, BIG SUNFLOWER RIVER, MISSISSIPPI.— The Yazoo Basin, Big Sunflower River, Mississippi, project authorized by the Flood Control Act of 1944, as amended and modified, is further modified to include the design and construction at full Federal expense of such measures as determined by the Chief of Engineers to be advisable for the control and reduction of sedimentation, erosion and headcutting in watersheds of the Yazoo Basin: Yazoo Headwater and Big Sunflower.¿ øSEC. 117. LOWER MISSISSIPPI RIVER MUSEUM AND RIVERFRONT INTERPRETIVE SITE, MISSISSIPPI.—The Water Resources Development Act of 1992 (106 Stat. 4811) is amended by— (1) in section 103(c)(2) by striking ‘‘property currently held by the Resolution Trust Corporation in the vicinity of the Mississippi River Bridge’’ and inserting ‘‘riverfront property’’; and (2) in section 103(c)(7)— (A) by striking ‘‘There is’’ and inserting the following: ‘‘(A) IN GENERAL.—There is’’; and (B) by striking ‘‘$2,000,000’’ and all that follows and inserting the following: ‘‘$15,000,000 to plan, design, and construct generally in accordance with the conceptual plan to be prepared by the Corps of Engineers. ‘‘(B) FUNDING.—The planning, design, and construction of the Lower Mississippi River Museum and Riverfront Interpretive Site shall be carried out using funds appropriated as part of the Mississippi River Levees feature of the Mississippi River and Tributaries Project, authorized by the Act of May 15, 1928 (45 Stat. 534, chapter 569).’’.¿ øSEC. 118. Section 593(h) of Public Law 106–541 is amended by striking ‘‘$25,000,000’’ and inserting ‘‘$50,000,000’’ in lieu thereof.¿ øSEC. 119. The project for navigation, Los Angeles Harbor, California, authorized by section 101(b)(5) of the Water Resources Development Act of 2000 (114 Stat. 2577) is modified to authorize the Chief of Engineers to carry out the project at a total cost of $222,000,000.¿ øSEC. 120. Section 219(f) of the Water Resources Development Act of 1992 (Public Law 102–580; 106 Stat. 4835), as amended by section 502(b) of the Water Resources Development Act of 1999 (Public Law 106–53) and section 108(d) of title I of division B of the Miscellaneous Appropriations Act, 2001 (as enacted by Public Law 106–554; 114 Stat. 2763A–220), is further amended by adding at the end the following: ‘‘(72) ALPINE, CALIFORNIA.—$10,000,000 is authorized for a water transmission main, Alpine, CA.’’.¿ øSEC. 121. (a) The Secretary of the Army may carry out and fund projects to comply with the 2003 Biological Opinion described in section 205(b) of the Energy and Water Development Appropriations Act, 2005 (Public Law 108–447; 118 Stat. 2949) as amended by subsection (b) and may award grants and enter into contracts, cooperative agreements, or interagency agreements with participants in the Endangered Species Act Collaborative Program Workgroup referenced in section 209(a) of the Energy and Water Development Appropriations Act, 2004 (Public Law 108–137; 117 Stat. 1850) in order to carry out such projects. Any project undertaken under this subsection shall require a non-Federal cost share of 25 percent, which may VerDate Aug 31 2005 12:14 Jan 26, 2006 Jkt 206762 PO 00000 Frm 00019 Fmt 3616 1009 be provided through in-kind services or direct cash contributions and which shall be credited on a programmatic basis instead of on a project-by-project basis, with reconciliation of total project costs and total non-Federal cost share calculated on a three year incremental basis. Non-Federal cost share that exceeds that which is required in any calculated three year increment shall be credited to subsequent three year increments. (b) Section 205(b) of Public Law 108–447 (118 Stat. 2949) is amended by adding ‘‘and any amendments thereto’’ after the word ‘‘2003’’.¿ øSEC. 122. BLUESTONE, WEST VIRGINIA. Section 547 of the Water Resources Development Act of 2000 (114 Stat. 2676) is amended— (1) in subsection (b)(1)(A) by striking ‘‘4 years’’ and inserting ‘‘5 years’’; (2) in subsection (b)(1)(B)(iii) by striking ‘‘if all’’ and all that follows through ‘‘facility’’ and inserting ‘‘assurance project’’; (3) in subsection (b)(1)(C) by striking ‘‘and construction’’ and inserting ‘‘, construction, and operation and maintenance’’; (4) by adding at the end of subsection (b) the following: ‘‘(3) OPERATION AND OWNERSHIP.—The Tri-Cities Power Authority shall be the owner and operator of the hydropower facilities referred to in subsection (a).’’; (5) in subsection (c)(1)— (A) by striking ‘‘No’’ and inserting ‘‘Unless otherwise provided, no’’; (B) by inserting ‘‘planning,’’ before ‘‘design’’; and (C) by striking ‘‘prior to’’ and all that follows through ‘‘subsection (d)’’; (6) in subsection (c)(2) by striking ‘‘design’’ and inserting ‘‘planning, design,’’; (7) in subsection (d)— (A) by striking paragraphs (1) and (2) and inserting the following: ‘‘(1) APPROVAL.—The Secretary shall review the design and construction activities for all features of the hydroelectric project that pertain to and affect stability of the dam and control the release of water from Bluestone Dam to ensure that the quality of construction of those features meets all standards established for similar facilities constructed by the Secretary.’’; (B) by redesignating paragraph (3) as paragraph (2); (C) by striking the period at the end of paragraph (2) (as so redesignated) and inserting ‘‘, except that hydroelectric power is no longer a project purpose of the facility so long as Tri-Cities Power Authority continues to exercise its responsibilities as the builder, owner, and operator of the hydropower facilities at Bluestone Dam. Water flow releases and flood control from the hydropower facilities shall be determined and directed by the Corps of Engineers.’’; and (D) by adding at the end the following: ‘‘(3) COORDINATION.—Construction of the hydroelectric generating facilities shall be coordinated with the dam safety assurance project currently in the design and construction phases.’’; (8) in subsection (e) by striking ‘‘in accordance’’ and all that follows through ‘‘58 Stat. 890)’’; (9) in subsection (f)— (A) by striking ‘‘facility of the interconnected systems of reservoirs operated by the Secretary’’ each place it appears and inserting ‘‘facilities under construction under such agreements’’; and (B) by striking ‘‘design’’ and inserting ‘‘planning, design’’; (10) in subsection (f)(2)— (A) by ‘‘Secretary’’ each place it appears and inserting ‘‘TriCities Power Authority’’; and (B) by striking ‘‘facilities referred to in subsection (a)’’ and inserting ‘‘such facilities’’; (11) by striking paragraph (1) of subsection (g) and inserting the following: ‘‘(1) to arrange for the transmission of power to the market or to construct such transmission facilities as necessary to market the power produced at the facilities referred to in subsection (a) with funds contributed by the Tri-Cities Power Authority; and’’; (12) in subsection (g)(2) by striking ‘‘such facilities’’ and all that follows through ‘‘the Secretary’’ and inserting ‘‘the generating facility’’; and (13) by adding at the end the following: ‘‘(i) TRI-CITIES POWER AUTHORITY DEFINED.—In this section, the ‘Tri-Cities Power Authority’ refers to the entity established by the City of Hinton, West Virginia, the City of White Sulphur Springs, West Virginia, and the City of Philippi, West Virginia, pursuant Sfmt 3616 E:\BUDGET\COE.XXX COE 1010 GENERAL PROVISIONS—Continued cprice-sewell on PROD1PC66 with BUDGET PAG CORPS OF THE BUDGET FOR FISCAL YEAR 2007 ENGINEERS—CIVIL—Continued to a document entitled ‘Second Amended and Restated Intergovernmental Agreement’ approved by the Attorney General of West Virginia on February 14, 2002.’’.¿ øSEC. 123. (a) IN GENERAL.— (1) After the date of enactment of this Act, the Secretary of the Army shall carry out the project for wastewater infrastructure, DeSoto County, Mississippi, authorized by section 219(f)(30) of Public Law 102–580, as amended, in accordance with the provisions of this subsection. (2) The non-Federal interest shall be primarily responsible for carrying out work on the project referred to in paragraph (1) that is not covered by the Project Cooperation Agreement executed on May 13, 2002 or any amendments thereto, including work associated with the design, construction, management, and administration of the project. The non-Federal interest may carry out work on the project subject to obtaining any permits required pursuant to Federal and State laws and subject to general supervision and administrative oversight by the Secretary of the Army. (3) The Federal share of project costs incurred by the non-Federal interest in carrying out work on the project as provided for in paragraph (2) shall equal 75 percent of the total cost of the work and shall be in the form of grants or reimbursements, except that the total amount of Federal funds available for the project, including that portion of the project carried out as provided for in paragraph (2), may not exceed $55,000,000. (b) TECHNICAL AMENDMENT.—Section 6006 of the Emergency Supplemental Appropriations Act, 2005 (119 Stat. 282) is amended by striking ‘‘between May 13, 2002, and September 30, 2005’’ and inserting ‘‘after May 13, 2002’’ in lieu thereof.¿ øSEC. 124. The project for flood control, Las Vegas Wash and Tributaries (Flamingo and Tropicana Washes), Nevada, authorized by section 101(13) of Public Law 102–580 and modified by Public Law 108–7 (H.J. Res. 2) Consolidated Appropriations Resolution, 2003, section 107 is further modified to provide that the costs incurred for design and construction of the project channel crossings in the reach of the channels from Shelbourne Avenue proceeding north along the alignment of Durango Drive and continuing east along the Southern Beltway to Martin Avenue shall be added to the authorized cost of the project and such costs shall be cost shared and shall not be considered part of the non-Federal sponsor’s responsibility to provide lands, easements, and rights-of-way, and to perform relocations for the project.¿ øSEC. 125. RESTORATION OF THE LAKE MICHIGAN WATERFRONT AND RELATED AREAS, LAKE AND PORTER COUNTIES, INDIANA.—The Secretary of the Army, acting through the Chief of Engineers is authorized and directed to carry out a continuing program for the restoration of the Lake Michigan Waterfront and Related Areas, Lake and Porter Counties, Indiana. (1) DEFINITIONS.— (A) Related areas are defined as adjacent or close sites that have an impact or influence on the waterfront areas or aquatic habitat. (B) Restore is defined as— (i) activities that improve a site’s ecosystem function, structure, and dynamic processes to a less degraded and more natural condition, and/or (ii) the management of contaminants that allow the site to be safely used for ecological and/or economic purposes. (2) JUSTIFICATION.—Projects can be justified by ecosystem benefits, clean-up of contaminated sites, public health, safety, economic benefits or any combination of these. Sites restored for economic purposes can be redeveloped by others. Restoration sites may include compatible recreation facilities that do not diminish the restoration purpose and do not increase the Federal cost share by more than 10 percent. (3) COST SHARING.—The construction of projects are cost shared at 65 percent Federal and 35 percent non-Federal except when there is a demonstration of innovative technology. The cost share is then 85 percent Federal and 15 percent non-Federal. (4) CREDIT.— (A) The Secretary shall credit the non-Federal interest for the value of any lands, easements, rights-of-way, relocations, excavated and/or dredged material disposal areas required for carrying out a project. When the cost of the provision of all lands, easements, rights-of-way, relocations, excavated and/or dredged material disposal areas exceeds the non-Federal share, VerDate Aug 31 2005 12:14 Jan 26, 2006 Jkt 206762 PO 00000 Frm 00020 Fmt 3616 as identified in paragraph (3), the non-Federal interest may waive any right under Federal cost-sharing policy to receive cash reimbursement for any such value in excess of the nonFederal share as identified in paragraph (3). (B) The non-Federal interest may provide up to 100 percent of the non-Federal share required under paragraph (3) in the form of services, materials, supplies, or other in-kind contributions including monies paid pursuant to, or the value of any in-kind service performed under, an administrative order on consent or jurisdictional consent decree but may not include any monies paid pursuant to, or the value of any in-kind service performed under, a unilateral administrative order or court order. (C) The total of non-Federal credit for services, materials, supplies, or other in-kind contributions when combined with lands, easements, rights-of-way, relocations, excavated and/or dredged material disposal areas shall not exceed the non-Federal share identified in paragraph (3). (5) OPERATION, MAINTENANCE, REPAIR, REPLACEMENT AND REHABILITATION.—Operation, maintenance, repair, replacement and rehabilitation is 100 percent non-Federal cost. (6) HOLD HARMLESS.—Non-Federal interests hold and save harmless the United States free from claims or damages due to implementation of the project except for negligence of the government. (7) AUTHORIZED APPROPRIATIONS.—There is authorized to be appropriated to carry out this program $20,000,000 for each fiscal year.¿ øSEC. 126. CHESAPEAKE BAY OYSTER RESTORATION, MARYLAND AND VIRGINIA.—The second sentence of section 704(b) of the Water Resources Development Act of 1986 (33 U.S.C. 2263(b)) is amended by striking ‘‘$20,000,000’’ and inserting ‘‘$30,000,000’’.¿ øSEC. 127. The project for flood control, Little Calumet River, Indiana, authorized by section 401(a) of Public Law 99–662 (100 Stat. 4115) is modified to authorize the Secretary of the Army to complete the project in accordance with the post authorization change report dated August 2000 at a total cost of $198,000,000 with an estimated Federal cost of $148,500,000 and an estimated non-Federal cost of $49,500,000.¿ øSEC. 128. AMERICAN RIVER WATERSHED, CALIFORNIA (FOLSOM DAM AND PERMANENT BRIDGE).—(a) COORDINATION OF FLOOD DAMAGE REDUCTION AND DAM SAFETY.—The Secretary of the Army and the Secretary of the Interior are directed to collaborate on authorized activities to maximize flood damage reduction improvements and address dam safety needs at Folsom Dam and Reservoir, California. The Secretaries shall expedite technical reviews for flood damage reduction and dam safety improvements. In developing improvements under this section, the Secretaries shall consider reasonable modifications to existing authorized activities, including a potential auxiliary spillway. In conducting such activities, the Secretaries are authorized to expend funds for coordinated technical reviews and joint planning, and preliminary design activities. (b) SECRETARY’S ROLE.—Section 134 of Public Law 108–137 (117 Stat. 1842) is modified to read as follows: ‘‘SEC. 134. BRIDGE AUTHORIZATION. ‘‘There is authorized to be appropriated to the Secretary of the Army $30,000,000 for the construction of the permanent bridge described in section 128(a), above the $36,000,000 provided for in the recommended plan for bridge construction. The $30,000,000 shall not be subject to cost sharing requirements with non-Federal interests.’’. (c) CONFORMING CHANGE.—Section 128(a) of Public Law 108–137 (117 Stat. 1838) is modified by deleting ‘‘above the $36,000,000 provided for in the recommended plan for bridge construction,’’ and inserting in lieu thereof the following: ‘‘above the sum of the $36,000,000 provided for in the recommended plan for bridge construction and the amount authorized to be appropriated by section 134, as amended,’’. (d) MAXIMUM COST OF PROJECT.—The costs cited in subsections (b) and (c) shall be adjusted to allow for increases pursuant to section 902 of Public Law 99–662 (100 Stat. 4183). For purposes of making adjustments pursuant to this subsection, the date of authorization of the bridge project shall be December 1, 2003. (e) EXPEDITED CONSTRUCTION.—The Secretary, in coordination with the Secretary of the Interior and affected non-Federal officials (including the City of Folsom, California), shall expedite construction of a new bridge and associated roadway authorized in Public Law 108– 137. The Secretary, to the extent practicable, may construct such work in a manner that is compatible with the design and construction Sfmt 3616 E:\BUDGET\COE.XXX COE GENERAL PROVISIONS—Continued cprice-sewell on PROD1PC66 with BUDGET PAG CORPS OF ENGINEERS—CIVIL WORKS of authorized projects for flood damage reduction and dam safety. The Secretary and the Secretary of the Interior shall expedite actions under their respective jurisdictions to facilitate timely completion of construction. (f) REPORT TO CONGRESS.—The Secretary of the Army, in consultation with the Secretary of the Interior and non-Federal interests, shall report to Congress within ninety days of the date of enactment of this Act, and at four-month intervals thereafter, on the status and schedule of planning, design and construction activity.¿ øSEC. 129. JACKSONVILLE HARBOR, FLORIDA.—(a) The project for navigation, Jacksonville Harbor, Florida, authorized by section 101(a)(17) of the Water Resources Development Act of 1999 (113 Stat. 276), is modified to authorize the Secretary to extend the navigation features in accordance with the Report of the Chief of Engineers, dated July 22, 2003, at a total cost of $14,658,000, with an estimated Federal cost of $9,636,000 and an estimated non-Federal cost of $5,022,000. (b) The non-Federal share of the costs of the General Reevaluation Reports on the Jacksonville Harbor which were begun prior to August 2004, shall be consistent with the non-Federal costs in implementing the overall construction project.¿ øSEC. 130. Section 594(g) of the Water Resources Development Act of 1999 (113 Stat. 383) is amended by striking ‘‘$60,000,000’’ and inserting ‘‘$240,000,000’’.¿ øSEC. 131. ONONDAGA LAKE, NEW YORK.—Section 573 of the Water Resources Development Act of 1999 (113 Stat. 372) is amended— (1) in subsection (f) by striking ‘‘$10,000,000’’ and inserting ‘‘$30,000,000’’; (2) by redesignating subsections (f) and (g) as subsections (g) and (h), respectively; and (3) by inserting after subsection (e) the following: ‘‘(f) NONPROFIT ENTITIES.—Notwithstanding section 221(b) of the Flood Control Act of 1970 (42 U.S.C. 1962d–5b(b)), for any project carried out under this section, a non-Federal interest may include a nonprofit entity, with the consent of the affected local government.’’.¿ øSEC. 132. WHITE RIVER BASIN, ARKANSAS.—(a) MINIMUM FLOWS.— (1) IN GENERAL.—The Secretary is authorized and directed to implement alternatives BS–3 and NF–7, as described in the White River Minimum Flows Reallocation Study Report, Arkansas and Missouri, dated July 2004. (2) COST SHARING AND ALLOCATION.—Reallocation of storage and planning, design and construction of White River Minimum Flows project facilities shall be considered fish and wildlife enhancement that provides national benefits and shall be a Federal expense in accordance with section 906(e) of the Water Resources Development Act of 1986 (33 U.S.C. 2283(e)). The non-Federal interests shall provide relocations or modifications to public and private lakeside facilities at Bull Shoals Lake and Norfork Lake to allow reasonable continued use of the facilities with the storage reallocation as determined by the Secretary in consultation with the non-Federal interests. Operations and maintenance costs of the White River Minimum Flows project facilities shall be 100 percent Federal. All Federal costs for the White River Minimum Flows project shall be considered non-reimbursable. (3) IMPACTS ON NON-FEDERAL PROJECT.—The Administrator of Southwestern Power Administration, in consultation with the project licensee and the relevant state public utility commissions, shall determine any impacts on electric energy and capacity generated at Federal Energy Regulatory Commission Project No. 2221 caused by the storage reallocation at Bull Shoals Lake, based on data and recommendations provided by the relevant state public utility commissions. The licensee of Project No. 2221 shall be fully compensated by the Corps of Engineers for those impacts on the basis of the present value of the estimated future lifetime replacement costs of the electrical energy and capacity at the time of implementation of the White River Minimum Flows project. Such costs shall be included in the costs of implementing the White River Minimum Flows project and allocated in accordance with subsection (a)(2) above. (4) OFFSET.—In carrying out this subsection, losses to the Federal hydropower purpose of the Bull Shoals and Norfork Projects shall be offset by a reduction in the costs allocated to the Federal hydropower purpose. Such reduction shall be determined by the Administrator of the Southwestern Power Administration on the basis of the present value of the estimated future lifetime replacement cost of the electrical energy and capacity at the time of implementation of the White River Minimum Flows project. VerDate Aug 31 2005 12:14 Jan 26, 2006 Jkt 206762 PO 00000 Frm 00021 Fmt 3616 1011 (b) FISH HATCHERY.—In constructing, operating, and maintaining the fish hatchery at Beaver Lake, Arkansas, authorized by section 105 of the Water Resources Development Act of 1976 (90 Stat. 2921), losses to the Federal hydropower purpose of the Beaver Lake Project shall be offset by a reduction in the costs allocated to the Federal hydropower purpose. Such reduction shall be determined by the Administrator of the Southwestern Power Administration based on the present value of the estimated future lifetime replacement cost of the electrical energy and capacity at the time operation of the hatchery begins. (c) REPEAL.—Section 374 of the Water Resources Development Act of 1999 (113 Stat. 321) and section 304 of the Water Resources Development Act of 2000 (Public Law 106–541) are repealed.¿ øSEC. 133. CALCASIEU SHIP CHANNEL, LOUISIANA. (a) IN GENERAL.—At such time as Pujo Heirs and Westland Corporation convey all right, title, and interest in and to the real property described in paragraph (b)(1) to the United States, the Secretary shall convey all right, title, and interest of the United States in and to the real property described in paragraph (b)(2) to Pujo Heirs and Westland Corporation. (b) LAND DESCRIPTION.—The parcels of land referred to in paragraph (a) are the following: (1) NON-FEDERAL INTEREST IN LAND.—An easement for placement of dredged materials over a contiguous equivalent area to the real property described in subparagraph (2). The parcels on which such an easement may be exchanged is all of the area within the diked or confined boundaries of the Corps of Engineers Dredge Material Placement Area M comprising Tract 128E, Tract 129E, Tract 131E, Tract 41A, Tract 42, Tract 132E, Tract 130E, Tract 134E, Tract 133E–3, Tract 140E, or some combination thereof. (2) FEDERAL INTEREST IN LAND.—An easement for placement of dredged materials over an area in Cameron Parish, Louisiana, known as portions of Government Tract Numbers 139E–2 and 48 (both tracts on the west shore of the Calcasieu Ship Channel), and other tracts known as Corps of Engineers Dredge Material Placement Area O. (c) CONDITIONS.—The exchange of real property under paragraph (1) shall be subject to the following conditions: (1) DEEDS.— (A) NON-FEDERAL LAND.—The conveyance of the real property described in paragraph (b)(1) to the Secretary shall be by a warranty deed acceptable to the Secretary. (B) FEDERAL LAND.—The conveyance of the real property described in paragraph (b)(2) to Pujo Heirs and Westland Corporation shall be by a quitclaim deed. (2) TIME LIMIT FOR EXCHANGE.—The land exchange under paragraph (a) shall be completed not later than six months after the date of enactment of this Act. (3) INCREMENTAL COSTS.—As determined by the Secretary, incremental costs to the Lake Charles Harbor and Terminal District associated with the preparation of the area and the placement of dredge material in the new disposal easement area, paragraph (b)(1), including, site preparation costs, associated testing, permitting, mitigation and diking costs associated with such new disposal easement over the costs that would have been incurred in the placement of dredge material in the old disposal easement area, paragraph (b)(2) (comprising all of Corps of Engineers Dredge Material Placement Area O) up to the disposal capacity equivalent of the property described in paragraph (b)(2), shall be made available by the Owners. Owners shall make appropriated guarantees, as agreed to by the Secretary, that funds will be available as needed to cover such incremental costs. The Lake Charles Harbor and Terminal District, as local sponsor for the Calcasieu Ship Channel Project, shall not be assessed or caused to incur any costs arising out of, associated with or as a consequence of the land exchange authorized under paragraph (a). (d) VALUE OF PROPERTIES.—If the appraised fair market value, as determined by the Secretary, of the real property conveyed to Pujo Heirs and Westland Corporation by the Secretary under paragraph (a) exceeds the appraised fair market value, as determined by the Secretary, of the real property conveyed to the United States by Pujo Heirs and Westland Corporation under paragraph (a), Pujo Heirs and Westland Corporation shall make a payment to the United States equal to the excess in cash or a cash equivalent that is satisfactory to the Secretary.¿ øSEC. 134. PROJECT MODIFICATION.—(a) IN GENERAL.—The project for flood damage reduction, environmental restoration, recreation, Johnson Creek, Arlington, Texas, authorized by section 101(b)(14) Sfmt 3616 E:\BUDGET\COE.XXX COE 1012 GENERAL PROVISIONS—Continued THE BUDGET FOR FISCAL YEAR 2007 ‘‘SEC. 134. BRIDGE AUTHORIZATION.—Continued cprice-sewell on PROD1PC66 with BUDGET PAG of the Water Resources Development Act of 1999 (113 Stat. 280– 281) is modified— (1) to deauthorize the ecosystem restoration portion of the project that consists of approximately 90 acres of land located between Randol Mill and the Union Pacific East/West line; and (2) to authorize the Secretary of the Army to design and construct an ecosystem restoration project on lands identified in subsection (c) that will provide the same or greater level of national ecosystem restoration benefits as the portion of the project described in paragraph (1). (b) CREDIT TOWARD FEDERAL SHARE.—The Secretary of the Army shall credit toward the Federal share of the cost of the modified project the costs incurred by the Secretary to carry out the project as originally authorized under section 101(b)(14) of the Water Resources Development Act of 1999 (113 Stat. 280). The non-Federal interest shall not be responsible for reimbursing the Secretary for any amount credited under this subsection. (c) COMPARABLE PROPERTY.—Not later than 6 months after the date of enactment of this Act, the City of Arlington, Texas, shall identify lands, acceptable to the Secretary of the Army, amounting to not less than 90 acres within the City, where an ecosystem restoration project may be constructed to provide the same or greater level of National ecosystem restoration benefits as the land described in subsection (a)(1).¿ øSEC. 135. Funds made available in Public Law 105–62 and Public Law 105–245 for Hudson River, Athens, New York, shall be available for projects in the Catskill/Delaware watersheds in Delaware and Greene Counties, New York, under the authority of the New York City Watershed Environmental Assistance Program.¿ øSEC. 136. None of the funds contained in title I of this Act shall be available to permanently reassign or to temporarily reassign in excess of 180 days personnel from the Charleston, South Carolina district office: Provided, That this limitation shall not apply to voluntary change of station.¿ øSEC. 137. The Secretary of the Army, acting through the Chief of Engineers, is hereby authorized and directed to design and construct until hereafter completed, the recreation and access features designated as Phase II of the Louisville Waterfront Park, Kentucky, as described in the Louisville Waterfront Park, Phases II and III, Detailed Project Report, by the Louisville District of the Corps of Engineers dated May 2002. The project shall be cost shared 50 percent Federal and 50 percent non-Federal. The cost of project work VerDate Aug 31 2005 12:14 Jan 26, 2006 Jkt 206762 PO 00000 Frm 00022 Fmt 3616 undertaken by the non-Federal interests, including but not limited to prior planning, design, and construction, shall be credited toward the non-Federal share of project design and construction costs.¿ øSEC. 138. AKUTAN, ALASKA.—(a) IN GENERAL.—The Secretary of the Army is authorized to carry out the project for navigation, Akutan, Alaska, substantially in accordance with the plans, and subject to the conditions, described in the Report of the Chief of Engineers dated December 20, 2004, at a total cost of $19,700,000. (b) TREATMENT OF CERTAIN DREDGING.—The headlands dredging for the mooring basin shall be considered a general navigation feature for purposes of estimating the non-Federal share of the cost of the project.¿ øSEC. 139. (a) IN GENERAL.—The project for the beneficial use of dredged material at Poplar Island, Maryland, authorized by section 537 of the Water Resources Development Act of 1996 (110 Stat. 3776) shall be known as and designated as the ‘‘Paul S. Sarbanes Ecosystem Restoration Project at Poplar Island’’. (b) REFERENCE.—Any reference in a law, map, regulation, document, paper or other record of the United States (including reference by the Corps of Engineers) to the project referred to in subsection (a) shall be deemed to be a reference to the ‘‘Paul S. Sarbanes Ecosystem Restoration Project at Poplar Island’’. (c) EFFECTIVE DATE.—The project designation in this section shall become effective on January 4, 2007.¿ (Energy and Water Development Appropriations Act, 2006.) f øTitle V—General Provisions and Technical Corrections¿ øSEC. 5008. Section 118 of Public Law 109–103 is amended by striking ‘‘106–541’’ and inserting ‘‘106–53’’ in lieu thereof.¿ (Emergency Supplemental Appropriations Act to address hurricanes in the Gulf of Mexico and Pandemic Influenza, 2006.) ALLOCATIONS RECEIVED FROM OTHER ACCOUNTS Note.—Obligations incurred under allocations from other accounts are shown in the schedules of the parent appropriation as follows: State and Private Forestry, Forest Service, Department of Agriculture. Construction, National Park Service, Department of the Interior. Federal Aid to Highways, Miscellaneous Studies, Reports, and Projects; Federal Highway Administration, Department of Transportation. Bonneville Power Administration Fund (Power Marketing Administration), Department of Energy. Sfmt 3616 E:\BUDGET\COE.XXX COE